HomeMy WebLinkAbout8505_BelewsFGDRevisedEPAWellRequest_DIN25888_20160331.pdfBelews Creek Steam Station
3195 Pine Hall Road
Belews Creek, NC 27009
336-445-0610
336-669-2994
www.duke-energy.com
March 31, 2016 North Carolina Department of Environmental Quality
Division of Waste Management Solid Waste Section
1646 Mail Service Center
Raleigh, North Carolina 27699-1649
Attn: Ms. Elizabeth Werner
Re: Duke Energy Carolinas - Belews Creek Steam Station
Permit No. INDUS-8505 Stokes County Drilling Request
Dear Ms. Werner,
Duke Energy Carolinas (DEC), Belews Creek Steam Station, received a concurrence letter from North Carolina Department of Environmental Quality (NCDEQ) Division of Waste Management (Division) for drilling USEPA CCR wells at the FGD Landfill (Permit No. INDUS-8505) on March 29, 2016. The
concurrence was based on the well location drawing that was provided on March 23, 2016.
The originally provided map showed eighteen (18) wells being installed at the FGD Landfill. The revised
map (attached) shows twenty-four (24) wells. With this letter DEC requests concurrence for the revised drilling plan at the FGD Landfill.
This request is being submitted electronically. Please let me know if you would like to receive paper copies.
Respectfully submitted,
Melonie Martin Environmental Services
Attachments: Proposed CCR Rule Groundwater Monitoring Well Location Drawing - FGD Landfill
cc (via e-mail): Will Harrison, Duke Evan Andrews, Duke
Ed Sullivan, Duke Ed Mussler, NCDEQ