Loading...
HomeMy WebLinkAbout74D_RES_20180125FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section UNIT TYPE: Lined MSWLF LCID X YW Transfer Compost SLAS COUNTY: Pitt Closed MSWLF HHW White goods Incin T&P FIRM PERMIT NO.: 74D-LCID-1994 CDLF Tire T&P / Collection Tire Monofill Industrial Landfill DEMO SDTF FILE TYPE: COMPLIANCE Date of Inspection: 25 January 2018 Date of Last Inspection: 27 July 2017 FACILITY NAME AND ADDRESS: ER Lewis LCID Landfill #2 3034 Highway 33 Greenville, NC GPS COORDINATES: N: 35.684294 E: -077.427102 FACILITY CONTACT NAME AND PHONE NUMBER: Curt Williford; Safety & Environmental Compliance Officer 252.321.1101 FACILITY CONTACT ADDRESS: ER Lewis Construction Company PO Box 565 Greenville, NC 27835 Attn: Curt Williford E-mail: curt@erlewisconstruction.com Participants: Curt Williford; ER Lewis Construction Eddie Lewis; ER Lewis Construction Ray Williams; NCDEQ-Solid Waste STATUS OF PERMIT: Expired; Permit to Construct (PTC) and Permit to Operate (PTO) a Landclearing and Inert Debris Landfill issued 1 September 2010. PTO expired 1 September 2015. *A complete permit review request for the next five-year phase of construction and/or operations was due on or before 15 May 2015. A permit review request has been submitted and is currently under review. PURPOSE OF SITE VISIT: Comprehensive Facility Compliance Inspection STATUS OF PAST NOTED VIOLATIONS: 1) 15A NCAC 13B .0566 (1) states “Operational plans shall be approved and followed as specified for the facility.” -LAND CLEARING AND INERT DEBRIS (LCID) LANDFILL NO. 1 PERMIT NO. 74-C ATTACHMENT 3 CONDITIONS OF PERMIT TO OPERATE PART I: FACILITY SPECIFIC CONDITIONS (2) states “This Facility must conform to the operations requirements of the NC Solid Waste Management Rules, 15A NCAC 13B .0566, and to the operational plan required by 15A NCAC 13B .0565(4).” RESOLVED: This Facility is now operating in compliance with the approved operational plan. FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section 74D_RES_20180125 Page 2 of 4 -LAND CLEARING AND INERT DEBRIS (LCID) LANDFILL NO. 1 PERMIT NO. 74-C ATTACHMENT 3 CONDITIONS OF PERMIT TO OPERATE PART I: FACILITY SPECIFIC CONDITIONS Cover Material Requirements (17) states “Vegetative ground cover sufficient to control erosion must be established within 30 (thirty) working days upon completion of any phase of LCID landfill development or as addressed in the approved Sedimentation and Erosion Control permit.” RESOLVED: Vegetative ground cover sufficient to control erosion has been established on the outside slopes in all inactive or completed development phases of the landfill. -LAND CLEARING AND INERT DEBRIS (LCID) LANDFILL NO. 1 PERMIT NO. 74-C ATTACHMENT 3 CONDITIONS OF PERMIT TO OPERATE PART I: FACILITY SPECIFIC CONDITIONS Drainage Control and Water Protection Requirements (19) states “All required sedimentation and erosion control measures must be installed and maintained to mitigate excessive on-site erosion and to prevent silt from leaving the site of the landfill unit during the service life of the facility.” RESOLVED: The sedimentation and erosion control measures required to mitigate excessive on-site erosion have been installed and are being maintained. 2) 15A NCAC 13B .0566 (5) states “120 calendar days after completion of any phase of disposal operations, or upon revocation of a permit, the disposal area shall be covered with a minimum of one foot of suitable soil cover sloped to allow surface water runoff in a controlled manner. The Division may require further action in order to correct any condition which is or may become injurious to the public health, or a nuisance to the community.” RESOLVED: The completed phases of disposal operations have been covered and sloped properly to allow surface water runoff in a controlled manner. 3) 15A NCAC 13B .0566 (6) states “Adequate erosion control measures, structures, or devices shall be utilized to prevent silt from leaving the site and to prevent excessive on site erosion.” RESOLVED: Adequate erosion control measures have been utilized to prevent excessive on site erosion.” 