Loading...
HomeMy WebLinkAbout3303-COMPOST-2010-FY16-17 EASTER N COMPOST, LLC P.O. BOX 460 BATTLEBORO, NC 27809 YEAR END REPORT JUNE 30, 2017 D (Describe) (Describe) (Describe) TOTAL 26,976.84 26,976.84 Compost State of North Carolina Department of Environmental Quality Division of Waste Management COMPOST Facility Annual Report For the period of July 1, 2016-June 30, 2017 According to G.S. 130A-309.09D(b), completed forms must be returned by August I , 2017 and a copy of this report must be sent to the County Manager of each county from which waste was received. If you have questions or require assistance in completing this report, contact your Regional Environmental Senior Specialist. Facility Name:EASTERN COMPOST LLC Permit: 3303-COMPOST-2010 -, 1. Tipping Fee: $_2_5._oo per Ton (Attach a schedule of tipping fees if appropriate.) 2. Did your facility stop receiving waste during this past Fiscal Year? If so, please report the date this occurred: 0 Yes No 3. Please attach results of monthly temperature monitoring for the period of July 1, 2016 thru June 30, 2017. 4. For Type II, Ill, and fV facilities, attach results of tests (Waste Analysis with metals, foreign matter and pathogens) as required in Table 3 of Rule 15A NCAC 13B .1408 for the period of July 1, 2016 thru June 30, 2017. Current Rules state that "Compost shall be analyzed at intervals of every 20,000 tons of compost produced or every six months, whichever comes first." 5. What type and quantity of waste was composted by your facility? Materials COMPOSTED Check X if Received Tons RECEIVED Tons COMPOSTED Unusable Tons DISPOSED Yard Waste 1,410 1,410 Clean Wood D Sawdust lg] 2,285.71 2,285.71 Wooden Pallets 2,285.8 2,285.8 Food Waste lg] 396.22 396.22 Animal Waste D Sludge and Biosolids lg] 15,214.2 15,214.2 Grease Trap Waste Animal Mortalities D Sheetrock 71 71 Commingled (Describe) D Other Cotton Gin Trash lg] 3,025 3,025 Other Land Clearing lg] 1,925 1,925 Other Ferric 363.91 363.91 Compost 2017 3303-COMPOST-20 10 Page I Physical Address Mailing Address Street 1: 8487 BATILEBORO-LEGGEIT ROAD Street 2: Street 1: POST OFFICE BOX 460 Street 2: City: BATTLEBORO County: Edgecombe City: BA1TLEB0RO State: North Carolina Zip: 27809 State: North Carolina Zip: 27809 Primary Facility Contact Person Name: JASON SMITH Billing Contact Person Name: JEAN SMITH Phone: (252) 903-5367 Fax: (919) 690-1157 Phone: (252) 446-2536 Fax: Email: jsmith @granvillefarmsinc.com Email: 6. What type and quantity of compost was produced and removed from your facility? Type Mulch Tons CREATED 26,976.84 Tons USED On Site Tons SOLD to Public Tons GIVEN to Public 1,700 Tons STOCKPlLED 6,879.09 Tons DISPOSED 0th.er 4,046.53 14,351.22 Grade A Compost Grade B Compost Other Other TOTAL 26,976.84 4,046.53 14,351.22 1,700 6,879.09 7. Indicate waste received at this compost faci lity during the period of July L 2016, through June 30, 2017. lndicate tonnage received by COUNTY of waste origin. Please indicate COUNTY and STATE if received from another state. Received from Johnston Jul 12.65 Aug 48.20 Sept 63.15 Oct 84.16 Nov 142.33 Dec 13.42 Jan 0.00 Feb 0.00 Mar 0.00 Apr 0.00 May 0.00 June 0 00 Total 363.91 Wilson 379.53 1,238.78 1,024.53 116.53 908.57 480.58 661.12 1,08301 1,272.95 771.15 198.63 404.09 8,539.47 Wake 434.59 442.85 449.58 405.56 469.08 562.15 652.23 354.77 587.30 631.84 507.36 422.89 5,920.20 Pitt 59.99 62.96 46.50 49.00 80.92 66.1 1 65.54 65.90 67.90 69.35 95.21 81.26 810.64 Edgecombe 441.89 614 03 451.97 606.57 496.93 862.03 67143 616.59 566.03 335.09 64 176 582.82 6,887.14 Granville 0.00 125.00 100.00 0.00 45.00 125.00 0.00 16.00 0.00 0.00 0.00 15.00 426.00 Martin 50.00 250.00 125.00 0 00 175.00 75.00 50.00 100.00 25.00 275.00 0.00 75.00 1,200.00 Nash 175.76 171.64 158.64 253.64 240.89 233.63 190.69 140.11 586.79 200.51 265.13 212.05 2,829.48 Grand Total 26,976.841 Name: Jason Smith Title: Member Manager Phone Number: Compost 2017 (252) 903-5367 Email: jsmith@granvillefarmsinc.com 3303-COMPOST-20 l 0 Page 2 Please send your completed report to: CERTIFICATION: I accurate representation of the activity at this facility. Signature: Date: 07/31/2017 REMINDER: According to G.S. 130A-309.09D(b), this report must be sent to the Regional Environmental Senior Specialist for your area and a copy of this report must be sent to the County Manager of each county from which waste was received. John College PO Box 782 Columbia, NC 27925 Tele: 919.268.1524 Email: john .college@ncdenr.gov A N N U A L R E P O R T Eastern Compost, LLC Annual Report for July 1, 2016 through June 30, 2017 TO: FROM: DATE: John College/ DWM Eastern Compost, LLC July 31, 2017 1. Composting site location, contact and background information The Type 4 composting site is located approximately 400 yards off Battleboro-Leggett Road approximately one mile east of Battleboro in Edgecombe County, North Carolina. Eastern Compost, LLC is the legal entity responsible for the corporate operation of the facility. Jason Smith, Principal Partner, is the primary contact for this facility. Jason Smith's contact information is 252-903-5367. The Division of Waste Management issued approval of the modified application for solid waste composting permit on March 16,2005. During the site preparation phase for the aerated composting method Eastern Compost, LLC discovered the required 3-Phase electricity and water to the site were not readily available. The Division issued a modified permit on July 6, 2006 to allow windrow composting on this site. A site visit was conducted on July 13, 2005 with Division of Waste Management representatives to review the site conditions prior to the initiation of composting activities. On March 4, 2010 Eastern Compost, LLC was issued a permit to operate a Large Type 4 Solid Waste Composting Facility. Facility Permit No.: SWC-33-03. 2. Operational Information Eastern Compost, LLC began its composting operation in August 2005. Appendix A contains the daily operational logs for the period from July 1, 2016 until June 30, 2017. The operational logs include the results of the temperature monitoring for each windrow produced. 3. Type and Amount of Materials Composted Waste Received Tons Food Byproduct 396.22 Sawdust 2285.71 Yard Waste 1410.00 Cotton Gin Waste 3025.00 Wood Pallets 2285.80 Land Clearing Debris 1925.00 Class B Cake 15214.20 Sheet Rock 71.00 Ferric 363.91 4. Quantity and Class of Compost Produced and Distributed All materials produced were Grade A Compost. Once a windrow had reached its pathogen reduction requirements, it was moved to the passive curing area. A majority of finished compost was land applied for agricultural soil amendment. A portion was screened and particles over 2 inches were reused in composting. Distribution of the compost included land application by Boseman Farms and landscaping clients such as Carolina Mulch and Parish Nursery. Waste Processed Tons Coarse Compost Produced- reused in composting 4046.53 Fine Compost Produced 26976.84 On-site Stockpile 6897.09 Distributed - Landscaping 1700.00 Distributed - Land Application 14351.22 5. Laboratory Results Laboratory results for Eastern Compost, LLC are included in Appendix B. 2 Appendix A Daily Operat ional Logs EASTERN COMPOST, LLC 8487 Battieboro-Leggett Road P.O. Box 460 Battleboro, North Carolina 27809 DAILY OPERATION RECORD COMPOST ROW NO. Row Construction Date(s): Section #1: 9 - H --7/18/2016 -- Linear Feet:----- 290 Section #2: Section #3: ------- Linear Feet:------- Linear Feet: Cycle Day Date Time Section # Temp Temp Temp Temp Turned Service Provider 1 7/18/2016 8:30 AM 100 110 110 105 Built 79 2 7/19/2016 10:00 AM 115 111 115 110 79 3 7/20/2016 9:00 AM 120 115 120 115 79 4 7/21/2016 9:00 AM 120 120 120 122 Turned 79 5 7/22/2016 8:30 AM 128 129 125 130 79 6 7/23/2016 9:00 AM 132 153 153 154 79 7 7/24/2016 9:00 AM 135 135 140 140 79 8 7/25/2016 8:30 AM 140 140 142 142 Turned 79 9 7/26/2016 8:30 AM 131 135 135 134 79 10 7/27/2016 9:00 AM 140 140 142 140 79 11 7/28/2016 9:30 AM 142 140 140 142 79 12 7/29/2016 9:00 AM 148 145 148 145 Turned 79 13 7/30/2016 8:00 AM 138 138 138 135 79 14 7/31/2016 8:30 AM 138 140 140 140 79 15 8/1/2016 8:00 AM 140 145 142 142 79 16 8/2/2016 8:30 AM 140 145 140 140 79 17 8/3/2016 8:00 AM 144 145 142 142 79 18 8/4/2016 9:30 AM 150 145 145 142 Tured 79 19 8/5/2016 9:00 AM 145 142 140 140 79 20 8/6/2016 11:00 AM 145 140 140 140 79 21 817/2016 10:30 AM 150 145 140 142 79 22 8/8/2016 1:00 PM 152 145 142 142 79 23 8/9/2016 2:00 PM 150 142 142 140 79 24 8/10/2016 1:30 AM 152 148 148 145 79 25 8/11/2016 2:00 PM 150 150 152 150 Turned 79 26 8/12/2016 2:30 AM 145 145 148 142 79 27 8/13/2016 8:30 AM 145 145 140 150 79 28 8/14/2016 9:00 AM 148 150 150 152 79 29 8/15/2016 10:00 AM 150 155 152 154 79 - EASTERN COMPOST, LLC 8487 Battleboro-Leggett Road P.O. Box 4-60 Batdeboro, North Carollina 27809 COMPOST ROW NO. Row Construction Date(s): DAILY OPERATION RECORD 10 - I Section #1: - 7/18/2016--Linear Feet: ----- -- 295 Section #2: Section #3: ------ Linear Feet: Linear Feet: ----- Cycle Day Date Time Section # Temp Temp Temp Temp Turned Service Provider 1 7/18/2016 8:30 AM 110 100 105 105 Built 79 2 7/19/2016 8:30 AM 110 110 110 110 Turned 79 3 7/20/2016 9:00 AM 110 113 118 117 79 4 7/21/2016 9:30 AM 130 130 139 130 79 5 7/22/2016 10:00 AM 135 135 130 135 79 6 7/23/2016 8:30 AM 140 136 135 132 79 7 7/24/2016 9:00 AM 140 140 140 142 Turned 79 8 7/25/2016 9:00 AM 135 135 135 138 79 9 7/26/2016 9:00 AM 140 138 135 138 79 10 7/27/2016 9:00 AM 140 140 138 140 79 11 7/28/2016 9:00 AM 140 145 140 142 79 12 7/29/2016 8:30 AM 142 145 145 144 Turned 79 13 7/30/2016 9:00 AM 135 138 138 138 79 14 7/31/2016 8:00 AM 142 142 140 140 79 15 8/1/2016 9:00 AM 145 142 140 145 79 16 8/2/2016 9:00 AM 145 145 140 145 79 17 8/3/2016 9:00 AM 150 152 145 150 79 18 8/4/2016 10:00 AM 150 150 145 152 Turned 79 19 8/5/2016 9:00 AM 140 142 138 142 79 20 8/6/2016 12:00 PM 140 145 140 145 79 21 8/7/2016 12:00 PM 142 145 145 150 79 22 8/8/2016 1:00 PM 144 150 145 142 79 23 8/9/2016 1:00 AM 142 152 150 150 79 24 8/10/2016 1:00 AM 145 155 150 152 ?fl 25 8/11/2016 1:00 AM 140 145 145 148 Turned 79 26 8/12/2016 2:00 PM 145 148 148 148 79 27 8/13/2016 8:30 AM 145 150 148 150 79 28 8/14/2016 9:00 AM 145 155 152 155 79 29 8/15/2016 9:00 AM 150 155 150 155 79 EASTERN COMPOST, LLC - Batdeboro, North Carolina 27809 DAILY OPERATION RECORD COMPOST ROW NO. Row Construction Date(s): 11 -J Section #1: - 7/20/2016 --Linear Feet:------ - 295 Section #2: Section #3: -------Linear Feet: ------ Linear Feet: Cycle Day Date Time Section # Temp Temp Temp Temp Turned Service Provider 1 7/20/2016 10:00 AM 110 110 115 110 Built 79 2 7/21/2016 8:30 AM 115 115 115 115 Turned 79 3 7/22/2016 9:00 AM 120 120 119 122 79 4 7/23/2016 10:00 AM 125 128 128 129 79 5 7/24/2016 9:00 AM 135 135 138 135 79 6 7/25/2016 8:30 AM 144 142 140 140 Turned 79 7 7/26/2016 9:00 AM 140 138 135 125 79 8 7/27/2016 8:30 AM 140 140 135 138 79 9 7/28/2016 8:30 AM 140 144 140 140 79 10 7/29/2016 8:30 AM 144 135 142 140 Turned 79 11 7/30/2016 9:00 AM 145 135 135 138 79 12 7/31/2016 10:00 AM 140 140 138 140 79 13 8/1/2016 10:00 AM 142 142 140 140 79 14 8/2/2016 10:00 AM 140 145 145 145 79 15 8/3/2016 9:00 AM 145 150 150 150 79 16 8/4/2016 9:00 AM 145 150 152 152 Turned 79 17 8/5/2016 9:00 AM 145 140 140 145 79 18 8/6/2016 8:00 AM 148 142 142 145 79 19 8/7/2016 9:00 AM 140 145 145 150 79 20 8/8/2016 12:00 PM 150 142 145 150 79 21 8/9/2016 12:00 PM 152 150 150 152 79 22 8/10/2016 12:00 PM 155 155 145 155 79 23 8/11/2016 1:00 AM 155 153 150 150 Turned 79 24 8/12/2016 1:00 AM 145 144 144 148 79 25 8/13/2016 1:00 AM 145 140 142 150 79 26 8/14/2016 1:00 AM 145 145 145 154 79 27 8/15/2016 8:30 AM 150 145 150 150 79 28 8/16/2016 9:00 AM 150 150 150 155 Turned 79 29 8/17/2016 9:00 AM 145 140 145 145 79 EASTERN COMPOST, LLC 8487 Battleboro- Leggett Road P.O. Box 460 Batdeboro, North Carolina 27809 DAILY OPERATION RECORD COMPOST ROW NO. Row Construction Date(s): 12 - K Section #1: - 7/20/2016--Linear Feet:------ 295 ---- Section #2: ------ Linear Feet:------- Section #3: - Linear Feet: Cycle Day Date Time Section # Temp Temp Temp Temp Turned Service Provider 1 7/20/2016 8:30 AM 115 115 110 115 Built 79 2 7/21/2016 8:30 AM 115 115 110 110 Turned 79 3 7/22/2016 8:30 AM 120 120 115 115 79 4 7/23/2016 8:30 AM 125 129 120 125 79 5 7/24/2016 9:00 AM 134 134 138 135 7fl 6 7/25/2016 9:00 AM 142 140 144 140 Turned 79 7 7/26/2016 9:00 AM 135 130 140 135 79 8 7/27/2016 9:00 AM 142 142 140 140 79 9 7/28/2016 8:30 AM 140 142 172 145 79 10 7/29/2016 8:30 AM 142 140 145 145 Turned 7fl 11 7/30/2016 9:30 AM 135 138 140 140 79 12 7/31/2016 9:30 AM 140 140 142 140 79 13 8/1/2016 9:00 AM 140 140 140 138 79 14 8/2/2016 9:30 AM 145 140 145 145 79 15 8/3/2016 9:30 AM 150 145 145 145 79 16 8/4/2016 9:00 AM 152 145 150 152 Turned 79 17 8/5/2016 5:00 AM 140 140 142 140 79 18 8/6/2016 7:00 AM 142 140 145 142 79 19 8/7/2016 7:00 AM 145 145 145 142 7fl 20 8/8/2016 7:30 AM 145 148 145 145 7fl 21 8/9/2016 7:30 AM 150 150 150 150 79 22 8/10/2016 7:30 AM 150 155 150 152 79 23 8/11/2016 8:00 AM 152 155 152 152 Turned 79 24 8/12/2016 8:00 AM 149 148 145 145 79 25 8/13/2016 8:00 AM 149 150 145 144 79 26 8/14/2016 8:00 AM 150 150 150 150 79 27 8/15/2016 8:00 AM 152 155 150 150 7fl 28 8/16/2016 8:00 AM 155 155 154 155 Turned 7fl 29 8/17/2016 8:00 AM 150 150 148 142 79 EASTERN COMPOST, LLC 8487 Battleboro-Leggett Road P.O. Box 460 Bat:tleboro, North Carolina 27809 DAILY OPERATION RECORD COMPOST ROW NO. Row Construction Date(s): Section #1: 13 - L - 7/20/2016 -Linear Feet:------ 295 Section #2: ----- ------ Linear Feet:------- Section #3: - Linear Feet: Cycle Day Date Time Section # Temp Temp Temp Temp Turned Service Provider 1 7/20/20 16 8:30 AM 110 110 120 115 Built 79 2 7/21/2016 8:30 AM 115 115 120 120 Turned 79 3 7/22/2016 8:30 AM 120 120 128 125 79 4 7/23/2016 8:30 AM 128 125 135 128 79 5 7/24/2016 8:30 AM 155 152 135 135 79 6 7/25/2016 8:30 AM 138 135 140 143 Turned 79 7 7/26/2016 8:30 AM 135 135 137 135 79 8 7/27/2016 8:30 AM 142 140 140 140 79 9 7/28/2016 8:30 AM 142 142 140 142 79 10 7/29/2016 8:30 AM 145 144 144 145 Turned 79 11 7/30/2016 9:00 AM 140 140 135 138 79 12 7/31/2016 7:30 AM 142 144 140 140 79 13 8/1/2016 8:30 AM 140 140 140 144 79 14 8/2/2016 8:30 AM 140 140 140 150 79 15 8/3/2016 9:00 AM 142 140 142 152 Turned 79 16 8/4/2016 9:00 AM 142 144 142 150 79 17 8/5/2016 9:00 AM 140 145 145 152 79 18 8/6/2016 12:00 PM 142 142 145 152 79 19 8/7/2016 8:30 AM 145 145 148 155 79 20 8/8/2016 9:00 AM 145 145 150 155 79 21 8/9/2016 9:30 AM 150 150 152 156 79 22 8/10/2016 9:30 AM 155 152 150 156 79 23 8/11/2016 9:30 AM 155 150 155 155 Turned 79 24 8/12/2016 9:30 AM 148 147 150 145 79 25 8/13/2016 9:30 AM 148 149 151 145 79 26 8/14/2016 9:30 AM 150 150 155 150 79 27 8/15/2016 9:30 AM 152 150 155 150 79 28 8/16/2016 9:30 AM 150 155 155 155 Turned 79 29 8/17/2016 9:30 AM 175 150 147 150 79 EASTERN COMPOST, LLC 8487 Batdeboro-Leggett Road P.O. Box 460 Batdeboro, North Carolina 27809 DAILY OPERATION RECORD - COMPOST ROW NO. Row Construction Date(s): Section #1: 14 - M - 7/25/2016 - Linear Feet:------ 285 ---- - Section #2: Section #3: -------Linear Feet:------ Linear Feet: Cycle Day Date Time Section # Temp Temp Temp Temp Turned Service Provider 1 7/25/2016 9:00 AM 120 120 115 120 Built 7fl 2 7/26/2016 9:00 AM 130 130 130 125 7fl 3 7/27/2016 9:00 AM 135 135 134 135 7fl 4 7/28/2016 9:00 AM 140 135 138 142 7fl 5 7/29/2016 9:00 AM 140 140 140 145 Turned 7fl 6 7/30/2016 9:00 AM 135 138 135 140 7fl 7 7/31/2016 9:00 AM 135 140 142 140 7fl 8 8/1/2016 9:00 AM 140 140 145 142 7fl 9 8/2/2016 9:00 AM 142 142 145 145 7fl 10 8/3/2016 9:00 AM 142 142 150 145 7fl 11 8/4/2016 9:00 AM 140 145 150 150 Turned ?fl 12 8/5/2016 8:30 AM 145 140 148 150 7fl 13 8/6/2016 8:00 AM 145 142 148 152 7fl 14 8/7/2016 8:30 AM 145 145 150 152 7fl 15 8/8/2016 9:00 AM 150 145 150 155 7fl 16 8/9/2016 9:30 AM 155 150 155 150 7fl 17 8/10/2016 9:30 AM 155 150 155 155 7fl 18 8/11/2016 8:00 AM 156 150 155 155 Turned 7fl 19 8/12/2016 8:00 AM 150 145 142 150 7fl 20 8/13/2016 8:00 AM 150 145 142 152 7fl 21 8/14/2016 8:30 AM 152 150 145 155 7fl 22 8/15/2016 9:00 AM 152 150 145 155 7fl 23 8/16/2016 8:30 AM 155 152 150 156 Turned 7fl 24 8/17/2016 8:30 AM 148 145 140 148 ?fl 25 8/18/2016 8:30 AM 142 140 140 142 ?fl 26 8/19/2016 8:30 AM 145 142 140 145 7fl 27 8/20/2016 8:30 AM 145 144 142 145 7fl 28 8/21/2016 8:30 AM 158 145 142 150 7fl 29 8/22/2016 8:30 AM 150 145 140 150 7fl EASTERN COMPOST, LLC 8487 Battleboro-Leggett Road P.O. Box 460 Batt[eboro, North Carolina 27809 DAILY OPERATION RECORD COMPOST ROW NO. Row Construction Date(s): Section #l: 15 - N - 7/29/2016- Linear Feet:------ [60 ---- - Section #2: ------ Linear Feet:------- Section #3: - Linear Feet:: Cycle Day Date Time Section # Temp Temp Temp Temp Turned Service Provider 1 7/29/2016 12:00 PM 120 120 125 128 Built 79 2 7/30/2016 12:00 PM 125 128 130 130 ?fl 3 7/31/2016 12:00 PM 135 135 134 135 79 4 8/1/2016 12:00 PM 140 138 138 140 79 5 8/2/2016 12:00 PM 140 140 142 142 ?fl 6 8/3/2016 12:00 PM 142 140 140 145 ?fl 7 8/4/2016 12:00 PM 135 138 135 137 Turned 79 8 8/5/2016 12:00 PM 135 140 135 140 79 9 8/6/2016 12:00 PM 135 142 140 142 79 10 8/7/2016 12:00 PM 140 145 140 142 79 11 8/8/2016 12:00 PM 145 145 142 144 ?fl 12 8/9/2016 12:00 PM 145 150 145 150 79 13 8/10/2016 12:00 PM 150 152 145 152 79 14 8/11/2016 12:00 PM 150 148 148 152 Turned 79 15 8/12/2016 12:00 PM 142 142 145 148 79 16 8/13/2016 12:00 PM 145 144 145 149 79 17 8/14/2016 1:00 AM 145 145 146 150 79 18 8/15/2016 12:30 PM 150 150 150 152 79 19 8/16/2016 1:00 AM 152 150 150 152 Turned 79 20 8/17/2016 1:30 AM 146 142 146 146 79 21 8/18/2016 1:30 AM 142 142 145 142 79 22 8/19/2016 1:30 AM 140 145 145 144 79 23 8/20/2016 1:30 AM 140 142 144 148 79 24 8/21/2016 1:30 AM 142 144 146 150 79 25 8/22/2016 1:30 AM 142 145 150 152 Turned 79 26 8/23/2016 1:30 AM 140 140 145 148 79 27 8/24/2016 1:30 AM 140 142 150 148 79 28 8/25/2016 1:30 AM 145 145 150 150 79 29 8/26/2016 1:30 AM 145 145 146 150 79 EASTERN COMPOST, LLC 8487 BattleboroLeggett Road P.O. Box 460 Batdeboro, North Carolina 27809 DAILY OPERATION RECORD COMPOST ROW NO. Row Construction Date(s): Section #1: 16 - 0 - 8/22/2016 - Linear Feet:------ 285 ---- - Section #2: ------ Linear Feet:------- Section #3: - Linear Feet: Cycle Day Date Time Section # Temp Temp Temp Temp Turned Service Provider 1 8/22/2016 5:00 PM 120 125 128 122 Built 79 2 8/23/2016 5:00 PM 128 128 130 125 Turned 79 3 8/24/2016 5:00 PM 130 130 130 130 7fJ 4 8/25/2016 5:00 PM 132 134 130 130 79 5 8/26/2016 5:00 PM 135 135 135 135 7fJ 6 8/27/2016 5:00 PM 135 138 135 135 7fJ 7 8/28/2016 5:00 PM 136 140 138 138 7fJ 8 8/29/2016 5:00 PM 138 142 140 140 79 9 8/30/2016 5:00 PM 140 144 140 140 79. 10 8/31/2016 5:00 PM 140 145 143 142 79 11 9/1/2016 5:00 PM 145 145 142 143 Turned 79 12 9/2/2016 5:00 PM 140 140 145 138 79 13 9/3/2016 6:00 PM 140 138 140 140 7fJ 14 9/4/2016 7:00 AM 138 138 140 140 79 15 9/5/2016 6:00 PM 139 140 142 145 79 16 9/6/2016 5:00 PM 134 135 135 140 Turned 79 17 9/7/2016 7:00 PM 136 135 135 138 79 18 9/8/2016 7:00 PM 137 138 140 142 7fJ 19 9/9/2016 7:00 PM 140 142 140 140 7fJ 20 9/10/2016 6:30 PM 140 142 140 140 7fJ 21 9/11/2016 5:00 PM 144 145 140 140 79 22 9/12/2016 4:30 PM 144 146 142 140 7fJ 23 9/13/2016 4:30 PM 150 145 144 141 7fJ 24 9/14/2016 4:30 PM 152 150 144 144 79 25 9/15/2016 4:30 PM 152 149 150 144 7fJ 26 9/16/2016 4:30 PM 150 152 152 148 Turned 79 27 9/17/2016 5:00 PM 142 144 145 140 ?fl 28 9/18/2016 5:00 PM 144 140 145 142 79 29 9/19/2016 5:00 PM 144 142 144 142 79 EASTERN COMPOST, LLC 8487 Battleboro-Leggett: Road P.O. Box 460 - Battleboro, North Carolina 27809 DAILY OPERATION RECORD COMPOST ROW NO. Row Construction Date(s): Section #1: 17 - P - 8/22/2016- Linear Feet:------ 285 ---- - Section #2: Section #3: -------Linear Feet: ------ Linear Feet: Cycle Day Date Time Section # Temp Temp Temp Temp Turned Service Provider 1 8/22/2016 1:00 PM 115 115 120 120 Built 7fl 2 8/23/2016 1:00 PM 120 130 122 120 Turned 7fl 3 8/24/2016 1:00 PM 125 124 128 125 7fl 4 8/25/2016 2:00 PM 130 132 130 125 7fl 5 8/26/2016 1:00 PM 134 135 135 132 79 6 8/27/2016 1:00 PM 135 140 138 135 79 7 8/28/2016 1:30 PM 135 147 138 135 79 8 8/29/2016 1:00 PM 140 145 140 140 79 9 8/30/2016 1:30 PM 142 146 142 142 79 10 8/31/2016 1:30 PM 142 150 142 145 79 11 9/1/2016 1:30 PM 145 150 140 141 Turned 79 12 9/2/2016 1:30 PM 135 140 135 136 79 13 9/3/2016 1:30 PM 138 140 136 138 79 14 9/4/2016 1:30 PM 140 140 136 138 79 15 9/5/2016 1:30 PM 140 142 140 142 ?fl 16 9/6/2016 1:30 PM 144 144 140 142 Turned 79 17 9/7/2016 1:00 PM 136 138 138 136 79 18 9/8/2016 1:00 PM 139 138 136 139 ?fl 19 9/9/2016 1:00 PM 140 138 138 140 ?fl 20 9/10/2016 1:00 PM 140 139 138 142 ?fl 21 9/11/2016 1:00 PM 142 140 142 145 79 22 9/12/2016 1:00 PM 144 145 142 146 79 23 9/13/2016 1:00 PM 144 146 145 148 79 24 9/14/2016 1:00 PM 145 145 150 150 ?fl 25 9/15/2016 1:00 PM 145 150 151 150 ?fl 26 9/16/2016 1:00 PM 148 152 152 154 Turned ?fl 27 9/17/2016 1:00 PM 144 147 146 150 ?fl 28 9/18/2016 1:00 PM 145 148 150 151 ?fl 29 9/19/2016 1:00 PM 145 150 150 152 79 EASTERN COMPOST, LLC 84-87 Battleboro-Legge tt Road - -- P.O.Box 4-60 Bat:t:leboro, Nort:h Carolina 27809 DAILY OPERATION RECORD COMPOST ROW NO. -18 - Q----- Row Construction Date{s): Section #1: -- 9/5/2016 Linear Feet: ---- 285 - -- Section #2: Section #3: -------Linear Feet:------ Linear Feet: Cycle Day Date Time Section # Temp Temp Temp Temp Turned Service Provider 1 9/5/2016 7:00 AM 120 115 115 118 Built 79 2 9/6/2016 5:00 PM 120 115 114 116 Turned 79 3 9/7/2016 5:00 PM 125 120 120 122 79 4 9/8/2016 8:00 AM 132 129 128 128 79 5 9/9/2016 8:00 AM 135 135 134 132 79 6 9/10/2016 8:00 AM 135 138 136 134 79 7 9/11/2016 8:30 AM 136 140 136 135 79 8 9/12/2016 5:00 PM 140 136 138 137 Turned 79 9 9/13/2016 7:00 AM 136 136 135 135 79 10 9/14/2016 12:00 PM 140 140 140 142 79 11 9/15/2016 1:00 PM 140 140 142 145 79 12 9/16/2016 8:30 AM 142 148 145 148 79 13 9/17/2016 9:00 AM 144 148 150 150 79 14 9/18/2016 10:00 AM 144 155 152 155 79 15 9/19/2016 11:00 AM 145 155 152 155 79 16 9/20/2016 11:00 AM 156 156 155 158 Turned 79 17 9/21/2016 11:00 AM 142 144 146 149 79 18 9/22/2016 11:00 AM 142 142 148 150 79 19 9/23/2016 11:00 AM 144 145 150 152 79 20 9/24/2016 11:00 AM 148 145 152 152 Turned 79 21 9/25/2016 11:00 AM 140 140 142 144 79 22 9/26/2016 11:00 AM 146 142 135 138 79 23 9/27/2016 11:00 AM 148 142 140 140 79 24 9/28/2016 11:00 AM 146 144 140 142 79 25 9/29/2016 11:00 AM 146 142 140 140 Turned 79 26 9/30/2016 5:00 PM 140 138 138 135 79 27 10/1/2016 5:00 PM 140 140 140 136 79 28 10/2/2016 8:00 AM 142 145 140 135 79 29 10/3/2016 8:00 AM 142 145 142 138 79 EASTERN COMPOST, LLC 8487 Batdeboro-Leggett Road P.O. Box 'il-60 Batdeboro, North Carollina 27809 DAILY OPERATION RECORD COMPOST ROW NO. Row Construction Date(s): Section #1: -- 19 - R 9/ 5/2()16 --Linear Feet:----- 285 Section #2: ------ Linear Feet:;------ Section #3: - - Linear Feet: Cycle Day Date Time Section # Temp Temp Temp Temp Turned Service Provider 1 9/5/2016 10:30 AM 110 110 115 115 Built 7fJ 2 9/6/2016 10:30 AM 114 112 116 114 Turned 7fJ 3 9/7/2016 10:30 AM 120 118 116 114 7fJ 