Loading...
HomeMy WebLinkAbout3301_EdgecombeCDLF_20170612_HydraulicburrialwallConstructionspec_DIN28612 Request for Proposal Bid No. 322-0717 Corrective Measures for Surface and Groundwater Improvements Edgecombe County Landfill 2872 Colonial Road, Tarboro, NC 27886 S&ME Project No. 4305-15-173A Prepared for: Edgecombe County 201 St. Andrew Street P.O. Box 10 Tarboro, North Carolina 27886 Prepared by: S&ME, Inc. 3201 Spring Forest Road Raleigh, North Carolina 27616 June 12, 2017 1 Chao, Ming-tai From:Claudia B Irvin <CIrvin@smeinc.com> Sent:Friday, November 03, 2017 9:43 AM To:Chao, Ming-tai Cc:Sam Watts Subject:[External] Edgecombe County Corrective Measures for Surface and Groundwater Improvements Attachments:11-2-2017__Specs-Plans for Ming.pdf CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to report.spam@nc.gov. 11-2-2017 Ming – Attached are the specifications and plans for the Corrective Measures being conducted at the Edgecombe County Landfill. Please contact Sam Watts or myself with any questions. Thanks, Claudia B. Irvin Environmental Professional S&ME 3201 Spring Forest Road Raleigh, NC 27616 map O: 919.872.2660 M: 919.906.4867 cirvin@smeinc.com www.smeinc.com LinkedIn | Twitter | Facebook This electronic message is subject to the terms of use set forth at www.smeinc.com/email. If you received this message in error please advise the sender by reply and delete this electronic message and any attachments. Please consider the environment before printing this email. TECHNICAL SPECIFICATIONS DIVISION 01000 GENERAL REQUIREMENTS Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 01000-1 Summary of Work SECTION 01000 SUMMARY OF WORK AND GENERAL REQUIREMENTS PART 1 GENERAL 1.1 SUMMARY A.Section Includes: 1.Definitions for Reference. 2.Bid Proposals 3.Contract Description. 4.Contractor and Subcontractor Qualifications. 5.Contract Terms and Conditions 6.Site Conditions 7.Contractor’s use of site. 8.Work Sequence. 9.Owner occupancy. 10.Drawings Accompanying Specifications 1.2 DEFINITIONS FOR REFERENCE A.Atterberg Limits: the liquid limit and plastic limit (ASTM D4318). B.Authorized Representative: shall mean the Engineer or his authorized agent of who has the authority to approve construction quality assurance testing on behalf of the Owner. C.Classification System: the soil classification system shall be in accordance with the standard test method for classification of soils for engineering purposes (ASTM D2487). D.Compaction: the process of increasing the dry density or unit weight of soil by rolling, tamping, vibrating, or other mechanical means. Compaction tests are determined by the Sand Cone Method (ASTM D1556), Drive Cylinder Method (ASTM D2937), or Nuclear Density Gauge (ASTM D2922). E.Contract: Either a purchase order placed by “Owner” and accepted by “Contractor” together with these Specifications and all other documents referred to in such purchase order, or a formal contract executed by “Owner” and “Contractor”, together with these Specifications and all other documents referred to in such a formal contract. F.Contractor: the organization that will be retained by the “Owner” for all construction activities (i.e.: site preparation, earthwork construction, etc.) in accordance with the design and construction criteria, drawings, and specifications. The “Contractor” shall submit all the shop drawings and other necessary documents for approval by the “Engineer”. The “Contractor” is also responsible for cooperating with the “Engineer” to help conduct all CQA inspection and testing. G.CQA: Construction Quality Assurance. H.CQAO: Construction Quality Assurance Officer. I.Density: mass density of a soil is its weight per unit volume; usually reported in pounds per cubic foot. Maximum dry density as determined by Standard Proctor Test (ASTM D698) or Modified Proctor Test (ASTM D1557). J.Dewatering: process of lowering the groundwater level or removing surface water from the construction area to permit construction activities to proceed "in the dry". Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 01000-2 Summary of Work K.Engineer: the authorized representative or registered professional engineer who is employed by the Owner to design and/or oversee aspects of construction, installation, and testing. The Engineer is responsible for the design and construction specifications and/or quality control and quality assurance activities as specified in these Specifications. L.Geocomposite: Generally any combination of geosynthetic materials. For this project the geocomposite consists of a geonet consisting of two or more transverse HDPE strands that have geotextile layers heat bonded to one or both sides and is used in civil engineering to convey fluids and facilitate drainage. M.Geosynthetics: synthetic products used as substitutes for natural materials used in traditional geotechnical engineering applications generally including geotextiles, geonets, geogrids, geomembranes, and geocompsoites. N.Geosynthetic Clay Liner (GCL): a manufactured hydraulic barrier consisting of clay bonded to a layer or layers of geosynthetics. The GCL may be reinforced or unreinforced as required by site conditions. O.Geotextile: a relatively porous, permeable construction or reinforcement fabric used in civil engineering for geotechnical projects. The fabric structure may be knit, woven or nonwoven. Filter geotextile is a material which provides separation of materials with different pore size openings to prevent clogging. Drainage geotextiles are materials with adequate transmissivity to provide planar flow of fluid. Reinforcing geotextile is a material with sufficient strength to support some or all of the load applied to a composite system. P.In-Situ: "As is", or as it exists in-place naturally. Q.Manufacturer: the organization(s) that will manufacture and supply the geosynthetic materials for this project. R.Minimum Average Roll Value (MARV): The minimum average value of a particular physical property of a material, for 95 percent of all of the material in the lot. S.Moisture Content: ratio of quantity of water in the soil (by weight) to the weight of the soil solids (dry soil), expressed in percentage; also referred to as water content (ASTM D2216). T.NCDOT: North Carolina Department of Transportation. U.Optimum Moisture Content (OMC): moisture content corresponding to maximum dry density as determined by the Standard Proctor Test (ASTM D698) or Modified Proctor Test (ASTM D1557). V.Overlap: The distance measuring perpendicular from the overlying edge of one roll of material to the underlying edge of the adjacent roll of the same material. W.Owner: the entity who possesses the Edgecombe County Landfill facility which include the transfer station associated structures and borrow areas. The Owner has the authority to select and dismiss the Contractor, the Installer and/or the Manufacturer. The Owner also has the authority to accept or reject design plans and specifications, recommendations of the Engineer, the materials supplied, and the workmanship of the “Contract(s)” and the Geosynthetics Contractor. X.Permeability: ability of pore fluid to travel through a soil mass via interconnected voids. "High" permeability indicates relatively rapid flow of pore fluid and vice versa. Coefficients of permeability are generally reported in centimeters per second (cm/sec) and are determined by a flexible wall permeameter test (ASTM D5084), constant head permeability test (k-sat), or double ring infiltrometer test. