Loading...
HomeMy WebLinkAbout6512_DukeEnergy_Sutton_FactSheet_DIN25590_20160211.pdf PAT MCCRORY Governor DONALD R. VAN DER VAART Secretary LINDA CULPEPPER Director State of North Carolina | Environmental Quality | Waste Management 1646 Mail Service Center | 217 West Jones Street | Raleigh, NC 27699-1646 919 707 8200 T FACT SHEET SOLID WASTE PERMIT NUMBER 6512-INDUS-2016 FACILITY: Duke Energy, L.V. Sutton Energy Complex, Industrial Landfill COUNTY: New Hanover CITY: Wilmington, North Carolina DIN #: 25590 OWNER & OPERATOR: Duke Energy Progress, LLC DESCRIPTION Duke Energy Progress, LLC owns and operates the L.V. Sutton Energy Complex (Facility), electrical power generating facility, located (911 address) at 801 Sutton Steam Plant Road in Wilmington, North Carolina and includes a total area of approximately 2,245 acres. Industrial landfill Permit Number 6512-INDUS-2016 is a new landfill permit that once completed will receive industrial solid wastes from Duke Energy’s L.V. Sutton Energy Complex, including; coal combustion residuals (CCRs) (including fly and bottom ash, pyrites and coal mill rejects, and boiler slag); waste water treatment sludge (WWTS); petroleum contaminated site soils; plant decommissioning-related materials, including construction and demolition (C&D) waste and land clearing and inert debris (LCID); and vacuum truck waste. The industrial landfill covers approximately 101 acres and will be permitted to include three (3) phases made up of eleven (11) cells with a total disposal capacity of approximately 11.9 million cubic yards. Duke Energy submitted a new permit application on August 7, 2015. The application requested a permit to construct for Phases 1 through 3 and permit to operate for Phases 1 through 3, as each unit is completed and approved by the Solid Waste Section. The Division of Waste Management (Division) has determined that the application satisfied the requirements of North Carolina Administrative Code 15A NCAC 13B .0503 through .0505. A draft permit has been prepared for public review. PERMIT STRUCTURE The permit is divided into two parts, the Permit to Construct and the Permit to Operate. The permit includes a list of approved documents and specific conditions for the construction, operation, and monitoring of the landfills. The Permit to Operate will be issued for a ten (10) year increment of operation. Specific conditions are included for the implementation, operation, and assessment of the groundwater Corrective Action Plan and post-closure care associated with an industrial solid waste landfill. Fact Sheet Duke Energy, L.V. Sutton Energy Complex Permit No. 6512-INDUS-2016 DIN 25590 Page 2 PUBLIC COMMENT PERIOD North Carolina General Statue (NCGS) 130A-309.203 Coal Ash Management Act of 2014 requires the permitting process for this activity provide for public review of, and input to, permit documents containing the applicable design and operating conditions and shall provide for consideration of comments received and notification to the public of the final permit design. The 60-day comment period begins on February 11, 2016 and ends on April 15, 2016, at 5:00 pm. Persons wishing to comment on the draft permit or to object to the permit issuance should submit their comments in writing by 5:00 p.m., April 15, 2016. Comments should be sent to the Division contact address shown below and include the permit number. All comments received within the 60-day period will be considered in making the final determination regarding the permit. The application and draft permit are available for review by appointment from 9:00 a.m. to 4:00 p.m., Monday through Friday, at the Department of Environment Quality, 217 West Jones Street, Raleigh, NC 27603. The administrative record including the application, fact sheet, and draft permit can be found online at http://portal.ncdenr.org/web/guest/sutton-power-station. PUBLIC HEARING A public hearing has been scheduled for March 15, 2016 at 6:00 pm and will be held at the Cape Fear Community College’s Union Station Auditorium, 502 North Front Street, Wilmington, NC. Interested parties may submit oral or written statements and data concerning the proposed facility Permit. Persons wishing to speak may register at the hearing. Speaking times will be allotted per speaker as time allows. Interested parties may submit written statements and data concerning the proposed changes to the facility Permit to the Division contact at the address shown below. NOTIFICATION Persons who want to receive notice of the final permit decision should register with the Division contact. DIVISION CONTACT Comments and requests for additional information should be sent to: Mr. Edward Mussler, III, P.E. North Carolina Division of Waste Management Solid Waste Section 1646 Mail Service Center Raleigh, North Carolina 27699-1646 Telephone/Fax: (919) 707-8200 Email publiccomments@ncdenr.gov, please insert the permit number (6512-INDUS-2016) and the permit name (Duke Energy, L.V. Sutton Energy Complex) in the subject.