4 9/8/2016 10:30 AM 125 118 120 128 ?fJ 5 9/9/2016 10:30 AM 128 124 120 125 7fJ 6 9/10/2016 10:30 AM 135 134 130 132 7fJ 7 9/11/2016 10:30 AM 135 136 135 134 7fJ 8 9/12/2016 10:30 AM 142 145 142 140 Turned ?fl 9 9/13/2016 10:30 AM 140 140 138 138 7fJ 10 9/14/2016 11:00 AM 140 142 142 145 ?fl 11 9/15/2016 11:00 AM 144 142 144 145 7fl 12 9/16/2016 11:00 AM 148 148 148 146 7fJ 13 9/17/2016 11:00 AM 149 148 150 144 7fl 14 9/18/2016 10:30 AM 150 150 152 148 7fl 15 9/19/2016 10:30 AM 150 150 155 150 79 16 9/20/2016 11:00 AM 150 151 158 152 Turned 79 17 9/21/2016 11:00 AM 152 152 158 150 ?fl 18 9/22/2016 11:00 AM 154 151 156 152 ?fl 19 9/23/2016 11:30 AM 154 151 158 152 7fl 20 9/24/2016 11:00 AM 156 154 158 154 Turned ?fl 21 9/25/2016 11:00 AM 142 140 145 153 ?fl 22 9/26/2016 11:30 AM 144 140 145 144 ?fl 23 9/27/2016 11:30 AM 142 142 146 144 79 24 9/28/2016 11:30 AM 144 142 146 144 7fl 25 9/29/2016 11:30 AM 145 142 145 144 Turned 79 26 9/30/2016 11:30 AM 138 138 139 140 ?fl 27 10/1/2016 11:00 AM 140 140 140 142 7fl 28 10/2/2016 10:00 AM 140 138 142 142 79 29 10/3/2016 11:00 AM 140 140 142 144 79 ---- EASTERN COMPOST, LLC 8487 Battleboro-Leggett Road P.O. Box 460 Batdeboro, North Carolina 27809 DAILY OPERATION RECORD COMPOST ROW NO. Row Construction Date(s): Section #1: 20 - S --9/16/2016 Linear Feeil::----- 285 Section #2: ------ Linear Feet: ------ Section #3: - Linear Feet: Cycle Day Date Time Section # Temp Temp Temp Temp Turned Service Provider 1 9/16/2016 1:00 PM 125 120 120 125 Built 7fl 2 9/17/2016 1:00 PM 134 121 125 128 Turned 7fl 3 9/18/2016 1:00 PM 135 133 132 134 7fl 4 9/19/2016 1:00 PM 136 134 136 138 7fl 5 9/20/2016 1:00 PM 138 135 136 137 79 6 9/21/2016 1:00 PM 144 140 140 143 79 7 9/22/2016 11:30 AM 142 140 138 144 7fl 8 9/23/2016 12:00 PM 148 148 142 146 79 9 9/24/2016 12:00 PM 146 150 144 146 7fl 10 9/25/2016 11:30 AM 150 150 148 150 Turned ?fl 11 9/26/2016 11:30 AM 142 140 140 142 7fl 12 9/27/2016 11:00 AM 144 140 142 142 7fl 13 9/28/2016 11:00 AM 144 142 140 144 7fl 14 9/29/2016 10:30 AM 140 140 142 145 Turned 7fl 15 9/30/2016 12:00 PM 142 136 135 140 ?fl 16 10/1/2016 12:00 PM 142 136 136 142 7fl 17 10/2/2016 12:00 PM 144 138 135 142 ?fl 18 10/3/2016 12:00 PM 144 140 140 142 ?fl 19 10/4/2016 12:00 PM 142 142 140 142 ?fl 20 10/5/2016 12:00 PM 144 140 144 140 7fl 21 10/6/2016 12:00 PM 145 142 146 140 ?fl 22 10/7/2016 12:00 PM 144 144 146 142 7fl 23 10/8/2016 12:00 PM 144 145 147 142 7fl 24 10/9/2016 12:00 PM 140 145 146 142 Turned ?fl 25 10/10/2016 12:00 PM 140 135 140 134 ?fl 26 10/11/2016 12:00 PM 141 138 140 138 7fl 27 10/12/2016 12:00 PM 142 138 138 140 7fl 28 10/13/2016 12:00 PM 142 140 138 142 ?fl 29 10/14/2016 12:00 PM 142 140 140 140 ?fl EASTERN COMPOST, LLC 84-87 Battleboro-Leggett Road P.O.Box 460 Battleboro, North Carolina 27809 DAILY OPERATION RECORD COMPOST ROW NO. Row Construction Date(s): Section #1: -- 21 - T 9/16/2016--Linear Feet:-- --- 285 Section #2: Section #3: -------Linear Feet:------- Linear Feet: Cycle Day Date Time Section # Temp Temp Temp Temp Turned Service Provider 1 9/16/2016 9:30 AM 120 122 128 128 Built 7fl- 2 9/17/2016 8:30 AM 130 135 132 133 7fl- 3 9/18/2016 9:00 AM 135 135 133 134 Turned 7fl- 4 9/19/2016 9:30 AM 140 140 142 141 7fl- 5 9/20/2016 10:00 AM 142 142 140 140 7fl- 6 9/21/2016 9:00 AM 144 148 142 142 7fl- 7 9/22/2016 9:00 AM 144 150 144 142 Turned 7fl- 8 9/23/2016 9:00 AM 150 150 145 145 7fl- 9 9/24/2016 9:00 AM 152 150 146 145 7fl- 10 9/25/2016 9:30 AM 152 150 146 146 7fl- 11 9/26/2016 9:30 AM 142 140 140 140 7fl- 12 9/27/2016 9:30 AM 142 140 142 142 7fl- 13 9/28/2016 9:30 AM 144 144 145 142 Turned 7fl- 14 9/29/2016 9:30 AM 145 144 145 145 7fl- 15 9/30/2016 9:30 AM 145 141 144 142 7fl- 16 10/1/2016 9:30 AM 142 142 142 142 7fl- 17 10/2/2016 9:00 AM 140 142 142 142 7fl- 18 10/3/2016 9:00 AM 142 144 148 144 7fl- 19 10/4/2016 9:00 AM 140 142 144 144 7fl- 20 10/5/2016 9:00 AM 142 142 144 140 7fl- 21 10/6/2016 9:00 AM 145 144 145 142 Turned 7fl- 22 10/7/2016 9:00 AM 145 142 145 140 7fl- 23 10/8/2016 9:00 AM 142 140 142 140 7fl- 24 10/9/2016 9:00 AM 142 142 140 140 79 25 10/10/2016 9:00 AM 144 140 142 144 Turned 79 26 10/11/2016 9:00 AM 140 136 134 135 7fl- 27 10/12/2016 9:00 AM 140 136 135 135 79 28 10/13/2016 9:00 AM 142 140 136 138 7fl- 29 10/14/2016 9:00 AM 142 142 136 138 7fl- - EASTERN COMPOST, LLC 84-87 Battleboro- Leggett Road P.O. Box 4-60 Batt:leboro, North Carolina 27809 DAILY OPERATION RECORD COMPOST ROW NO. Row Construction Date(s): Section #1:-- 22 - U 9/9/2016 --Linear Feet:---- 125 Section #2: Linear Feet: ------- Section #3: Linear Feet: Cycle Day Date Time Section # Temp Temp Temp Temp Turned Service Provider 1 9/16/2016 9:30 AM 115 120 115 122 Built ?fl 2 9/17/2016 11:00 AM 118 120 118 122 Turned ?fl 3 9/18/2016 11:30 AM 120 122 124 125 7fl 4 9/19/2016 11:30 AM 125 125 128 129 7fl 5 9/20/2016 11:30 AM 125 127 133 134 7fl 6 9/21/2016 11:30 AM 134 134 140 140 7fl 7 9/22/2016 11:30 AM 135 135 142 142 7fl 8 9/23/2016 11:30 AM 135 135 144 142 7fl 9 9/24/2016 12:00 PM 140 138 144 142 7fl 10 9/25/2016 10:00 AM 142 139 142 145 Turned 7fl 11 9/26/2016 10:00 AM 142 140 146 142 7fl 12 9/27/2016 10:00 AM 144 140 142 144 7fl 13 9/28/2016 9:30 AM 144 144 144 142 ?fl 14 9/29/2016 11:30 AM 145 142 142 142 ?fl 15 9/30/2016 11:30 AM 146 144 139 138 7fl 16 10/1/2016 11:30 AM 148 144 140 138 7fl 17 10/2/2016 11:30 AM 150 145 140 140 Turned 7fl 18 10/3/2016 11:30 AM 152 145 142 142 ?fl 19 10/4/2016 11:30 AM 152 144 140 140 ?fl 20 10/5/2016 11:30 AM 150 146 142 138 ?fl 21 10/6/2016 11:30 AM 152 148 142 138 ?fl 22 10/7/2016 11:30 AM 152 146 142 140 ?fl 23 10/8/2016 10:00 AM 154 146 142 140 ?fl 24 10/9/2016 10:00 AM 154 148 144 140 7fl 25 10/10/2016 11:30 AM 152 148 144 142 7fl 26 10/11/2016 11:30 AM 145 140 135 142 Turned ?fl 27 10/12/2016 11:30 AM 145 140 135 140 ?fl 28 10/13/2016 11:30 AM 146 142 138 142 7fl 29 10/14/2016 11:30 AM 145 142 138 142 ?fl EASTERN COMPOST, LLC 84-87 Battleboro- Leggett Road P.O. Box 460 Bat:tleboro, Nort:h Carolina 27809 DAILY OPERATION RECORD COMPOST ROW NO. Row Construction Date(s): 23 - V 10/11/2016 - - 280 Section #1: ------ Linear Feet: ------ Section #2: Section #3: -------Linear Feet:------- Linear Feet: Cycle Day Date Time Section # Temp Temp Temp Temp Turned Service Provider 1 10/11/2016 10:30 AM 120 120 118 118 Built 79 2 10/12/2016 10:30 AM 128 124 120 120 Turned 79 3 10/13/2016 10:30 AM 130 128 124 122 79 4 10/14/2016 10:30 AM 135 129 124 122 79 5 10/15/2016 10:30 AM 135 130 128 126 79 6 10/16/2016 10:30 AM 136 135 134 130 79 7 10/17/2016 10:30 AM 140 140 138 134 79 8 10/18/2016 10:30 AM 142 140 140 138 Turned 79 9 10/19/2016 11:30 AM 140 135 136 133 79 10 10/20/2016 9:00 AM 140 138 136 135 79 11 10/21/2016 11:30 AM 142 140 136 138 79 12 10/22/2016 11:00 AM 140 140 138 138 79 13 10/23/2016 1:00 PM 144 142 138 138 79 14 10/24/2016 1:00 PM 142 142 140 140 79 15 10/25/2016 1:00 PM 144 140 142 140 79 16 10/26/2016 1:00 PM 144 142 142 144 Turned 79 17 10/27/2016 1:00 PM 140 138 136 138 79 18 10/28/2016 1:00 PM 141 140 130 138 79 19 10/29/2016 1:00 PM 142 142 138 138 79 20 10/30/2016 1:00 PM 144 142 140 140 79 21 10/31/2016 1:00 PM 144 144 140 142 79 22 11/1/2016 1:00 PM 144 145 142 142 79 23 11/2/2016 1:00 PM 142 142 144 142 79 24 11/3/2016 1:00 PM 140 140 142 142 Turned 79 25 11/4/2016 12:30 PM 140 138 140 138 79 26 11/5/2016 12:30 PM 140 130 140 140 79 27 11/6/2016 12:30 PM 140 142 142 140 79 28 11/7/2016 12:30 PM 142 144 142 145 79 29 11/8/2016 12:30 PM 142 145 142 144 79 EASTERN COMPOST, LLC 84-87 Battleboro-Leggett Road P.O.Box 460 Battleboro, North Carolina 27809 DAILY OPERATION RECORD COMPOST ROW NO. Row Construction Date(s): Section #1: - 24 - W 10/ H /2016--Linear Feet:------ 286 Section #2: Section #3: Linear Feet: ------- Linear Feet: Cycle Day Date Time Section # Temp Temp Temp Temp Turned Service Provider 1 10/11/2016 1:00 PM 110 120 112 120 Built 79 2 10/12/2016 2:00 PM 110 124 114 128 Turned 79 3 10/13/2016 1:30 PM 115 125 115 130 79 4 10/14/2016 1:30 PM 115 132 120 130 79 5 10/15/2016 1:30 PM 125 134 125 132 79 6 10/16/2016 1:30 PM 125 138 133 133 79 7 10/17/2016 1:30 PM 130 138 135 135 7fl 8 10/18/2016 1:30 PM 135 140 138 140 Turned 7fl 9 10/19/2016 1:30 PM 133 135 134 134 7fl 10 10/20/2016 2:00 PM 137 135 136 135 7fl 11 10/21/2016 2:00 PM 138 140 135 138 ?fl 12 10/22/2016 2:00 PM 138 140 142 140 ?fl 13 10/23/2016 2:00 PM 140 140 144 142 79 14 10/24/2016 2:00 PM 142 138 144 142 ?fl 15 10/25/2016 2:00 PM 140 142 146 142 7fl 16 10/26/2016 2:00 PM 140 130 139 136 Turned 7fl 17 10/27/2016 2:00 PM 140 136 140 137 7fl 18 10/28/2016 2:00 PM 142 140 140 138 79 19 10/29/2016 2:00 PM 142 140 140 140 7fl 20 10/30/2016 2:00 PM 144 142 140 142 7fl 21 10/31/2016 2:00 PM 142 142 138 142 79 22 11/1/2016 2:00 PM 144 140 142 140 79 23 11/2/2016 1:30 PM 148 142 144 145 ?fl 24 11/3/2016 1:30 PM 150 146 144 148 Turned ?fl 25 11/4/2016 2:00 PM 142 140 144 142 ?fl 26 11/5/2016 2:00 PM 140 140 144 144 ?fl 27 11/6/2016 2:00 PM 142 142 142 147 ?fl 28 11/7/2016 2:00 PM 144 142 146 146 79 29 11/8/2016 2:00 PM 142 144 148 146 79 ------- EASTERN COMPOST, LLC 8487 Battleboro-Leggett Road P.O. Box 460 Batdeboro, North Carolina 27809 DAILY OPERATION RECORD COMPOST ROW NO. Row Construction Date(s): Section #1: - 25 - X 10/18/2016 Linear Feet:------ 290 ------ Section #2: Li.near Feet: ------- Section #3: Li.near Feet:: Cycle Day Date Time Section # Temp Temp Temp Temp Turned Service Provider 1 10/18/2016 10:30 AM 118 118 120 122 Built 79 2 10/19/2016 10:00 AM 116 120 121 122 Turned 79 3 10/20/2016 10:30 AM 120 121 122 124 79 4 10/21/2016 10:30 AM 125 130 126 126 79 5 10/22/2016 10:30 AM 125 132 129 128 79 6 10/23/2016 10:30 AM 136 130 130 132 79 7 10/24/2016 10:30 AM 130 131 133 134 79 8 10/25/2016 10:30 AM 134 138 135 136 79 9 10/26/2016 10:30 AM 136 138 170 142 Turned 79 10 10/27/2016 10:30 AM 136 136 130 138 79 11 10/28/2016 10:30 AM 140 138 139 140 79 12 10/29/2016 10:30 AM 140 138 138 142 79 13 10/30/2016 10:30 AM 142 140 140 145 79 14 10/31/2016 10:00 AM 144 140 142 146 79 15 11/1/2016 10:00 AM 144 140 140 144 Turned 79 16 11/2/2016 10:00 AM 140 138 140 140 79 17 11/3/2016 10:00 AM 140 142 140 142 79 18 11/4/2016 10:00 AM 142 140 144 142 79 19 11/5/2016 10:00 AM 142 142 144 144 79 20 11/6/2016 10:00 AM 145 142 145 144 79 21 11/7/2016 10:30 AM 146 142 146 146 79 22 11/8/2016 10:00 AM 148 144 148 146 79 23 11/9/2016 10:30 AM 142 140 150 146 79 24 11/10/2016 11:00 AM 140 138 145 140 Turned 79 25 11/11/2016 12:00 PM 140 140 145 140 79 26 11/12/2016 10:00 AM 142 140 145 142 79 27 11/13/2016 10:00 AM 144 142 144 142 79 28 11/14/2016 10:00 AM 142 140 145 142 79 29 11/15/2016 10:00 AM 145 140 148 144 Turned 79 EASTERN COMPOST, LLC 8487 Battleboro-Leggett Road P.O. Box 460 Battleboro, North Carolina 27809 DAILY OPERATION RECORD COMPOST ROW NO. Row Construction Date(s): 26 - Y 295 Section #1: - 10/18/2016--Linear Feet:------- Section #2: Linear Feet:: ------ Section #3: Linear Feet: Cycle Date Time Section Temp Temp Temp Temp Turned Service Day 1 10/18/2016 2 10/19/2016 3 10/20/2016 4 10/21/2016 5 10/22/2016 6 10/23/2016 7 10/24/2016 8 10/25/2016 9 10/26/2016 10 10/27/2016 11 10/28/2016 12 10/29/2016 13 10/30/2016 14 10/31/2016 15 11/1/2016 16 11/2/2016 17 11/3/2016 18 11/4/2016 19 11/5/2016 20 11/6/2016 21 11/7/2016 22 11/8/2016 23 11/9/2016 24 11/10/2016 25 11/11/2016 26 11/12/2016 27 11/13/2016 28 11/14/2016 29 11/15/2016 10:30 AM 140 144 145 142 Turned 7fJ # Provider 11:00 AM 120 122 125 130 Built 7fl 11:30 AM 124 124 125 130 Turned 7fl 11:00 AM 126 126 128 130 7fl 11:00 AM 130 132 132 134 79 11:00 AM 135 136 134 138 79 11:00 AM 136 140 136 142 79 11:00 AM 138 142 138 142 79 11:00 AM 139 144 140 142 79 11:00 AM 136 140 138 140 Turned 79 11:00 AM 136 140 138 138 79 11:00 AM 138 140 140 140 79 10:30 AM 140 142 140 142 79 11:00 AM 142 144 140 140 79 10:30 AM 140 144 142 144 79 10:30 AM 138 146 144 146 Turned 79 11:00 AM 140 140 142 140 79 11:00 AM 140 140 140 140 79 11:00 AM 145 142 142 142 79 11:00 AM 146 145 142 145 79 11:00 AM 146 146 148 145 7fJ 11:00 AM 148 146 148 145 79 11:00 AM 148 144 150 144 7fl 11:00 AM 141 140 144 140 Turned 79 11:00 AM 138 138 140 138 79 11:00 AM 138 140 140 140 79 11:00 AM 140 142 140 140 7fl 10:30 AM 140 142 144 140 79 10:30 AM 142 144 144 142 7fl EASTERN COMPOST, LLC 84-87 Bat:deboro-Leggett Road P.O. Box 460 Battleboro, North Carolina 27809 DAILY OPERATION RECORD - COMPOST ROW NO. Row Construction Date(s): CURVE ROW Section #1: - 10/20/2016 -Linear Feet:------ 175 Section #2: Section #3: ----- -------Linear Feet:------ Linear Feet: Cycle Day Date Time Section # Temp Temp Temp Temp Turned Service Provider 1 10/20/2016 1:00 PM 118 120 120 125 Built 7fl 2 10/21/2016 1:00 PM 122 125 125 130 Turned 7fl 3 10/22/2016 1:00 PM 126 135 130 135 7fl 4 10/23/2016 1:00 PM 134 138 135 140 7fl 5 10/24/2016 1:00 PM 140 142 140 144 Turned 7fl 6 10/25/2016 1:00 PM 138 140 135 138 ?fl 7 10/26/2016 1:00 PM 140 142 140 144 7fl 8 10/27/2016 1:00 PM 142 142 140 144 ?fl 9 10/28/2016 1:00 PM 142 144 144 148 7fl 10 10/29/2016 1:30 PM 142 145 145 145 Turned 7fl 11 10/30/2016 1:30 PM 138 140 140 142 79 12 10/31/2016 1:30 PM 138 142 140 144 7fl 13 11/1/2016 1:30 PM 140 142 140 147 7fl 14 11/2/2016 1:30 PM 142 144 142 145 7fl 15 11/3/2016 1:30 PM 142 145 140 148 ?fl 16 11/4/2016 1:30 PM 144 142 145 148 Turned 79 17 11/5/2016 1:30 PM 140 138 138 140 ?fl 18 11/6/2016 1:00 PM 142 142 138 140 ?fl 19 11/7/2016 1:00 PM 144 144 140 140 ?fl 20 11/8/2016 1:00 PM 145 142 142 142 7fl 21 11/9/2016 1:00 PM 145 145 144 140 7fl 22 11/10/2016 1:00 PM 142 142 145 142 Turned ·79 23 11/11/2016 1:00 PM 140 138 140 140 ?fl 24 11/12/2016 2:00 PM 140 140 142 142 7fl 25 11/13/2016 2:00 PM 142 142 140 142 7fl 26 11/14/2016 2:00 PM 145 142 142 144 7fl 27 11/15/2016 2:00 PM 144 144 142 145 79 28 11/16/2016 2:00 PM 142 145 142 144 7fl 29 11/17/2016 2:00 PM 145 144 144 145 Turned 7fl EASTERN COMPOST, LLC 84-87 Battleboro- Leggett Road P.O.Box 4-60 Batdeboro, Nort:h Carolina 27809 DAILY OPERATION RECORD - COMPOST ROW NO. Row Construction Date(s): Section #1:- 10/24/2016--Linear Feet: ----- 285 Section #2: Linear Feet: ------- Section #3: Linear Feet: Cycle Day Date Time Section # Temp Temp Temp Temp Turned Service Provider 1 10/24/2016 2:00 PM 120 122 124 120 Built 79 2 10/25/2016 2:00 PM 120 124 124 122 Turned 79 3 10/26/2016 2:30 PM 130 128 138 128 79 4 10/27/2016 2:00 PM 136 134 138 130 79 5 10/28/2016 2:00 PM 136 136 140 134 79 6 10/29/2016 2:00 PM 140 136 142 136 79 7 10/30/2016 2:30 PM 140 140 142 138 79 8 10/31/2016 2:30 PM 142 144 140 138 Turned 79 9 11/1/2016 2:00 PM 138 140 136 136 79 10 11/2/2016 2:00 PM 140 140 140 140 79 11 11/3/2016 2:00 PM 140 142 142 142 79 12 11/4/2016 2:00 PM 142 144 142 142 79 13 11/5/2016 2:00 PM 144 148 145 142 79 14 11/6/2016 2:00 PM 142 150 145 145 79 15 11/7/2016 2:00 PM 145 150 145 145 79 16 11/8/2016 2:00 PM 148 152 146 145 79 17 11/9/2016 2:00 PM 140 144 142 140 Turned 79 18 11/10/2016 2:00 PM 138 138 140 138 79 19 11/11/2016 2:00 PM 138 138 140 140 79 20 11/12/2016 2:30 PM - 138 140 140 142 79 21 11/13/2016 2:30 PM 140 144 142 144 79 22 11/14/2016 2:30 PM 142 145 140 144 79 23 11/15/2016 2:30 PM 142 145 142 142 Turned 79 24 11/16/2016 2:30 PM 140 142 140 140 79 25 11/17/2016 2:30 PM 142 142 140 140 79 26 11/18/2016 2:30 PM 142 145 145 145 79 27 11/19/2016 2:30 PM 140 145 142 145 Turned 79 28 11/20/2016 2:30 PM 145 145 148 148 79 29 11/21/2016 2:30 PM 140 140 140 142 79 EASTERN COMPOST, LLC 84-87 Battleboro-Leggett Road P.O. Box 460 Battleboro, North Carolina 27809 DAILY OPERATION RECORD COMPOST ROW NO. Row Construction Date{s): Section #1: 28 - ZZ - 10/24/2016 Linear Feet: ----- 288 ------ - Section #2: ------ Linear Feet:: ------ Section #3: - - Linear Feet:: Cycle Day Date Time Section # Temp Temp Temp Temp Turned Service Provider 1 10/24/2016 9:30 AM 122 120 115 120 Built 79 2 10/25/2016 9:00 AM 124 122 118 121 Turned 79 3 10/26/2016 9:30 AM 126 138 120 128 79 4 10/27/2016 12:00 PM 130 130 126 130 79 5 10/28/2016 1:00 PM 134 130 130 134 79 6 10/29/2016 1:00 PM 136 132 134 138 79 7 10/30/2016 1:00 PM 134 134 140 142 79 8 10/31/2016 1:00 PM 130 140 142 144 79 9 11/1/2016 1:00 PM 140 138 142 142 Turned 79 10 11/2/2016 1:00 PM 138 138 138 136 79 11 11/3/2016 1:00 PM 138 140 139 138 79 12 11/4/2016 1:00 PM 140 142 140 140 79 13 11/5/2016 1:00 PM 142 142 140 140 79 14 11/6/2016 2:00 PM 144 140 142 142 79 15 11/7/2016 2:00 PM 144 145 140 142 79 16 11/8/2016 2:00 PM 146 144 142 142 79 17 11/9/2016 2:00 PM 138 140 144 145 Turned 79 18 11/10/2016 2:00 PM 138 140 140 145 79 19 11/11/2016 2:00 PM 138 144 144 145 79 20 11/12/2016 2:00 PM 140 145 145 147 79 21 11/13/2016 2:00 PM 138 145 145 140 79 22 11/14/2016 1:30 PM 140 144 148 147 79 23 11/15/2016 1:30 PM 142 14 146 145 Turned 79 24 11/16/2016 1:30 PM 140 140 138 140 79 25 11/17/2016 1:30 PM 140 142 140 142 79 26 11/18/2016 1:30 PM 142 145 142 142 79 27 11/19/2016 1:30 PM 144 145 144 145 79 28 11/20/2016 1:30 PM 144 150 145 145 Turned 79 29 11/21/2016 1:30 PM 140 142 140 142 79 EASTERN COMPOST, LLC 8487 Bat:deboro-Leggett Road P.O. Box 460 Batdeboro, North Carolina 27809 DAILY OPERATION RECORD COMPOST ROW NO. Row Construction Dat:e{s): Section #1: - LONG - 1 11/9/2016 - Linear Feet:------ 285 ---- - Section #2: Linear Feet: ------- Section #3: Linear Feet: Cycle Day Date Time Section # Temp Temp Temp Temp Turned Service Provider 1 11/9/2016 1:00 PM 105 110 115 110 Built 79 2 11/10/2016 1:00 PM 105 110 115 115 Turned 79 3 11/11/2016 1:00 PM 115 120 120 120 79 4 11/12/2016 1:00 PM 118 125 125 125 Turned 79 5 11/13/2016 2:00 PM 128 128 134 128 79 6 11/14/2016 2:00 PM 135 137 138 133 ?fl 7 11/15/2016 2:00 PM 135 134 138 135 79 8 11/16/2016 2:00 PM 138 135 142 140 Turned 79 9 11/17/2016 2:00 PM 140 138 144 142 ?fl 10 11/18/2016 2:00 PM 145 140 144 140 79 11 11/19/2016 2:00 PM 145 142 150 142 79 12 11/20/2016 3:00 PM 142 140 150 140 ?fl 13 11/21/2016 3:00 PM 148 142 152 145 79 14 11/22/2016 3:00 PM 150 145 154 140 79 15 11/23/2016 3:00 PM 150 145 155 145 Turned ?fl 16 11/24/2016 3:00 PM 139 138 145 138 79 17 11/25/2016 3:00 PM 139 138 145 140 79 18 11/26/2016 3:00 PM 140 142 146 142 79 19 11/27/2016 1:00 PM 142 140 146 142 ?fl 20 11/28/2016 2:00 PM 142 140 148 140 Turned ?fl 21 11/29/2016 2:00 PM 140 138 140 140 ?fl 22 11/30/2016 1:00 PM 140 140 142 140 ?fl 23 12/1/2016 1:00 PM 144 140 140 140 ?fl 24 12/2/2016 1:30 PM 144 142 142 142 79 25 12/3/2016 3:00 PM 145 142 142 146 79 26 12/4/2016 3:00 PM 144 144 144 142 79 27 12/5/2016 3:00 PM 146 144 146 142 Turned ?fl 28 12/6/2016 3:00 PM 140 140 140 138 7fJ 29 12/7/2016 3:00 PM 140 142 142 140 79 EASTERN COMPOST, LLC 84-87 Batdeboro-Leggett Road P.O. Box 460 Battleboro, North Carolina 27809 DAILY OPERATION RECORD COMPOST ROW NO. Row Construction Date(s): Section #1: - LONG - 2 11/9/2016--Linear Feet: ------ - 285 Section #2: ------ Linear Feet:------- Section #3: - Linear Feet: Cycle Day Date Time Section # Temp Temp Temp Temp Turned Service Provider 1 11/9/2016 5:00 PM 110 110 115 110 Built ?fl 2 11/10/2016 5:00 PM 100 110 115 115 Turned ?fl 3 11/11/2016 5:00 PM 120 132 125 125 7fl 4 11/12/2016 5:00 PM 125 128 130 132 Turned 7fl 5 11/13/2016 5:00 PM 134 134 137 134 7fl 6 11/14/2016 5:00 PM 135 138 138 134 7fl 7 11/15/2016 4:00 PM 135 136 132 133 Turned ?fl 8 11/16/2016 4:30 PM 138 138 140 142 7fl 9 11/17/2016 4:30 PM 140 140 142 142 ?fl 10 11/18/2016 4:00 PM 142 140 144 140 ?fl 11 11/19/2016 5:00 PM 140 140 145 142 ?fl 12 11/20/2016 3:00 PM 144 142 148 145 7fl 13 11/21/2016 3:00 PM 145 142 150 145 7fl 14 11/22/2016 4:00 PM 144 145 150 148 7fl 15 11/23/2016 4:00 PM 145 146 152 150 Turned 7fl 16 11/24/2016 4:00 PM 138 136 142 140 ?fl 17 11/25/2016 4:00 PM 130 138 140 142 ?fl 18 11/26/2016 4:30 PM 140 138 142 142 ?fl 19 11/27/2016 5:00 PM 140 140 142 144 7fl 20 11/28/2016 5:00 PM 140 140 144 142 79 21 11/29/2016 4:30 PM 142 144 145 146 Turned ?fl 22 11/30/2016 4:00 PM 140 140 140 140 ?fl 23 12/1/2016 4:00 PM 140 140 142 142 7fl 24 12/2/2016 4:30 PM 140 142 142 140 79 25 12/3/2016 4:00 PM 142 142 144 142 '79 26 12/4/2016 4:00 PM 142 144 144 144 79 27 12/5/2016 4:00 PM 142 144 144 146 Turned 79 28 12/6/2016 4:30 PM 138 138 140 140 7fl 29 12/7/2016 4:00 PM 140 140 140 142 '79 EASTERN COMPOST, LLC 84-87 Battleboro-Leggett Road - P.O. Box 4-60 Battleboro, North Carolina 27809 DAILY OPERATION RECORD COMPOST ROW NO. Row Construction Date(s): SHORT ROW Section #1: - H/9/2016--Li.near Feet:------ 100 Section #2: Section #3: ---- ------ Linear Feet:------- Linear Feet:: Cycle Day Date Time Section # Temp Temp Temp Temp Turned Service Provider 1 11/9/2016 3:30 PM 110 105 115 110 Built 79 2 11/10/2016 3:30 PM . 