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 01000-3 Summary of Work Y.Plasticity: ability of a soil mass to be remolded without raveling or breaking apart. The plasticity index, numerically equal to the difference between the liquid and plastic limit, is a comparative number which describes the range of moisture contents over which a soil behavior is plastic. Z.QA/QC Technician: Quality Assurance/Quality Control Technician. AA.Work: any and all labor, supervision, services, materials, supplies, utilities, machinery, equipment, tools, and facilities called for by the “Contract”. 1.3 BID PROPOSALS A.Five (5) copies of each proposal must be mailed or delivered allowing sufficient time to ensure receipt by the County of Edgecombe (the “Owner”) 1.4 CONTRACT DESCRIPTION A.Work of the Project includes and consists of furnishing all labor, materials, supervision, equipment and services necessary to complete the construction of the Corrective Measures and all associated facilities and structures. The work will include: (i) installation of required Erosion and Sedimentation (E&S) Control measures and tree protection areas; (ii) site clearing and preparation; (iii) removing the berm and general grading to restore land contours surrounding ponds, (iv) general excavation and fill placement; (v) repairing existing sedimentation basins (SB-1 and SB-2), removing trees and vegetation, dewatering, removing accumulated sediment, , removing and re-constructing earthen embankments, check permeability of basin bottom, install liner layers, re-check permeability installing skimmers, and spillway systems, (vi) constructing new unlined sedimentation basin SB-3, earthen embankments, installing skimmer, and spillway systems; (vii) excavation and grading to install perimeter drainage ditches south and west boundaries of landfill, (viii) trench excavation and drain system installations for hydraulic barriers, (ix) constructing storm water control measures, culvert pipes, and filling or installing ditches, and (x) all incidental items necessary to complete this work. B.Perform Work of Contract under stipulated sum with Owner in accordance with Conditions of Contract. C.Work of Contract shall be constructed to the lines and elevations as shown on the Drawings and as identified in these Technical Specifications. Any deviations from the Drawings or Technical Specifications require the prior written approval of the ENGINEER and State Solid Waste Section and must be documented by "as-built" revisions to the Drawings and/or Technical Specifications. D.During all phases of construction, construction will be tested, monitored, and evaluated prior to approval. 1.5 CONTRACT TERMS AND CONDITIONS A.Standards for Acceptance of Proposal for Award Contract:The Owner reserves the right to reject any or all proposals and to waive minor irregularities in the evaluation process. The award for the corrective measures installation contract may be made to the responsible Contractor that best meets the needs and interests of the Owner, taking into consideration quality and performance. The Owner also reserves the right to further negotiate minor modifications with the Owner upon completion of the evaluation process prior to the execution of the final contract. B.Guarantee: Unless otherwise specified by the Owner, the Contractor will unconditionally guarantee the service and workmanship on all services. Any defects that occur which are due to faulty services, the Contractor, at his/her expense, shall repair, adjust the condition, or replace the services to the complete satisfaction of the Owner. These repairs, replacements or adjustments Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 01000-4 Summary of Work shall be made only at such time designated by the Owner to be the least detrimental to the operation of the Owner’s business. (Taken from “Guarantee” section of Edgecombe Co RFP for Monitoring and Supervision Services of Debris Management and Removal.) C.Transfer or Assignment: The covenants and agreements contained within the awarded proposal are specifically binding and Owner will not allow the awarded proposal to be transferred or assigned to any other party or parties without the express written consent form the Owner. (Taken from “Transfer or Assignment” section of Edgecombe Co RFP for Monitoring and Supervision Services of Debris Management and Removal.) D.Oral Explanation:The Owner will not be bound by oral explanations or instructions given at any time during the bid process or after a project is awarded. (Taken from “Oral Explanations” section of Edgecombe Co RFP for Monitoring and Supervision Services of Debris Management and Removal.) E.Equipment and Supplies:The Contractor must provide all equipment and supplies necessary to perform the services required under this specification. 1.6 SITE CONDITIONS A.Site conditions and existing topographic information can be found in the Drawings. The Contractor is responsible for completing the proposed work beginning from the current existing conditions. The Contractor is responsible for verification of existing conditions in the field and scheduling any additional site visits to verify these existing conditions prior to bid. 1.7 CONTRACTOR AND SUBCONTRACTOR QUALIFICATIONS A.General Contractor (Contractor): 1.The Contractor must be qualified and experienced in construction work and must complete and submit a Contractor Qualifications Questionnaire. Contractors must provide on the Questionnaire a list of three construction projects including erosion and sedimentation control measures, trench drain installation, sedimentation basin and discharge controls, dewatering, embankment/dam removal, embankment/dam construction, grading and site restoration completed within the last five years, including brief project descriptions along with names, addresses and phone numbers of contact persons relative to each project. 2.The Contractor shall provide a full-time Health & Safety professional on-site during construction activities. B.Surveyor: 1.All field layouts shall be performed by or under the supervision of a licensed Professional Land Surveyor registered in the state where the Work is to be conducted. The Contractor shall establish and maintain a minimum of two permanent benchmarks. Horizontal and vertical locations of the benchmarks shall be recorded on the As-Built Drawings. 1.8 CONTRACTOR'S USE OF SITE A.Limit use of site and premises to allow: 1.Owner occupancy and operation of landfill and maintenance facility. B.Access to site: as established by the Owner. C.Construction Operations limited to areas noted on Drawings. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 01000-5 Summary of Work D.Time Restrictions for Performing Work: 1.In accordance with Owner’s designated schedule or as otherwise agreed upon by the Owner. 