Loading...
HomeMy WebLinkAbout6512-INSP-201701115FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 1 of 3 UNIT TYPE: Lined MSWLF LCID YW Transfer Compost SLAS COUNTY: NEW HANOVER Closed MSWLF HHW White goods Incin T&P FIRM PERMIT NO.: 6512-INDUS-2016 CDLF Tire T&P / Collection Tire Monofill Industrial Landfill X DEMO SDTF FILE TYPE: COMPLIANCE Date of Site Inspection: November 15, 2017 Date of Last Inspection: August 17, 2017 FACILITY NAME AND ADDRESS: Duke Energy, Sutton Energy Complex 801 Sutton Steam Plant Road Wilmington, North Carolina 28401 GPS COORDINATES: N: 34.284019 W: -77.984175 FACILITY CONTACT NAME AND PHONE NUMBER: John Toepfer, Lead Engineer, 919-546-7863, John.Toepfer@duke-energy.com James Dalrymple, Duke Energy, James.Dalrymple@duke-energy.com FACILITY CONTACT ADDRESS: Same as above PARTICIPANTS: Shawn McKee, NCDEQ, Solid Waste Section Shannon Aufman, NCDEQ, Solid Waste Section Elizabeth Werner, NCDEQ, Solid Waste Section Corinne Law, NCDEQ, Solid Waste Section James Dalrymple, Duke Energy Tim Russell, Duke Energy Daniel Atkinson Duke Energy Fabian Benavente, Geosyntec STATUS OF PERMIT: Permit to Construct and Permit to Operate, Original Issuance, September 21, 2016 Permit Approval to Operate Cell 3, Issuance, July 6, 2017 Permit Approval to Operate Cell 4, Issuance, August 25, 2017 PURPOSE OF SITE VISIT: Partial Inspection STATUS OF PAST NOTED VIOLATIONS: None. OBSERVED VIOLATIONS: None. FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 2 of 2 ADDITIONAL COMMENTS This facility is a permitted industrial landfill. It is permitted to receive solid waste generated by or at the Duke Energy, L.V. Sutton Energy Complex property. Acceptable waste types include, but are not limited to: coal combustion residuals, wastewater treatment sludge, vacuum truck waste, waste soils (i.e. from ash removal activities or soil that has contacted petroleum), and small quantities of inert debris from CCR unit decommissioning activities. The Permit to Operate shall expire September 21, 2026. 1. The Permit and Operations Plan must be maintained on-site as required and were reviewed during the site inspection. 2. The facility is secured by a locked gate. Personnel are on site during operating hours. The facility has all required information on signs. 3. The facility is operated by TRANS-ASH Corporation which is responsible for hauling materials to the landfill, daily operations of the landfill, and conducting other associated activities. TRANS-ASH personnel are responsible for daily landfill operations; certified staff are always present when activities are occurring at the facility. 4. On or before August 1, 2018, the permittee must submit an annual facility report to the Section for the period between July 1, 2017 and June 30, 2018. The report must be submitted annually thereafter. 5. Around 700,000 tons of coal combustion residuals have been landfilled onsite since the landfill began operations in July 2017. The facility averages 8,000-12,000 tons of CCR landfilled per day depending on operating conditions. 6. Edge-of-waste markers delineating the permitted disposal area were visible and being maintained. Cell 4, active area, with Cell 5 in the background The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit, or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules. FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 3 of 3 7. There was no water observed ponded over waste. Chimney drains convey the flow of leachate to the leachate control system. Chimney drains are maintained to facilitate contact water collection 8. The access road to the site was of all-weather construction and maintained in good condition. 9. Dust was being well controlled at the time of the inspection. Please contact me if you have any questions or concerns regarding this inspection report. Phone: 919-707-8284 Shawn McKee Environmental Senior Specialist Regional Representative Sent on: December 5, 2017 Email: X Hand delivery US Mail Certified No. [ _] Copies: Ed Mussler, Permitting Branch Head, Solid Waste Section Jason Watkins, Field Operations Branch Head, Solid Waste Section Elizabeth Werner, Permitting Hydrogeologist, Solid Waste Section Shannon Aufman, Permitting Engineer, Solid Waste Section