110 110 115 110 Turned 79 3 11/11/2016 3:30 PM 115 120 120 120 79 4 11/12/2016 2:00 PM 118 122 125 122 79 5 11/13/2016 2:00 PM 125 135 128 125 79 6 11/14/2016 3:00 PM 135 130 133 130 7fl 7 11/15/2016 3:30 PM 133 134 135 135 Turned 7fl 8 11/16/2016 3:30 PM 135 135 135 135 7fl 9 11/17/2016 3:30 PM 135 135 135 138 7fl 10 11/18/2016 3:30 PM 138 138 135 138 7f1 11 11/19/2016 3:00 PM 140 138 135 138 79 12 11/20/2016 3:30 PM 140 140 140 140 7fl 13 11/21/2016 3:30 PM 140 140 140 140 7fl 14 11/22/2016 3:00 PM 142 140 142 142 79 15 11/23/2016 3:30 PM 140 142 140 142 Turned 79 16 11/24/2016 3:30 PM 136 135 136 140 7fl 17 11/25/2016 3:30 PM 138 136 138 140 ?fl 18 11/26/2016 3:30 PM 138 138 138 142 ?fl 19 11/27/2016 3:30 PM 140 140 140 144 ?fl 20 11/28/2016 3:30 PM 140 142 138 144 Turned 7fl 21 11/29/2016 3:30 PM 138 140 136 140 ?fl 22 11/30/2016 3:00 PM 138 140 138 140 7fl 23 12/1/2016 3:00 PM 140 142 140 144 ?fl 24 12/2/2016 3:00 PM 140 144 142 145 7fl 25 12/3/2016 3:00 PM 142 144 142 146 7fl 26 12/4/2016 3:00 PM 142 142 144 148 7fl 27 12/5/2016 3:00 PM 140 140 142 144 Turned 7fl 28 12/6/2016 3:30 PM 140 144 142 144 7fl 29 12/7/2016 3:30 PM 142 144 144 148 79 EASTERN COMPOST, LLC 84-87 Battleboro-Leggett Road P.O. Box 460 Battleboro, North Carolina 27809 DAILY OPERATION RECORD COMPOST ROW NO. Row Construction Date(s): Section #1: 1 - MIDDLE ROW - 11/25/2016--Linear Feet:------ 285 Section #2: ------ Linear Feet:------- Section #3: - Linear Feet: Cycle Day Date Time Section # Temp Temp Temp Temp Turned Service Provider 1 11/25/2016 1:00 PM 120 120 125 125 Built 79 2 11/26/2016 1:30 PM 125 126 130 130 Turned 79 3 11/27/2016 1:00 PM 128 128 134 132 7fJ 4 11/28/2016 1:30 PM 132 134 135 134 79 5 11/29/2016 8:30 AM 136 140 140 138 79 6 11/30/2016 8:30 AM 136 142 140 138 79 7 12/1/2016 8:30 AM 140 142 142 140 Turned 7fJ 8 12/2/2016 8:30 AM 140 132 140 138 79 9 12/3/2016 8:30 AM 140 144 142 140 7f/ 10 12/4/2016 8:30 AM 142 146 144 140 7fJ 11 12/5/2016 8:30 AM 144 148 146 142 Turned 7fJ 12 12/6/2016 8:30 AM 140 142 140 135 79 13 12/7/2016 8:30 AM 140 144 140 140 7fJ 14 12/8/2016 8:30 AM 140 146 142 142 7fJ 15 12/9/2016 8:30 AM 142 148 142 144 7fl 16 12/10/2016 8:30 AM 144 148 144 146 Turned 7fl 17 12/11/2016 8:30 AM 140 142 140 140 79 18 12/12/2016 8:30 AM 140 144 140 142 7fJ 19 12/13/2016 9:00 AM 140 142 144 140 7fl 20 12/14/2016 9:00 AM 142 140 146 135 7fl 21 12/15/2016 9:00 AM 144 140 144 140 Turned 7fJ 22 12/16/2016 10:00 AM 146 142 146 142 7fJ 23 12/17/2016 9:30 AM 138 140 140 138 7fJ 24 12/18/2016 8:30 AM 138 138 138 138 7fJ 25 12/19/2016 8:30 AM 140 140 140 140 7fJ 26 12/20/2016 8:30 AM 142 140 140 142 7fJ 27 12/21/2016 8:30 AM 142 142 140 144 79 28 12/22/2016 8:30 AM 144 142 144 144 7fJ 29 12/23/2016 8:30 AM 144 140 144 140 Turned 7fJ - EASTERN COMPOST, LLC 8487 Battleboro-Leggett Road P.O. Box 4-60 Battleboro, North Carolina 27809 DAILY OPERATION RECORD COMPOST ROW NO. Row Construction Date(s): 2 - MIDDLE ROW Section #1: - 11/25/2016 -Linear Feet:------ 290 Section #2: Section #3: -------Linear Feet: ------ Linear Feet: Cycle Day Date Time Section # Temp Temp Temp Temp Turned Service Provider 1 11/25/2016 8:00 AM 125 125 120 125 Built ?fl 2 11/26/2016 8:00 AM 130 132 125 128 ?fl 3 11/27/2016 8:30 AM 132 134 138 132 Turned ?fl 4 11/28/2016 8:30 AM 134 136 130 134 ?fl 5 11/29/2016 8:30 AM 138 140 138 138 79 6 11/30/2016 10:00 AM 138 140 140 135 ?fl 7 12/1/2016 10:00 AM 140 140 142 140 Turned ?fl 8 12/2/2016 9:30 AM 140 138 140 136 7fl 9 12/3/2016 10:30 AM 140 138 140 138 ?fl 10 12/4/2016 11:00 AM 142 142 144 140 ?fl 11 12/5/2016 11:00 AM 144 146 148 146 Turned ?fl 12 12/6/2016 11:00 AM 140 142 142 144 79 13 12/7/2016 11:00 AM 140 144 146 148 ?fl 14 12/8/2016 11:00 AM 142 146 148 150 79 15 12/9/2016 11:00 AM 147 144 150 152 ?fl 16 12/10/2016 11:30 AM 146 148 150 150 Turned 79 17 12/11/2016 11:00 AM 140 142 140 142 ?fl 18 12/12/2016 11:00 AM 140 140 142 142 79 19 12/13/2016 11:00 AM 140 142 142 144 7fl 20 12/14/2016 11:00 AM 142 140 144 146 79 21 12/15/2016 11:30 AM 144 142 146 148 79 22 12/16/2016 11:30 AM 144 142 148 148 Turned 79 23 12/17/2016 11:30 AM 138 138 140 142 79 24 12/18/2016 11:30 AM 140 140 140 140 ?fl 25 12/19/2016 11:30 AM 140 142 140 144 79 26 12/20/2016 11:30 AM 142 144 144 146 79 27 12/21/2016 11:30 AM 140 144 148 146 ?fl 28 12/22/2016 11:00 AM 140 144 150 148 79 29 12/23/2016 11:00 AM 144 144 150 150 Turned 79 - EASTERN COMPOST, LLC 84-87 Battleboro-Legge tt Road P.O. Box 460 Bat:t:leboro, North Carolina 27809 DAILY OPERATION RECORD COMPOST ROW NO. Row Construction Date(s): SHORT PINE TREE Section #1: - 11/25/2016 Linear Feet:------ 140 Section #2: Section #3: ------ -------Lilllear Feet: ------ Linear Feet: Cycle Day Date Time Section # Temp Temp Temp Temp Turned Service Provider 1 11/25/2016 11:30 AM 120 120 118 120 Built 7fl 2 11/26/2016 11:30 AM 125 126 120 125 Turned 7fl 3 11/27/2016 12:00 PM 128 126 124 125 ?fl 4 11/28/2016 12:00 PM 130 128 126 128 ?fl 5 11/29/2016 11:30 AM 134 136 134 136 79 6 11/30/2016 11:30 AM 138 138 138 138 79 7 12/1/2016 12:30 PM 138 144 140 140 Turned 79 8 12/2/2016 12:30 PM 135 140 136 138 79 9 12/3/2016 12:30 PM 140 140 140 140 7fl 10 12/4/2016 11:30 AM 142 142 144 144 79 11 12/5/2016 11:30 AM 144 140 148 146 Turned 79 12 12/6/2016 11:30 AM 140 138 144 142 7fl 13 12/7/2016 11:00 AM 140 142 148 144 79 14 12/8/2016 11:30 AM 142 144 150 144 7fl 15 12/9/2016 1:00 PM 142 144 150 146 7fl 16 12/10/2016 10:00 AM 144 146 152 148 Turned 79 17 12/11/2016 11:30 AM 140 140 144 142 7fl 18 12/12/2016 11:30 AM 140 140 144 142 7fl 19 12/13/2016 11:30 AM 140 142 144 144 ?fl 20 12/14/2016 11:30 AM 140 144 142 144 7fl 21 12/15/2016 11:30 AM 142 144 144 144 7fl 22 12/16/2016 1:00 PM 142 146 142 146 Turned 7f1 23 12/ 17/2016 1:00 PM 136 138 138 140 7f1 24 12/18/2016 1:00 PM 138 140 140 142 7f1 25 12/19/2016 1:00 PM 140 142 140 142 ?fl 26 12/20/2016 1:00 PM 140 140 140 140 7fl 27 12/21/2016 1:00 PM 140 140 138 142 Turned 79 28 12/22/2016 1:00 PM 142 140 140 144 7fl 29 12/23/2016 9:00 AM 144 140 140 144 79 EASTERN COMPOST, LLC 8487 Battleboro-Leggett Road P.O. Box 460 Battleboro, North Carolina 278,09 DAILY OPERATION RECORD COMPOST ROW NO. Row Construction Date(s): Section #1: - I - COTTON 12/2/2016--Linear Feet:------ 285 Section #2: Section #3: -------Linear Feet:------- Linear Feet: Cycle Day Date Time Section # Temp Temp Temp Temp Turned Service Provider 1 121212016 1:00 PM 125 130 130 128 Built 7J 2 12/3/2016 2:00 PM 130 132 134 132 Turned 7J 3 1214/2016 1:30 PM 134 138 136 136 7J 4 1215/2016 1:30 PM 136 138 138 138 'TJ 5 1216/2016 1:30 PM 140 142 142 140 7J 6 12/7/2016 1:30 PM 142 144 144 142 7J 7 12/8/2016 1:30 PM 142 146 142 140 7J 8 12/9/2016 1:30 PM 144 148 144 142 7J 9 12110/2016 1:30 PM 144 142 146 142 Turned 'TJ 10 12111/2016 2:00 PM 140 140 140 138 7J 11 1211212016 2:00 PM 140 140 136 138 7J r 12 12113/2016 2:00 PM 142 144 138 140 'TJ 13 12114/2016 2:00 PM 144 146 138 142 'TJ 14 12115/2016 2:00 PM 142 144 140 142 'TJ 15 12116/2016 2:00 PM 146 144 140 140 Turned 7J 16 12117/2016 2:00 PM 136 138 140 138 7J 17 12118/2016 2:00 PM 135 138 140 138 'lJ 18 12119/2016 2:00 PM 138 138 144 140 'lJ 19 12120/2016 2:00 PM 140 140 144 142 7J 20 12121/2016 2:00 PM 140 142 142 144 'lJ 21 1212212016 2:00 PM 142 144 146 146 Turned 'lJ 22 12/23/2016 2:00 PM 140 140 142 140 7J 23 12124/2016 1:30 PM 140 140 140 142 'lJ 24 12125/2016 1:30 PM 142 140 140 142 'lJ 25 12126/2016 2:00 PM 142 142 144 144 'TJ 26 12127/2016 2:00 PM 144 144 146 146 Turned 'TJ 27 12128/2016 2:00 PM 140 140 142 142 'TJ 28 12129/2016 2:00 PM 140 140 142 142 'TJ 29 12130/2016 2:00 PM 142 142 142 144 'TJ EASTERN COMPOST, LLC 84-87 Battleboro-Leggett Road P.O. Box 4-60 Battleboro, North Carolina 27809 DAILY OPERATION RECORD COMPOST ROW NO. Row Construction Date(s): 2 - COTTON Section #1: 12/2/2016--Linear Feet:------ 285 Section #2: Linear Feet:------- Section #3: Linear Feet: Cycle Day Date Time Section # Temp Temp Temp Temp Turned Service Provider 1 12/2/2016 7:45 AM 130 128 132 130 Built <{J 2 12/3/2016 7:45 AM 132 130 136 134 Turned <{J 3 12/4/2016 8:00 AM 134 132 136 136 '1J 4 12/5/2016 8:00 AM 136 138 130 140 '1J 5 12/6/2016 8:30 AM 140 140 136 140 '1J 6 12/7/2016 8:00 AM 140 140 138 146 <{J 7 12/8/2016 9:00 AM 142 140 140 148 '1J 8 12/9/2016 7:30 AM 144 142 142 146 '1J 9 12/10/2016 7:45 AM 144 142 140 148 Turned <{J 10 12/11/2016 7:45 AM 140 140 138 142 '1J 11 12/12/2016 8:00 AM 140 140 144 138 '1J 12 12/13/2016 8:00 AM 140 140 144 138 '1J 13 12/14/2016 8:00 AM 132 140 146 140 '1J 14 12/15/2016 8:00 AM 140 142 144 144 <J{ 15 12/16/2016 8:00 AM 142 144 146 146 Turned <J{ 16 12/17/2016 8:00 AM 138 140 138 140 <J{ 17 12/18/2016 8:00 AM 140 140 142 140 '1J 18 12/19/2016 8:00 AM 142 138 146 142 <{J 19 12/20/2016 8:00 AM 142 140 146 140 '1J 20 12/21/2016 8:00 AM 144 144 146 142 '1J 21 12/22/2016 8:00 AM 146 146 148 144 Turned <{J 22 12/23/2016 8:00 AM 142 140 142 140 '1J 23 12/24/2016 8:00 AM 142 140 142 144 '1J 24 12/25/2016 8:00 AM 144 140 142 144 <J{ 25 12/26/2016 8:00 AM 144 142 140 144 '1J 26 12/27/2016 8:00 AM 144 142 144 146 Turned '1J 27 12/28/2016 8:00 AM 140 140 142 142 '1J 28 12/29/2016 8:00 AM 140 142 142 142 '1J 29 12/30/2016 8:00 AM 140 140 144 144 '1J EASTERN COMPOST, LLC 84-87 Batdeboro-Leggett Road P.O. Box 4-60 Battleboro, North Carolina 27809 DAILY OPERATION RECORD COMPOST ROW NO. Row Construction Date(s): Section #1: - 1- TOB 12/20/2016 -Linear Feet:------ 295 Section #2: Linear Feet:------- Section #3: Linear Feet: Cycle Day Date Time Section # Temp Temp Temp Temp Turned Service Provider 1 12/20/2016 100 110 110 120 Built 7J 2 12/21/2016 110 115 115 115 Turned 7J 3 12/22/2016 115 120 115 120 'TJ 4 12/23/2016 120 125 120 125 7J 5 12/24/2016 135 130 125 125 7J 6 12/25/2016 138 135 128 135 7J 7 12/26/2016 140 138 136 135 'TJ 8 12/27/2016 140 140 142 142 Turned 'TJ 9 12/28/2016 145 138 138 136 'TJ 10 12/29/2016 140 140 140 136 7J 11 12/30/2016 142 140 140 140 'TJ 12 12/31/2016 140 142 140 140 'TJ 13 1/1/2017 142 142 144 142 7J 14 1/2/2017 144 142 144 142 Turned 7J 15 1/3/2017 142 140 140 140 7J 16 1/4/2017 144 140 142 140 7J 17 1/5/2017 144 142 142 142 7J 18 1/6/2017 140 140 138 138 Turned 7J 19 117/2017 140 140 140 140 'TJ 20 1/8/2017 142 140 132 152 'TJ 21 1/9/2017 140 142 140 140 7J 22 1/10/2017 142 144 144 140 7J 23 1/11/2017 144 142 144 140 Turned 7J 24 1/12/2017 140 136 138 138 'TJ 25 1/13/2017 138 136 135 140 7J 26 1/14/2017 138 132 140 142 7J 27 1/15/2017 140 136 142 144 7J 28 1/16/2017 140 140 142 140 'TJ 29 1/17/2017 140 140 140 142 Turned 7J EASTERN COMPOST, LLC - - 84-87 Battleboro-Leggett Road P.O.Box 460 Battleboro, North Carolina 27809 DAILY OPERATION RECORD COMPOST ROW NO. Row Construction Date(s): Section #1: - 2 - TOB 12/20/2016- Linear Feet:------ 295 Section #2: ------ Linear Feet:------- Section #3: Linear Feet: Cycle Day Date Time Section # Temp Temp Temp Temp Turned Service Provider 1 12/20/2016 12/21/2016 5:00 PM 90 95 95 100 Built 'IJ 2 5:00 PM 94 100 110 105 Turned 'IJ 3 12/22/2016 5:00 PM 100 100 110 110 'IJ 4 12/23/2016 5:00 PM · 120 115 115 120 'IJ 5 12/24/2016 5:00 PM 130 120 122 125 'TJ 6 12/25/2016 12/26/2016 5:00 PM 136 125 125 128 'IJ 7 5:00 PM 138 134 130 136 'IJ 8 12/27/2016 5:00 PM 140 142 140 142 Turned 'IJ 9 12/28/2016 5:00 PM 138 136 138 136 'IJ 10 12/29/2016 5:00 PM 138 138 140 140 'IJ 11 12/30/2016 5:00 PM 140 140 140 144 'IJ 12 12/31/2016 5:00 PM 140 142 140 144 'IJ 13 1/1/2017 6:00 PM 140 140 140 142 'IJ' 14 1/2/2017 7:00 AM 142 144 144 146 Turned 'TJ 15 1/3/2017 6:00 PM 142 142 144 146 'IJ 16 1/4/2017 5:00 PM 140 144 144 144 'IJ 17 1/5/2017 7:00 PM 144 142 144 144 'IJ 18 1/6/2017 7:00 PM 144 144 146 148 Turned 'IJ' 19 1/7/2017 7:00 PM 140 146 142 142 'IJ 20 1/8/2017 6:30 PM 146 146 142 140 'IJ 21 1/9/2017 5:00 PM 140 138 140 140 'IJ 22 1/10/2017 4:30 PM 140 130 138 140 'IJ 23 1/11/2017 4:30 PM 142 140 142 142 Turned 'IJ 24 1/12/2017 4:30 PM 140 132 138 138 'IJ 25 1/13/2017 4:30 PM 146 140 138 138 'IJ 26 1/14/2017 4:30 PM 140 140 130 138 'IJ 27 1/15/2017 5:00 PM 142 142 140 140 'IJ 28 1/16/2017 5:00 PM 142 142 140 140 'IJ 29 1/17/2017 5:00 PM 142 142 140 142 Turned 'IJ EASTERN COMPOST, LLC 84-87 Battleboro-Leggett Road P.0.Box 460 Batdeborn, North CaroHna 27809 DAILY OPERATION RECORD COMPOST ROW NO. Row Construction Date{s): Section #1: - TOE - SHOOT 12/20/2016 -Linear Feet:------ 150 Section #2: Section #3: -------Linear Feet:------- Linear Feet: Cycle Day Date Time Section # Temp Temp Temp Temp Turned Service Provider 1 12/20/2016 1:00 PM 110 110 115 120 Built 7.J' 2 12/21/2016 1:00 PM 115 115 120 120 Turned <JJ 3 12/22/2016 1:00 PM 120 130 125 122 <JJ 4 12/23/2016 1:00 PM 120 120 130 125 <JJ 5 12/24/2016 1:00 PM 125 125 134 134 Turned <JJ 6 12/25/2016 1:00 PM 125 134 138 140 <JJ 7 12/26/2016 11:30 AM 135 140 140 142 7.J' 8 12/27/2016 12:00 PM 135 142 142 144 Turned <JJ 9 12/28/2016 12:00 PM 136 140 138 140 <JJ 10 12/29/2016 11:30 AM 140 140 138 140 <JJ 11 12/30/2016 11:30 AM 140 144 138 144 <JJ 12 12/31/2016 11:00 AM 140 142 140 146 <JJ 13 1/1/2017 11:00 AM 138 144 140 144 <JJ 14 1/2/2017 10:30 AM 140 142 144 144 Turned <JJ 15 1/3/2017 12:00 PM 140 142 146 146 <JJ 16 1/4/2017 12:00 PM 140 144 144 144 7.J' 17 1/5/2017 12:00 PM 142 144 144 142 <JJ 18 1/6/2017 12:00 PM 142 144 146 144 Turned 7.J' 19 117/2017 12:00 PM 138 138 140 140 7.J' 20 1/8/20 17 12:00 PM 138 136 138 144 <JJ 21 1/9/2017 12:00 PM 140 140 140 144 <JJ 22 1/10/2017 12:00 PM 140 140 140 144 7.J' 23 1/11/2017 12:00 PM 140 142 142 135 Turned 7.J' 24 1/12/2017 12:00 PM 136 136 136 138 <JJ 25 1/13/2017 12:00 PM 138 136 138 140 <JJ 26 1/14/2017 12:00 PM 132 138 138 140 <JJ 27 1/15/2017 12:00 PM 140 138 140 142 <JJ 28 1/16/2017 12:00 PM 140 140 142 140 <JJ 29 1/17/2017 12:00 PM 140 140 142 138 Turned <JJ EASTERN COMPOST, LLC 84-87 Batdeboro-Leggett Road - P.O. Box 4-60 Battleboro, North Carolina 27809 DAILY OPERATION RECORD COMPOST ROW NO. Row Construction Date(s): Section #1: -- 1 - PINE 1/5/2017 --Linear Feet:---- 295 - -- Section #2: Section #3: -------Linear JFeet: ------ Linear Feet: Cycle Day Date Time Section # Temp Temp Temp Temp Turned Service Provider 1 1/5/2017 8:30 AM 100 100 105 105 Built '[J 2 1/6/2017 10:00 AM 105 105 110 110 Turned '[J 3 1/7/2017 9:00 AM 110 110 120 113 '[J 4 1/8/2017 9:00 AM 110 115 120 115 'lJ 5 1/9/2017 8:30 AM 115 120 120 120 'lJ 6 1/10/2017 9:00 AM 115 120 125 120 Turned 'lJ 7 1/11/2017 9:00 AM 115 120 125 120 'lJ 8 1/12/2017 8:30 AM 120 122 125 125 '[J 9 1/13/2017 8:30 AM 130 132 135 135 'lJ 10 1/14/2017 9:00 AM 136 136 138 135 '[J 11 1/15/2017 9:30 AM 138 138 140 140 '[J 12 1/16/2017 9:00 AM 142 140 142 144 '[J 13 1/17/2017 8:00 AM 144 142 144 146 Turned '[J 14 1/18/2017 8:30 AM 144 146 142 144 '[J 15 1/19/2017 8:00 AM 144 142 144 144 '[J 16 1/20/2017 8:30 AM 146 142 144 146 '[J 17 1/21/2017 8:00 AM 148 144 146 146 '[J 18 1/22/2017 9:30 AM 148 142 144 144 'lJ 19 1/23/2017 9:00 AM 148 144 144 144 Turned 'lJ 20 1/24/2017 11:00 AM 144 140 142 140 'lJ 21 1/25/2017 10:30 AM 142 140 142 142 'lJ 22 1/26/2017 1:00 PM 144 140 142 142 '[J 23 1/27/2017 2:00 PM 144 140 144 142 '[J 24 1/28/2017 1:30 AM 146 142 144 144 'lJ 25 1/29/2017 2:00 PM 146 140 144 142 Turned '[J 26 1/30/2017 2:30 AM 140 138 140 140 '[J 27 1/31/2017 8:30 AM 142 143 142 140 'lJ 28 2/1/2017 9:00 AM 140 142 142 142 '[J 29 2/2/2017 10:00 AM 142 142 146 140 '[J EASTERN COMPOST, LLC 84-87 Battleboro-Leggett Road P.0. Box 4-60 Battleboro, North Carolina 27809 DAILY OPERATION RECORD 2 - PINE COMPOST ROW NO. Row Construction Date(s): Section #1: -- 1/5/2017--Linear Feet:------ 300 Section #2: -------Linear Feet:------- Section #3: Linear Feet: Cycle Day Date Time Section # Temp Temp Temp Temp Turned Service Provider 1 1/5/2017 10:00 AM 110 110 115 118 Built '[J 2 1/6/2017 10:00 AM 115 120 125 115 Turned '[J 3 1/7/2017 10:00 AM 120 120 125 120 '[J 4 1/8/2017 10:00 AM 120 125 130 120 'lJ 5 1/9/2017 10:00 AM 125 125 135 130 'lJ 6 1/10/2017 10:00 AM 125 130 135 135 Turned 'lJ 7 1/11/2017 10:00 AM 120 125 130 135 'I:! 8 1/12/2017 10:00 AM 125 130 135 136 'IJ' 9 1/13/2017 9:00 AM 136 138 138 140 'IJ' 10 1/14/2017 9:30 AM 140 140 140 140 'lJ 11 1/15/2017 9:30 AM 142 144 138 140 'I:! 12 1/16/2017 10:00 AM 140 144 140 142 'IJ' 13 1/17/2017 10:30 AM 140 142 140 140 Turned 'IJ' 14 1/18/2017 10:00 AM 140 140 140 140 TJ 15 1/19/2017 10:45 AM 140 142 140 140 'I:! 16 1/20/2017 10:45 AM 142 144 142 140 'I:! 17 1/21/2017 10:45 AM 142 142 142 142 'lJ 18 1/22/2017 10:45 AM 144 144 144 142 'lJ 19 1/23/2017 10:45 AM 142 144 142 142 Turned 'lJ 20 1/24/2017 10:45 AM 138 140 138 140 'lJ 21 1/25/2017 10:45 AM 140 140 140 140 'lJ 22 1/26/2017 10:45 AM 142 142 144 140 TJ 23 1/27/2017 10:45 AM 140 144 146 140 'lJ 24 1/28/2017 10:45 AM 142 144 148 142 'lJ 25 1/29/2017 10:45 AM 142 146 146 142 Turned 'I:! 26 1/30/2017 10:45 AM 140 140 140 140 'lJ 27 1/31/2017 10:45 AM 140 142 140 140 'lJ 28 2/1/2017 10:45 AM 144 140 138 142 TJ 29 2/2/2017 10:45 AM 142 142 142 142 TJ EASTERN COMPOST, LLC 84-87 Battleboro-Leggett Road P.O. Box 460 Battleboro, North Carolina 27809 DAILY OPERATION RECORD 3 - PINE COMPOST ROW NO. Row Construction Date(s): - Section #1: -- 1/5/2017--Linear Feet:------ 295 Se,ction #2: Section #3: -------Linear Feet:------ Linear Feet: Cycle Day Date Time Section # Temp Temp Temp Temp Turned Service Provider 1 1/5/2017 8:45 AM 110 115 120 120 Built <JJ' 2 1/6/2017 8:45 AM 110 115 125 125 Turned V 3 1/7/2017 9:00 AM 120 120 125 130 <JJ' 4 1/8/2017 9:00 AM 120 125 136 136 <JJ' 5 1/9/2017 9:30 AM 125 125 130 136 <[J 6 1/10/2017 9:00 AM 134 125 135 136 V 7 1/11/2017 10:00 AM 131 138 138 140 <JJ' 8 1/12/2017 8:30 AM 136 136 131 138 Turned <JJ' 9 1/13/2017 8:45 AM 146 136 136 138 1'J 10 1/14/2017 8:45 AM 138 138 140 140 1'J 11 1/15/2017 9:00 AM 140 140 142 142 V 12 1/16/2017 8:00 AM 142 144 144 146 'IJ 13 1/17/2017 9:00 AM 140 142 140 140 Turned V 14 1/18/2017 8:30 AM 140 140 142 142 V 15 1/19/2017 8:00 AM 140 138 142 144 'IJ 16 1/20/2017 9:00 AM 140 138 142 146 V 17 1/21/2017 8:00 AM 140 140 144 146 V 18 1/22/2017 8:00 AM 142 142 144 148 V 19 1/23/2017 8:30 AM 144 142 146 146 Turned V 20 1/24/2017 8:00 AM 140 140 · 140 138 V 21 1/25/2017 8:30 AM 140 142 140 140 V 22 1/26/2017 9:00 AM 140 140 144 146 V 23 1/27/2017 8:00 AM 142 140 144 146 <J[ 24 1/28/2017 8:00 AM 146 142 146 148 Turned <[J 25 1/29/2017 8:00 AM 138 140 142 144 <J[ 26 1/30/2017 8:00 AM 140 143 142 146 1'J 27 1/31/2017 8:00 AM 140 144 144 146 <[J 28 2/1/2017 8:00 AM 142 144 142 148 <JJ' 29 2/2/2017 8:00 AM 140 142 140 141 TJ EASTERN COMPOST, LLC 84-87 Battleboro-Leggett Road P.O.Box 4-60 Battleboro, North Carolina 27809 DAILY OPERATION RECORD 4 - PINE COMPOST ROW NO. Row Construction Date(s): Section #1: -- 1/5/2017--Li.near Feet-:---- 295 Section #2: Section #3: -------Linear lFeet:------- Linear lFeet: Cycle Day Date Time Section # Temp Temp Temp Temp Turned Service Provider 1 1/5/2017 10:00 AM 110 110 115 115 Built '[J 2 1/6/2017 10:00 AM 115 115 120 120 Turned '[J 3 1/7/2017 10:30 AM 115 115 125 125 '[J 4 1/8/2017 11:00 AM 120 125 130 136 '[J 5 1/9/2017 10:00 AM 125 125 136 136 '[J 6 1/10/2017 11:00 AM 130 130 140 140 '[J 7 1/11/2017 11:30 AM 128 138 142 142 '[J 8 1/12/2017 1:00 PM 136 136 140 140 Turned '[J 9 1/13/2017 12:00 PM 136 136 140 140 '[J 10 1/14/2017 12:00 PM 140 140 142 144 '[J 11 1/15/2017 12:30 PM 142 140 140 144 '[J 12 1/16/2017 12:00 PM 142 140 142 140 '[J 13 1/17/2017 1:00 AM 140 142 114 144 '[J 14 1/18/2017 1:30 AM 138 140 140 140 Turned '[J 15 1/19/2017 1:30 AM 140 140 142 140 '[J 16 1/20/2017 12:00 PM 142 142 142 140 '[J 17 1/21/2017 12:30 PM 142 144 142 140 '[J 18 1/22/2017 1:00 AM 144 144 144 142 Turned '[J 19 1/23/2017 12:00 PM 140 140 140 140 '[J 20 1/24/2017 12:00 PM 142 142 140 140 '[J 21 1/25/2017 12:00 PM 144 142 142 142 '[J 22 1/26/2017 12:00 PM 144 140 144 140 '[J 23 1/27/2017 1:00 AM 142 140 144 140 '[J 24 1/28/2017 12:30 PM 144 142 146 142 '[J 25 1/29/2017 12:00 PM 140 146 146 144 Turned '[J 26 1/30/2017 12:00 PM 142 140 140 140 '[J 27 1/31/2017 12:00 PM 140 142 140 140 '[J 28 2/1/2017 12:00 PM 144 142 142 144 '[J 29 2/2/2017 12:00 PM 146 142 140 142 'J EASTERN COMPOST, LLC 84-87 Battleboro-Leggett Road P.O. Box 460 Batdeboro, North Carolina 27809 DAILY OPERATION RECORD 5 - PINE COMPOST ROW NO. Row Construction Date(s): Section #1: -- 1/22/2017--Linear Feet:------ 290 Section #2: Section #3: -------Linear Feet:------- Linear Feet: Cycle Day Date Time Section # Temp Temp Temp Temp Turned Service Provider 1 1/22/2017 9:00 AM 110 110 115 115 Built 'lJ 2 1/23/2017 9:30 AM 115 120 120 120 Turned 'TJ 3 1/24/2017 9:30 AM 115 125 125 130 'lJ 4 1/25/2017 10:00 AM 120 135 125 135 'lJ 5 1/26/2017 10:30 AM 130 138 125 140 'TJ 6 1/27/2017 10:45 AM 130 140 140 142 Turned 'lJ 7 1/28/2017 10:00 AM 136 140 140 140 'lJ 8 1/29/2017 10:15 AM 136 142 140 145 'lJ 9 1/30/2017 9:30 AM 140 142 142 144 'lJ 10 1/31/2017 9:00 AM 142 144 144 144 7J 11 2/1/2017 9:30 AM 140 140 142 146 'lJ 12 2/2/2017 8:30 AM 140 146 144 146 Turned 'TJ 13 2/3/2017 8:30 AM 142 144 140 140 'lJ 14 2/4/2017 9:00 AM 144 145 142 140 'lJ 15 2/5/2017 9:00 AM 144 144 144 142 'lJ 16 2/6/2017 9:00 AM 146 142 146 144 'TJ 17 2/7/2017 9:00 AM 146 142 146 144 Turned 7J 18 2/8/2017 9:00 AM 140 142 140 140 7J 19 2/9/2017 9:00 AM 140 140 142 140 'TJ 20 2/10/2017 9:00 AM 144 140 142 140 7J 21 2/11/2017 8:30 AM 142 138 144 142 'TJ 22 2/12/2017 8:30 AM 140 140 144 142 'TJ 23 2/13/2017 8:30 AM 142 142 142 140 Turned 7J 24 2/14/2017 8:30 AM 140 140 140 138 7J 25 2/15/2017 9:00 AM 142 145 145 140 7J 26 2/16/2017 9:00 AM 144 145 145 140 7J 27 2/17/2017 9:00 AM 145 145 148 142 'lJ 28 2/18/2017 9:00 AM 144 145 140 140 Turned 7J 29 2/19/2017 9:00 AM 140 140 142 140 7J EASTERN COMPOST, LLC 84-87 Batdeboro-Leggett Road P.O. Box 4-60 Battleboro, North Carolina 27809 DAILY OPERATION RECORD COMPOST ROW NO. Row Construction Date(s): Section #1: -- 6 - PINE 1/22/2017--Linear Feet:------ 290 Section #2: Section #3: -------Linear Feet:------- Linear Feet: Cycle Day Date Time Section # Temp Temp Temp Temp Turned Service Provider 1 1/22/2017 1:00 PM 115 115 120 120 Built 'IJ 2 1/23/2017 2:00 PM 120 120 120 125 Turned 'IJ 3 1/24/2017 2:00 PM 120 125 125 136 TJ 4 1/25/2017 1:30 PM 135 125 135 136 TJ 5 1/26/2017 1:30 PM 130 140 135 140 TJ 6 1/27/2017 2:00 PM 136 142 140 140 TJ 7 1/28/2017 1:30 PM 136 142 142 142 'IJ 8 1/29/2017 1:30 PM 138 144 142 142 Turned TJ 9 1/30/2017 3:00 PM 140 140 140 140 TJ 10 1/31/2017 3:00 PM 140 140 140 140 'IJ 11 2/1/2017 3:00 PM 142 142 140 144 TJ 12 2/2/2017 3:00 PM 142 140 144 144 TJ 13 2/3/2017 3:00 PM 142 140 142 146 TJ 14 2/4/2017 2:00 PM 144 144 140 146 'IJ 15 2/5/2017 2:00 PM 140 140 144 140 Turned TJ 16 2/6/2017 2:00 PM 142 140 146 140 'IJ . 