1.9 WORK SEQUENCE 1.Installation of required Erosion and Sedimentation (E&S) Control measures and tree protection areas; 2.Site clearing and preparation; 3.Dewatering former farm pond southeast of landfill, removing the dam, general grading to restore land contours surrounding ponds, 4.General excavation and fill placement; 5.Repairing existing sedimentation basins (SB-1 and SB-2), removing trees and vegetation, dewatering, removing accumulated sediment, removing and re-constructing earthen embankments, check permeability of basin bottom, install liner layers, re-check permeability installing skimmers, and spillway systems, 6.Constructing new lined or unlined sedimentation basins SB-3, SSB-1 and SSB-2, earthen embankments, installing skimmers, and spillway systems; 7.Excavation and grading to install perimeter drainage ditch south and west boundaries of landfill, 8.Trench excavation and drain system installation for an hydraulic barrier, 9.Constructing storm water control measures, catch basins, culvert pipes, filling or installing ditches, and improving storm water drainage swales, and 10.Place erosion and vegetative soil layers, grade perimeter berms and roadways and all incidental items necessary to complete this work. 1.10 OWNER OCCUPANCY A.Access must be maintained for other site activities. B.Cooperate with Owner to minimize conflict and to facilitate Owner’s operations. Primary Owner operation includes work associated with support facilities. Lay down space and contractor movement on the site must be accommodated. C.Schedule the Work to accommodate Owner occupancy. 1.11 DRAWINGS ACCOMPANYING SPECIFICATION SHEET 1 COVER SHEET SHEET 2 EXISTING CONDITIONS PLAN SHEET 3 PROPOSED NORTHWEST INTERCEPTOR TRENCH – GRADING PLAN SHEET 4 PROPOSED NORTHWEST INTERCEPTOR PROFILE SHEET 5 PROPOSED NORTHWEST INTERCEPTOR CROSS SECTIONS SHEET 6 PROPOSED SOUTHEAST INTERCEPTOR TRENCH – GRADING PLAN SHEET 7 DETAILS I SHEET 8 DETAILS II SHEET 9 DETAILS III END OF SECTION Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 01025-1 Measurement and Payment Procedures SECTION 01025 MEASUREMENT AND PAYMENT PROCEDURES PART 1 GENERAL 1.1 SUMMARY A.All payments under this Contract shall be made only for services requested and approved by the County. No work will begin without written authorization (Notice to Proceed) from the County or its designee. County shall pay Contractor in accordance with the lump sum cost estimate or in accordance with the fee schedule established in Exhibit A, which is attached hereto and incorporated by reference as part of this Agreement. The County shall be invoiced monthly. Invoices shall contain a coversheet with a summary of the percent completion of the project, the total units approved by the Engineer as completed and a lien waiver signed by sub-contractors, if applicable. Payment may be delayed to the Contractor up to sixty (60) days due to Local, State and/or Federal reporting and funding reimbursement process. All invoices shall be delivered to: Edgecombe County c/o Edgecombe County Department of Solid Waste Post Office Box 10 Tarboro, NC 27886 The County will retain 5% of the value of each invoice until such time as the project is completed. In order for both parties herein to close their books and records, the Contractor will clearly state “Final Invoice”on the Contractor’s final/last billing to the County. This certifies that all services have been properly performed and all charges and costs have been invoiced to the County. Since this account will thereupon be closed, any and other further charges if not properly included on this final invoice are waived by the Contractor. B.Section Includes: 1.Allowances. 2.Certification of Independent Price Determination 3.Applications for payment. 4.Change Procedures. 5.Defect Assessment. 6.Unit prices. 7.Alternates. 1.2 ALLOWANCES A.OVERHEAD AND PROFIT 1.Allowance for overhead and profit combined shall not exceed fifteen percent (15%) of the net cost except where the change involves a Subcontractor; allowances shall not exceed fifteen percent (15%) for the Subcontractor and seven and one-half percent (7- 1/2%) for the Prime Contractor. 2.Work covered by unit prices will have no allowance for overhead and profit. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 01025-2 Measurement and Payment Procedures 3.In the case of deductible Change Orders other than for unit prices, the Contractor shall include not less than ten percent (10%) profit but no allowance for overhead. B.CERTIFICATION OF INDEPENDENT PRICE DETERMINATION 1.By submission of this bid, the bidder certifies and, in the case of a joint bid, each party thereto certifies as to its own organization, that in connection with this procurement: a.The price in this bid have been arrived at independently, without consultation, communication or agreement for the purpose of restricting competition as to any matter relating to such prices with any other bidder or with any competitor; b.Unless otherwise required by law, the prices which have been quoted in this bid have not and will not be knowingly disclosed by the bidder prior to bid opening, directly or indirectly, to any other bidder or to any competition; and c.No attempt has been made or will be made by the bidder to induce any other person or firm to submit or not to submit a bid for the purpose of restricting competition. 1.3 APPLICATIONS FOR PAYMENT A.The Contractor shall submit to the Engineer an original itemized Application for Payment, notarized, in accordance with EJCDC Document C-700, supported by such data substantiating the Contractor’s right to payment as the Owner or the Engineer may require, and reflecting retainage amounts as indicated elsewhere in the documents. This Application for Payment will be submitted on a date to be mutually agreed upon by all Prime Contractors, the Engineer, and the Owner at preconstruction conference. B.The Contractor shall include in his Contract Sum and shall pay all County, State and Federal Sales or Use Taxes applicable to performance of the Work. The Contractor shall submit with each payment request, submitted on quarter months, an original notarized statement showing all taxes paid on the project. The statement shall list each Subcontractor and supplier by name and the amount of Sales Tax paid to and by each of them and the total amount of Sales Tax paid. C.Applications for Payment shall be accompanied by a North Carolina Local Sales or Use Tax Statement. This statement shall be submitted on the forms provided by the Owner and shall show the North Carolina, County, and/or Local Sales Tax and any other applicable Taxes paid. It shall also list any payments made directly to the North Carolina Department of Revenue. If no sales tax has been paid, “NONE” shall be entered on the statement form. Payment will not be made until properly documented, signed, and notarized original sales and use tax statements are submitted by Contractor. D.When requesting payment for materials stored, the Contractor shall submit with his request a Certificate of Insurance showing proof of coverage for the materials. Payment will be made for up to ninety percent (90%) of invoice amount only for the stored materials. No payment will be made for anticipated overhead and profit. Requests for payment for materials stored shall be accompanied by the Supplier’s invoices, or other indications of the value of the stored materials, satisfactory to the Owner. The Contractor shall notify the Engineer of this intention to bill for stored materials seven (7) days prior to the normal billing date and will reimburse the Owner for costs incurred upon reviewing stored materials. 1.4 CHANGE PROCEDURES A.Submittals: Submit name of individual authorized to receive change documents, and be responsible for informing others in Contractor's employ or Subcontractors of changes to the Work. B.The Engineer will advise of minor changes in the Work not involving adjustment to Contract Sum/Price or Contract Time. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 01025-3 Measurement and Payment Procedures C.The Engineer may issue a Notice of Change including a detailed description of proposed change with supplementary or revised Drawings and specifications, a change in Contract Time for executing the change, and the period of time during which the requested price will be considered valid. Contractor will prepare and submit estimate within three days. D.Contractor may propose changes by submitting a request for change to Engineer, describing proposed change and its full effect on the Work. Include a statement describing reason for the change, and effect on Contract Sum/Price and Contract Time with full documentation and a statement describing effect on Work by separate or other Contractors. Document requested substitutions in accordance with Section 01600. E.Work Directive Change: Engineer may issue directive instructing Contractor to proceed with change in the Work, for subsequent inclusion in a Change Order. Document will describe changes in the Work, and designate method of determining any change in Contract Sum/Price or Contract Time. Promptly execute change. 1.5 DEFECT ASSESSMENT A.Replace the Work, or portions of the Work, not conforming to specified requirements. B.If, in the opinion of the Engineer and/or Owner, it is not practical to remove and replace the Work, the Engineer will direct appropriate remedy or adjust payment. C.Individual specification sections may modify these options or may identify specific formula or percentage sum/price reduction. D.Authority of Engineer and/or Owner to assess defects and identify payment adjustments is final. E.Non-Payment For Rejected Products: Payment will not be made for rejected products for any of the following: 1.Products wasted or disposed of in a manner that is not acceptable. 2.Products determined as unacceptable before or after placement. 3.Products not completely unloaded from transporting vehicle. 4.Products placed beyond lines and levels of required Work. 5.Products remaining on hand after completion of the Work. 6.Loading, hauling, and disposing of rejected products. 1.6 UNIT PRICES A.Unit Quantities 1.Measurement methods delineated in individual specification sections complement criteria of this section. In event of conflict, requirements of individual specification section govern. 2.Take measurements and compute quantities. Engineer will verify measurements and quantities. 3.Quantities and measurements indicated in Bid Form and/or Contract Documents are for contract purposes only. Quantities and measurements supplied or placed in the Work shall determine payment. Final payment for Work governed by unit prices will be made on basis of actual measurements and quantities accepted by Engineer multiplied by unit sum/price for Work incorporated in or made necessary by the Work. a.When actual Work requires more or fewer quantities than those quantities indicated, provide required quantities at unit prices contracted. b.When actual Work requires 30 percent or greater change in quantity than those quantities indicated, Owner or Contractor may claim for Contract Price adjustment. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 01025-4 Measurement and Payment Procedures B.Unit Prices 1.Payment Includes: Full compensation for required labor, products, tools, equipment, plant and facilities, transportation, services and incidentals; erection, application or installation of item of the Work; overhead and profit. 2.Specific Item Unit Pricing is delineated in the individual specification sections. 3.Mobilization a.Basis of Measurement: By lump sum. b.Basis of Payment: Includes mobilization for the project. 4.Surveying a.Basis of Measurement: By lump sum. b.Basis of Payment: Includes surveying to the locations and grades according to the plans and providing as-built drawings, and any incidentals in completing the contract. 5.Record Drawings a.Basis of Measurement: By lump sum. b.Basis of Payment: Includes surveying of as-built conditions, and preparation of record drawings to record actual construction. 6.Minor Demolition a.Basis of Measurement: By lump sum. b.Basis of Payment: Includes removal and disposal of any incidental structures located within the construction limits. 7.Coffer Dams a.Basis of Measurement: By lump sum. b.Basis of Payment: Includes design, construction, installation, demolition, removal and disposal of coffer dams. 1.7 ALTERNATES A.Alternates quoted on Bid Forms will be reviewed and accepted or rejected at the Owner’s option. Accepted Alternates will be identified in the Owner-Contractor Agreement. B.Coordinate related work and modify surrounding work. END OF SECTION Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 01050-1 Field Engineering SECTION 01050 FIELD ENGINEERING PART 1GENERAL 1.1 SECTION INCLUDES A.General requirements for survey work to be performed by CONTRACTOR to layout Work under this Contract. B.Before commencing any surveys, CONTRACTOR will give ENGINEER two (2) working days advance notice so that ENGINEER may witness such work. 1.2 RELATED SECTIONS A.Section 01025 - Measurement and Payment. Section 01052 – Surveying for Corrective Measures 1.3 DESCRIPTION A.Reference points: Reference points to be provided by ENGINEER will include referenced monuments and elevation benchmarks in the vicinity of the Project. If displaced by CONTRACTOR, replacement of these reference points will be at the expense of CONTRACTOR. B.CONTRACTOR will furnish all necessary detail surveys including all lines, grades, and elevation appropriate to control construction. 1.4 SURVEYS FOR MEASUREMENT FOR PAYMENT A.When the Specifications or ENGINEER require Bid Schedule items of work to be measured by surveying methods, CONTRACTOR will perform the surveys. All such surveys, including control surveys for establishing the measurement reference lines, will be performed by a duly qualified and licensed surveyor in the presence of CONTRACTOR who will provide notice so ENGINEER may witness the surveying operation. ENGINEER may independently check calculations of final quantities for payment purposes. A duplicate of the note reductions and calculations will be given to ENGINEER. All calculated quantities shall be certified by surveyor as to accuracy. 1.5 SURVEYING ACCURACY AND TOLERANCES IN SETTING OF SURVEY STAKES A.Perform control traverse field surveys and computations to an accuracy of at least 1:10,000. B.The tolerances applicable in setting survey stakes are as set forth below. Such tolerances cannot supersede stricter tolerances required by the Drawings or Specifications, and cannot otherwise relieve the CONTRACTOR of responsibility for measurements in compliance therewith. Type of Mark Horizontal Position Elevation Permanent reference points 1 in 10,000 ±.01 ft. General excavation and earthwork 1 in 2,000 ±.10 ft. A.Tolerances for designed grades shown on Drawings and for elevations shown on the Drawings are ±0.10 foot unless otherwise specified. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 01050-2 Field Engineering B.Surveyor must be licensed in the State of North Carolina, unless otherwise noted in the Specifications. PART 2PRODUCTS Not Used. PART 3EXECUTION Not Used. END OF SECTION Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 01052-1 Surveying for Corrective Measures Installation SECTION 01052 SURVEYING FOR CORRECTIVE MEASURES INSTALLATION PART 1 - GENERAL 1.1 SUMMARY Section includes requirements for surveying, field engineering, and record documents. 