4) 15A NCAC 13B .0566 (7) states “Provisions for a ground cover sufficient to restrain erosion must be accomplished within 30 working days or 120 calendar days upon completion of any phase of landfill development.” RESOLVED: Vegetative ground cover sufficient to control erosion has been established on the outside slopes of the completed development phases of the landfill. OBSERVED VIOLATIONS: No violations were observed during this Facility Compliance Inspection; please see the ADDITIONAL COMMENTS section below. ADDITIONAL COMMENTS: 1) This Facility is a Land Clearing and Inert Debris (LCID) Landfill. 2) This Facility is recorded with the Pitt County Register of Deeds at Book #460; Page #05. 3) This Facility is permitted to receive land clearing waste, yard trash, untreated and unpainted wood, uncontaminated soil, and inert debris such as unpainted rock, brick, concrete, and concrete block; and asphalt in accordance with NCGS 130-294(m). 4) This Facility is permitted to receive wastes generated within Pitt County. 5) The operating hours for this Facility are Monday through Friday from 8:00 AM to 5:00 PM. 6) Proper signage has been posted at the Facility entrance. 7) The Facility is secured by means of a locked gate at the Facility entrance. The access gate was open upon my arrival and an attendant was on-site during this Facility Compliance Inspection. 8) The Facility access road is of all-weather construction and is being maintained in overall good condition at this time. FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section 74D_RES_20180125 Page 3 of 4 9) This Facility maintains a separate cell adjacent to the LCID for the disposal of yard trash. 10) Inert materials consisting of scrap concrete and asphalt are being stockpiled on-site in an area adjacent to the landfill for later crushing and reuse in accordance with NC GS 130A-309.05. *Please note that the State rules regarding recovered materials state that for a material to qualify as a recovered material, the majority of the material (75% or more) must be sold, used, or re-used within twelve months. 11) Permanent, highly-visible markers delineating the permitted waste disposal boundary have been installed as required. 12) The Facility is currently maintaining one active working area which is being maintained in a compact and manageable size. 13) The outside slopes have been covered and graded at a slope not greater than 3:1. 14) A cover crop of native warm season grasses has been established on the outside slopes in all inactive areas of the landfill. *Please continue to monitor your cover crop. Any areas of sparse cover should be seeded and mulched to establish a groundcover suitable to prevent erosion of your landfill cap system. 15) Surface water collection/diversion devices are maintained on the top lift of the landfill. These devices collect and convey surface water from the top of the landfill to the toe of the slope to prevent excessive erosion of the outside slopes. FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section 74D_RES_20180125 Page 4 of 4 16) The active working area is being covered monthly or when it reaches 1/2 acre in size, whichever occurs first. 17) The waste type at the landfill working face was reviewed during this Facility Compliance Inspection; the waste type being disposed is LCID only and no unpermitted materials were observed during this Facility Compliance Inspection. 18) Facility personnel were on site during this Facility Compliance Inspection compacting, covering and grading the landfill. 19) No off site erosion was observed during this Facility Compliance Inspection. 20) *Corrective actions are required as a result of this Facility Compliance Inspection. Please contact me if you have any questions or concerns regarding this Facility Compliance Inspection Report. Ray Williams; Environmental Senior Specialist Phone: 252.948.3955 E-mail: ray.williams@ncdenr.gov Regional Representative Delivered on: 29 January 2018 by X Electronic delivery US Mail Certified No. cc: Andrew Hammonds; Eastern District Supervisor/SWS: andrew.hammonds@ncdenr.gov John Demary; Director/Pitt County Solid Waste & Recycling: jwdemary@pittcountync.gov C: \2018\Pitt\Facilities\74D\Inspections\74D_RES_20180125 NCDEQ DWM Laserfiche Online Document Management System: http://edocs.deq.nc.gov/WasteManagement/Welcome.aspx   Go Green! Thank you for helping NCDEQ be environmentally responsible.