Loading...
HomeMy WebLinkAbout18004_Tremont Redevelopment_Appendix B - Site PhotographsSoil Removal Action ‐Pre‐Removal PhotographsVCC Charlotte, April 2017– June 2017Removal Areas 15 through 20 – facing north Removal Areas 11 through 14 – facing south1 Removal Areas 5, 6, 7, and 11 – facing westRemoval Areas 7, 8, and 11 – facing east2Soil Removal Action ‐Pre‐Removal PhotographsVCC Charlotte, April 2017– June 2017 Soil Removal Action ‐Concrete RemovalVCC Charlotte, April 2017– June 2017Removal Areas 4 and 5 – facing southwest Removal Areas 2 and 4 – facing northwest3 Soil Removal Action ‐Concrete RemovalVCC Charlotte, April 2017– June 20174Removal Areas 15-17 post removal of concrete –facing southStockpiled concrete staged for off-site recycling Soil Removal Action ‐Soil ExcavationVCC Charlotte, April 2017– June 20175Removal Area 1 – facing northwest Removal Areas 1 through 4 - facing north Soil Removal Action ‐Soil ExcavationVCC Charlotte, April 2017– June 20176Removal Area 18 – facing northeast Removal Areas 15 through 20 - facing north Soil Removal Action ‐Soil ExcavationVCC Charlotte, April 2017– June 20177Removal Areas 21 – facing north Removal Areas 16 and 17 - facing southwest Soil Removal Action ‐Soil ExcavationVCC Charlotte, April 2017– June 20178Demarcation placed in Removal Area 19 footprint – facing northRemoval Area 19 – facing northeast Removal Areas 13 and 14 – facing northeastDemarcation placed in Removal Areas 13 and 14 footprint – facing northeast9Soil Removal Action ‐Soil ExcavationVCC Charlotte, April 2017– June 2017 Soil Removal Action ‐BackfillingVCC Charlotte, April 2017– June 2017Placement of backfill – facing southPlacement of backfill – facing southeast10 Soil Removal Action ‐BackfillingVCC Charlotte, April 2017– June 2017Placement of backfill – facing south11Placement of backfill – facing southwest