1.2 CONTRACTOR'S SURVEYOR CONTRACTOR is required to use a qualified and North Carolina licensed surveyor to provide field engineering and surveying services as required for layout and as-built surveys as indicated on the Drawings and specified herein. The CONTRACTOR may use qualified in-house staff to perform intermediate surveying work during the construction. The CONTRACTOR's surveyor shall perform the following as necessary to install the Corrective Measures: •Locate existing features; •Generate cut sheets; •Provide construction stake out; •Update Record Drawings; •Create final Record Drawings; •Provide surveys for measurement and payment for the work, and provide survey base maps for record Drawings. 1.3 OWNER'S SURVEYOR The OWNER's surveyor may verify the work as the OWNER deems necessary. 1.4 DEFINITIONS A.Existing Features: existing features may include but are not limited to the following: •Buildings, roads and other site improvements •Stormwater System Components •Sediment Basins •Spillway and Emergency Spillways •Grading Areas •Hydraulic Barrier Components •Placed Fill •Low permeability Liner Material •Grass lined, rip rap lined, and gabion lined channels, drainage ditches or drainage swales •Placed or Buried piping •Embankments •Manholes •Groundwater Monitoring Wells, Gas Monitoring Wells •Leachate Systems B.Independent Surveyor: employed by an organization, which is independent from the CONTRACTOR. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 01052-2 Surveying for Corrective Measures Installation 1.5 SUBMITTALS Submit the following items to the ENGINEER for review: A.Pre-Construction Survey: To account for site conditions that may differ significantly from those shown on the drawings, the CONTRACTOR shall submit to the ENGINEER for review a complete pre-construction survey of (at a minimum) all erosion and sedimentation control measures, tree protection areas, limits of disturbance, limits of designed sedimentation basins, embankment and spillway equipment, alignment and elevation stakes of hydraulic barrier, alignment and elevation stakes of barrier drainage ditch, grade stakes for dam removal area, and all proposed culvert and catch basin locations. Grade stakes shall include existing and proposed elevations. The pre-construction survey must include the northing, easting, and vertical elevation of all points and must be delivered to the ENGINEER in a digital file in AutoCAD. The CONTRACTOR to stake these locations in the field for visual approval by the ENGINEER and OWNER prior to beginning work. B.Project As-Built Drawings (record documents): Upon Substantial Completion of the Work, deliver As-Built 24” x 36” drawings to ENGINEER. Final payment will not be made until satisfactory record documents are received by the ENGINEER. Accompany record documents with transmittal letter containing: •Date; •Project title and number; •CONTRACTOR'S name and address; •Title and number of each record document; •Certification that each document as submitted is complete and accurate; •Signature of CONTRACTOR, or his authorized representative; and, •Certification from North Carolina licensed surveyor. At a minimum, the as-built drawings should consist of the following level of detail: •Northing and Easting (State Plane Coordinate System) coordinates or reference to permanent surface improvements for every installed structure, pipe inlet/outlet, alignment and final elevation of hydraulic barrier, grade and alignment of perimeter ditch perimeter of sedimentation basins and final elevation of the top of the basin liner for sediment basins. •Grade of channel in dewatered pond influent and effluent to pond area •Top of pipe elevations at all hydraulic barrier drain pipes and channel bottom measurements at dewatered pond and sediment basins at intervals not to exceed 50 linear feet between horizontal measurements, as well as at every lateral/header/pipe cleanout location. •Give particular attention to concealed elements that would be difficult to measure and record at a later date. •A digital file of the Record Drawings must be provided to the ENGINEER in AutoCAD format. 1.6 MONTHLY INSPECTIONS To verify the CONTRACTOR's monthly progress payment requests, the ENGINEER may request the following items for monthly inspection: Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 01052-3 Surveying for Corrective Measures Installation A.Record Documents maintained by CONTRACTOR B.Surveyor's Measurements, Notes and Cut Sheets 1.7 SITE CONDITIONS A.Existing Grades: The Drawings depict year 2011surface elevations. Filling activities, maintenance activities, new construction, re-grading, and routine settlement may have occurred since the original survey. The CONTRACTOR is responsible for locating, and notifying the OWNER of such changes if they materially affect the proposed LFG system installation. B.Existing Features: CONTRACTOR is required to field verify the location of existing features that materially affect installation of the proposed corrective measures installation. The OWNER’s record drawings are available to the CONTRACTOR to field verify existing features. The existence and location of existing features shown on the drawings are not guaranteed. Before beginning site work, the CONTRACTOR shall investigate and verify the existence and location of underground utilities and existing features. The OWNER and the ENGINEER take no responsibility for the accuracy of these record drawings implied or otherwise. C.Field Verification: Prior to construction, the CONTRACTOR shall verify the location of existing features at points of connection or tie-in to the Work. D.Field Conditions and Measurements: The CONTRACTOR shall base all measurements, both horizontal and vertical, from established benchmarks. The CONTRACTOR shall be responsible for field verification of all dimensions and conditions at the job site. E.Discrepancies: Should the CONTRACTOR discover any discrepancy between actual conditions and those indicated which prevent following good practice or the intent of the Drawings and Specifications, he shall notify the ENGINEER, request clarification and instructions, and shall not proceed with his work until he has received the same from the ENGINEER. F.No Additional Payment: No claims shall be made for extra payment or extensions of Contract completion time if the CONTRACTOR fails to notify the ENGINEER of any discrepancy before proceeding with the aspect of the Work. PART 2 - PRODUCTS (Not Applicable) PART 3 - EXECUTION 3.1 QUALIFICATIONS OF SURVEYOR The CONTRACTOR shall utilize a qualified surveyor. As noted in Part 1.2 above, the CONTRACTOR’s surveyor must be licensed in the State of North Carolina for all work except intermediate grade and construction assistance surveying. 