17 2/7/2017 3:00 PM 140 140 146 142 'lJ 18 2/8/2017 2:00 PM 142 142 146 142 'IJ 19 2/9/2017 3:00 PM 142 144 144 146 'IJ 20 2/10/2017 3:00 PM 142 140 144 146 Turned 'IJ 21 2/11/2017 2:00 PM 140 132 140 142 'lJ 22 2/12/2017 2:00 PM 140 140 142 142 'lJ 23 2/13/2017 1:30 PM 140 142 142 140 Turned 'IJ 24 2/14/2017 2:00 PM 140 142 140 140 'lJ 25 2/15/2017 2:00 PM 140 145 144 144 'IJ 26 2/16/2017 3:00 PM 144 140 144 145 'lJ 27 2/17/2017 3:00 PM 144 140 140 140 'IJ 28 2/18/2017 3:00 PM 145 145 145 144 'IJ 29 2/19/2017 3:00 PM 145 145 140 140 Turned 'IJ EASTERN COMPOST, LLC 8487 Battleboro-Leggett Road P.O. Box 460 Battleboro, North Carolina 27809 DAILY OPERATION RECORD 7 - PINE COMPOST ROW NO. Row Construction Date(s): Section #1: - 1/22/2017--Linear Feet:------ 175 Section #2: Section #3: -------Linear Feet:------- Linear Feet: Cycle Day Date Time Section # Temp Temp Temp Temp Turned Service Provider 1 1/22/2017 8:45 AM 115 120 120 120 Built <(J 2 1/23/2017 8:45 AM 120 130 128 125 Turned <(J 3 1/24/2017 9:00 AM 125 136 125 135 <JJ' 4 1/25/2017 8:30 AM 130 140 135 140 <(J 5 1/26/2017 9:30 AM 136 142 140 142 <(J 6 1/27/2017 9:00 AM 136 140 140 144 <J'J 7 1/28/2017 10:00 AM 135 138 138 140 Turned <JJ.' 8 1/29/2017 8:30 AM 140 142 138 140 <JJ.' 9 1/30/2017 8:45 AM 142 142 140 138 <J'J 10 1/31/2017 8:45 AM 144 144 138 140 <(J 11 2/1/2017 9:00 AM 142 140 140 142 Turned <(J 12 2/2/2017 8:00 AM 140 140 140 140 <JJ.' 13 2/3/2017 9:00 AM 140 146 140 140 <(J 14 2/4/2017 8:30 AM 142 144 142 140 <(J 15 2/5/2017 8:00 AM 142 142 142 142 <(J 16 2/6/2017 11:00 AM 144 144 144 144 <(J 17 217/2017 12:00 AM 144 142 144 142 Turned <JJ' 18 2/8/2017 9:00 AM 145 142 140 142 <(J 19 2/9/2017 8:30 AM 140 140 142 142 <J'J 20 2/10/2017 8:00 AM 146 144 142 142 <J'J 21 2/11/2017 7:30 AM 146 144 142 144 Turned <J'J 22 2/12/2017 7:30 AM 142 140 140 144 <(J 23 2/13/2017 8:00 AM 140 144 144 146 <JJ.' 24 2/14/2017 7:45 AM 142 142 146 144 <JJ' 25 2/15/2017 7:30 AM 144 145 140 145 <(J 26 2/16/2017 8:00 AM 144 145 148 146 Turned <JJ' 27 2/17/2017 8:15 AM 140 142 140 140 <J'J 28 2/18/2017 8:30 AM 142 144 142 142 <(J 29 2/19/2017 8:00 AM 140 140 145 145 <(J EASTERN COMPOST, LLC 84-87 Battleboro-Leggett Road P.O. Box 460 Battleboro, North Carolina 27809 DAILY OPERATION RECORD 8 - PINE COMPOST ROW NO. Row Construction Date(s): Section #1:- 2/14/2017--Linear Feet: ---- 285 Section #2: Linear Feet: ------ Section #3: Linear Feet: Cycle Day Date Time Section # Temp Temp Temp Temp Turned Serv ice Provider 1 2/14/2017 5:00 PM 120 125 125 125 Built <IJ 2 2/15/2017 4:40 PM 125 125 130 130 Turned <TJ 3 2/16/2017 4:30 PM 135 138 138 140 <TJ 4 2/17/2017 4:30 PM 145 140 144 144 Turned <IJ 5 2/18/2017 4:30 PM 138 138 140 135 <IJ 6 2/19/2017 4:30 PM 142 140 138 138 <TJ 7 2/20/2017 4:30 PM 144 140 142 142 <IJ 8 2/21/2017 4:30 PM 144 145 140 140 Turned <IJ 9 2/22/2017 4:30 PM 140 140 138 140 <IJ 10 2/23/2017 4:30 PM 140 142 140 140 <IJ 11 2/24/2017 4:30 PM 144 140 140 140 <IJ 12 2/25/2017 4:30 PM 144 142 140 140 <TJ 13 2/26/2017 4:30 PM 144 140 144 142 <TJ 14 2/27/2017 4:30 PM 145 144 144 140 Turned <IJ 15 2/28/2017 4:30 PM 140 138 138 136 <IJ 16 3/1/2017 5:00 PM 146 138 140 138 <IJ 17 3/2/2017 4:30 PM 140 140 138 144 <TJ 18 3/3/2017 3:00 PM 142 140 140 144 <IJ 19 3/4/2017 3:00 PM 144 140 140 146 <TJ 20 3/5/2017 3:00 PM 144 142 142 144 <IJ 21 3/6/2017 3:30 PM 142 142 144 144 <IJ 22 3/7/2017 2:00 PM 140 142 142 142 Turned <IJ 23 3/8/2017 1:30 PM 138 128 140 140 <IJ 24 3/9/2017 2:00 PM 140 142 140 140 <IJ 25 3/10/2017 2:00 PM 142 140 144 144 <IJ 26 3/11/2017 3:00 PM 142 140 144 144 <IJ 27 3/12/2017 3:00 PM 142 146 142 144 <IJ 28 3/13/2017 3:00 PM 142 142 140 140 <IJ 29 3/14/2017 3:00 PM 140 146 148 142 Turned <IJ EASTERN COMPOST, LLC 8487 Battleboro-Leggett Road P.O. Box 460 Battleboro, North Carolina 27809 DAILY OPERATION RECORD COMPOST ROW NO. Row Construction Date(s): 9 - PINE Section #1: - 2/14-/2017--Linear Feet: ---- 290 Section #2: Section #3: -------Linear Feet:------ Linear Feet: Cycle Day Date Time Section # Temp Temp Temp Temp Turned Service Provider 1 2/14/2017 2:00 PM 130 130 130 128 Built TJ 2 2/15/2017 1:00 PM 140 140 138 138 Turned TJ 3 2/16/2017 1:30 PM 142 140 144 140 TJ 4 2/17/2017 2:00 PM 144 144 145 145 Turned 'IJ 5 2/18/2017 1:00 PM 140 140 138 140 'IJ 6 2/19/2017 1:00 PM 144 142 140 140 'IJ 7 2/20/2017 1:30 PM 144 145 142 144 TJ 8 2/21/2017 2:00 PM 148 140 142 142 Turned 'IJ 9 2/22/2017 2:00 PM 140 138 138 140 'IJ 10 2/23/2017 1:30 PM 140 140 140 142 TJ 11 2/24/2017 1:30 PM 140 132 140 138 TJ 12 2/25/2017 1:00 PM 142 140 144 138 TJ 13 2/26/2017 2:00 PM 142 138 146 140 TJ 14 2/27/2017 1:00 PM 144 142 144 142 Turned 'IJ 15 2/28/2017 1:00 PM 140 140 142 140 TJ 16 3/1/2017 2:00 PM 140 142 140 138 'IJ 17 3/2/2017 1:00 PM 142 144 140 146 'IJ 18 3/3/2017 1:00 PM 144 144 140 140 TJ 19 3/4/2017 1:30 PM 146 142 142 142 TJ 20 3/5/2017 2:00 PM 146 146 144 142 'IJ 21 3/6/2017 1:30 PM 144 144 142 144 'IJ 22 317/2017 1:30 PM 146 148 142 146 Turned 'lJ' 23 3/8/2017 1:30 PM 144 142 140 140 'IJ 24 3/9/2017 1:30 PM 144 140 142 142 'IJ 25 3/10/2017 2:00 PM 144 142 146 144 'IJ 26 3/11/2017 2:00 PM 142 140 144 146 'IJ 27 3/12/2017 2:00 PM 140 142 144 146 'IJ 28 3/13/2017 2:00 PM 144 140 144 148 'IJ 29 3/14/2017 2:00 PM 142 148 146 146 Turned 'lJ' EASTERN COMPOST, LLC 84-87 Battleboro-Leggett Road P.O. Box 460 Battleboro, North Carolina 27809 DAILY OPERATION RECORD 10 - PINE COMPOST ROW NO. Row Construction Date(s): Section #1: -- 2/20/2017- Li.near Feet:----- 200 Section #2: Section #3: - -------Li.near Feet: Li.near Feet: ----- Cycle Day Date Time Section # Temp Temp Temp Temp Turned Service Provider 1 2/20/2017 2:30 PM 120 115 120 120 Built TJ 2 2/21/2017 2:30 PM 120 120 125 125 Turned TJ 3 2/22/2017 2:30 PM 125 126 130 130 TJ 4 2/23/2017 2:30 PM 130 125 135 136 TJ 5 2/24/2017 2:30 PM 138 134 138 138 TJ 6 2/25/2017 2:30 PM 140 140 142 144 TJ 7 2/26/2017 2:30 PM 140 144 144 146 Turned TJ 8 2/27/2017 1:00 PM 138 140 144 140 CJJ.' 9 2/28/2017 1:30 PM 140 142 140 138 TJ 10 3/1/2017 1:30 PM 142 144 142 140 TJ 11 3/2/2017 1:30 PM 140 144 140 142 CJJ.' 12 3/3/2017 1:30 PM 142 140 138 142 CJJ.' 13 3/4/2017 1:00 PM 142 142 144 144 Turned TJ 14 3/5/2017 1:00 PM 140 140 142 142 CJJ.' 15 3/6/2017 1:00 PM 144 146 146 142 CJJ.' 16 3/7/2017 1:00 PM 146 146 144 144 TJ 17 3/8/2017 1:00 PM 144 144 146 146 TJ 18 3/9/2017 3:00 PM 142 142 146 146 TJ 19 3/10/2017 3:00 PM 144 140 144 144 CJJ.' 20 3/11/2017 3:00 PM 142 142 140 140 Turned TJ 21 3/12/2017 3:30 PM 140 142 144 140 TJ 22 3/13/2017 2:00 PM 144 142 142 144 TJ 23 3/14/2017 1:30 PM 140 144 140 146 CJJ.' 24 3/15/2017 2:00 PM 142 140 142 142 Turned TJ 25 3/16/2017 2:00 PM 136 140 138 140 TJ 26 3/17/2017 2:30 PM 138 138 140 138 TJ 27 3/18/2017 2:30 PM 144 146 140 140 CJJ.' 28 3/19/2017 2:30 PM 144 142 142 144 CJJ.' 29 3/20/2017 2:30 PM 146 142 142 142 Turned TJ EASTERN COMPOST, LLC 84-87 Battleboro-Leggett Road P.O. Box 4-60 Battleboro, North Carolina 27809 DAILY OPERATION RECORD 11 - PINE COMPOST ROW NO. Row Construction Date(s): Section #1: - 2/20/2017--Linear Feet:----- 225 Section #2: ------ Linear Feet::------ Section #3: - Linear Feet: Cycle Day Date Time Section # Temp Temp Temp Temp Turned Service Provider 1 2/20/2017 8:30 AM 120 130 136 120 Built <[J' 2 2/21/2017 9:00 AM 125 130 136 125 Turned <[J' 3 2/22/2017 9:00 AM 128 130 138 130 <[J' 4 2/23/2017 9:30 AM 136 138 140 134 V 5 2/24/2017 9:00 AM 140 142 142 140 V 6 2/25/2017 1:00 AM 140 140 138 138 V 7 2/26/2017 10:00 AM 140 142 140 142 Turned V 8 2/27/2017 10:00 AM 132 140 138 140 V 9 2/28/2017 10:30 AM 138 148 142 140 V 10 3/1/2017 11:00 AM 140 140 146 148 V 11 3/2/2017 10:30 AM 144 144 146 146 Turned V 12 3/3/2017 9:30 AM 140 140 142 144 TJ 13 3/4/2017 9:30 AM 140 140 142 144 V 14 3/5/2017 9:30 AM 142 142 140 146 TJ 15 3/6/2017 9:30 AM 140 144 140 146 <[J' 16 3/7/2017 9:30 AM 140 142 146 144 V 17 3/8/2017 8:30 AM 138 140 142 140 Turned V 18 3/9/2017 10:00 AM 132 140 142 142 V 19 3/10/2017 10:00 AM 140 140 144 142 V 20 3/11/2017 10:00 AM 142 140 140 142 V 21 3/12/2017 10:00 AM 142 140 140 144 V 22 3/13/2017 10:00 AM 144 144 144 142 Turned <[J' 23 3/14/2017 10:00 AM 140 144 140 142 V 24 3/15/2017 10:00 AM 146 144 140 142 V 25 3/16/2017 10:00 AM 144 146 142 140 TJ 26 3/17/2017 10:00 AM 142 140 142 144 V 27 3/18/2017 10:00 AM 146 140 140 144 V 28 3/19/2017 10:00 AM 144 142 142 144 TJ 29 3/20/2017 10:00 AM 144 140 144 144 Turned V EASTERN COMPOST, LLC 84-87 Batdeboro-Leggett Road P.O. Box 460 Battleboro, North Carolina 27809 DAILY OPERATION RECORD 12 - PINE COMPOST ROW NO. Row Construction Date(s): Section #1: - 2/28/2017 --Linear Feet:------ 275 Section #2: Section #3: -------Linear Feet:------ Linear Feet: Cycle Day Date Time Section # Temp Temp Temp Temp Turned Service Provider 1 2/28/2017 9:00 AM 120 115 115 125 Built 7fl 2 3/1/2017 8:00 AM 125 120 120 130 7fl 3 3/2/2017 8:30 AM 130 136 132 134 Turned 7fl 4 3/3/2017 8:30 AM 135 126 138 140 7fl 5 3/4/2017 9:00 AM 135 135 140 142 7fl 6 3/5/2017 9:15 AM 140 140 142 140 Turned 7fl 7 3/6/2017 9:30 AM 136 136 138 138 7fl 8 3/7/2017 8:30 AM 138 138 140 146 7fl 9 3/8/2017 8:00 AM 140 138 140 142 7fl 10 3/9/2017 9:00 AM 140 140 144 144 7fl 11 3/10/2017 8:30 AM 142 142 142 140 7f) 12 3/11/2017 8:30 AM 144 146 146 144 Turned 7fl 13 3/12/2017 8:30 AM 140 142 142 140 7fl 14 3/13/2017 8:30 AM 140 140 136 138 7fl 15 3/14/2017 8:00 AM 140 140 138 138 7fl 16 3/15/2017 8:00 AM 142 138 140 140 7fl 17 3/16/2017 8:30 AM 144 142 140 142 7fl 18 3/17/2017 9:00 AM 144 144 140 140 Turned 7f) 19 3/18/2017 8:00 AM 140 142 132 138 7fl 20 3/19/2017 8:00 AM 142 144 138 138 7fl 21 3/20/2017 9:00 AM 144 146 140 140 7fl 22 3/21/2017 8:00 AM 142 144 140 138 7fl 23 3/22/2017 8:00 AM 144 142 140 140 Turned 7fl 24 3/23/2017 8:30 AM 140 138 138 135 7fl 25 3/24/2017 8:30 AM 148 142 142 140 7fl 26 3/25/2017 8:30 AM 148 146 144 146 7fl 27 3/26/2017 8:00 AM 150 146 146 148 79 28 3/27/2017 8:30 AM 152 148 146 148 79 29 3/28/2017 8:00 AM 154 148 146 146 Turned 7fl EASTERN COMPOST, LLC 84-87 Batdeboro-Leggett Road P.O. Box 4-60 Battleboro, North Carolina 27809 DAILY OPERATION RECORD 13 - PINE COMPOST ROW NO. -- Row Construction Date{s): Section #1: -- 2/28/2017 Linear Feet: ------ 280 Se-ction #2: ------ Linear Feet:------- Section #3: - Linear Feet: Cycle Day Date Time Section # Temp Temp Temp Temp Turned Service Provider 1 2/28/2017 7:00 AM 115 120 125 120 Built 7fl 2 3/1/2017 8:00 AM 120 125 125 125 7fl 3 3/2/2017 7:00 AM 130 130 136 130 Turned 7fl 4 3/3/2017 12:00 PM 120 132 136 136 7fl 5 3/4/2017 1:00 PM 136 136 140 140 7fl 6 3/5/2017 3:00 PM 140 140 140 142 79 7 3/6/2017 8:00 AM 142 140 142 140 Turned 7fl 8 3/7/2017 7:00 AM 136 136 138 138 7fl 9 3/8/2017 5:00 PM 138 138 140 138 7fl 10 3/9/2017 4:00 AM 138 140 140 140 7fl 11 3/10/2017 4:00 AM 142 140 144 142 7fJ 12 3/11/2017 7:00 AM 142 140 146 144 7fl 13 3/12/2017 8:00 AM 144 144 146 142 7fl 14 3/13/2017 9:00 AM 146 142 148 142 Turned 7fl 15 3/14/2017 12:00 PM 138 140 144 140 7fl 16 3/15/2017 12:00 PM 140 140 144 140 79 17 3/16/2017 7:00 AM 140 140 144 146 7fl 18 3/17/2017 8:00 AM 140 144 146 144 Turned 7fl 19 3/18/2017 4:00 AM 138 140 140 142 7fl 20 3/19/2017 4:00 AM 140 140 142 140 7fl 21 3/20/2017 8:00 AM 142 140 144 142 79 22 3/21/2017 7:00 AM 140 142 144 144 7fl 23 3/22/2017 8:00 AM 142 144 146 146 Turned 79 24 3/23/2017 8:00 AM 140 142 142 144 79 25 3/24/2017 7:00 AM 148 144 146 146 7fl 26 3/25/2017 9:00 AM 142 146 142 150 7fl 27 3/26/2017 10:00 AM 144 146 144 152 79 28 3/27/2017 11:00 AM 144 150 144 154 7fl 29 3/28/2017 12:00 PM 144 150 144 157 Turned 79 EASTERN COMPOST, LLC 84-87 Battleboro-Legge tt Road P.O. Box 4-60 Battleboro, North Carolina 27809 DAILY OPERATION RECORD COMPOST ROW NO. Row Construction Date(s): Section #1: - 14- - PINE 3/17/2017--Linear Feet:---- 295 - -- Section #2: Section #3: -------Linear Feet:------- Linear Feet: 1 3/17/2017 2 3/18/2017 3 3/19/2017 4 3/20/2017 5 3/21/2017 6 3/22/2017 7 3/23/2017 8 3/24/2017 9 3/25/2017 10 3/26/2017 11 3/27/2017 12 3/28/2017 13 3/29/2017 14 3/30/2017 15 3/31/2017 16 4/1/2017 17 4/2/2017 18 4/3/2017 19 4/4/2017 20 4/5/2017 21 4/6/2017 22 4/7/2017 23 4/8/2017 24 4/9/2017 25 4/10/2017 26 4/11/2017 27 4/12/2017 28 4/13/2017 29 4/14/2017 Turned Service Provider Cycle Date Time Section Temp Temp Temp Temp Day # 10:00 AM 95 100 110 110 Built 79 10:00 AM 100 110 110 110 Turned 79 10:00 AM 105 115 120 115 79 10:00 AM 115 125 125 125 Turned 79 10:00 AM 125 130 130 130 79 10:00 AM 125 130 125 125 79 10:00 AM 130 136 138 135 79 11:00 AM 136 138 138 140 79 12:00 PM 140 142 142 142 79 12:00 AM 140 140 138 140 Turned 79 11:00 AM 142 142 140 142 79 10:00 AM 144 144 140 144 79 10:00 AM 146 146 142 146 79 10:00 AM 140 142 140 144 Turned 79 10:00 AM 140 140 140 144 79 10:00 AM 142 142 140 144 79 10:00 AM 144 144 140 144 79 10:00 AM 144 146 142 146 79 11:00 AM 142 146 144 148 79 11:00 AM 146 144 142 148 Turned 79 11:00 AM 142 140 140 144 79 11:00 AM 142 144 140 149 79 11:00 AM 144 146 142 146 79 11:00 AM 144 146 144 148 79 9:30 AM 146 142 142 144 Turned 79 9:30 AM 142 144 142 144 79 9:30 AM 142 146 142 146 79 9:30 AM 144 146 144 146 Turned 79 9:30 AM 144 144 144 144 79 EASTERN COMPOST, LLC 84-87 Battleboro-Legge tt Road P.O. Box 4-60 Battleboro, North Carolina 27809 DAILY OPERATION RECORD EASTERN COMPOST, LLC 84-87 Battleboro-Leggett Road P.O. Box 460 Battleboro, North Carolina 27809 DAILY OPERATION RECORD COMPOST ROW NO. Row Construction Date(s): 15 - PINE -- 295 Section #1: - 3/17/2017--Linear Feet: ----- Section #2: Linear Feet: ------ Section #3: Linear Feet: Cycle Day Date Time Section # Temp Temp Temp Temp Turned Service Provider 1 3/17/2017 8:00 AM 100 110 110 115 Built 79 2 3/18/2017 8:00 AM 110 120 115 115 7fl 3 3/19/2017 9:00 AM 115 120 120 125 Turned 7fl 4 3/20/2017 8:00 AM 120 130 125 130 79 5 3/21/2017 12:00 PM 125 135 130 135 Turned 79 6 3/22/2017 8:00 AM 125 130 130 130 79 7 3/23/2017 5:00 PM 130 136 138 140 79 8 3/24/2017 5:30 PM 136 140 140 140 79 9 3/25/2017 7:00 AM 138 140 140 142 Turned 79 10 3/26/2017 8:00 AM 140 138 135 138 79 11 3/27/2017 9:00 AM 140 132 140 140 79 12 3/28/2017 8:00 AM 140 140 144 142 79 13 3/29/2017 7:00 AM 142 140 146 146 Turned 79 14 3/30/2017 8:00 AM 138 132 140 144 79 15 3/31/2017 12:00 PM 140 140 142 142 79 16 4/1/2017 8:00 AM 142 140 142 144 Turned ?fl 17 4/2/2017 5:00 PM 144 142 140 144 ?fl 18 4/3/2017 8:00 AM 144 144 144 146 79 19 4/4/2017 7:00 AM 146 140 140 144 Turned 79 20 4/5/2017 12:00 PM 146 142 144 146 79 21 4/6/2017 8:00 AM 142 140 142 144 79 22 417/2017 8:00 AM 140 140 142 142 79 23 4/8/2017 12:00 PM 142 140 140 145 ?fl 24 4/9/2017 7:00 AM 144 144 142 144 Turned ?fl 25 4/10/2017 7:00 AM 140 140 142 140 ?fl 26 4/11/2017 8:00 AM 140 140 142 140 79 27 4/12/2017 5:00 PM 142 144 144 142 ?fl 28 4/13/2017 7:00 AM 140 146 144 142 Turned 7fl 29 4/14/2017 8:00 AM 144 144 144 142 ?fl EASTERN COMPOST, LLC 84-87 Battleboro-Leggett Road P.O.Box 460 Batdeboro, North Carolina 27809 DAILY OPERATION RECORD COMPOST ROW NO. Row Construction Date(s): Section #l; - 16 - PINE 3/27/2017--Linear Feet:: --- 300 -- -- Section #2: ------ Linear Feet: ----- Section #3: - -- Linear Feet: Cycle Day Date Time Section # Temp Temp Temp Temp Turned Service Provider 1 3/27/2017 8:00 AM 110 115 115 120 Built 7fJ 2 3/28/2017 8:00 AM 110 115 155 120 Turned 7fJ 3 3/29/2017 8:00 AM 115 115 120 125 7fJ 4 3/30/2017 8:00 AM 125 125 125 125 7fJ 5 3/31/2017 8:00 AM 135 135 138 138 7fJ 6 4/1/2017 8:00 AM 140 142 144 144 79 7 4/2/2017 8:00 AM 142 144 146 146 Turned 7fJ 8 4/3/2017 8:00 AM 140 140 142 142 7fJ 9 4/4/2017 8:00 AM 142 144 140 142 7fJ 10 4/5/2017 8:00 AM 142 144 142 144 7fJ 11 4/6/2017 8:00 AM 140 142 144 146 79 12 4/7/2017 8:00 AM 142 144 144 146 7fJ 13 4/8/2017 8:00 AM 142 144 146 146 Turned 7fJ 14 4/9/2017 8:00 AM 140 140 144 142 7fJ 15 4/10/2017 8:00 AM 142 140 142 140 79 16 4/11/2017 8:00 AM 142 142 144 140 79 17 4/12/2017 8:00 AM 144 140 142 142 79 18 4/13/2017 8:00 AM 142 142 146 144 7fJ 19 4/14/2017 8:00 AM 144 146 144 144 79 20 4/15/2017 8:00 AM 144 140 142 142 Turned 79 21 4/16/2017 8:00 AM 144 142 140 140 79 22 4/17/2017 8:00 AM 142 142 142 140 79 23 4/18/2017 8:00 AM 146 142 146 146 79 24 4/19/2017 8:00 AM 144 144 148 146 Turned 79 25 4/20/2017 8:00 AM 140 140 140 142 7fJ 26 4/21/2017 8:00 AM 140 140 144 144 79 27 4/22/2017 8:00 AM 142 142 142 144 79 28 4/23/2017 8:00 AM 142 140 144 146 7fJ 29 4/24/2017 8:00 AM 140 142 146 144 Turned 79 EASTERN COMPOST, LLC 8487 Battleboro-Leggett Road P.O.Box 460 Bauleboro, North Carolina 27809 DAILY OPERATION RECORD COMPOST ROW NO. Row Construction Date(s): Section #1: 17 - PINE - 3/27/2017 - Linear Feet: ---- 290 ---- - -- Section #2: ------ Linear Feet:------ Section #3: - Linear Feet: Cycle Day Date Time Section # Temp Temp Temp Temp Turned Service Provider 1 3/27/20 17 8:30 AM 115 120 120 115 Built 79 2 3/28/2017 9:30 AM 120 125 125 120 Turned 79 3 3/29/2017 10:30 AM 125 130 130 130 79 4 3/30/2017 9:00 AM 130 136 138 138 79 5 3/31/2017 9:00 AM 136 138 140 142 79 6 4/1/2017 9:00 AM 140 140 140 142 79 7 4/2/20 17 10:00 AM 142 142 144 146 79 8 4/3/20 17 10:00 AM 140 142 142 142 79 9 4/4/2017 10:30 AM 142 142 144 142 79 10 4/5/2017 11:00 AM 142 144 144 144 79 11 4/6/2017 9:00 AM 142 144 142 144 Turned 79 12 4/7/2017 9:00 AM 146 146 144 146 79 13 4/8/2017 9:00 AM 146 148 144 18 79 14 4/9/2017 9:00 AM 142 144 142 142 Turned 79 15 4/10/2017 9:00 AM 140 140 140 140 79 16 4/11/2017 9:00 AM 140 140 140 142 79 17 4/12/2017 9:30 AM 142 140 144 144 79 18 4/13/2017 9:00 AM 142 142 144 144 79 19 4/14/2017 9:30 AM 142 146 144 146 79 20 4/15/2017 10:00 AM 140 140 140 142 Turned 79 21 4/16/2017 9:30 AM 140 142 140 144 79 22 4/17/2017 9:30 AM 142 142 146 146 79 23 4/18/2017 9:30 AM 142 144 142 146 79 24 4/19/2017 9:30 AM 144 144 142 148 79 25 4/20/2017 9:30 AM 142 146 144 148 79 26 4/21/20 17 9:30 AM 140 140 142 142 Turned ?fl 27 4/22/2017 9:30 AM 144 142 144 144 79 28 4/23/2017 9:30 AM 146 141 142 144 79 29 4/24/2017 9:30 AM 142 146 144 146 79 EASTERN COMPOST, LLC 8487 Battleboro-Leggett Road P.O. Box 460 Battleboro, North Carolina 27809 DAILY OPERATION RECORD COMPOST ROW NO. Row Construction Date(s): Section #1:- 18 - PINE 3/30/2017----Linear Feet:------ 175 Section #2: Section #3: --------Linear Feet:-------- Linear Feet: Cycle Day Date Time Section # Temp Temp Temp Temp Turned Service Provider 1 3/30/2017 9:00 AM 125 130 128 130 Built <IJ 2 3/31/2017 9:30 AM 135 136 136 138 <IJ 3 4/1/2017 9:30 AM 138 140 140 138 Turned <IJ 4 4/2/2017 10:00 AM 140 140 140 142 <IJ 5 4/3/2017 10:30 AM 142 140 140 140 <IJ 6 4/4/2017 10:45 AM 142 144 142 140 <IJ 7 4/5/2017 10:00 AM 144 144 142 144 Turned <IJ 8 4/6/20 17 10:15 AM 140 140 140 142 <IJ 9 10 417/2017 9:30 AM 144 140 140 144 <IJ 4/8/2017 9:00 AM 146 140 142 146 Turned <IJ 11 4/9/2017 9:30 AM 140 140 140 140 <IJ 12 4/10/2017 8:30 AM 142 145 146 142 <IJ 13 4/11/2017 8:30 AM 144 142 142 142 <IJ 14 4/12/2017 9:00 AM 144 144 142 142 <IJ 15 4/13/2017 9:00 AM 146 144 144 146 <IJ 16 4/14/2017 9:00 AM 144 142 144 144 Turned <IJ 17 4/15/2017 9:00 AM 142 142 145 142 <IJ 18 4/16/2017 9:00 AM 142 142 142 142 <IJ 19 4/17/2017 9:00 AM 140 144 144 140 <IJ 20 4/18/2017 9:00 AM 144 146 144 140 <IJ 21 4/19/2017 8:30 AM 142 146 144 144 Turned <IJ 22 4/20/2017 8:30 AM 140 142 142 140 <IJ 23 4/21/2017 8:30 AM 142 144 140 140 <IJ 24 4/22/2017 8:30 AM 144 144 144 142 <IJ 25 4/23/2017 9:00 AM 142 140 140 140 <IJ 26 4/24/2017 9:00 AM 140 140 142 140 <IJ 27 4/25/2017 9:00 AM 140 144 140 142 <IJ 28 4/26/2017 9:00 AM 142 146 140 142 <IJ 29 4/27/2017 9:00 AM 142 144 144 140 Turned <IJ EASTERN COMPOST, LLC 8487 Battleboro-Leggett Road P.O. Box 4-60 Battleboro, North Carolina 27809 DAILY OPERATION RECORD COMPOST ROW NO. Row Construction Date(s): Section #1: 1- GREEN - 3/20/2017--Linear Fee-t: --295 Section #2: Section #3: ------- Li.near Feet: Li.near Feet: ----- Cycle Day Date Time Section # Temp Temp Temp Temp Turned Service Provider 1 3/20/2017 8:00 AM 90 100 105 100 Built 'IJ' 2 3/21/2017 8:30 AM 95 110 110 110 Turned 'I'J 3 3/22/2017 9:00 AM 100 115 115 120 'I'J 4 3/23/2017 9:00 AM 100 115 115 115 'I'J 5 3/24/2017 8:30 AM 120 125 128 120 Turned 'I'J 6 3/25/2017 8:30 AM 125 130 138 125 'I'J 7 3/26/2017 10:00 AM 135 138 138 125 'I'J 8 3/27/2017 10:00 AM 138 135 140 130 Turned 'I'J 9 3/28/2017 10:30 AM 140 140 142 130 'I'J 10 3/29/2017 11:00 AM 142 140 140 140 'I'J 11 3/30/2017 11:00 AM 140 140 136 140 Turned 'IJ' 12 3/31/2017 11:00 AM 142 138 136 156 'IJ' 13 4/1/2017 11:00 AM 140 138 140 138 'I'J 14 4/2/2017 11:00 AM 144 140 140 170 Turned 'I'J 15 4/3/2017 11:00 AM 142 142 142 142 'I'J 16 4/4/2017 11:00 AM 144 146 140 142 'I'J 17 4/5/2017 11:00 AM 144 146 144 144 Turned 'I'J 18 4/6/2017 10:30 AM 140 142 140 138 'I'J 19 4/7/2017 10:30 AM 138 142 142 142 'I'J 20 4/8/2017 10:30 AM 144 144 144 142 'I'J 21 4/9/20 17 10:30 AM 144 142 144 142 'IJ' 22 4/10/20 17 11:00 AM 146 142 142 144 Turned 'IJ' 23 4/11/2017 11:00 AM 142 140 142 140 'I'J 24 4/12/2017 11:00 AM 142 142 144 140 'I'J 25 4/13/2017 11:00 AM 144 142 142 142 'IJ' 26 4/14/2017 11:00 AM 144 144 144 142 'I'J 27 4/15/2017 11:00 AM 146 144 142 140 'I'J 28 4/16/2017 11:00 AM 140 146 144 142 Turned 'IJ' 29 4/17/2017 11:00 AM 140 142 140 140 'IJ' EASTERN COMPOST, LLC 8487 Battleborn-Leggett Road P.O. Box 460 Battleboro, North Carolina 27809 DAILY OPERATION RECORD COMPOST ROW NO. Row Construction Date(s): 2 - GREEN Section #1: -- 3/20/2017 -Linear Feet: ---- 285 Section #2: Section #3: ------- Linear Feet: Unear Feet: ------ Cycle Day Date Time Section # Temp Temp Temp Temp Turned Service Provider 1 3/20/2017 1:00 PM 110 100 110 115 Built '1J 2 3/21/2017 1:00 PM 115 115 110 120 '1J 3 3/22/2017 12:30 PM 120 120 120 125 Turned '1J 4 3/23/2017 12:30 PM 115 115 115 120 '1J 5 3/24/2017 1:00 PM 125 125 130 125 '1J 6 3/25/2017 2:00 PM 125 130 120 125 '1J 7 3/26/2017 1:30 PM 135 135 125 135 Turned 'IJ' 8 3/27/2017 1:30 PM 140 135 130 140 'IJ' 9 3/28/2017 1:00 PM 142 140 140 142 '1J 10 3/29/2017 1:00 PM 144 140 140 144 '1J 11 3/30/2017 1:00 PM 140 142 144 144 '1J 12 3/31/2017 1:00 PM 146 144 146 148 Turned '1J 13 4/1/2017 1:00 PM 140 142 144 142 'IJ' 14 4/2/2017 12:00 PM 142 142 144 140 'IJ' 15 4/3/20 17 1:00 PM 140 142 144 142 'IJ' 16 4/4/20 17 12:30 PM 144 142 144 142 'IJ' 17 4/5/2017 1:00 PM 146 142 144 142 '1J 18 4/6/2017 1:00 PM 144 140 144 146 Turned '1J 19 4/7/2017 12:30 PM 142 140 140 142 '1J 20 4/8/2017 1:00 PM 146 142 142 144 'IJ' 21 4/9/2017 1:00 PM 146 140 146 144 '1J 22 4/10/2017 1:30 PM 148 142 140 142 '1J 23 4/11/2017 1:30 PM 144 144 142 142 'IJ' 24 4/12/2017 2:00 PM 146 144 142 146 '1J 25 4/13/2017 12:30 PM 144 148 144 142 Turned 'IJ' 26 4/14/2017 12:30 PM 142 140 140 142 'IJ' 27 4/15/2017 12:30 PM 144 140 146 144 '1J 28 4/16/2017 12:30 PM 142 140 146 144 '1J 29 4/17/2017 12:30 PM 140 144 141 144 Turned '1J EASTERN COMPOST, LLC 84-87 Battleboro.Leggett Road P.O.Box 460 Battleboro, North Carolina 27809 DAILY OPERATION RECORD COMPOST ROW NO. Row Construction Date(s): Section #1: 3 - GREEN 4/26/2017----Linear Feet:------ 285 Section #2: Section #3: --------Linear Feet:------- Linear Feet: Cycle Day Date Time Section # Temp Temp Temp Temp Turned Service Provider 1 4/26/2017 10:00 AM 120 120 125 120 Built 'IJ 2 4/27/2017 10:00 AM 125 125 135 130 Turned <JJ' 3 4/28/2017 10:00 AM 135 135 135 135 'IJ 4 4/29/2017 10:00 AM 138 140 140 142 'IJ 5 4/30/2017 10:00 AM 138 140 140 140 Turned 'IJ 6 5/1/2017 10:00 AM 140 142 142 142 'IJ 7 5/2/2017 10:00 AM 144 145 146 144 'IJ 8 5/3/2017 10:00 AM 144 144 144 146 'IJ' 9 5/4/2017 9:00 AM 145 146 148 144 Turned 'IJ' 10 5/5/2017 9:30 AM 140 140 146 142 'IJ 11 5/6/2017 9:30 AM 142 142 142 144 'IJ' 12 5/7/2017 10:00 AM 142 140 142 146 <JJ' 13 5/8/2017 10:30 AM 146 144 140 144 Turned 'IJ 14 5/9/2017 10:00 AM 140 142 140 144 'IJ 15 5/10/2017 10:45 AM 142 140 140 146 'IJ' 16 5/11/2017 10:45 AM 140 140 146 144 'IJ' 17 5/12/2017 10:45 AM 145 144 142 146 'IJ 18 5/13/2017 10:45 AM 142 142 148 148 'IJ 19 5/14/2017 10:45 AM 142 144 148 148 Turned 'IJ' 20 5/15/2017 10:45 AM 144 146 148 150 'IJ 21 5/16/2017 10:45 AM 140 142 142 142 'IJ 22 5/17/2017 10:45 AM 140 144 142 140 'IJ' 23 5/18/2017 10:45 AM 140 144 144 142 'IJ' 24 5/19/2017 10:45 AM 142 144 146 142 'IJ 25 5/20/2017 10:45 AM 142 142 148 142 'IJ' 26 5/21/2017 10:45 AM 144 146 148 144 'IJ' 27 5/22/2017 10:45 AM 146 144 148 146 Turned 'IJ 28 5/23/2017 10:45 AM 142 140 144 142 'IJ 29 5/24/2017 10:45 AM 142 142 142 146 'IJ EASTERN COMPOST, LLC 84-87 Battleboro-Leggett Road P.O.Box 4-60 Battleboro, North Carolina 27809 DAILY OPERATION RECORD COMPOST ROW NO. Row Construction Date(s): Section #1: 4- - GREEN 4/26/2017 - - Linear Feet:------ 290 ---- - Section #2:------ Linear Feet:------- Section #3: - Linear Feet: Cycle Day Date Time Section # Temp Temp Temp Temp Turned Service Provider 1 4/26/2017 7:00 AM 120 120 125 120 Built 'TJ 2 4/27/2017 7:00 AM 125 120 120 125 Turned 'TJ 3 4/28/2017 7:30 AM 130 125 125 128 'TJ 4 4/29/2017 7:30 AM 130 125 125 130 'TJ 5 4/30/2017 7:30 AM 138 136 138 135 'TJ 6 5/1/2017 7:30 AM 144 142 144 140 Turned 'TJ 7 5/2/2017 7:30 AM 140 140 142 140 'TJ 8 5/3/2017 7:30 AM 142 146 138 140 'TJ 9 5/4/2017 7:30 AM 142 142 140 144 'TJ 10 5/5/2017 7:30 AM 144 143 140 146 'TJ 11 5/6/2017 7:30 AM 146 142 146 144 Turned 'TJ 12 517/2017 7:30 AM 140 142 144 144 'TJ 13 5/8/2017 7:30 AM 142 142 144 146 'TJ 14 5/9/2017 7:30 AM 140 142 144 144 'TJ 15 5/10/2017 7:30 AM 142 144 146 144 'TJ 16 5/11/2017 7:30 AM 144 142 148 142 'TJ 17 5/12/2017 7:30 AM 146 144 148 146 Turned 'TJ 18 5/13/2017 7:30 AM 142 142 149 144 'TJ 19 5/14/2017 7:30 AM 140 140 140 146 'TJ 20 5/15/2017 8:00 AM 144 140 144 144 'TJ 21 5/16/2017 8:00 AM 144 144 142 146 'TJ 22 5/17/2017 8:00 AM 146 142 144 148 'TJ 23 5/18/2017 8:00 AM 146 144 146 148 Turned 'TJ 24 5/19/2017 8:00 AM 140 142 144 142 'TJ 25 5/20/2017 8:00 AM 142 142 146 144 'TJ 26 5/21/2017 8:00 AM 142 140 148 148 'TJ 27 5/22/2017 8:00 AM 144 144 148 148 Turned 'TJ 28 5/23/2017 8:00 AM 140 140 146 144 'TJ 29 5/24/2017 8:00 AM 142 140 144 144 'TJ EASTERN COMPOST, LLC 8487 Battleboro-Leggett Road P.O. Box 4-60 Battleboro, North Carolina 27809 DAILY OPERATION RECORD 5 - GREEN COMPOST ROW NO. Row Construction Date(s): Section #1: -- 5/2/2017--Linear Feet:------ 290 Section #2: Section #3: -------Linear Feet:------- Linear Feet: Cycle Day Date Time Section # Temp Temp Temp Temp Turned Service Provider 