HomeMy WebLinkAbout7906_INSP_20171113FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Page 1 of 4
UNIT TYPE:
Lined
MSWLF LCID YW Transfer Compost SLAS COUNTY: Rockingham
Closed
MSWLF HHW White
goods Incin T&P FIRM PERMIT NO.: 7906-INDUS-2016
CDLF Tire T&P /
Collection Tire
Monofill Industrial
Landfill X DEMO SDTF FILE TYPE: COMPLIANCE
Date of Site Inspection: November 13, 2017 Date of Last Inspection: May 30, 2017
FACILITY NAME AND ADDRESS:
Dan River Steam Station
Duke Energy Carolinas, LLC
900 South Edgewood Road
Eden, NC 27288
GPS COORDINATES: N: 36.4948 W: -79.7155
FACILITY CONTACT NAME AND PHONE NUMBER:
Eric Kinstler, 704-507-4582, Eric.Kinstler@duke-energy.com
Melonie Martin, Office: 336-445-0610, Cell: 336-669-2994, melonie.martin@duke-energy.com
FACILITY CONTACT ADDRESS:
Same as above
PARTICIPANTS:
Shawn McKee, NCDEQ, Solid Waste Section, Environmental Senior Specialist
Elizabeth Werner, NCDEQ, Solid Waste Section, Permitting Hydrogeologist
Shannon Aufman, Solid Waste Section, Permitting Engineer
Amanda Freeman, NCDEQ, Solid Waste Section, Environmental Senior Specialist
Melonie Martin, Duke Energy
Jason Jomp, Duke Energy
Jim Mallory, Duke Energy
Chad Groover, Duke Energy
Henry Taylor, Duke Energy
Jeff Gately, Duke Energy
Swaine Skeen, Parsons
STATUS OF PERMIT:
Permit to Construct/Permit to Operate issued on October 26, 2016
Approval to Operate was issued on May 30, 2017
The Permit to Operate shall expire October 26, 2021
PURPOSE OF SITE VISIT:
Comprehensive Site Inspection
STATUS OF PAST NOTED VIOLATIONS:
None.
OBSERVED VIOLATIONS:
None.
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Page 2 of 4
ADDITIONAL COMMENTS
This facility is permitted to receive solid waste generated by or at the Dan River Steam Station. Waste types include, but
are not limited to: coal combustion residuals, wastewater treatment sludge, vacuum truck waste, waste soils (i.e. from
ash removal activities or soil that has contacted petroleum), and small quantities of inert debris from CCR unit
decommissioning activities. The Permit to Operate shall expire October 26, 2021.
1. The Permit and Operations Plan must be maintained on-site as required and were reviewed during the site
inspection.
2. The facility is operated by Parsons Corporation which is responsible for hauling materials to the landfill, daily
operations of the landfill, and conducting other associated activities.
3. Ash disposal began on May 31, 2017. For the period between 5/31/17 and 11/11/17, the facility landfilled
383,571.86 tons. Since July 2017, approximately, 27,000 tons of ash have been transported by truck to
Roanoke Cement for beneficial reuse.
4. Parsons personnel are responsible for daily landfill operations; certified staff are always present when the
landfill is in operation. Training records were documented and maintained on-site. The following Parsons
personnel are NC Certified Landfill Managers:
Brian Mastin, 17-02M-00295, expires 5/31/2020
James Morning, 17-02M-00296, expires 5/31/2020
Mark Otten, 17-02M-00298, expires 5/31/2020
Swaine Skeen, 17-02M-00297, expires 5/31/2020
Anton Bantel, 17-020-00293, expires 5/31/2017
5. No concerns were noted with monitoring wells observed during the inspection. It is recommended that the
areas around the monitoring wells be mowed on a regular basis.
6. Edge-of-waste markers delineating the permitted disposal area were visible and being maintained. The markers
are offset from the edge of the landfill liner.
7. All required signs have been posted.
8. Facility access roads are of all-weather construction and are well maintained.
9. Water trucks are utilized to control road dust, as needed. Water trucks were not operating at the time of the
inspection because intermittent rain was providing sufficient dust control. Dust control checks occur daily at
9am and 2pm. Records from 8/1/17 through 11/13/17 were reviewed during the inspection.
10. Operational cover is being maintained as approved in the facility Operations Plan. Minimal soil is utilized for
cover; landfilled materials are moistened and allowed to crust over to prevent windblown material.
Additionally, Gorilla Snot is used to aid in the process of crusting.
The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance
with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an
administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit,
or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to
enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any
such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules.
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Page 3 of 4
11. The semi-annual ground water, surface water and leachate monitoring samples were taken on 11/1/17. The
report had not been completed at the time of the inspection.
12. Leachate and contact water generated by the facility is pumped from the landfill sumps to a leachate tank
storage facility and ultimately to the City of Eden publically owned treatment works (POTW) for treatment.
Leachate records were reviewed during the inspection. Leachate pumps have backup generators to continue
pumping in the event of a power failure.
13. Coal ash compaction (a.k.a. “Field Density”) records were reviewed during the inspection.
14. Active filling was occurring in Cell 2 at the time of the inspection. Cell 1 is also active and will receive
additional. Cell 3 was under construction at the time of the inspection with completion anticipated by Spring
2018.
View of Cell 2 being filled with Cell 3 behind under construction.
15. Side slopes and inactive areas have soil cover and established vegetation. Side slopes were well vegetated and
are being well maintained. Vegetative growth on side slopes and facility property are mowed regularly every 4
to six weeks or as needed. No on-site or off-site erosion observed.
16. Additional chimney drains have been installed to facilitate leachate drainage into the collection system.
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Page 4 of 4
17. No windblown dust from landfill operations or roadways was noted during the inspection. Weather conditions
during the inspection were partly cloudy.
Please contact me if you have any questions or concerns regarding this inspection report.
_____ ___ Phone: 919-707-8284 _
Environmental Senior Specialist
Regional Representative
Sent on:
11/29/17
Email:
X
Hand delivery US Mail Certified No. [ _]
Copies: Ed Mussler, Permitting Branch Head, Solid Waste Section
Jason Watkins, Field Operations Branch Head, Solid Waste Section
Elizabeth Werner, Permitting Hydrogeologist, Solid Waste Section
Larry Frost, Engineering Project Manager, Solid Waste Section
Shannon Aufman, Solid Waste Section, Permitting Engineer