3.2 FIELD SURVEY WORK A.Control Points: The ENGINEER will identify existing control points as indicated in the Bidding Documents Specifications or Drawings portions of these specifications. The CONTRACTOR shall promptly replace lost or destroyed project control points. Replacements shall be based on the original survey control points. The CONTRACTOR shall relate all work to the facility elevation datum and coordinate system. The CONTRACTOR is responsible for all construction layout and staking. As needed, CONTRACTOR shall establish additional benchmarks and control points to complete his surveying. Any additional benchmarks shall be noted on the Record Drawings. B.Site Improvements: The CONTRACTOR shall work from lines and levels established by benchmarks and markers to set lines and levels as needed to properly locate each element of the Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 01052-4 Surveying for Corrective Measures Installation Project. The CONTRACTOR shall locate and lay out Corrective Measures and appurtenances by instrumentation and similar appropriate means. The CONTRACTOR shall calculate and measure required dimensions within indicated or recognized tolerances. The CONTRACTOR shall not scale Drawings to determine dimensions. C.Relocation of Existing Utilities: The CONTRACTOR shall furnish information necessary to adjust, move or relocate existing features, structures, utility poles, lines, services or other appurtenances located in, or affected by construction of the Corrective Measures. The CONTRACTOR shall coordinate with local authorities having jurisdiction. D.Surveyor's Log: The CONTRACTOR shall keep neat legible notes of all measurements and calculations made by him while surveying and laying out the work. The CONTRACTOR shall maintain a surveyor's log of control and other survey work. The CONTRACTOR shall make this log available for reference by the ENGINEER. 3.3 TOLERANCES A.Inside the Limits of Existing Refuse: Within the limit of existing refuse, elevations and contour lines shown on the drawings are approximate. However, minimum and maximum slope requirements shown on the drawings and specified herein must be observed at all times unless otherwise approved by the ENGINEER. Slopes shall be constructed as indicated. Minimum slope for down drains and headers on the landfill surface shall be as indicated on the drawings or approved by the ENGINEER. B.Outside the Limits of Existing Refuse: Outside the limits of existing refuse, grades and pipe slopes shall be constructed as indicated on the drawings or as otherwise approved by the ENGINEER. 3.4 RECORD DOCUMENTS A.General: Do not use record documents for construction purposes; protect from deterioration and loss in a secure, fire-resistive location; provide access to record documents for the ENGINEER's reference during normal working hours. Store record documents and samples in CONTRACTOR'S field office apart from documents used for construction. Provide files, racks, and secure storage for record documents and samples. B.Recording 1.Label and file record documents and samples in accordance with Specification Section number listings in Table of Contents of this Project Manual. Label each document "PROJECT RECORD" in neat, large, printed letters. 2.Preparation of project record documents shall be by personnel qualified to prepare the required drawings. 3.Record and update daily record information from field notes, on set of blue line prints, and copy of Project Manual. 4.Record information concurrently (daily) with construction progress. Do not conceal work until required information is recorded. 5.Record deviations from required lines and levels, and advise the ENGINEER when deviations that exceed indicated or recognized tolerances are detected. On Project Record Drawings, record deviations that are accepted and not corrected. C.Record Drawings: Maintain a clean, undamaged set of blue or black line white-prints of Contract Drawings and Shop Drawings. Mark the set to show the actual installation where the installation Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 01052-5 Surveying for Corrective Measures Installation varies substantially from the work as originally shown. Mark whichever drawing is most capable of showing conditions fully and accurately; where Shop Drawings are used, record a cross- reference at the corresponding location on the Contract Drawings. Give particular attention to concealed elements that would be difficult to measure and record at a later date. Mark record sets with red erasable pencil. Mark new information that is important to the OWNER, but was not shown on Contract Drawings or Shop Drawings. Note related Change Order numbers where applicable. Organize record drawing sheets into manageable sets, bind with durable paper cover sheets, and print suitable titles, dates and other identification on the cover of each set. Legibly mark each item to record actual construction, including: 1.Measured horizontal and vertical locations of underground appurtenances in accordance with Section 1.5 C above. 2.Measured locations of Corrective Measures, existing liner systems, internal utilities, and appurtenances concealed in construction, referenced to visible and accessible features of construction. 3.Field changes (dimensions and detail). 4.Changes made by Modifications. 5.Details not on original Contract Drawings. 6.References to related Shop Drawings and Modifications. 7.Depths of various elements of the Work in relation to datum. D.Record Specifications: Maintain one complete copy of the Project Manual, including addenda, and one copy of other written construction documents such as Change Orders and modifications issued in printed form during construction. Mark these documents to show substantial variations in actual work performed in comparison with the text of the Specifications and modifications. Give particular attention to substitutions, selection of options and similar information on elements that are concealed or cannot otherwise be readily discerned later by direct observation. Note related record drawing information and product data. Legibly mark up each Section to record: 1.Manufacturer, trade name, catalog number, and supplier of each product and item of equipment actually installed. 2.Changes made by Change Order or Field Order. 3.Other matters not originally specified. E.Record Product Data: Maintain one copy of each Product Data submittal. Mark these documents to show significant variations in actual work performed in comparison with information submitted. Include variations in products delivered to the site, and from the manufacturer's installation instructions and recommendations. Give particular attention to concealed products and portions of the work which cannot be otherwise be readily discerned later by direct observation. Note related Change Orders and mark-up of record drawings and Specifications. Upon completion of mark-up, submit complete set of record Product Data to the ENGINEER for the OWNER'S records. F.Record Sample Submitted: Immediately prior to the date or dates of Substantial Completion, the CONTRACTOR will meet at the site with the ENGINEER and the OWNER'S personnel to determine which of the submitted samples that have been maintained during progress of the work Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 01052-6 Surveying for Corrective Measures Installation are to be transmitted to the OWNER for record purposes. Comply with delivery to the OWNER'S sample storage area. G.Miscellaneous Record Submittals: Refer to other Specification Sections for requirements of miscellaneous record-keeping and submittals in connection with actual performance of the work. Immediately prior to the date or dates of substantial completion, complete miscellaneous records and place in good order, properly identified and bound or filed, ready for continued use and reference. Submit to the ENGINEER for the OWNER'S records. Miscellaneous record submittals include but are not limited to: 1.Field test records 2.Inspection certificates 3.Manufacturer's certificates H.CONTRACTOR is required to present all Record Drawings, Record Specifications, retained submittals, survey data, and other required information to ENGINEER on-site for inspection prior to CONTRACTOR submittal of any monthly pay requests. 3.6 INSPECTION Verify locations of survey control points and existing features prior to starting work. Promptly notify ENGINEER of any discrepancies. 