1 5/2/2017 1:00 PM 120 120 125 125 Built 'IJ' 2 5/3/2017 1:00 PM 125 120 135 135 Turned 'IJ' 3 5/4/2017 1:30 PM 125 125 138 138 'IJ' 4 5/5/2017 1:30 PM 130 125 140 140 <[J 5 5/6/2017 1:00 PM 138 135 144 142 <[J 6 5/7/2017 1:00 PM 142 140 146 148 Turned <[J 7 5/8/2017 1:30 PM 140 140 142 144 'IJ' 8 5/9/2017 2:00 PM 144 142 138 136 <[J 9 5/10/2017 2:00 PM 138 138 140 138 'IJ' 10 5/11/2017 1:30 PM 138 140 146 138 <[J 11 5/12/2017 1:30 PM 142 142 146 140 <[J 12 5/13/2017 1:00 PM 144 142 144 144 <[J 13 5/14/2017 1:00 PM 148 144 146 146 Turned <[J 14 5/15/2017 1:00 PM 142 142 144 144 'IJ' 15 5/16/2017 1:00 PM 140 140 144 144 'IJ' 16 5/17/2017 1:00 PM 142 144 146 144 <[J 17 5/18/2017 1:00 PM 144 146 144 144 <[J 18 5/19/2017 1:00 PM 146 148 144 144 <[J 19 5/20/2017 1:30 PM 146 146 148 146 <[J 20 5/21/2017 1:30 PM 144 146 148 148 Turned 'IJ' 21 5/22/2017 1:30 PM 142 146 142 144 <[J 22 5/23/2017 1:30 PM 142 142 144 144 <[J 23 5/24/2017 1:30 PM 140 144 144 144 'IJ' 24 5/25/2017 1:30 PM 144 142 146 142 'IJ' 25 5/26/2017 2:00 PM 144 142 146 144 'IJ' 26 5/27/2017 2:00 PM 144 142 148 144 Turned <[J 27 5/28/2017 2:00 PM 140 142 146 140 <[J 28 5/29/2017 2:00 PM 142 140 144 144 'IJ' 29 5/30/2017 2:00 PM 142 144 144 140 <[J EASTERN COMPOST, LLC 84-87 Battleboro-Leggett Road P.O. Box 4-60 Battleboro, North Carolina 27809 DAILY OPERATION RECORD 6 - GREEN COMPOST ROW NO. Row Construction Date(s): ------- Section #1: -- 5/3/2017--Linear Feet:------ 285 Section #2: Section #3: Li.near Fe-et: ------- Li.near Feet: Cycle Day Date Time Section # Temp Temp Temp Temp Turned Service Provider 1 5/3/2017 2:00 PM 125 120 120 125 Built <JJ 2 5/4/2017 2:00 PM 125 120 120 125 Turned <JJ 3 5/5/2017 3:00 PM 130 125 120 135 'IJ 4 5/6/2017 3:00 PM 136 125 125 135 <JJ 5 5/7/2017 2:30 PM 134 130 130 140 'IJ 6 5/8/2017 2:30 PM 142 142 140 142 'IJ 7 5/9/2017 2:30 PM 144 142 140 142 Turned <JJ 8 5/10/2017 2:30 PM 140 136 136 140 'IJ' 9 5/11/2017 2:30 PM 140 138 138 142 <JJ 10 5/12/2017 2:30 PM 142 148 142 146 <JJ 11 5/13/2017 1:00 PM 144 140 142 148 <JJ 12 5/14/2017 1:00 PM 144 144 144 144 'IJ' 13 5/15/2017 1:00 PM 146 148 140 140 <JJ 14 5/16/2017 1:00 PM 148 148 142 148 <JJ 15 5/17/2017 2:00 PM 146 153 144 150 Turned <JJ 16 5/18/2017 1:00 PM 140 144 142 146 <JJ 17 5/19/2017 1:00 PM 144 140 142 146 <JJ 18 5/20/2017 1:00 PM 142 140 144 140 <JJ 19 5/21/2017 1:30 PM 144 144 142 147 <JJ 20 5/22/2017 1:00 PM 146 144 144 142 Turned <JJ 21 5/23/2017 1:30 PM 144 146 144 146 <JJ 22 5/24/2017 2:00 PM 140 142 142 144 <JJ 23 5/25/2017 1:00 PM 140 142 140 142 <JJ 24 5/26/2017 1:00 PM 142 147 146 144 'IJ 25 5/27/2017 1:00 PM 146 142 144 146 'IJ 26 5/28/2017 1:00 PM 144 142 146 145 Turned <JJ 27 5/29/2017 1:00 PM 142 149 148 142 <JJ 28 5/30/2017 1:00 PM 144 146 148 144 'IJ' 29 5/31/2017 1:00 PM 144 148 146 146 <JJ EASTERN COMPOST, LLC 8487 Battleboro-Leggett Road P.O. Box 460 Batdeboro, North CaroHl1la 27809 DAILY OPERATION RECORD 7 - GREEN COMPOST ROW NO. Row Construction Date(s): Section #1: -- 5/5/2017--Linear Feet:------ 285 Section #2: Section #3: -------Linear Feet:------- Linear Feet: Cycle Day Date Time Section # Temp Temp Temp Temp Turned Service Provider 1 5/5/2017 8:30 AM 120 120 120 128 Built '[J 2 5/6/2017 8:30 AM 125 130 130 130 '1.J 3 5/7/2017 8:30 AM 125 135 138 135 Turned '1.J 4 5/8/2017 8:30 AM 136 136 140 135 '1.J 5 5/9/2017 9:00 AM 138 138 140 146 '1.J 6 5/10/2017 9:00 AM 140 140 144 142 Turned '1.J 7 5/11/2017 9:00 AM 136 136 138 135 '[J 8 5/12/2017 9:00 AM 136 136 136 136 '[J 9 5/13/2017 8:30 AM 140 144 142 142 '1.J 10 5/14/2017 8:30 AM 142 144 142 144 '1.J 11 5/15/2017 9:30 AM 144 148 144 146 T.J 12 5/16/2017 9:30 AM 144 148 148 144 Turned T.J 13 5/17/2017 9:00 AM 140 144 142 140 '1.J 14 5/18/2017 9:30 AM 144 142 144 140 '1.J 15 5/19/2017 9:30 AM 148 148 150 140 '[J 16 5/20/2017 9:00 AM 148 15 148 146 Turned T.J 17 5/21/2017 5:00 AM 146 140 144 140 '1.J 18 5/22/2017 7:00 AM 144 140 140 142 '[J 19 5/23/2017 7:00 AM 148 146 148 144 '[J 20 5/24/2017 7:30 AM 146 148 148 156 Turned '[J 21 5/25/2017 7:30 AM 140 142 140 142 '[J 22 5/26/2017 7:30 AM 140 142 142 140 '[J 23 5/27/2017 8:00 AM 142 142 140 140 T.J 24 5/28/2017 8:00 AM 144 140 140 144 '[J 25 5/29/2017 8:00 AM 144 142 144 144 Turned T.J 26 5/30/2017 8:00 AM 140 140 140 140 '[J 27 5/31/2017 8:00 AM 140 142 144 144 '[J 28 6/1/2017 8:00 AM 142 148 146 144 T.J 29 6/2/2017 8:00 AM 142 146 144 148 Turned T.J EASTERN COMPOST, LLC 8487 Batdeboro-Leggett Road P.O. Box 460 Battleboro, North Carolina 27809 DAILY OPERATION RECORD 8 - GREEN COMPOST ROW NO. Row Construction Date(s): Section #1: - 5/5/2017--Linear lFeet:----- 290 Section #2: Section #3: -------Li.near lFeet:------- Li.near lFeet: Cycle Day Date Time Section # Temp Temp Temp Temp Turned Service Provider 1 5/5/2017 11:00 AM 125 120 120 125 Built 1J 2 5/6/2017 11:00 AM 125 125 125 130 Turned 'IJ 3 5/7/2017 11:00 AM 130 120 130 138 1J 4 5/8/2017 11:00 AM 135 135 135 135 1J 5 5/9/2017 11:00 AM 138 138 146 148 Turned 1J 6 5/10/2017 11:00 AM 138 138 135 135 'IJ 7 5/ 11/2017 11:00 AM 138 138 136 128 'IJ 8 5/12/2017 11:00 AM 146 146 140 135 'IJ 9 5/13/2017 11:00 AM 142 141 144 142 'IJ 10 5/14/2017 11:00 AM 144 146 146 144 'IJ 11 5/15/2017 11:00 AM 146 148 148 146 Turned 1J 12 5/16/2017 11:00 AM 144 142 144 142 'IJ 13 5/17/2017 11:00 AM 140 140 140 142 1J 14 5/18/2017 11:00 AM 140 140 142 142 1J 15 5/19/2017 11:00 AM 142 140 142 146 1J 16 5/20/2017 10:00 AM 142 142 142 142 1J 17 5/21/2017 10:00 AM 142 140 140 140 'IJ 18 5/22/2017 10:00 AM 140 142 140 142 1J 19 5/23/2017 10:00 AM 142 142 140 140 'IJ 20 5/24/2017 10:30 AM 140 140 142 142 Turned 1J 21 5/25/2017 10:00 AM 140 140 140 140 1J 22 5/26/2017 10:30 AM 140 144 144 144 'IJ 23 5/27/2017 10:45 AM 144 142 144 144 1J 24 5/28/2017 11:00 AM 142 144 142 144 'IJ 25 5/29/2017 10:00 AM 142 144 142 140 Turned TJ 26 5/30/2017 11:00 AM 140 142 142 144 1J 27 5/31/2017 10:00 AM 144 144 144 144 1J 28 6/1/2017 10:00 AM 144 142 144 142 'IJ 29 6/2/2017 10:00 AM 146 144 144 142 Turned 'l'J EASTERN COMPOST, LLC 84-87 Battleboro-Leggett Road P.O. Box 460 Batdeborn, North Carolina 27809 DAILY OPERATION RECORD COMPOST ROW NO. Row Construction Date(s): Section #1: 9 - GREEN -5/17/2017--Linear Feel::------ 280 Section #2: ------ Linear Feet:------- Section #3: - Linear Feet: Cycle Day Date Time Section # Temp Temp Temp Temp Turned Service Provider 1 5/17/2017 9:30 AM 120 120 130 120 Built <[J 2 5/18/2017 9:30 AM 120 126 130 130 Turned <[J 3 5/19/2017 10:30 AM 128 130 130 128 <J[ 4 5/20/2017 10:30 AM 130 136 126 130 <[J 5 5/21/2017 11:00 AM 136 138 140 136 <J[ 6 5/22/2017 12:00 PM 140 140 142 138 Turned <[J 7 5/23/2017 11:00 AM 138 136 138 136 <[J 8 5/24/2017 11:00 AM 138 136 136 136 <J[ 9 5/25/2017 11:00 AM 140 144 144 144 <[J 10 5/26/2017 10:30 AM 144 144 144 146 <[J 11 5/27/2017 10:30 AM 146 146 146 144 <[J 12 5/28/2017 9:00 AM 142 144 148 148 <[J 13 5/29/2017 9:30 AM 144 148 146 148 Turned <[J 14 5/30/2017 9:45 AM 146 142 142 140 <J[ 15 5/31/2017 10:00 AM 144 142 144 140 <J[ 16 6/1/2017 10:00 AM 144 149 142 142 <[J 17 6/2/2017 10:00 AM 142 146 144 146 'IJ 18 6/3/2017 10:00 AM 144 146 146 146 <[J 19 6/4/2017 10:00 AM 144 140 148 148 Turned <[J 20 6/5/2017 10:00 AM 140 140 144 144 <[J 21 6/6/2017 9:30 AM 141 144 142 146 'IJ 22 6/7/2017 9:30 AM 149 140 144 146 <[J 23 6/8/2017 9:30 AM 142 140 140 148 <[J 24 6/9/2017 9:30 AM 142 142 140 146 <[J 25 6/10/2017 9:30 AM 146 144 148 148 Turned 'IJ 26 6/11/2017 9:30 AM 140 140 146 144 <[J 27 6/12/2017 9:30 AM 140 140 144 144 <J[ 28 6/13/2017 9:30 AM 142 140 144 142 'IJ 29 6/14/2017 10:00 AM 144 142 142 146 Turned <[J EASTERN COMPOST, LLC 84-87 Battleboro-Leggett Road P.O. Box 460 Battleboro, North Carolina 27809 DAILY OPERATION RECORD COMPOST ROW NO. Row Construction Date(s): Section #1: - IO - GREEN 5/20/2017--Linear Feet:------ 290 Section #2: Section #3: -------Linear Feet:------- Linear Feet: Cycle Day Date Time Section # Temp Temp Temp Temp Turned Service Provider 1 5/20/2017 8:30 AM 110 110 120 126 Built 'IJ 2 5/21/2017 8:30 AM 120 120 130 130 Turned 'IJ 3 5/22/2017 8:30 AM 120 120 125 134 'IJ 4 5/23/2017 12:00 AM 120 130 130 134 'IJ 5 5/24/2017 12:00 AM 126 130 134 134 Turned 'IJ 6 5/25/2017 8:30 AM 126 130 134 140 'TJ 7 5/26/2017 9:00 AM 130 134 136 140 'TJ 8 5/27/2017 9:00 AM 138 140 140 142 'IJ 9 5/28/2017 9:30 AM 140 144 146 142 'TJ 10 5/29/2017 9:00 AM 140 140 144 146 'IJ 11 5/30/2017 8:30 AM 140 140 146 144 Turned 'TJ 12 5/31/2017 8:30 AM 142 140 144 142 'TJ 13 6/1/2017 8:30 AM 144 140 142 144 'TJ 14 6/2/2017 10:00 AM 142 140 144 144 'IJ 15 6/3/2017 10:00 AM 140 144 142 140 'TJ 16 6/4/2017 8:30 AM 144 142 144 140 'IJ 17 6/5/2017 9:00 AM 147 144 142 140 'TJ 18 6/6/2017 8:30 AM 144 142 144 140 Turned 'TJ 19 6/712017 8:30 AM 144 140 142 140 'TJ 20 6/8/2017 8:30 AM 140 144 142 140 <[J' 21 6/9/2017 9:00 AM 144 146 140 144 'IJ 22 6/10/2017 9:00 AM 142 146 146 144 <[J' 23 6/11/2017 9:00 AM 144 146 148 144 'IJ 24 6/12/2017 9:00 AM 142 140 144 146 'IJ 25 6/13/2017 9:00 AM 144 142 146 144 Turned 'TJ 26 6/14/2017 9:00 AM 140 144 142 140 'TJ 27 6/15/2017 9:00 AM 142 142 144 140 'TJ 28 6/16/2017 9:00 AM 140 142 144 142 'IJ 29 6/17/2017 9:00 AM 140 144 140 144 Turned 'IJ EASTERN COMPOST, LLC 8487 Battleboro-Leggett Road P.O. Box 460 Battleboro, North Carolina 27809 DAILY OPERATION RECORD COMPOST ROW NO. Row Construction Date(s): Section #1: - 1 - RED 6/5/2017 - Linear Feet: ---- 285 Section #2: ------ Section #3: Linear Feet:------- Linear Feet: Cycle Day Date Time Section # Temp Temp Temp Temp Turned Service Provider 1 6/5/2017 10:00 AM 120 120 128 128 Built TJ 2 6/6/2017 10:00 AM 120 120 156 128 Turned <JJ 3 6/7/2017 10:30 AM 126 126 130 136 <JJ 4 6/8/2017 11:00 AM 128 128 134 134 <JJ 5 6/9/2017 10:00 AM 136 128 136 140 rrj 6 6/10/2017 11:00 AM 138 140 140 142 <JJ 7 6/11/2017 11:30 AM 140 140 142 140 Turned TJ 8 6/12/2017 1:00 PM 140 138 138 140 TJ 9 6/13/2017 12:00 PM 140 138 140 140 <JJ 10 6/14/2017 12:00 PM 142 140 132 138 <JJ 11 6/15/2017 12:30 PM 140 142 140 140 TJ 12 6/16/2017 12:00 PM 140 140 144 142 TJ 13 6/17/2017 1:00 AM 146 142 146 140 <JJ 14 6/18/2017 1:30 AM 144 142 142 144 Turned TJ 15 6/19/2017 1:30 AM 140 140 140 146 TJ 16 6/20/2017 12:00 PM 142 140 130 140 <JJ 17 6/21/2017 12:30 PM 142 140 140 142 TJ 18 6/22/2017 1:00 AM 144 144 140 142 TJ 19 6/23/2017 12:00 PM 144 140 142 142 TJ 20 6/24/2017 12:00 PM 144 144 142 144 Turned TJ 21 6/25/2017 12:00 PM 138 132 142 140 TJ 22 6/26/2017 12:00 PM 140 140 144 144 <JJ 23 6/27/2017 1:00 AM 140 140 148 144 TJ 24 6/28/2017 12:30 PM 142 142 144 144 <JJ 25 6/29/2017 12:00 PM 146 142 146 148 TJ 26 6/30/2017 12:00 PM 146 146 148 148 Turned <JJ 27 7/1/2017 12:00 PM 140 147 142 146 <JJ 28 7/2/2017 12:00 PM 142 140 144 145 TJ 29 7/3/2017 12:00 PM 142 144 140 142 <JJ EASTERN COMPOST, LLC 84-87 Battleboro-Leggett Road P.O. Box 4-60 Battleboro, North Carolina 27809 DAILY OPERATION RECORD COMPOST ROW NO. Row Construction Date(s): Section #I: - 2 - RED 6/5/2017--Linear Feet:------ 285 Section #2: Section #3: ---- -------Linear Feet:------- Linear Feet: 7 6/11/2017 Cycle Day Date Time Section # Temp Temp Temp Temp Turned Service Provider 1 6/5/2017 1:00 PM 120 126 120 120 Built CJJ' 2 6/6/2017 1:00 PM 128 128 120 122 'lJ 3 6/7/2017 1:00 PM 130 130 126 126 Turned CJJ' 4 6/8/2017 1:00 PM 130 132 128 134 'lJ 5 6/9/2017 1:00 PM 136 138 130 136 'I'J 6 6/10/2017 12:00 PM 140 140 138 138 'lJ 12:30 PM 142 142 138 140 Turned CJJ' 8 6/12/2017 1:00 PM 138 136 136 140 'lJ 9 6/13/2017 1:00 AM 135 138 140 140 'lJ 10 6/14/2017 12:30 PM 138 138 140 138 'IJ 11 6/15/2017 12:30 PM 138 140 142 144 Turned 'lJ 12 6/16/2017 12:45 PM 138 138 142 140 CJJ' 13 6/17/2017 1:00 PM 138 138 140 144 'lJ 14 6/18/2017 1:30 PM 140 140 144 144 CJJ' 15 6/19/2017 1:30 PM 144 142 146 142 'lJ 16 6/20/2017 1:30 PM 140 140 148 142 CJJ' 17 6/21/2017 1:30 PM 140 142 148 144 Turned 'IJ 18 6/22/2017 1:30 PM 140 140 144 142 'lJ 19 6/23/2017 1:30 PM 140 142 142 144 'lJ 20 6/24/2017 2:00 AM 142 142 144 146 'lJ 21 6/25/2017 2:30 AM 144 144 144 148 Turned 'lJ 22 6/26/2017 1:30 PM 142 140 140 192 'lJ 23 6/27/2017 1:30 PM 142 142 144 142 'lJ 24 6/28/2017 1:30 PM 144 142 144 144 'lJ 25 6/29/2017 2:00 AM 142 142 144 144 'lJ 26 6/30/2017 1:30 PM 140 144 142 144 'IJ 27 7/1/2017 1:30 PM 138 142 147 142 Turned 'IJ 28 7/2/2017 2:00 AM 128 142 140 142 'IJ 29 7/3/2017 1:30 PM 140 140 140 142 'lJ EASTERN COMPOST, LLC 84-87 Battleboro-Leggett Road P.O. Box 4-60 Battleboro, North Carolina 27809 DAILY OPERATION RECORD COMPOST ROW NO. Row Construction Date(s): Section #1:- 3 - RED 6/26/2017--Linear Feet:------ 290 Section #2: Linear Feet:------- Section #3: Linear Feet: Cycle Day Date Time Section # Temp Temp Temp Temp Turned Service Provider 1 6/26/2017 5:00 PM 120 125 125 120 Built rrJ 2 6/27/2017 5:00 PM 125 125 135 125 Turned rrJ 3 6/28/2017 5:30 PM 130 125 125 130 rrJ 4 6/29/2017 5:30 PM 136 136 130 136 rrJ 5 6/30/2017 5:00 PM 140 140 138 138 'IJ 6 7/1/2017 5:00 PM 142 140 142 144 Turned 'IJ 7 7/2/2017 4:30 PM 141 140 140 142 rrJ 8 7/3/2017 4:00 PM 140 144 144 142 rrJ 9 7/4/2017 4:30 PM 140 142 142 140 'IJ 10 7/5/2017 4:30 PM 146 144 142 142 'IJ 11 7/6/2017 5:00 PM 144 146 144 148 'IJ 12 7f7/2017 5:00 PM 146 148 146 146 Turned rrJ 13 7/8/2017 4:30 PM 142 144 144 142 rrJ 14 7/9/2017 4:00 PM 146 142 142 144 'IJ 15 7/10/2017 4:30 PM 144 140 142 144 rrJ 16 7/11/2017 4:30 PM 146 148 140 142 rrJ 17 7/12/2017 5:00 PM 144 146 144 148 'IJ 18 7/13/2017 5:00 PM 146 145 142 144 'IJ 19 7/14/2017 4:30 PM 148 150 140 149 Turned rrJ 20 7/15/2017 4:00 PM 140 142 140 140 rrJ 21 7/16/2017 4:30 PM 144 142 146 146 rrJ 22 7/17/2017 4:30 PM 142 140 144 142 rrJ 23 7/18/2017 5:00 PM 140 144 142 142 'IJ 24 7/19/2017 4:45 PM 142 146 146 147 rrJ 25 7/20/2017 5:00 PM 142 144 146 140 Turned t{J 26 7/21/2017 5:30 PM 142 142 144 142 rrJ 27 7/22/2017 5:30 PM 144 140 144 142 rrJ 28 7/23/2017 5:00 PM 144 146 140 140 'IJ 29 7/24/2017 5:00 PM 146 140 146 141 Turned rrJ EASTERN COMPOST, LLC 8487 Battleboro-Leggett Road P.O. Box 4-60 Battleboro, North Carolina 27809 DAILY OPERATION RECORD COMPOST ROW NO. Row Constructnon Date(s): Section #1: 4 - RED - 6/28/2017--Linear Feet:------ 285 Section #2: Section #3: ---- -------Linear .Feet:------- Linear .Feet: Cycle Day Date Time Section # Temp Temp Temp Temp Turned 1 6/28/2017 10:00 AM 120 126 130 115 2 6/29/2017 10:15 AM 126 128 130 136 Tu 3 6/30/2017 10:00 AM 128 132 136 135 4 7/1/2017 10:30 AM 130 138 138 136 5 7/2/2017 10:00 AM 136 140 140 136 6 7/3/2017 10:30 AM 140 144 144 138 7 7/4/2017 10:30 AM 140 140 138 138 Turned 8 7/5/2017 10:30 AM 144 142 140 140 9 7/6/2017 10:30 AM 144 140 142 142 10 7/7/2017 10:30 AM 146 142 142 140 11 7/8/2017 10:30 AM 148 144 140 140 12 7/9/2017 10:30 AM 146 142 144 142 13 7/10/2017 10:30 AM 144 144 142 144 Turned 14 7/11/2017 10:30 AM 140 144 142 140 15 7/12/2017 10:30 AM 144 140 142 144 16 7/13/2017 10:30 AM 144 142 142 142 17 7/14/2017 10:30 AM 142 140 144 144 18 7/15/2017 10:30 AM 144 144 148 146 Turned 19 7/16/2017 10:30 AM 144 140 142 140 20 7/17/2017 10:30 AM 142 140 140 144 21 7/18/2017 9:00 AM 144 142 142 141 22 7/19/2017 10:30 AM 144 144 144 148 23 7/20/2017 10:00 AM 144 140 142 146 24 7/21/2017 10:00 AM 142 144 142 148 Tu 25 7/22/2017 10:00 AM 144 144 142 146 26 7/23/2017 10:00 AM 142 140 142 142 27 7/24/2017 10:00 AM 142 140 148 144 28 7/25/2017 10:00 AM 140 144 146 148 29 7/26/2017 10:00 AM 142 144 144 144 Tu EASTERN COMPOST, LLC 84-87 Battleboro-Leggett Road P.O. Box 4-60 Battleboro, North Carolin.a 27809 DAILY OPERATION RECORD COMPOST ROW NO. Row Construction Date(s): Section #1: 5 - RED - 6/29/2017--Li.near Feet:------ 285 Section #2: Section #3: ---- -------Linear f'eet:------- Linear f'eet: Cycle Day Date Time Section # Temp Temp Temp Temp Turned Service Provider 1 6/29/2017 9:00 AM 125 115 120 115 Built TJ 2 6/30/2017 9:30 AM 125 145 120 115 Turned TJ 3 7/1/2017 9:00 AM 120 115 120 120 'IJ' 4 7/2/2017 9:45 AM 120 120 126 128 TJ 5 7/3/2017 9:15 AM 126 130 135 130 <JJ' 6 7/4/2017 9:15 AM 130 136 135 138 TJ 7 7/5/2017 9:15 AM 138 136 140 140 <JJ' 8 7/6/2017 9:15 AM 138 147 142 142 TJ 9 717/2017 9:15 AM 142 144 146 144 TJ 10 7/8/2017 9:15 AM 140 140 144 142 Turned TJ 11 7/9/2017 9:15 AM 142 142 140 140 <JJ' 12 7/10/2017 9:15 AM 144 142 145 135 Turned <JJ' 13 7/11/2017 9:00 AM 140 140 140 140 'IJ' 14 7/12/2017 9:00 AM 140 144 148 144 TJ 15 7/13/2017 10:00 AM 145 148 146 144 TJ 16 7/14/2017 10:15 AM 144 148 148 146 'IJ' 17 7/15/2017 9:30 AM 144 146 146 146 Turned 7J 18 7/16/2017 9:30 AM 142 142 144 142 7J 19 7/17/2017 9:30 AM 144 140 140 144 7J 20 7/18/2017 9:30 AM 146 140 144 140 7J 21 7/19/2017 9:30 AM 146 148 146 142 7J 22 7/20/2017 9:30 AM 148 146 144 144 Turned 7J 23 7/21/2017 9:30 AM 144 142 144 144 TJ 24 7/22/2017 9:30 AM 144 145 144 142 TJ 25 7/23/2017 9:30 AM 144 142 146 143 'IJ' 26 7/24/2017 9:30 AM 146 144 148 144 'IJ' 27 7/25/2017 9:30 AM 146 142 148 146 Turned <JJ' 28 7/26/2017 9:30 AM 148 142 142 146 <JJ' 29 7/27/2017 9:30 AM 144 142 144 146 'IJ' EASTERN COMPOST, LLC 8487 Battleboro•Leggett Road P.O. Box 460 Battleboro, North Carolina 27809 DAILY OPERATION RECORD COMPOST ROW NO. 6 - RED Row Construction Date(s): Section #1: - 6/28/2017- Linear Feet: ----- 28.5 ---- - - Section #2: Linear Feet:------- Section #3: Linear Feet: Cycle Day Date Time Section # Temp Temp Temp 1 Temp Turned Service Provider 1 6/28/2017 8:30 AM 110 115 120 120 Built qJ 2 6/29/2017 8:30 AM 120 115 120 128 Turned 3 6/30/2017 8:30 AM 120 120 126 120 126 4 7/1/2017 8:30 AM 126 128 130 5 7/2/2017 8:30 AM 128 126 124 126 6 7/3/2017 8:30 AM 144 140 142 140 Turned 7 7/4/2017 8:30 AM 144 142 140 144 8 7/5/2017 8:30 AM 146 144 142 140 9 7/6/2017 8:30 AM 142 146 144 140 10 717/2017 8:30 AM 144 146 146 144 11 7/8/2017 9:00 AM 146 148 144 140 12 7/9/2017 7:30 AM 148 144 146 141 13 7/10/2017 8:30 AM 146 146 144 148 Turned 14 7/11/2017 8:30 AM 140 140 142 144 15 7/12/2017 9:00 AM 140 140 144 146 16 7/13/2017 9:00 AM 142 146 146 148 17 7/14/2017 9:00 AM 144 148 148 148 18 7/15/2017 12:00 PM 146 148 146 140 19 7/16/2017 8:30 AM 148 150 152 150 20 7/17/2017 9:00 AM 142 144 146 144 Turned 21 7/18/2017 9:30 AM 144 146 146 143 22 7/19/2017 9:30 AM 142 146 144 144 23 7/20/2017 9:30 AM 144 148 146 146 24 7/21/2017 9:30 AM 144 146 148 148 Turned 25 7/22/2017 9:30 AM 142 142 144 146 26 7/23/2017 9:30 AM 142 142 147 142 27 7/24/2017 9:30 AM 144 140 146 146 28 7/25/2017 9:30 AM 144 142 144 146 29 7/26/2017 9:30 AM 146 146 144 144 Turned EASTERN COMPOST, LLC 8487 Battleboro-Leggett Road P.O. Box 460 Battleboro, North Carolina 27809 DAILY OPERATION RECORD 6 - RED COMPOST ROW NO. Row Construction Date{s): Section #1: - 6/28/2017 Unear Feet:- --- 285 ------ - Section #2: Linear Feet:------- Section #3: Linear Feet: Cycle Day Date Time Section # Temp Temp Temp Temp Turned Service Provider 1 6/28/2017 8:30 AM 110 115 120 120 Built t(J 2 6/29/2017 8:30 AM 120 115 120 128 126 Turned t(J 3 6/30/2017 8:30 AM 120 120 126 t(J 4 7/1/2017 8:30 AM 126 128 120 130 t(J 5 7/2/2017 8:30 AM 128 126 124 126 t(J 6 7/3/2017 8:30 AM 144 140 142 140 Turned t(J 7 7/4/2017 8:30 AM 144 142 140 144 t(J 8 7/5/2017 8:30 AM 146 144 142 140 t(J 9 7/6/2017 8:30 AM 142 146 144 140 t(J 10 717/2017 8:30 AM 144 146 146 144 t(J 11 7/8/2017 9:00 AM 146 148 144 140 t(J 12 7/9/2017 7:30 AM 148 144 146 141 t(J t(J 13 7/10/2017 8:30 AM 146 146 144 148 Turned 14 7/11/2017 8:30 AM 140 140 142 144 t(J 15 7/12/2017 9:00 AM 140 140 144 146 t(J 16 7/13/2017 9:00 AM 142 146 146 148 t(J 17 7/14/2017 9:00 AM 144 148 148 148 t(J 18 7/15/2017 12:00 PM 146 148 146 140 'TJ 19 7/16/2017 8:30 AM 148 150 152 150 t(J 20 7/17/2017 9:00 AM 142 144 146 144 Turned 'TJ 21 7/18/2017 9:30 AM 144 146 146 143 t(J 22 7/19/2017 9:30 AM 142 146 144 144 'TJ 23 7/20/2017 9:30 AM 144 148 146 146 t(J 24 7/21/2017 9:30 AM 144 146 148 148 Turned t(J 25 7/22/2017 9:30 AM 142 142 144 146 t(J 26 7/23/2017 9:30 AM 142 142 147 142 t(J 27 7/24/2017 9:30 AM 144 140 146 146 t(J 28 7/25/2017 9:30 AM 144 142 144 146 t(J 29 7/26/2017 9:30 AM 146 146 144 144 Turned t(J EASTERN COMPOST, LLC 8487 Batdeboro-Leggett Road P.O. Box 4-60 Battleboiro, North Carolina 27809 DAILY OPERATION RECORD 7 - RED COMPOST ROW NO. Row Construction Date(s): Section # 1: -- 7/3/2017--Linear Feet:------ 285 Section #2: Linear Feet: ------- Section #3: Linear Feet: 7 7/9/2017 Cycle Day Date Time Section # Temp Temp Temp Temp Turned Service Provider 1 7/3/2017 9:30 AM 120 126 120 115 Built 7J 2 7/4/2017 8:30 AM 126 128 126 115 Turned 7J 3 7/5/2017 9:00 AM 130 138 139 120 <JJ 4 7/6/2017 9:30 AM 138 138 140 128 <JJ 5 7/7/2017 10:00 AM 140 140 140 130 <JJ 6 7/8/2017 9:00 AM 142 142 140 138 138 7J 9:00 AM 142 140 142 <JJ 8 7/10/2017 9:00 AM 144 140 146 142 144 Turned 7J 9 7/11/2017 9:00 AM 140 142 144 <JJ 10 7/12/2017 9:30 AM 144 144 146 146 <JJ 11 7/13/2017 9:30 AM 146 146 150 148 <JJ 12 7/14/2017 9:30 AM 146 150 152 148 <JJ 13 7/15/2017 9:30 AM 146 154 152 150 Turned 'IJ' 14 7/16/2017 9:30 AM 140 148 148 142 <JJ 15 7/17/2017 9:30 AM 142 144 146 144 'IJ' 16 7/18/2017 9:30 AM 144 146 144 144 7J 17 7/19/2017 9:00 AM 144 144 146 146 7J 18 7/20/2017 9:00 AM 146 142 146 146 Turned <JJ 19 7/21/2017 9:00 AM 142 144 144 140 <JJ 20 7/22/2017 9:00 AM 142 144 144 142 7J 21 7/23/2017 9:00 AM 142 144 144 142 <JJ 22 7/24/2017 9:00 AM 144 146 142 144 <JJ 23 7/25/2017 9:00 AM 140 146 142 140 <JJ 24 7/26/2017 9:00 AM 144 146 144 144 Turned <JJ 25 7/27/2017 9:00 AM 142 142 140 140 <JJ 26 7/28/2017 9:00 AM 142 146 146 144 <JJ 27 7/29/2017 9:00 AM 142 144 144 146 'IJ' 28 7/30/2017 9:00 AM 140 146 144 146 7J 29 7/31/2017 9:00 AM 144 146 144 144 Turned <JJ Appendix B Laboratory Results ANALYTICAL CHEMISTS and BACTERIOLOGISTS l\fil)foved b Stale or Caltfornia SOIL CONTROL LAB Eastern Compost LLC P.O. Box 1396 Oxford, NC 27565 Attn: Jason Smith TEL: 831-724-5422 FAX: 831-724-3188 www.compostlab.com Account #: 6120460-1/1-1299 Group: Dec16C #17 Reporting Date: December 28, 2016 Date Received: Sample Identification: Sample ID #: 14 Dec. 16 Course Comp 6120460 - 1/1 Analyst: Assaf Sadeh 6 ,, *Sample was received and handled m accordance with TMECC procedures. Nutrients Dry wt. As Revd. units Stability Indicator: Biologically CO2 Evolution Respirometery Available C mg C02-C/g OM/day 2.2 2.3 mg COrC!g TS/day 1.2 1.2 Stability Rating stable stable Maturity Indicator: Cucumber Bioassay Compost:Vermiculite(v:v) 1:2 Emergence (%) 100 Seedling Vigor (%) 91 Description of Plants fungus Pathogens Results Units Rating Fecal Coliform < 7.5 MPN/g pass Salmonella < 3 MPN/4g pass Date Tested: 14 Dec. 16 Inerts % by weight Plastic < 0.5 Glass < 0.5 Metal < 0.5 Sharps ND Total Nitrogen: 1.5 0.85 % Ammonia (NH4-N): 2400 1400 mg/kg Nitrate (NOrN): 11 6.1 mg/kg Org. Nitrogen (Org.