Loading...
HomeMy WebLinkAbout9217_INSP_20160223.pdfFACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 1 of 3 UNIT TYPE: Lined MSWLF LCID YW Transfer X Compost SLAS COUNTY: WAKE Closed MSWLF HHW White goods Incin T&P FIRM PERMIT NO.: 9217-TRANSFER-1994 CDLF Tire T&P / Collection Tire Monofill Industrial Landfill DEMO SDTF FILE TYPE: COMPLIANCE Date of Site Inspection: February 23, 2016 Date of Last Inspection: May 21, 2014 FACILITY NAME AND ADDRESS: Waste Industries Solid Waste Transfer Facility Crosswinds Industrial Park 3714 Conquest Drive Garner, NC 27529-9487 GPS COORDINATES: N: 35.72748 W: -78.56935 FACILITY CONTACT NAME AND PHONE NUMBER: Travis Hitchcock, General Manager, 919-534-3724, Travis.Hitchcock@wasteindustries.com Nick Zdeb, Operations Supervisor, 919-534-3730, Nick.Zdeb@wasteindustries.com FACILITY CONTACT ADDRESS: Travis Hitchcock, General Manager Waste Industries, Inc. 3741 Conquest Drive Garner, NC 27529 PARTICIPANTS: Liz Patterson, NCDEQ-Solid Waste Section Junior Wiseman – Waste Industries STATUS OF PERMIT: Permit to Construct: September 13, 1994 Permit to Operate: September 13, 1994 PTO (Modification #1): March 23, 2000 PTO (Modification #2): July 6, 2000 PTO (Modification #3): July 25, 2001 PTO (Amendment): March 20, 2008 PTO (Modification/change in service area): April 21, 2009 PTO (Amendment): November 16, 2012 Permit Expiration: March 20, 2018 PURPOSE OF SITE VISIT: Comprehensive Inspection STATUS OF PAST NOTED VIOLATIONS: None OBSERVED VIOLATIONS: None FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 2 of 3 ADDITIONAL COMMENTS This facility is a solid waste transfer facility that is permitted to receive solid waste as defined in NCGS 130A-290 (a)(35). The following must not be accepted at this facility: hazardous waste, yard trash, liquid wastes, regulated medical waste, sharps not properly packaged, PCB waste and regulated-asbestos containing material. Wastes banned from landfill disposal in North Carolina by NCGS 130A-309.10 (f) and by 15A NCAC 13 .0542(e) must not be transferred for landfill disposal. 1. The current permit was issued November 16, 2012. The permit expiration date is March 20, 2018 2. The facility operating hours are Monday through Friday from 5:00 am to 4:30 pm. 3. The facility site plan and operations plan were verified. Copies are kept onsite. The facility is permitted to receive municipal solid waste (MSW) and construction and demolition waste (C&D) generated in Chatham, Harnett, Johnston, Lee, and Wake Counties. MSW is transferred to the Sampson County Landfill, Permit Number 82-02, located in Roseboro, North Carolina for disposal. The Wake County Landfill- South Feltonsville, Permit Number 92-03, located in Apex, North Carolina may be used as alternate receiving facility. C&D must be transported to the Red Rock Disposal, LLC Landfill, Permit 92-28, located in Holly Springs, North Carolina. 4. The following are facility certified personnel: a. Dennis J. Braxton, Certified Transfer Station Operations Specialist, TS-2011037, exp. 7/20/2017 b. Ricky M. Creel, Certified Transfer Station Operations Specialist, TS-2015095, exp. 11/5/2018 c. William E. Debnam, Certified Transfer Station Operations Specialist, TS-2009143, exp. 4/14/2018 d. Jeremiah Jay DuFresno, Certified Transfer Station Operations Specialist, TS-2015031, exp. 3/15/2018 e. Eric Thompson, Certified Transfer Station Operations Specialist, TS-2015109, exp. 12/11/2018 f. Howard Wiseman, Jr., Certified Transfer Station Operations Specialist, TS-2015110, exp. 12/11/2018 5. The facility is managing approximately 400 tons of waste per day. 6. Waste screening reports were verified for January 2, 2016 through January 30, 2016. The facility conducts screenings on 1 percent of loads received (or 1 per day). 7. Leachate from the tipping floor is collected via a floor drain through an oil/water separator. A similar collection system and second oil/water separator collects the leachate that drips in downgradient from the compactor unit in the loading bay for transfer trailers. The drains are cleaned weekly or more often as needed. Liquid levels in the separators are manually checked on a weekly basis or as needed to keep proper flow. Both tanks were most recently pumped on January 21, 2016 by EP+S Services of VT. Inc. The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit, or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules. FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 3 of 3 8. Waste on the tipping floor was being well managed. Tipping Floor Loading Bay 9. The facility had multiple fire extinguishers at the facility. All appeared to be properly charged and maintained. 10. The facility scale was most recently calibrated on January 4, 2016. 11. Windblown waste at the site was very well controlled. Please contact me if you have any questions or concerns regarding this inspection report. Phone: 919-707-8286(O) 919-805-6499(C) elizabeth.patterson@ncdenr.gov Liz Patterson Environmental Senior Specialist Regional Representative Sent on:3/15/2016 X Email Hand delivery US Mail Certified No. [ _] Copies: Jason Watkins, Field Operations Branch Head - Solid Waste Section Jessica Montie, Compliance Officer – Solid Waste Section