3.7 SURVEY FOR MEASUREMENT AND PAYMENT Measurement for payment calculations shall be performed by the CONTRACTOR'S licensed surveyor at the CONTRACTOR’s expense and verified by the ENGINEER. END OF SECTION Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 01200-1 Project Meetings SECTION 01200 PROJECT MEETINGS PART 1GENERAL 1.1 REQUIREMENTS INCLUDED A.Representatives of CONTRACTOR, subcontractors, and suppliers attending meetings must be authorized to act on behalf of organizations they represent. B.A pre-construction conference will be scheduled as soon as practicable after the award of the contract. The Contractor shall attend the conference along with anticipated major Subcontractors. During this conference, the Contractor shall submit a list of anticipated Subcontractors and major material suppliers, a detailed construction schedule, and a statement of anticipated weekly, monthly, or quarterly progress payments showing the percent of progress each period. The Contractor shall also provide at least two local telephone numbers that may be used to contact the Contractor or his authorized representative in the event of an emergency after normal business hours. The Contractor shall also have his prospective job Superintendent attend the pre- construction conference. C.The Contractor shall attend all daily and weekly progress meetings for the purpose of informing the Owner and the Engineer regarding the status of the project. A person authorized to act on behalf of the Subcontractor(s) shall be present. Each representative shall be thoroughly familiar with the status of the project and shall be prepared to discuss and act upon any situations that may arise. The time, date and location of these meetings will be established during the pre- construction conference. The General Contractor shall provide an updated job progress schedule at each weekly meeting. 1.2 PRE-CONSTRUCTION MEETING A.Meeting will be held at a location selected by OWNER. B.Attendance: 1.CONTRACTOR's Project Manager. 2.CONTRACTOR's On-Site Field Superintendent. 3.Any Subcontractors or Supplier's representatives whom CONTRACTOR may desire to invite or OWNER may request. 4.ENGINEER's Representatives. 5.OWNER's Representatives. C.A suggested format would include, but not be limited to, the following subjects: 1.Presentation of Contract Documents, including Drawings and Specifications, proposed construction progress schedule, and submittals as required by the Contract Documents. 2.Required bonds and insurance certifications prior to Notice to Proceed. 3.Contract Times and Liquidated Damages. 4.Procedures for handling submittals, including pre-construction survey. 5.Direction of correspondence, and coordinating responsibility between CONTRACTOR, ENGINEER, and OWNER. 6.Request or scheduling of routine progress meetings. 7.Laboratory testing of construction materials, including any off-site soil. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 01200-2 Project Meetings 8.Applications for payment, and progress payment procedures. 9.Change Order procedures. 10.OWNER's site regulations. 11.CONTRACTOR questions. 12.Site tour and job walk. D.The meeting will be documented by the ENGINEER. Copies of the minutes and relevant documents will be provided to all parties. 1.3 ROUTINE PROGRESS MEETINGS A.The ENGINEER will schedule and administer progress meetings at a minimum of once per month, but may be daily or weekly, or as requested by ENGINEER or OWNER. B.Attendance: 1.OWNER’S Representative. 2.ENGINEER. 3.ENGINEER’s CQA personnel (as applicable). 4.CONTRACTOR's superintendent. 5.Subcontractors as appropriate to agenda. 6.Suppliers as appropriate to agenda. C.Meeting requirements: 1.ENGINEER will administer the following general requirements for progress meetings: a.Prepare agenda for meetings. b.Make physical arrangements for meetings. c.Preside at meetings. d.Record significant proceedings and decisions of meeting. e.Reproduce and distribute copies of meeting record to participants in meeting and to parties affected by decisions made at meeting. D.Suggested Agenda: 1.Review and approval of record of previous meeting. 2.Review of Work progress since previous meeting. 3.Field observations, problems, and conflicts. 4.Problems which impede Work Schedule. 5.Review of off-site delivery schedules. 6.Corrective measures and procedures to regain projected schedule if a review of the schedule deems it necessary. 7.Revisions to Construction Progress Schedule. 8.Coordination of schedules between contractors. 9.Review submittal schedules; expedite as required. 10.Maintenance of quality and safety standards. 11.Pending changes and substitutions. 12.Review proposed changes for effect on construction schedule and completion date, and on other contracts of projects. 13.Review of Drawings and Specifications. 14.Review of bid item quantities relative to original estimates. 15.Review and update of as-built Drawings. 16.Other business. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 01200-3 Project Meetings 1.4 DAILY PROGRESS MEETINGS A.At the ENGINEER’s option, an informal progress meeting will be held daily before or shortly after the start of work. At a minimum, this meeting will be attended by the ENGINEER (or ENGINEER’s CQA personnel) and CONTRACTOR’s Superintendent or designee. The purpose of this meeting is to: 1.Review scheduled work activities. 2.Discuss problems and resolutions. 3.Review survey or test data. 4.Discuss the CONTRACTOR's personnel and equipment assignments for the day. 5.Review the previous day's activities and accomplishments. B.This meeting will be documented by the ENGINEER (or ENGINEER’s CQA personnel). PART 2PRODUCTS Not Used. PART 3EXECUTION Not Used. END OF SECTION Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 01300-1 Submittals SECTION 01300 SUBMITTALS PART 1GENERAL 1.1 SECTION INCLUDES A.Submittal procedures. B.Construction progress schedules. C.Proposed Products list. D.Shop Drawings. E.Product Data. F.Samples. G.Manufacturer's installation instructions. H.Manufacturers' certificates. 1.2 SUBMITTAL PROCEDURES A.Transmit each submittal with a transmittal form. Within fifteen (15) calendar days after the CONTRACTOR has received the OWNER’s Notice To Proceed, the CONTRACTOR shall provide to the ENGINEER a minimum of four (4) copies of each submittal. B.Sequentially number the transmittal form. For revised submittals add an alphabetic suffix to the original number. C.Identify Project, CONTRACTOR, Subcontractor or supplier; pertinent drawing and detail number, and specification section number, as appropriate. D.Apply CONTRACTOR’s stamp, signed or initialed certifying review, verification of Products required, field dimensions, adjacent construction Work, and coordination of information, is in accordance with the requirements of the Work and Contract Documents. E.Schedule submittals to expedite review by the ENGINEER and delivery in the time frame specified. Coordinate submission of related items. F.ENGINEER shall have seven (7) calendar days review time for each submittal excluding delivery time to and from the CONTRACTOR. G.CONTRACTOR to identify variations from Contract Documents and Product or system limitations which may be detrimental to successful performance of the completed Work. H.Provide space for CONTRACTOR, ENGINEER and/or OWNER’s Representative review stamps. I.If revisions and re-submittals are required, identify all changes made since previous submission. J.Distribute copies of reviewed submittals as appropriate. Instruct parties to promptly report any inability to comply with provisions. K.Submittals not requested may not be recognized or processed. 