-N): 1.3 0.74 % Phosphorus (as P20s): 1.7 0.96 % Phosphorus (P): 7400 4200 mg/kg Potassium (as K20): 0.51 0.29 % Potassium (K): 4200 2400 mg/kg Calcium (Ca): 0.90 0.51 % Magnesium (Mg): 0.16 0.092 % Sulfate (S04-S): 2600 1500 mg/kg Boron (Total 8): 11 6.3 mg/kg Moisture: 0 42.9 % Sodium (Na): 0.028 0.016 % Chloride (Cl): 0.084 0.048 % pH Value: NA 7.49 unit Bulk Density : 20 35 lb/cu ft Carbonates (CaC03): 12 6.7 lb/ton Conductivity (EC5): 5.1 NA mmhos/cm Organic Matter: 52.4 29.9 % Organic Carbon: 24.0 14.0 % Ash: 47.6 27.2 % C/N Ratio 16 16 ratio Aolndex > 10 > 10 ratio Metals Dry wt. EPA Limit units Size Distribution Aluminum (Al): 6900 - mg/kg MM % by weight Arsenic (As): 13 41 mg/kg > 50 0.0 Cadmium (Cd): < 1.0 39 mg/kg 25 to 50 0.0 Chromium (Cr): 32 1200 mg/kg 16 to 25 0.0 Cobalt (Co) 5.7 - mg/kg 9.5 to 16 5.1 Copper (Cu): 85 1500 mg/kg 6.3 to 9.5 7.0 Iron (Fe): 42000 - mg/kg 4.0 to 6.3 11.1 Lead (Pb): Manganese (Mn): 36 250 300 mg/kg - mg/kg 2.0 to 4.0 19.1 < 2.0 57.8 Mercury (Hg): < 1.0 17 mg/kg Molybdenum (Mo): 3.6 75 mg/kg Nickel (Ni): 9.7 420 mg/kg Selenium (Se): 1.2 36 mg/kg Zinc (Zn): 250 2800 mo/kq Account No.: 6120460 - 1/1 - 1299 Date Received Sample i.d. 14 Dec. 16 Course Comp - < safe SloRelease> < Avera e Nutrient Release Rate > <Hi h Available Nutrients +++++++++++++++++++ < Low > < Avera e > < Hi h Lime Content as CaC03 Sieve Size % > 6.3 MM (0.25'-'':....-------------------------------------. Group: Dec16C No. 17 Sample l.d. No. 1/1 6120460 INTERPRETATION: Is Your Compost Stable? Respiration Rate 2.2 mg CO2-Cl Biode radalion Rate of Your Pile Page one of three g OM/day > <Moderate! Unstable> < Unstable > < Hi h For Mulch Biologically Available Carbo.n,...B_A_c..,"""'!'_o .ti.m..;.u;;;m.;....De..r,a.da,t;;i,o_n R_a_te..... _ 2.3 mg CO2-Cl g OM/day Is Your Compost Mature? AmmoniaN/NitrateN ratio 220 Ratio Ammonia N ppm 2400 mg/kg dry wt. Nitrate N ppm 11 mg/kg dry wt. pH value 7.49 units Cucumber Emergence 100.0 percent Is Your Compost Safe Regarding Health? Fecal Coliform < 1000 MPN/g dry wt. '++++++ Salmonella Less than 3 /4g dry wt. Metals US EPA 503 Pass dry wt. >i< High:Feca1 c01iform :::: Does Your Compost Provide Nutrients or Organic Matter? Nutrients (N+P205+K20) 3.7 Percent +++++++++++++++++++++++ ++++++ dry wt. <Low > < Avera e Aglndex (Nutrients / Sodium and Chloride Salts 15 Ratio r++++.+;;.+;.;.+;.;+;.;+.;;+;;;+;""+++++'"++_+_+_+_+_+_+_+_+_+_+_+_+_+_+_++++.;+..;+;;;+;;.+;"+"""+"+" ++'"++•+.;+.;;,+;_+_++"+'"+"_+_+_+_+_+_+_+_+_+_+_+_+_+_+_+_+_+_+_+_+_+_+_+_+.,. > < Nutrient and Sodium and Chloride Provider > < Nutrient Provider Plant Available Nitrogen (PAN Estimated release for first season 6 lbs/ton ++++++++++++++++++++++ C/N Ratio wet wt. 16 Ratio Low Nitro en Provider> < Avera e Nitro en Provider +++++++++++++++++++++++++++++++ > <Hi h Nitro en Provider < Nitro en Release > < N-Neutral > < N-Demand> < Hi h Nitro en Demand Soluble Available Nutrients & s_a_l_ts;.i,;E;;.C;;.5;;.w.;.;./;.w.;.;..d;;.w;.;._ _ 5.1 mmhos/cm ++++++++++++++++++++++++++ dry wt. Lime Content (CaC03) 12 Lbs/ton dry wt. What are the physical properties of your compost? Percent Ash 47.6 Percent I+++++++++++++++++++++++++++++++ ++++++ l dry wt. I< Hiah Oraanic Matter >I< Averaae >I< Hiah Ash Content l 12.1 Percent I++++++++++++++++++++++++++++++++++++++++++++ +++++++++++++++++++++++++++++++++++ dry wt. I All Uses >I< Size Mav Restri.ct Uses for Pottinn mix and Golf Courses l > <Moderate! Unstable> < Unstable > < Hi h For Mulch +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Ve Mature> < Mature > < Immature +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Ve Mature> < Mature > < Immature >i< Mature ++++++++++++++++++++++++++++++++++++++++++++++ +++++++++++++ < Immature > < Mature > < Immature ++++++++++++++++++++++ +++++++++++++++++++++++++++++++++++++++++++++++++++++++++ < Immature > < Mature. +++++++ <Safe none detected > < Hi h Salmonella Count > 3 er 4 rams ..+_+.,.+,,.+.,.+.,.+_+_+_+-=--------------=-----.,..,.-.,.-,,,....,,_------------1 <All Metals Pass > < One or more Metals Fail Account No.: 6120460 - 1/1 - 1299 Date Received Sample i.d. 14 Dec. 16 Course Comp Group: Dec16C No. 17 Sample l.d. No. 1H 6120460 INTERPRETATION : Is Your Compost Stable? Page two of three Respiration Rate 2.2 Low: Good for all uses mg C02-C/g OM/day The respiration rate is a measurement of the biodegradation rate of the organic matter in the sample (as received). The respiration rate is determined by measuring the rate at which CO2 is released under optimized moisture and temperature conditions. Biologically Available Carbon 2.3 Low: Good for all uses mg C02-C/g OM/day Biologically Available Carbon (BAG) is a measurement of the rate at which CO2 is released under optimized moisture, temperature, porosity, nutrients, pH and microbial conditions. If both the RR and the BAC test values are close to the same value, the pile is optimized for composting. If both values are high the compost pile just needs more time. If both values are low the compost has stabilized and should be moved to curing. BAG test values that are higher than RR indicate that the compost pile has stalled. This could be due to anaerobic conditions, lack of available nitrogen due to excessive air converting ammonia to the unavailable nitrate form, lack of nitrogen or other nutrients duelo poor choice of feedstock, pH value out of range, or microbes rendered non-active. Is Your Compost Mature? AmmoniaN:NitrateN ratio 220 immature Composting to stabilize carbon can occur at such a rapid rate that sometimes phytotoxins remain in the compost and must be neutralized before using in high concentrations or in high-end uses. This Ammonia N ppm step is called curing. Typically ammonia is in excess with the break-down of organic materials resulting .2:.:4.:.0.:.0.::... ....;cm..:.::m.;.:.:act:.u::"r'e"---in an increase in pH. This combination results in a loss of volatile ammonia (it smells).Once this toxic Nitrate N ppm ammonia has been reduced and the pH drops, the microbes convert the ammonia to nitrates. A low 1_1 i'm"'""m"_a'-t'-u'--r'-e'-- ammonia + high nitrate score is indicative of a mature compost, however there are many exceptions. pH value For example,a compost with a low pH {<7) will retain ammonia,while a compost with high lime content ..7:..;..4..;.9.;;. ....;m""a".':t..u:"r-.e:; can lose ammonia before the organic fraction becomes stable. Composts must first be stable before curing indicators apply. Cucumber Bioassay 100.0 Percent Cucumbers are chosen for this test because they are salt tolerant and very sensitive to ammonia and organic acid toxicity.Therefore, we can germinate seeds in high concentrations of compost to measure phytotoxic effects without soluble salts being the limiting factor. Values above 80% for both percent emergence and vigor are indicative of a well-cured compost. Exceptions include very high salts that affect the cucumbers, excessive concentrations of nitrates and other nutrients that will be in range when formulated to make a growing media. In addition to testing a 1:1 compost: vermiculite blend, we also test a diluted 1:3 blend to indicate a more sensitive toxicity level. Is Your Compost Safe Regarding Health? Fecal Coliform < 1000 / g dry wt. Fecal coliforms can survive in both aerobic and anaerobic conditions and is common in all initial compost piles. Most human pathogens occur from fecal matter and all fecal matter is loaded in fecal coliforms. Therefore fecal coliforms are used as an indicator to determine if the chosen method for pathogen reduction (heat for compost) has met the requirements of sufficient temperature, time and mixing. If the fecal coliforms are reduced to below 1000 per gram dry wt. it is assumed all others pathogens are eliminated. Potential problems are that fecal coliform can regrow during the curing phase or during shipping. This is because the conditions are now more favorable for growth than during the composting process. Salmonella Bacteria Less than 3 3 / 4g dry wt. Salmonella is not only another indicator organism but also a toxic microbe. It has been used in the case of biosolids industry to determine adequate pathogen reduction. Metals Pass The ten heavy metals listed in the EPA 503 regulations are chosen to determine if compost can be applied to ag land and handled without toxic effects.Most high concentrations of heavy metals are derived from woodwaste feedstock such as chrome-arsenic treated or lead painted demolition wood. Biosolids are rarely a problem. Does Your Compost Provide Nutrients or Organic Matter? Nutrients (N+P205+K20) 3.7 Average nutrient content This value is the sum of the primary nutrients Nitrogen, Phosphorus and Potassium. Reported units are consistent with those found on fertilizer formulations.A sum greater than 5 is indicative of a compost with high nutrient content, and best used to supply nutrients to a receiving soil. A sum below 2 indicates low nutrient content,and is best-used to improve soil structure via the addition of organic matter. Most compost falls between 2 and 5. Account No.: 6120460 - 1/1 - 1299 Group: Dec16C No. 17 INTERPRETATION: Aglndex (Nutrients/Na+CI) Date Received Sample i.d. Sample l.d. No. 14 Dec. 16 Course Comp 1/1 6120460 Page three of three 15 High nutrient ratio Composts with low Aglndex values have high concentrations of sodium and/or chloride compared to nutrients. Repeated use of a compost with a low Aglndex (< 2) may result in sodium and/or chloride acting as the limiting factor compared to nutrients,governing application rates. These composts may be used on well-draining soils and/or with salt-tolerant plants. Additional nutrients form another source may be needed if the application rate is limited by sodium or chloride. If the Ag Index is above 10, nutrients optimal for plant growth will be available without concern of sodium and/or chloride toxicity. Composts with an Ag Index of above 1O are good for increasing nutrient levels for allsoils. Most composts score between 2 and 10. Concentrations of nutrients, sodium, and chloride in the receiving soil should be considered when determining compost application rates. The Aglndex is a product of feedstock quality. Feedstock from dairy manure, marine waste, industrial wastes, and halophytic plants are likely to produce a finished compost with a low Aglndex. Plant Available Nitrogen (lbs/ton) 6 Average N Provider Plant Available Nitrogen (PAN) is calculated by estimating the release rate of Nitrogen from the organic fraction of the compost. This estimate is based on information gathered from the BAC test and measured ammonia and nitrate values. Despite the PAN value of the compost, additional sources of Nitrogen may be needed during he growing season to off- set the Nitrogen demand of the microbes present in the compost. With ample nutrients these microbes can further breakdown organic matter in the compost and release bound Nitrogen. Nitrogen demand based on a high C/N ratio is not considered in the PAN calculation because additional Nitrogen should always be supplemented to the receiving soil when composts with a high C/N ratio are applied. C/N Ratio 16 Indicates immaturity As a guiding principal, a C/N ratio below 14 indicates maturity and above 14 indicates immaturity, however, there are many exceptions. Large woodchips (>6.3mm), bark, and redwood are slow to breakdown and therefore can result in a relatively stable product while the C/N ratio value is high. Additionally, some composts with chicken manure and/or green grass feedstocks can start with a C/N ratio below 15 and are very unstable. A C/N ratio below 10 supplies Nitrogen, while a ratio above 20 can deplete Nitrogen from the soil. The rate at which Nitrogen will be released or used by the microbes is indicated by the respiration rate (BAC). Ifthe respiration rate is too high the transfer of Nitrogen will not be controlable. Soluble Nutrients & Salts (EC5 w/w dw - mmhos/cm) 5.1 Average salts This value refers to all soluble ions including nutrients,sodium, chloride and some soluble organic compounds. The concentration of salts will change due to the release of salts from the organic matter as it degrades, volatilization of ammonia, decomposition of soluble organics, and conversion of molecular structure. High salts + high Ag Index is indicative of a compost high in readily available nutrients. The application rate of these composts should be limited by the optimum nutrient value based on soil analysis of the receiving soil. High Salts + low Ag Index is indicative of a compost low in nutrients with high concentrations of sodium and/or chloride. Limit the application rate according to the toxicity level of thesodium and/or chloride. Low salts indicates that the compost can be applied without risking salt toxicity, is likely a good source of organic matter, and that nutrients will release slowly over time. Lime Content (lbs. per ton) 12 Average lime content Compost high in lime or carbonates are often those produced from chicken manure (layers) ash materials, and lime products. These are excellent products to use on a receiving soil where lime has been recommended by soil analysis to raise the pH. Composts with a high lime content should be closely considered for pH requirements when formulating potting mixes. Physical Properties Percent Ash 47.6 Average ash content Ash is the non-organic fraction of a compost. Most composts contain approximately 50% ash (dry weight basis). Compost can be high in ash content for many reasons including: excess minerilzation(old compost), contamination with soil base material during turning, poor quality feedstock, and soil or mineral products added. Finding the source and reducing high ash content is often the fastest means to increasing nutrient quality of a compost. Particle Size % > 6.3 MM (0.25") 12.1 May restrict use Large particles may restrict use for potting soils, golf course topdressings, seed-starter mixes, and where a fine size distribution is required. Composts with large particles can still be used as excellent additions to field soils, shrub mixes and mulches. Particle Size Distribution Each size fraction is measured by weight,volume and bulk density. These results are particularly relevent with decisions to screen or not, and if screening,which size screen to use. The bulk density indicates if the fraction screened is made of light weight organic material or heavy mineral material. Removing large mineral material can greatly improve compost quality by increasing nutrient and organic concentrations Appendix: Plant Available Nitrogen (PAN) calculations: PAN = (X * (organic N)) + ((NH4-N) + (N03-N)) X value = lfBAC < 2 then X = 0.1 If BAC =2.1 to 5 then X = 0.2 lfBAC =5.1 to 10 then X = 0.3 If BAC > 10 then X = 0.4 Note: If C/N ratio > 15 additional N should be applied. Estimated available nutrients for use when calculating application rates lbs/ton (As Revd.) Plant Available Nitrogen (PAN) Ammonia (NH4-N) Nitrate (N03-N) Available Phosphorus (P205*0.64) Available Potassium (K20) 5.6 2.80 0.01 12.2 5.8 ANALYTICAL CHEMISTS and BACTERIOLOGISTS Approved by State of calilomla SOIL CONTR OL LAB Eastern Compost LLC P.O. Box 1396 Oxford, NC 27565 Attn: Jason Smith Date Received: 14 Dec. 16 Sample Identification: Fine Compost Sample ID #: 6120461 - 1/1 TEL: 831-724-5422 FAX: 831-724-3188 www.compostlab.com Account #: 6120461-1/1 -1299 Group: Dec16C #18 Reporting Date: December 28, 2016 Nutrients Dry wt. As Revd. units Stability Indicator: Biologically CO2 Evolution Respirometery Available C mg COrClg OM/day 2.3 2.4 mg COrClg TS/day 0.79 0.81 Stability Rating stable stable Maturity Indicator: Cucumber Bioassay Compost:Vermiculite(v :v) 1:2 Emergence (%) 100 Seedling Vigor (%) 32 Description of Plants stunted Pathogens Results Units Rating Fecal Coliform < 7.5 MPN/g pass Salmonella < 3 MPN/4g pass Date Tested: 14 Dec. 16 Inerts % by weight Plastic < 0.5 Glass < 0.5 Metal < 0.5 Sharps ND Total Nitrogen: 1.4 0.81 % Ammonia (NH4-N): 1600 930 mg/kg Nitrate (N03-N): 26 15 mg/kg Org. Nitrogen (Org.-N): 1.2 0.68 % Phosphorus (as P205): 2.8 1.6 % Phosphorus (P): 12000 7000 mg/kg Potassium (as K20): 1.0 0.59 % Potassium (K): 8600 4900 mg/kg Calcium (Ca): 2.0 1.1 % Magnesium (Mg): 0.46 0.26 % Sulfate (S04-S): 1200 690 mg/kg Boron (Total B): 95 54 mg/kg Moisture: 0 43.2 % Sodium (Na): 0.15 0.088 % Chloride (Cl): 0.13 0.073 % pH Value: NA 8.90 unit Bulk Density : 32 57 lb/cu ft Carbonates (CaC03): 26 15 lb/ton Conductivity (EC5): 4.9 NA mmhos/cm Organic Matter: 33.8 19.2 % Organic Carbon: 20.0 11.0 % Ash: 66.2 37.6 % C/N Ratio 14 14 ratio Aalndex > 10 > 10 ratio Metals Dry wt. EPA Limit units Size Distribution Aluminum (Al): 7700 - mg/kg MM % by weight Arsenic (As): 23 41 mg/kg > 50 0.0 Cadmium (Cd): < 1.0 39 mg/kg 25 to 50 0.0 Chromium (Cr): 22 1200 mg/kg 16 to 25 0.0 Cobalt (Co) 4.9 - mg/kg 9.5 to 16 0.0 Copper (Cu): 180 1500 mg/kg 6.3 to 9.5 3.3 Iron (Fe): 99000 - mg/kg 4.0 to 6.3 6.5 Lead (Pb): 13 300 mg/kg 2.0 to 4.0 19.1 Manganese (Mn): 570 - mg/kg < 2.0 71.1 Mercury (Hg): < 1.0 17 mg/kg Analyst: Assaf Sadeh !;>....k!L ECC procedures. / Molybdenum (Mo): 4.7 75 mg/kg Nickel (Ni): 13 420 mg/kg Selenium (Se): 1.5 36 mg/kg Zinc (Zn): 320 2800 mg/kg *Sample was received and handled 1n accordance with TM Account No.: 6120461 - 1/1 - 1299 Date Received Sample i.d. Sample l.d. No. 14 Dec. 16 Fine Compost Group: Dec16C No. 18 1/1 6120461 ----...i <""""S""a'e"-- ........=-------------------i...;..;;;;i.;.;.;.;;;;;;..;;.;;.;;;.;;;.;.;.;.;, ...... +++++++ ----------------- >.i,<.-,H-"i"g-,h-=Fe,...c-a--1,.c..""ol"it''"o"r-m-------- <Safe none detected > < Hi h Salmonella Count > 3 er 4 rams +++++++++ '"<-A"'l,,...,....e....t,a.-1,-s-=P,a...s-s ---------->...,<...""O''"n"_e_o__mr _o_re....,M...,,e....t,a.""1-s=F,a..."i" ----------------------------------------- 1 INTERPRETATION: Is Your Compost Stable? Respiration Rate 2.3 mg CO2-Cl Page one of three Biode radation Rate of Your Pile g OM/day < Stable Unstable > < Hi h For Mulch Biologically Available Carbo.n.-:oB=:"Al C -- ----"""""-i-i,i-+---------------......._;..;;;;...;.=..... 2.4 mg CO2-Cl g OM/day Is Your Compost Mature? AmmoniaN/NitrateN ratio 62 Ratio Unstable· > < Hi h For Mulch Ammonia N ppm 1600 mg/kg dry wt. Nitrate N ppm 26 mg/kg dry wt. pH value 8.90 units Cucumber Emergence 100.0 percent Is Your Compost Safe Regarding Health? Fecal Coliform < 1000 MPN/g dry wt. 1+++++++ . Salmonella Less than 3 /4g dry wt. Metals US EPA 503 Pass dry wt . Does Your Compost Provide Nutrients or Organic Matter? Nutrients (N+P205+K20) 5.2 Percent ++++++++++++++++++++++++++++++++++++++++ dry wt. <Low > < Avera e h Nutrient Content Aglndex (Nutrients / Sodium a..n.,d...C.,.h,..l.o,_.ri,.d..e;..S; a.l,t;,s;,i. 15 Ratio --...i.-......;..;.....;.;..,;...;....,_,,,..."""--------------- Plant Available Nitrogen (PAN Estimated release for first season 5 lbs/ton ++++++++++++++++++ C/N Ratio wet wt. Low Nitro en Provider> < Avera e Nitro en Provider > <Hi h Nitro en Provider 14 Ratio +++++++++++++++++++++++++++ < Nitro en Release > < N-Neutral > < N-Demand> < Hi h Nitro en Demand Soluble Available Nutrients.&, salts...;E;;.C,;;;,.5;;;.w.;.;.;/.w;.;.,.d;;..w;,;...-- ------------------------ 4.9 mmhos/cm +++++++++++++++++++++++++ dry wt. SloRelease> < Avera e Nutrient Release Rate > <Hi h Available Nutrients Lime Content (CaC03) 26 Lbs/ton dry wt . +++++++++++++++++++++++++++++++++++++++ ++ < Low > < Avera e > < Hi h Lime Content as CaC03 What are the physical properties of your compost? Percent Ash 66.2 Percent I++++++++++++++++++++++++++++++++++++++++++++++++++++ I dry wt . I < Hiah Oraanic Matter >I< AveraQe >I< HiQh Ash Content I Sieve Size % > 6.3 MM (0.25'_'1.---------------------------------------. 3.3 Percent !++++++++++++++++++++++++++ I dry wt. IAll Uses >I< Size Mav Restrict Uses for Pottina mix and Golf Courses I +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Ve Mature> < Mature > < Immature +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Ve Mature> < Mature > < Immature ++++++++++++++++++++ < Immature > < Mature ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ < Immature > < Mature > < Immature +++++++++++++++++++++++++++++++++++++++++++++++++++ ++++++++++++++++++++++++++++ < Immature > < Mature Account No.: 6120461 - 1/1 - 1299 Date Received Sample i.d. Sample l.d. No. 14 Dec. 16 Fine Compost Group: Dec16C No. 18 1/1 6120461 INTERPRETATION: Is Your Compost Stable? Page two of three Respiration Rate 2.3 Low: Good for all uses mg C02-C/g OM/day The respiration rate is a measurement of the biodegradation rate of the organic matter in the sample (as received). The respiration rate is determined by measuring the rate at which CO2 is released under optimized moisture and temperature conditions. Biologically Available Carbon 2.4 Low: Good for all uses mg C02-C/g OM/day Biologically Available Carbon (BAC) is a measurement of the rate at which CO2 is released under optimized moisture, temperature , porosity, nutrients, pH and microbial conditions. Ifboth the RR and the BAC test values are close to the same value, the pileis optimized for composting. If both values are high the compost pilejust needs more time. If both values are low the compost has stabilized and should be moved to curing.BAC test values that are higher than RR indicate that the compost pile has stalled. This could be due to anaerobic conditions,lack of available nitrogen due to excessive air converting ammonia to the unavailable nitrate form, lack of nitrogen or other nutrients due to poor choice of feedstock, pH value out of range, or microbes rendered non-active. Is Your Compost Mature? AmmoniaN:NitrateN ratio 62 immature Composting to stabilize carbon can occur at such a rapid rate that sometimes phytotoxins remain in the compost and must be neutralized before using in high concentrations or in high-end uses. This Ammonia N ppm step is called curing. Typically ammonia is in excess with the break-down of organic materials resulting .1.;..6::..0::0.::... ...i;cm..:..:m.:.:..::.a:.t:u.::cr..e::: in an increase in pH. This combination results in a loss of volatile ammonia {iismells). Once this toxic Nitrate N ppm ammonia has been reduced and the pH drops, the microbes convert the ammonia to nitrates. A low ....2.a.6"----i'cm..;""m"'-a""t"u''r-e;;. ammonia + high nitrate score is indicative of a mature compost, however there are many exceptions. pH value For example, a compost with a low pH {<7) will retain ammonia, while a compost with high lime content .8.;;.;..9;;;.0.;;. ...i;cm..:.;m;..:..::.a:t.:u.::.r;..e;'-- can lose ammonia before the organic fraction becomes stable.Composts must first be stable before curing indicators apply. Cucumber Bioassay 100.0 Percent Cucumbers are chosen for this test because they are salt tolerant and very sensitive to ammonia and organic acid toxicity. Therefore , we can germinate seeds in high concentrations of compost to measure phytotoxic effects without soluble salts being the limiting factor. Values above 80% for both percent emergence and vigor are indicative of a well-cured compost. Exceptions include very high salts that affect the cucumbers, excessive concentrations of nitrates and other nutrients that will be in range when formulated to make a growing media. In addition to testing a 1:1 compost: vermiculite blend, we also test a diluted 1:3 blend to indicate a more sensitive toxicity level. Is Your Compost Safe Regarding Health? Fecal Coliform < 1000 / g dry wt. Fecal coliforms can survive in both aerobic and anaerobic conditions and is common in all initial compost piles. Most human pathogens occur from fecal matter and all fecal matter is loaded in fecal coliforms.Therefore fecal coliforms are used as an indicator to determine if the chosen method for pathogen reduction (heat for compost) has met the requirements of sufficient temperature, time and mixing. Ifthe fecal coliforms are reduced to below 1000 per gram dry wt. it is assumed all others pathogens are eliminated. Potential problems are that fecal coliform can regrow during the curing phase or during shipping.This is because the conditions are now more favorable for growth than during the composting process. Salmonella Bacteria Less than 3 3 / 4g dry wt. Salmonella is not only another indicator organism but also a toxic microbe. It has been used in the case of biosolids industry to determine adequate pathogen reduction. Metals Pass The ten heavy metals listed in the EPA 503 regulations are chosen to determine if compost can be applied to ag land and handled without toxic effects. Most high concentrations of heavy metals are derived from woodwaste feedstock such as chrome-arsenic treated or lead painted demolition wood. Biosolids are rarely a problem. Does Your Compost Provide Nutrients or Organic Matter? Nutrients (N+P205+K20) 5.2 High nutrient content This value is the sum of the primary nutrients Nitrogen,Phosphorus and Potassium. Reported units are consistent with those found on fertilizer formulations. A sum greater than 5 is indicative of a compost with high nutrient content, and best used to supply nutrients to a receiving soil. A sum below 2 indicates low nutrient content, and is best-used to improve soilstructure via the addition of organic matter. Most compost falls between 2 and 5. Appendix: Plant Available Nitrogen (PAN) calculations: PAN = (X * (organic N)) + ({NH4-N) + (N03-N)) X value = If BAC < 2 then X = 0.1 If BAC =2.1to 5 then X = 0.2 lfBAC =5.1to 10 then X = 0.3 lfBAC > 10 then X = 0.4 Note: If C/N ratio > 15 additional N should be applied. Account No.: 6120461 - 1/1- 1299 Group: Dec16C No. 18 INTERPRETATION: Aglndex (Nutrients/Na+CI) Date Received Sample i.d. Sample l.d. No. 14 Dec.16 Fine Compost 1/1 6120461 Page three of three 15 High nutrient ratio Composts with low Ag Index values have high concentrations of sodium and/or chloride compared to nutrients. Repeated use of a compost with a low Aglndex (< 2) may result in sodium and/or chloride acting as the limiting factor compared to nutrients,governing application rates. These composts may be used on well-draining soils and/or with salt-tolerant plants. Additional nutrients form another source may be needed if the application rate is limited by sodium or chloride. Ifthe AgIndex is above 10,nutrients optimal for plant growth will be available without concern of sodium and/or chloride toxicity. Composts with an Aglndex of above 10 are good for increasing nutrient levels for all soils. Most composts score between 2 and 10. Concentrations of nutrients, sodium,and chloride in the receiving soilshould be considered when determining compost application rates. The Ag Index is a product of feedstock quality. Feedstock from dairy manure,marine waste, industrial wastes, and halophytic plants are likely to produce a finished compost with a low Aglndex. Plant Available Nitrogen (lbs/ton) 5 Low N Provider Plant Available Nitrogen (PAN) is calculated by estimating the release rate of Nitrogen from the organic fraction of the compost. This estimate is based on information gathered from the BAC test and measured ammonia and nitrate values. Despite the PAN value of the compost, additional sources of Nitrogen may be needed during he growing season to off- set the Nitrogen demand of the microbes present in the compost. With ample nutrients these microbes can further breakdown organic matter in the compost and release bound Nitrogen.Nitrogen demand based on a high C/N ratio is not considered in the PAN calculation because additional Nitrogen should always be supplemented to the receiving soil when composts with a high C/N ratio are applied. C/N Ratio 14 Indicates maturity As a guiding principal,a C/N ratio below 14 indicates maturity and above 14 indicates immaturity, however,there are many exceptions. Large woodchips (>6.3mm), bark, and redwood are slow to breakdown and therefore can result in a relatively stable product while the C/N ratio value is high. Additionally, some composts with chicken manure and/or green grass feedstocks can start with a C/N ratio below 15 and are very unstable. A C/N ratio below 1O supplies Nitrogen, while a ratio above 20 can deplete Nitrogen from the soil. The rate at which Nitrogen will be released or used by the microbes is indicated by the respiration rate (BAC). Ifthe respiration rate is too high the transfer of Nitrogen will not be controlable. Soluble Nutrients & Salts (ECS w/w dw - mmhos/cm) 4.9 Average salts This value refers to all soluble ions including nutrients, sodium.chloride and some soluble organic compounds. The concentration of salts will change due to the release of salts from the organic matter as it degrades . volatilization of ammonia, decomposition of soluble organics, and conversion of molecular structure . High salts + high Aglndex is indicative of a compost high in readily available nutrients. The application rate of these composts should be limited by the optimum nutrient value based on soil analysis of the receiving soil. High Salts + low AgIndex is indicative of a compost low in nutrients with high concentrations of sodium and/or chloride. Limit the application rate according to the toxicity level of thesodium and/or chloride. Low salts indicates that the compost can be applied without risking salt toxicity,is likely a good source of organic matter, and that nutrients will release slowly over time. Lime Content (lbs. per ton) 26 High lime content Compost high in lime or carbonates are often those produced from chicken manure (layers) ash materials, and lime products. These are excellent products to use on a receiving soilwhere lime has been recommended by soil analysis to raise the pH. Composts with a high lime content should be closely considered for pH requirements when formulating potting mixes. Physical Properties Percent Ash 66.2 High ash content Ash is the non-organic fraction of a compost. Most composts contain approximately 50% ash (dry weight basis). Compost can be high in ash content for many reasons including: excess minerilzation(old compost), contamination with soil base material during turning, poor quality feedstock, and soilor mineral products added. Finding the source and reducing high ash content is often the fastest means to increasing nutrient quality of a compost. Particle Size % > 6.3 MM (0.25") 3.3 May restrict use Large particles may restrict use for potting soils, golf course topdressings , seed-starter mixes, and where a fine size distribution is required. Composts with large particles can still be used as excellent additions to field soils,shrub mixes and mulches. Particle Size Distribution Each size fraction is measured by weight, volume and bulk density. These results are particularly relevent with decisions to screen or not, and if screening , which size screen to use. The bulk density indicates if the fraction screened is made of light weight organic material or heavy mineral material. Removing large mineral material can greatly improve compost quality by increasing nutrient and organic concentrations. Estimated available nutrients for use when calculating application rates lbs/ton (As Revd.) Plant Available Nitrogen (PAN) Ammonia (NH4-N) Nitrate (N03-N) Available Phosphorus (P205*0.64) Available Potassium (K20) 4.8 1.86 0.03 20.4 11.8 ANALYTICAL CHEMISTS and BACTERIOLOGISTS Approved by State of California SOIL CONTR OL LAB Eastern Compost LLC P.O. Box 1396 Oxford, NC 27565 Attn: Jason Smith Date Received: 01 Jun. 16 Sample Identification: Biosolid Fine Comp Sample ID #: 6060007 - 1/2 TEL: 831-724-5422 FAX: 831-724-3188 www.compostlab.com Account #: 6060007-1/2-1299 Group: Jun16A #4 Reporting Date: June 17, 2016 Nutrients Total Nitrogen: Ammonia (NH4-N): Nitrate (NOrN): Org. Nitrogen (Org.-N): Dry wt. 1.5 2400 890 1.2 As Revd. 1.0 1600 580 0.79 units % mg/kg mg/kg % Stability Indicator: CO2 Evolution mg COrC!g OM/day mg C02-C/g TS/day Stability Rating Biologically Respirometery Available C 1.3 1.3 0.50 0.49 very stable very stable Phosphorus (as P205): 2.9 1.9 % Phosphorus (P): 13000 8500 mg/kg Potassium (as K20): 1.3 0.83 % Maturity Indicator: Cucumber Bioassay Potassium (K): 10000 6900 mg/kg Compost:Vermiculite(v:v) 1:2 Calcium (Ca): 1.8 1.2 % Emergence (%) 100 Magnesium (Mg): 0.39 0.26 % Seedling Vigor (%) 92 Sulfate (S04-S): 4200 2800 mg/kg Description of Plants healthy Boron (Total 8): 110 73 mg/kg Moisture: 0 34 0 % Sodium (Na): 0.21 0.14 % Pathogens Results Units Rating Chloride (Cl): 0.20 0.13 % Fecal Coliform < 7.5 MPN/g pass pH Value: NA 6.96 unit Salmonella < 3 MPN/4g pass Bulk Density : 30 45 lb/cu ft Date Tested: 01 Jun. 16 Carbonates {CaC03): 22 15 lb/ton Conductivity (EC5): 11 NA mmhos/cm Organic Matter: 34.2 22.6 % Inerts % by weight Organic Carbon: 20.0 13.0 % Plastic < 0.5 Ash: 65.8 43.5 % 'Glass < 0.5 C/N Ratio Aglndex 13 > 10 13 > 10 ratio ratio Metal < 0.5 Sharps ND Analyst: Assaf Sadeh L -- *Sample was received and handled in accordance with TMECC procedures. .r :M=:e:=ta=ls==========::::D:;:r=y =w=t ==;:E::P;;A::;L:i=m==i:t====u=n;it:s:=::: : Size Distribution Aluminum (Al): 5300 - mg/kg MM % by weight Arsenic (As): 28 41 mg/kg > 50 0.0 Cadmium (Cd): < 1.0 39 mg/kg 25 to 50 0.0 Chromium (Cr): 24 1200 mg/kg 16 to 25 0.0 Cobalt (Co) 4.6 - mg/kg 9.5 to 16 0.0 Copper (Cu): 180 1500 mg/kg 6.3 to 9.5 1.8 Iron (Fe): 88000 - mg/kg 4.0 to 6.3 5.7 Lead (Pb): 11 300 mg/kg 2.0 to 4.0 18.0 Manganese (Mn): 560 - mg/kg < 2.0 74.5 Mercury (Hg): < 1.0 17 mg/kg Molybdenum (Mo): 4.9 75 mg/kg Nickel (Ni): 13 420 mg/kg Selenium (Se): 1.6 36 mg/kg Zinc (Zn): 310 2800 mg/kg Account No.: 6060007 - 1/2 - 1299 Date Received Sample i.d. 01 Jun. 16 Biosolid Fine Comp 1 1irorm :::! +++++++++++++++++++++++++++ ++++++++++++++++++++++++++++++ S!oRelease> < Avera e Nutrient Release Rate > <Hi hAvailable Nutrients +++++++++++++++++++++++++++++++++++ < Low > < Avera e > < Hi h lime Content as CaC03 Group: Jun16A No. 4 INTERPRETATION: Is Your Compost Stable? Respiration Rate 1.3 mg CO2-Cl g OM/day Sample l.d. No. Biode radation Rate of Your Pile 1/2 6060007 Page one of three Unstable- ' > < Hi ll For Mulch Biologically Available Carbon.-.B.A.c. ==.=.;..;;.==;;.;.;..;.;.;;;.;.. -. 1.3 mg CO2-Cl g OM/day Is Your Compost Mature? AmmoniaN/NitrateN ratio 2.7 Ratio Ammonia N ppm 2400 mg/kg dry wt. Nitrate N ppm 890 mg/kg dry wt. pH value 6.96 units Cucumber Emergence 100.0 percent Is Your Compost Safe Regarding Health? Fecal Coliform < 1000 MPN/g dry wt. I+++++++ safe >1<Hianfee.aco: Salmonella Less than 3 /4g dry wt. Metals US EPA 503 +++++++ <safe· none detected) > < Hr h.SalmonellaCount. > 3 er 4 rams Pass dry wt. +++++++++ 1<- A'"':ecM'"""e".t,a....1,s.--P=,a_ss ---------->-.<-,..O.=n-e_o_r _m_o_re-=r-v-f=e-..t.,a,""'1,s..-.=F'"a""i"1 ------------------------------------------------ 1 Does Your Compost Provide Nutrients or Organic Matter? Nutrients (N+P205+K20) 5.7 Percent dry wt. >',;: HihNi:rtrient.Content Aglndex(N:..:trients: Sodium ar.d Chloride Sa!ts' ' N+P205+K20 / 'Na + Cl 14 Ratio +++++++++++++++++++++++++++++++++++++++++++;..++++++ ++++++++++++++++++++++ >'< Nutrient and Sodium and Chloride Provider ·> < N4trient Provider Plant Available Nitrogen (PAN Estimated release for first season 6 lbs/ton +++++++++++++++++++++++ C/N Ratio wet wt. Low Nitro en Provider> < Avera e Nitro. "'11 Provider 13 Ratio +++++++++++++++++++++++++ < Nitro en Release > < N-Nevtral > < NOemand> < Soluble Available Nutrients ;&;;;.S;;,a;;;,;.t;;;;..i.E;;,C;;,;5;..w;;;.;w.;.;..d;;,w; 11 mmhos/cm dry wt. Lime Content (CaC03) 22 Lbs/ton dry wt. -----------------------------.. What are the phvsical properties of your compost? Percent Ash 65.8 Percent dry wt. ++++++++++++++++++++++++++++++++++++++++++++++++++++ Sieve Size % > 6.3 MM (0.2s·.•....---------------------------------------. 1.8 Percent dry wt. > < Size Ma Restrict Uses for Pattin mix antiGo1f Courses .>!<MooeratE)fy .unstab e> < Unstable . · . .·> < HI h For Mulch +++++++++++++++++++++++++++++++++++++++++++++++++++++ +++++++++++++++++++++++++++++++++++++++++++++·+++++.;.+++++++++++++++++++-!+++++++ Ve v!iiture.> < Mature . >!< imr11ature +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ ln1mature > < Mature ++++++++++++++++++++++++++++++++++++++++++++++++++++++ mmature > <Mur.e, ·> <lmmilture ++++++++++++++++++++++++++++ +++++++++++++++++++++++++++++++++++++++++++++++++++ <Immature. > <Mature Ve Mature> < Mature. . " > < Immature < Hi h Or anic Matter > < Aver e.·· > < H" h'Ash Content 01 Jun. 16 Biosolid Fine Comp Date Received Sample i.d. Account No.: 6060007 - 1/2 - 1299 Group: Jun16A No. 4 Sample 1.d. No. 1/2 6060007 INTERPRETATION: Is Your Compost Stable? Page two of three Respiration Rate 1.3low: Good for all uses mg C02-C/g OM/day The respiration rate is a measurement of the biodegradation rate of the organic matter in the sample (as received). The respiration rate is determined by measuring the rate at which CO2 is released under optimized moisture and temperature conditions. Biologically Available Carbon 1.3 low:Good for all uses mg C02-C/g OM/day Biologically Available Carbon (BAC) is a measurement of the rate at which CO2 is released under optimized moisture,temperature, porosity, nutrients, pH and microbial conditions. If both the RR and the BAC tesi values are close to the same value, the pi e is optimized for composting. If both values are high the compost pi e just needs more time. If both values are low the compost has stabilized and should be moved to curing. BAG test values that are higher than RR indicate that the compost pile has stalled. This could be due to anaerobic conditions,lack of available nitrogen due to excessive air converting ammonia to the unavailable nitrate form,lack of nitrogen or other nutrients due to poor choice of feedstock, pH value out of range, or microbes rendered non-active. Is Your Compost Mature? AmmoniaN:NitrateN ratio 2.7 mature Composting to stabilize carbon can occur at such a rapid rate that sometimes phytotoxins remain in __ _ the compost and must be neutral zed before using in high concentrations or in high-end uses. This Ammonia N ppm step is called curing. Typically ammonia is in excess with the break-down of organic materials resulting .2c:_4.Oc.cOc .cim.-'-"m-'c.a.:;.t.-;u'-;'r..e;'-- in an increase in pH. This combination results in a loss of volati e ammonia (it smells). Once this toxic Nitrate N ppm ammonia has been reduced and the pH drops, the microbes convert the ammonia to nitrates. A low ...c:scg::o.;a._._-'-m;.;a;::.t::u::cr:.e:=----ammonia + high nitrate score is indicative of a mature compost,however there are many exceptions. pH value For example, a compost with a low pH(<7} will retain ammonia, while a compost with high lime content ---6''".'.9.;6.." - m"-a"t'"u'-r'--e"-- can lose ammonia before the organic fraction becomes stable. Composts must first be stable before curing indicators apply. Cucumber Bioassay 100.0 Percent Cucumbers are chosen for this test because they are salt tolerant and very sensitive to ammonia and organic acid toxicity.Therefore, we can germinate seeds in high concentrations of compost to measure phytotoxic effects without soluble salts being the limiting factor. Values above 80% for both percent emergence and vigor are indicative of a we!l-cured compost. Exceptions include very high salts that affect the cucumbers, excessive concentrations of nitrates and other nutrients that will be in range when formulated to make a growing media. In addition to testing a 1:1 compost: vermicul te blend, we also test a diluted 1:3 blend to indicate a more sensitive toxicity level. Is Your Compost Safe Regarding Health? Fecal Coliform < 1000 / g dry wt. Fecal coliforms can survive in both aerobic and anaerobic conditions andis common in all initial compost piles. Most human pathogens occur from fecal matter and all fecal matter is loaded in fecal coliforms. Therefore fecal coliforms are used as an indicator to determine if the chosen method for pathogen reduction (heat for compost} has met the requirements of sufficient temperature, time and mixing. If the fecal coliforms are reduced to below 1000 per gram dry wt. it is assumed all others pathogens are eliminated. Potential problems are that fecal coliform can regrow during the curing phase or during shipping.This is because the conditions are now more favorable for growth than during the composting process. Salmonella Bacteria Less than 3 3 / 4g dry wt. Salmonella is not only another indicator organism but also a toxic microbe. It has been used in the case of biosolids industry to determine adequate pathogen reduction. Metals Pass The ten heavy metals listed in the EPA 503 regulations are chosen to determine if compost can be applied to ag land and handled without toxic effects. Most high concentrations of heavy metals are derived from woodwaste feedstock such as chrome-arsenic treated or lead painted demolition wood. Biosolids are rarely a problem. Does Your Compost Provide Nutrients or Organic Matter? Nutrients (N+P205+K20) 5.7 High nutrient content This value is the sum of the primary nutrients Nitrogen, Phosphorus and Potassium. Reported units are consistent with those found on fertilizer formulations. A sum greater than 5 is indicative of a compost with high nutrient content, and best used to supply nutrients to a receiving soil. A sum below 2 indicates low nutrient content, and is best-used:o improve soil structure via the addition of organic matter. Most compost falls between 2 and 5. Appendix: Plant Available Nitrogen (PAN) calculations: PAN = (X * (organic N)) + ((NH4-N) + (N03-N)) X value = If SAC < 2 then X = 0.1 if SAC =2.1 to 5 then X = 0.2 if BAC =5.1to 10 then X = 0.3 If BAC > 10 then X = 0.4 Note:If C/N ratio > 15 additional N should be applied. Estimated available nutrients for use when calculating application rates lbs/ton (As Revd.) Plant Available Nitrogen (PAN) Ammonia (NH4-N) Nitrate (N03-N) Available Phosphorus (P205*0.64) Available Potassium (K20) 5.9 3.20 U 6 24.7 16.6 Account No.: 6060007 - 1/2 - 1299 Group: Jun16A No. 4 Date Received Sample i.d. Sample l.d.No. 01 Jun. 16 Siosolid Fine Comp 1/2 6060007 INTERPRETATION: Page three of three Aglndex (Nutrients/Na+CI) 14 High nutrient ratio Composts with low Aglndex values have high concentrations of sodium and/or chloride compared to nutrients. Repeated use of a compost with a low Aglndex (< 2) may result in sodium and/or chloride acting as the limiting factor compared to nutrients, governing application rates. These composts may be used on well-draining soils and/or with salt-tolerant plants. Additional nutrients form another source may be neededif the application rate is limited by sodium or chloride. If the Aglndex is above 10, nutrients optimal for plant growth will be available without concern of sodium and/or chloride toxicity. Composts with an Aglndex of above 10 are good for increasing nutrientlevels for all soils. Most composts score between 2 and 10. Concentrations of nutrients,sodium, and chloride in the receiving soilshould be considered when determining compost application rates. The Aglndex is a product of feedstock quality. Feedstock from dairy manure, marine waste,industrial wastes, and halophytic plants are likely to produce a finished compost with a low Ag Index. Plant Available Nitrogen (lbs/ton) 6 Average N Provider Plant Available Nitrogen (PAN) is calculated by estimating the release rate of Nitrogen from the organic fraction of the compost. This estimate is based on information gathered from the BAC test and measured ammonia and nitrate values. Despite the PAN value of the compost, additional sources of Nitrogen may be needed during he growing season to off- set the Nitrogen demand of the microbes present in the compost. With ample nutrients these microbes can further breakdown organic matter in the compost and release bound Nitrogen. Nitrogen demand based on a high C/N ratio is not considered in the PAN calculation because additional Nitrogen should aiways be supplemented to the ;eceiving soil when composts with a high C/N ratio are applied. C/N Ratio 13 Indicates maturity As a guiding principal,a C/N ratio below 14 indicates maturity and above 14 indicates immaturity, however, there are many exceptions. Large woodchips (>6.3mm). bark, and redwood are slow to breakdown and therefore can result in a relatively stable product while the C/N ratio value is high. Additionally,some composts with chicken manure and/or green grass feedstocks can start with a C/N ratio below 15 and are very unstable. A C/N ratio below 10 supplies Nitrogen. while a ratio above 20 can deplete Nitrogen from the soil. The rate at which Nitrogen will be released or used by the microbes is indicated by the respiration rate (SAC). Ifthe respiration rate is too high the transfer of Nitrogen will not be controlable. Soluble Nutrients & Salts [EC5 w/w dw - mmhos/cm) 11 High salts This value refers to all soluble ions including nutrients, sodium, chloride and some soluble organic compounds. The concentration of salts will change due to the release of salts from the organic matter as it degrades, volatilization of ammonia, decomposition of soluble organics, and conversion of molecular structure. High salts + high Aglndex is indicative of a compost high in readily available nutrients. The application rate of these composts should be limited by the optimum nutrient value based on soi! analysis of the receiving soil. High Salts + low Aglndex is indicative of a compost lowin nutrients with high concentrations of sodium and/or chloride. Limit the application rate according to the toxicity level of thesodium and/or chloride. Low salts indicates that the compost can be applied without risking salt toxicity, is likely a good source of organic matter, and that nutrients will release slowly over time. Lime Content (lbs. per ton) 22 High lime content Compost high in lime or carbonates are often ttiose produced from chicken manure (layers) ash materials, and lime products. These are excellent products to use on a receiving soilwhere lime has been recommended by soilanalysis to raise the pH. Composts with a high lime content should be closely considered for pH requirements when formulating potting mixes. Physical Properties Percent Ash 65.8 High ash content Ash is the non-organic fraction of a compost. Most composts contain approximately 50% ash (dry weight basis). Compost can be high in ash content for many reasons including:excess minerilzation(old compost), contamination with soilbase material during turning, poor quality feedstock, and soil or mineral products added. Finding the source and reducing high ash content is often the fastest meansioincreasing nutrient quality of a compost. Particle Size % > 6.3 MM (0.25") 1.8 May restrict use Large particles may restrict use for potting soils, golf course topdressings, seed-starter mixes, and where a fine size distribution is required. Composts with large particles can still be used as excellent additions to field soils. shrub mixes and mulches. Particle Size Distribution Each size fraction is measured by weight,volume and bulk density. These results are particularly relevent with decisions to screen or not, and if screening, which size screen to use. The bulk density indicates if the fraction screened is made of light weight organic material or heavy mineral material. Removing large mineral material can greatly improve compost quality by increasing nutrient and organic concentrations. ANALYTICAL CHEMISTS and BACTERIOLOGISTS Approved by Stale of Ca! om:a SOIL CONTR OL LAB Eastern Compost LLC P.O. Box 1396 Oxford, NC 27565 Attn: Jason Smith Date Received: 01 Jun. 16 Sample Identification: Biosolid Coarse Comp Sample ID #: 6060007 - 2/2 TEL: 831-724-5422 FAX: 831-724-3188 www.compostlab.com Account #: 6060007-2/2-1299 Group: Jun16A #5 Reporting Date: June 17, 2016 Metals Aluminum (Al): Arsenic (As): Cadmium (Cd): Chromium (Cr): Cobalt (Co) Copper (Cu): Iron (Fe): Lead (Pb): Manganese (Mn): Mercury (Hg): Molybdenum (Mo): Nickel (Ni): Selenium (Se): Zinc (Zn): *Sample was received and handled 1n accordance with TMECC procedures. Analyst: Assaf Sadeh µ,.. Nutrients Total Nitrogen: Dry wt. 2.2 As Revd. units l 1..3 % I Stability Indicator: CO2 Evolution Respirometery Biologically Available C Ammonia (NH4-N): 3600 2100 mg/kg mg COrC/g OM/day 2.1 mg COrClg TS/day 1.5 - Stability Rating stable Maturity Indicator: Cucumber Bioassay Compost:Vermiculite(v:v) 1:2 Emergence (%) 100 Seedling Vigor (%) 105 Description of Plants healthy Pathogens Results Units Fecal Coliform 900 MPN/g Salmonella < 3 MPN/4g Date Tested:01 Jun. 16 Inerts % by weight Plastic < 0.5 Glass < C .5 Metal < 0.5 2.2 1.7 Nitrate (N03-N): 28 16 mg/kg stable Org. Nitrogen (Org.-N): 1.8 1.0 % Phosphorus (as P205): 0.58 0.33 % Phosphorus (P): 2500 1500 mg/kg Potassium (as K20): 0.33 0.19 % Potassium (K): 2700 1600 mg/kg Calcium (Ca): 0.63 0.37 % Magnesium (Mg): 0.20 0.12 % Sulfate (S04-S): 2900 1700 mg/kg Boron (Total 8): 15 8.6 mg/kg Moisture: 0 42.1 % Rating Sodium (Na): 0.065 0.038 % Chloride (Cl): 0.07 0.042 % pass pH Value: NA 7.31 unit pass Bulk Density : 15 26 lb/cu ft Carbonates (CaC03): 13 7.6 lb/ton Conductivity (EC5): 7.6 NA mmhos/cm Organic Matter: 70.5 40.8 % Organic Carbon: 38.0 22.0 % Ash: 29.5 17 1 % C/N Ratio 17 17 ratio Aglndex > 10 > 10 ratio Dry wt. EPA Limit unitSI 2700 - mg/kg 1.7 41 mg/kg < 1.0 39 mg/kg 9.5 1200 mg/kg 3.7 - mg/kg 48 1500 mg/kg 22000 - mg/kg 9.6 300 mg/kg 150 - mg/kg < 1.0 17 mg/kg 3.2 75 mg/kg 8.3 420 mg/kg 1.2 36 mg/kg 230 2800 mg/kq Size Distribution M M % by weight > 50 0.0 25 to 50 0.0 16 to 25 2.5 9.5 to 16 7.9 6.3 to 9.5 10.8 4.0 to 6.3 13.9 2.0 to 4.0 19.3 < 2.0 45.7 Account No.: Date Received 01 Jun. 16 6060007 - 2/2 - 1299 Group: Jun16A No. 5 Sample i.d. Sample Ld. No. Biosolid Coarse Comp 2/2 6060007 INTERPRETATION: Is Your Compost Stable? Respiration Rate 2.1 mg CO2-Cl g OM/day Page one of three Biode radation Rate of Your Pile >. < Hi h.for Mulch Biologica2lly.2AmvagilCaObl2e-CClarbon BAC - 0-----..-..................,......... _ g OM/day Is Your Compost Mature? AmmoniaN/NitrateN ratio 130 Ratio > <MOdef<!lel unstable> < Unstable > < Hi b Fof Mutch Ammonia N ppm 3600 mg/kg dry wt. Nitrate N ppm 28 mg/kg dry wt. pHvalue 7.31 units Cucumber Emergence 100.0 percent Is Your Compost Safe Regarding Health? Fecal Coliform < 1000 MPN/g dry wt. 1 ++++++ Salmonella ._...<. s;:a:;;f:e-_------------------------------------------------------------------------------_-......------..-... ------.-.;:1:<.H;[;gh.F=...e...c.a.;;1:c:;;:o::1.;if:o:;r:m_.._-_-_-..---------------_-_----_-_-.-.1, Less than 3 /4g dry wt. Metals US EPA 503 Pass dry wt. nonedetected) > < Hi hSalmonella Count > 3 er 4 rams +++++++++ <All Metals Pass Does Your Compost Provide Nutrients or Organic Matter? > < One cir more Metals fail Nutrients (N+P205+K20) 3.1 Percent ++++++++++++++++++++++++ dry wt. <Low . > < Av r-a · ·>1<H" h Nutrient Content · Agtndf:x (Nutrients / Sodium and Chloride Salts' ( N+P205+K20 i Ma + Cl 15 Ratio +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ > < Nutrient and Sodium and Chlore Provi er >I< .NutrientProvi er · Plant Available Nitrogen {PAN Estimated release for first season 9 lbs/ton +++++++++++++++++++++++++++++++++ wet wt. Low Nitro en Provider> < C/N Ratio 17 Ratio +++++++++++++++++++++++++ ++++++++ Soluble Available Nutrients -& S-al-ts-E-C5-w-/w-dw----- --- --- --- --- --- --- --- --- --- --- --- --- --- --- - 7.6 mmhos/cm dry wt. ++++++++++++++++++++++++++++++++++++++++ S oRelease> < Avera e Nutrient Release Rate > <H. hAvailable Nutrients Lime Content (CaC03) 13 Lbs/ton dry wt What are the physical properties of your compost? Percent Ash 29.5 Percent I++++++++++++++ +++++++++ I dry wt. I< Hiah Orqanic Matter >I< Averaae >I<;: Hioh Ash Content I Sieve Size % > 6.3 MM (0.25.',l.---------------------------------------.. 21.2 Percent l+++++++++++ ++++++++++++++ ++++++++++++++++++++++++++++++++++++++++++++++++++++++-!f dry wt. IAll Uses >!< Size Mav Restrict Uses for Pottina mixand·Golf Coucses I +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Ve Mature> < Matu.r-e > < Immature +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ > < Mature _ +++++++++++++++++++++++++++++++++++++ ++++++++++++++++++++ ·Immature ' ><Mature > < I mature +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ < Jmmature > <Mature Mature · > < Imm ture · < Nitro enRelease > < N-Neut .ral > < N-Demand> < H" h. N.itro en Demand Avera > < Hi h LimeContent as CaC03 Account No.: Date Received 01 Jun. 16 Account No.: Date Received 01 Jun. 16 6060007 - 2/2 - 1299 Group: Jun16A No. 5 Sample i.d Sample l.d. No. Biosolid Coarse Comp 2 6060007 INTERPRETATION: Is Your Compost Stable? Page two of three Respiration Rate 2.1 Low: Good for all uses mg C02-C/g OM/day The respiration rate is a measurement of the biodegradation rate of the organic matter in the sample (as received). The respiration rate is determined by measuring the rate at which CO2 is released under optimized moisture and temperature conditions. Biologically Available Carbon 2.2 Low: Good for all uses mg C02-C/g OM/day Biologically Available Carbon (BAC) is a measurement of the rate at which CO2 is released under optimized moisture,temperature , porosity, nutrients, pH and microbialconditions. If both the RR and the BAC test values are close to the same value,the pile is optimized for composting. If both values are high the compost pile just needs more time. If both values are low the compost has stabilized and should be moved to curing. BAC test values that are higher than RR indicate that the compost pile has stalled. This could be due to anaerobic conditions,lack of available nitrogen due to excessive air converting ammonia to the unavailable nitrate form, lack of nitrogen or other nutrients due to poor choice of feedstock, pH value out of range, or microbes rendered non-active. Is Your Compost Mature? AmmoniaN:NitrateN ratio 130 immature Composting to stabilize carbon can occur at such a rapid rate that sometimes phytotoxins remain in ___ the compost and must be neutralized before using in high concentrations or in high-end uses. This Ammonia N ppm step is called curing. Typically ammonia is in excess with the break-down of organic materials resulting .3;;..6.;;.0.::.0:=----';m..;..:.m:.;.;a.:cctcu.:c;r..e:=----in an increase in pH. This combination results in a loss of volatile ammonia (it smells).Once this toxic Nitrate N ppm ammonia has been reduced and the pH drops, the microbes convert the ammonia to nitrates. A low 2=-8 __.....i;;m..;,.:.m:.:.c=at=u.r:ce=-- ammonia + high nitrate score is indicative of a mature compost, however there are many exceptions. pHvalue For example, a compost with a low pH (<7) will retain ammonia, while a compost with high lime content ---7'--.3''-1'----'m-'=at.:.u.:.:r.:=.e-- can lose ammonia before the organic fraction becomes stable. Composts must first be stable before curing indicators apply. Cucumber Bioassay 100.0 Percent Cucumbers are chosen for this test because they are salt tolerant and very sensitive to ammonia and organic acid toxicity. Therefore. we can germinate seeds in high concentrations of compost to measure phytotoxic effects without soluble salts being the limiting factor. Values above 80% for both percent emergence and vigor are indicative of a well-cured compost. Exceptions include very high salts that affect the cucumbers, excessive concentrations of nitrates and other nutrients that will be in range when formulated to make a growing media. In addition to testing a 1:1 compost: vermiculite blend, we also test a diluted 1:3 blend to indicate a more sensitive toxicity level. ts Your Compost Safe Regarding Health? Fecal Coliform < 1000 I g dry wt. Fecal coliforms can survive in both aerobic and anaerobic conditions and is common in all initial compost piles. Most human pathogens occur from fecal matter and all fecai matter is loaded in fecal coliforms. Therefore fecal coliforms are used as an indicator to determine if the chosen method for pathogen reduction (heat for compost) has met the requirements of sufficient temperature , time and mixing. If the fecal coliforms are reduced to below 1000 per gram dry wt.it is assumed al! others pathogens are eliminated. Potential problems are that fecal coliform can regrow during the curing phase or during shipping. This is because the conditions are now more favorable for growth than during the composting process. Salmonella Bacteria Less than 3 3 / 4g dry wt. Salmonella is not only another indicator organism but also a toxic microbe. It !-ias been used in!he case of biosolids industry to determine adequate pathogen reduction. Metals Pass The ten heavy metals listed in the EPA 503 regulations are chosen to determine if compost can be applied to ag land and handled without toxic effects. Most high concentrations of heavy metals are derived from woodwaste feedstock such as chrome-arsenic treated or lead painted demolition wood. Biosolids are rarely a problem. Does Your Compost Provide Nutrients or Organic Matter? Nutrients (N+P205+K20) 3.1 Average nutrient content This value is the sum of the primary nutrients Nitrogen, Phosphorus and Potassium.Reported units are consistent with those found on fertilizer formulations. A sum greater than 5 is indicative of a compost with high nutrient content, and best used to supply nutrients to a receiving soil. A sum below 2 indicates low nutrient content,and is best-used to improve soil structure via the addition of organic matter. Most compost falls between 2 and 5. Account No.: 6060007 - 2/2 - 1299 Group: Jun16A No. 5 INTERPRETATION: Aglndex (Nutrients/Na+CI) Date Received Sample i.d. Sample J.d. No. 01 Jun. 16 Biosolid Coarse Comp 212 6060007 Page three of three 15 High nutrient ratio Composts with low Aglndex values have high concentrations of sodium and/or chloride compared to nutrients. Repeated use of a compost with a low Aglndex (< 2) may result in sodium and/or chloride acting as the limiting factor compared to nutrients, governing application rates. These composts may be used on well-draining soils and/or with salt-tolerant plants. Additional nutrients form another source may be neededif the application rate is limited by sodium or chloride. If the Aglndex is above 10, nutrients optimal for plant growth will be available without concern of sodium and/or chloride toxicity. Composts with an Aglndex of above 10 are good for increasing nutrientlevels for all soils. Most composts score between 2 and 10. Concentrations of nutrients, sodium, and chloride in the receiving soil should be considered when determining compost application rates. The Aglndex is a product of feedstock quality. Feedstock from dairy manure, marine waste, industrial wastes,and halophytic p!ants are likely to produce a finished compost with a low Aglndex. Plant Availa ble Nitrogen (lbs/ton) 9 Average N Provider Plant Available Nitrogen (PAN) is calculated by estimating the release rate of Nitrogen from the organic fraction of the compost. This estimate is based on information gathered from the BAC test and measured ammonia and nitrate values. Despite the PAN value of the compost, additional sources of Nitrogen may be needed during he growing season to off- set the Nitrogen demand of the microbes present in the compost. With ample nutrients these microbes can further breakdown organic matter in the compost and release bound Nitrogen. Nitrogen demand based on a high G N ratio is not considered in the PAN calculation because additional Nitrogen should at·. ays be supplemented to the receiving soilwhen composts wi h a high C/N ratio are appiied. C/N Ratio 17 Indicates immaturity As a guiding principal, a C/N ratio below 14 indicates maturity and above 14 indicates immaturity,however, there are many exceptions. Large woodchips (>6.3mm). bark, and redwood are slow to breakdown and therefore can result in a relatively stable product while the C/N ratio value is high. Additionally, some composts with chicken manure and/or green grass feedstocks can start with a C/N ratio below 15 and are very unstable. A C/N ratio below 10 supplies Nitrogen, while a ratio above 20 can deplete Nitrogen from the soil. The rate at which Nitrogen will be released or used by the microbes is indicated by the respiration rate (BAC). If the respiration rate is too high the transfer of Nitrogen will not be controlable. Soluble Nutrients & Salts (EC5 w/w dw - mmhos/cm) 7.6 Average salts This value refers to all soluble ions including nutrients, sodium,chloride and some soluble organic compounds. The concentration of salts will change due to the release of salts irom the organic matter as it degrades, volatilization of ammonia,decomposition of soluble organics,and conversion of molecular structure. High salts + high Aglndexis indicative of a compost high in readily available nutrients. The application rate of these composts should be limited by the optimum nutrient value based on soilanalysis of the receiving soil. High Salts + low Ag Index is indicative of a compost low in nutrients with high concentrations of sodium and/or chloride. Limit the application rate according to the toxicity level of thesodium and/or chloride. Low salts indicates that the compost can be applied without risking salt toxicity, is likely a good source of organic matter, and that nutrients will release slowly over time. Lime Content (lbs. per ton) 13 Average lime content Compost high in lime er carbonates are often those produced from chicken manure (layers) ash materials, and lime products. These are exceilent products to use on a receiving soil where iime has been recommended by soil analysis to raise the pH. Composts with a high lime content should be closely considered. for pH requirements when formulating potting mixes. Physical Properties Percent Ash 29.5 Low ash content Ash is the non-organic fraction of a compost. Most composts contain approximately 50% ash (dry weight basis). Compost can be high in ash content for many reasons including: excess minerilzation(oid compost), contamination with soilbase material during turning, poor quality feedstock,and soil or mineral products added. Finding the source and reducing high ash content is often t11e fastest means to incrasing nutrient quality cf a compost. Particle Size % > 6.3 MM (0.25") 21.2 May restrict use Large particles may restrict use for potting soils, golf course topdressings,seed-starter mixes, and where a fine size distribution is required. Composts with large particles can still be used as excellent additions to field soils. shrub mixes and mulches. Particle Size Distribution Each size fraction is measured by weight, volume and bulk density. These results are particularly relevent with decisions to screen or not, and if screening, which size screen to use. The bulk density indicates if the fraction screened is made of light weight organic material or heavy mineralmaterial. Removing large mineral material can greatly improve compost quality by increasing nutrient and organic concentrations. Appendix: Estimated available nutrients for usewhen calculating application rates lbs/ton (As Revd.) Plant Available Nitrogen (PAN) 8.6 Ammonia (NH4-N) 4.20 Nitrate (N03-N) 0.03 Available Phosphorus (P205*0.64) 4.4 Available Potassium (K2_0-')- _ 3_._9 ___. Plant Available Nitrogen (PAN) calculations: PAN= (X * (organic N)) + ((NH4-N) + (N03-N)) X value = If BAC < 2 then X = 0.1 If BAC =2.1 to 5 then X = 0.2 If BAC =5.1 to 10 then X = 0.3 If BAC > 10 then X = 0.4 Note: If C/N ratio > 15 additional N should be applied. NCDA&CS A ronomic Division Phone: (919) 733-2655 Website: www.nca r. ovlaronomi/ FY17-W003150 ., 1 I ti kl ,y": . . ::· . . Predictive Client: Jason Smith Advisor: Drew Matthews ,-1tf.*:: \:rJ Granville Farms, Inc. 7693 Pleasant Grove f({( -ti.1-··1f)}11 Waste Report PO Box 1396 Church Rd PO Box 1396 "'...,. ' "'.:.. - Oxford, NC 27565 Spring Hope, NC 27882 :::;._ ,,, -. . ,, Edgecombe County ·Y,u1;1',"'" a,,.. Sampled: 11/1712016 Received: 11/1812016 Completed: 11/2312016 Farm: Links to Helpful Information Sample Information Nutrient and Other Measurements ' Nitroqen (N) (ppm) ' p (ppm) K (ppm) Ca (ppm) Mq (ppm) S (ppm) Fe (ppm) Mn (ppm) Zn (ppm) Cu (ppm) B (ppm) Na (ppm) C (ppm) Total N 12600 7030 0 8150 1200 4290 53200 648 255 92.3 21.7 909 192000 Total KJeldahl N - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - lnor,qanic N pH OM (%) SS (1Q·5S/cm) EC (mS!cm) CCE (%) ALE(tons) C:N NH4-N 5.78 42.5 326 3.26 15.2 : 1 N03-N - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Or,qanic N : Ni (ppm) Cd (ppm) Pb (ppm) Al (ppm) Se (ppm) Li (ppm) As (ppm) Cr (ppm) Co (ppm) Cl (ppm) Mo (ppm) Urea 7190 Sample ID: 01 Waste Code: BCO Description: Biosolids, Composted Comments: Finished Unscreened Application Method Broadcast Estimate of Nutrients Available for First Crop (lb / ton) N P20s K20 Ca Mq s Fe 10.7 13.7 T 6.92 1.02 3.64 45.2 Mn 0.55 Zn 0.22 Cu 0.08 B 0.02 Mo Other Elements (lb I ton) Cl Na Ni Cd 0.77 Pb Al 6.11 Se Li Agronomist's Comments: Insufficient information is available regarding the first year availability of nutrients in this material. The nutrient availability reported here is therefore the TOTAL nutrients in the material. Samples submitted prior to 2016 reported an estimated value rather than total nutrient levels. Please contact me if you have any questions . Reprogramming of the laboratory-information-management system that makes this report possible is being funded through a grant from the North Carolina Tobacco Trust Fund Commission. Thankyou for using agronomic services to manage nutrients and safeguard environmental quality. - Steve Troxler, Commissioner of NCDA&CS AAronomic Division Phone: (919) 733-2655 Website : www.ncaAr,Aov/aAronomi / FY17-W003150 Jason Smith Page 2 of 4 Sample Information Nutrient and Other Measurements ' Nitroqen (NJ (ppm) : p (ppm) K (ppm) Ca (ppm) Ma (ppm) S (ppm) Fe (ppm) Mn (ppm) Zn (ppm) Cu (ppm) B (ppm) Na (ppm) C (ppm) Total N 14600 ' 8720 3460 13900 2620 5890 90700 455 306 149 82.0 1610 208000 ' Total Kieldahl N .. - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - pH OM (%) SS (10·5S/cm) EC (mS!cm) CCE (%) ALE (tons) C:N lnorqanic N ' NH4-N ' 6.01 63.2 805 8.05 14.3 : 1 ' N03-N ' 1- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Orq. anic N : Ni (ppm) Cd (ppm) Pb (ppm) Al (ppm) Se (ppm) Li (ppm/ As (ppm) Cr (ppm) Co (ppm) Cl (ppm/ Mo (ppm) Urea ' 6640 Sample ID: 02 Waste Code: BCO Description: Biosolids, Composted Comments: Finished Screened Application Method Broadcast Estimate of Nutrients Available for First Crop (lb / ton) N P20s K20 Ca Mq s Fe 18.4 25.3 5.24 17.5 3.31 7.45 115 Mn 0.58 Zn 0.39 Cu 0.19 B 0.10 Mo ' ' ' ' Other Elements (lb / ton) Cl Na Ni Cd 2.03 Pb Al 8.39 Se Li Agronomist's Comments: • Insufficient information is available regarding the first year availability of nutrients in this material. The nutrient availability reported here is therefore the TOTAL nutrients in the material. Samples submitted prior to 2016 reported an estimated value rather than total nutrient levels. Please contact me if you have any questions. NCDA&CS Agronomic Division Phone: (919) 733-2655 Website: www. ncagr. ov/agronomi/ FY17-W003150 Jason Smith Page 3 of 4 Sample Information Nutrient and Other Measurements Nitroqen (NJ (ppm) : p (ppm) K (ppm) Ca (ppm) Mq (ppm) S (ppm) Fe (ppm) Mn (ppm) Zn (ppm) Cu (ppm) B (ppm) Na (ppm) C (ppm) Total N 54900 ' 10700 8360 6080 2500 5090 9600 114 117 36.6 17.9 7320 516000 ' Total Kieldahl N >- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - lnor_qanic N ' pH OM (%) SS (10-5S/cm) EC (mS!cm) CCE (%) ALE(tons) C:N ' I NH4-N ' 6.43 18.2 757 7.57 9.39 : 1 N03-N I 1- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Or_qanic N : Ni (ppm) Cd (ppm) Pb (ppm) Al (ppm) Se (ppm) Li (ppm) As (ppm) Cr (ppm) Co (ppm) Cl (ppm) Mo (ppm) Urea ' ' 3800 Sample ID: 03 Waste Code: BCO Description: Biosolids, Composted Comments: New Windrow Application Method Broadcast Estimate of Nutrients Available for First Crop (lb / ton) N P20s K20 Ca M.q s Fe 19.9 8.91 3.64 2.21 0.91 1.85 3.49 Mn 0.04 Zn 0.04 Cu 0.01 B 0.01 Mo ' ' ' ' ' ' Other Elements (lb / ton) Cl Na Ni Cd 2.66 Pb Al 1.38 Se Li Agronomist's Comments: * Insufficient information is available regarding the first year availability of nutrients in this material. The nutrient availability reported here is therefore the TOTAL nutrients in the material. Samoles submitted orior to 2016 reoorted an estimated value rather than total nutrient levels. Please contact me if vou have anv auestions . NCDA&CS Aqronomic Division Phone: (919) 733-2655 Website: www.ncaqr.qov/aqronomi/ FY17-W003150 Jason Smith Page 4 of 4 Sample Information Nutrient and Other Measurements Nitroqen (NJ (ppm) : p (ppm) K (ppmJ Ca (ppm) Ma (ppm) S (ppm) Fe (ppm) Mn (ppm) Zn (ppm) Cu (ppm) B (ppm) Na (ppm) C (ppm) Total N 19700 ' 8700 1650 6300 1420 6110 42800 243 254 65.3 15.2 1750 429000 ' ' Total K}eldahl N 1-- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - ' pH OM (%) SS (1Q-5S!cm) EC (mS!cm) CCE (%) ALE(tons) C:N lnorqanic N ' NH4-N ' 5.18 45.4 475 4.75 ' 21.8 : 1 N03-N ',_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ Orq, anic N : Ni (ppm) Cd (ppm) Pb (ppm) Al (ppm) Se (ppm) Li (ppm) As (ppm) Cr (ppm) Co (ppm) Cl (ppm) Mo (ppm) Urea ' 6620 Sample ID: 04 Waste Code: BCO Description: Biosolids, Composted Comments: Old Windrow Application Method Broadcast Estimate of Nutrients Available for First Crop (lb / ton) N P20s K20 Ca Mq s Fe 17.9 18.1 1.79 5.71 1.28 5.55 38.9 Mn 0.22 Zn 0.23 Cu 0.06 B 0.01 Mo ' Other Elements (lb / ton) ' Cl Na Ni Cd ' 1.59 ' Pb Al 6.01 Se Li Agronomist's Comments: • Insufficient information is available regarding the first year availability of nutrients in this material. The nutrient availability reported here is therefore the TOTAL nutrients in the material. Samoles submitted prior to 2016 reoorted an estimated value rather than total nutrient levels. Please contact me if vou have anv auestions.