1.3 HEALTH AND SAFETY PLAN AND COMPREHENSIVE WORK PLAN A.CONTRACTOR to submit to the ENGINEER a Health and Safety Plan that will be reviewed and found satisfactory by the Owner before work is performed. B.The content of the Health and Safety Plan shall comply with OSHA 29 CFR 1910.120 and shall include sections specific to each type of work and potential hazards that may be encountered during the work. The Comprehensive work plan shall include descriptions of safety measures that will be used by the Contractor and Subcontractors to perform all project tasks safely. 1.4 APPLICATIONS FOR PAYMENT A.CONTRACTOR to submit to the ENGINEER, no more frequently than monthly, Applications for Payment in accordance with the requirements listed in the General Conditions. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 01300-2 Submittals B.CONTRACTOR to use the standard forms shown in Appendix A and an Microsoft EXCEL spreadsheet to tabulate the quantities and unit prices for each item installed. The EXCEL spreadsheet to be provided to the ENGINEER updated with each Application for Payment. C.CONTRACTOR to provide a schedule of values for all materials and equipment as requested by the ENGINEER to process the Applications. D.CONTRACTOR to provide any survey measurements, photographs, drawings, record documents, etc. as requested by the ENGINEER to process the Application for Payment. E.Once ENGINEER determines that CONTRACTOR’s Application for Payment is properly completed and correct, ENGINEER will transmit the certificate for payment to the OWNER for payment. 1.5 CONSTRUCTION PROGRESS SCHEDULES A.Submit initial progress schedule in duplicate within five (5) business days after date of Notice to Proceed. The progress schedule will also include a cash flow schedule that defines on a monthly basis the estimated progress payment amount for the project duration. B.Revise and resubmit to ENGINEER as requested but no less than every 14 days and with each payment application. The revised schedule must show the original target schedule. Submit revised schedules during weekly progress meetings. C.Submit a computer-generated schedule with separate line for each item of Work or operation identifying first work day of each week. E.Show complete sequence of construction by activity, identifying Work of separate stages and other logically grouped activities. Indicate the critical path, start, and finish, float dates, and duration. F.Indicate estimated percentage of completion for each item of Work at each submission. G.Indicate submittal dates and review periods required for shop Drawings, product data, samples, and product delivery dates, including those furnished by OWNER. 1.6 PROPOSED PRODUCTS LIST AND HANDLING PLAN A.Within fifteen (15) calendar days after date of OWNER-CONTRACTOR Agreement, submit list of major products proposed for use, with name of manufacturer, trade name, and model number of each product and plan that describes delivery storage and handling procedures.. B.For products specified only by reference standards, give manufacturer, trade name, model or catalog designation, and reference standards. 1.7 SHOP DRAWINGS A.Provide a minimum of two (2) copies. B.Shop Drawings: Submit for review. After review, produce copies and distribute in accordance with the SUBMITTAL PROCEDURES article above and for record documents purposes described in Section 01700 - CONTRACT CLOSEOUT. 1.8 PRODUCT DATA A.Provide a minimum of two (2) copies. B.Mark each copy to identify applicable products, models, options, and other data. Supplement manufacturers' standard data to provide information unique to this Project. C.After review distribute in accordance with the Submittal Procedures article above and provide copies for record documents described in Section 01700 - CONTRACT CLOSEOUT. 1.9 MANUFACTURER INSTALLATION INSTRUCTIONS A.When specified in individual specification sections, submit three copies of printed instructions for delivery, storage, assembly, installation, start-up, adjusting, and finishing to the ENGINEER. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 01300-3 Submittals B.Indicate special procedures, perimeter conditions requiring special attention, and special environmental criteria required for application or installation. 1.10 MANUFACTURER CERTIFICATES A.When specified in individual specification sections, submit manufacturer’s certificates in specified quantities. B.Indicate material or product conforms to or exceeds specified requirements. Submit supporting data, affidavits, certifications, and quality control testing. C.Certificates must be specific to the material or product delivered to the site. 1.11 ADMINISTRATIVE SUBMITTALS A.Project Work Plan B.List of Subcontractors C.List of Chemical Products that will be Used or Stored D.MSDS Sheets for all Products and Chemicals E.List of Fuel Driven Equipment; and F.Contractor and Subcontractor Time and Materials Unit Rates. END OF SECTION Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 01400-1 Quality Requirements SECTION 01400 QUALITY REQUIREMENTS PART 1 GENERAL 1.1 SUMMARY A.Section Includes: 1.Tolerances. 2.Surveying and Record Drawings. 3.References. 4.Testing and Observation Requirements. 1.2 QUALITY CONTROL AND CONTROL OF INSTALLATION A.Monitor quality control over suppliers, manufacturers, products, services, site conditions, and workmanship, to produce Work of specified quality. B.Comply with manufacturers' and/or supplier’s instructions, including each step in sequence. C.When manufacturers' and/or supplier’s instructions conflict with Contract Documents, request clarification from Engineer before proceeding. D.Comply with specified standards as minimum quality for the Work except where more stringent tolerances, codes, or specified requirements indicate higher standards or more precise workmanship. E.Perform Work by persons qualified to produce required and specified quality. F.Verify field measurements are as indicated on Construction Drawings or as instructed by manufacturer. G.Materials stored off the site shall be stored in a bonded warehouse and shall be clearly marked as being for this project. 1.3 TOLERANCES A.Monitor fabrication and installation tolerance control of products to produce acceptable Work. Do not permit tolerances to accumulate. B.Comply with manufacturers' tolerances. When manufacturers' tolerances conflict with Contract Documents, request clarification from Engineer before proceeding. C.Adjust Work to appropriate dimensions within designated tolerances; position products and brace as needed before securing in place. 1.4 SURVEYING AND RECORD DRAWINGS A.All field layouts shall be performed by or under the supervision of a licensed Professional Land Surveyor registered in the state where the Work is to be conducted. The Contractor shall establish and maintain a minimum of two permanent benchmarks. Horizontal and vertical locations of the benchmarks shall be recorded on the As-Built Drawings. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 01400-2 Quality Requirements B.The Contractor will be responsible for all surveying necessary for construction including As-Built Drawings and Record Drawings. A 50’ X 50’ grid pattern or as otherwise approved by the Engineer, of ground surface elevations in the construction area shall be surveyed and reference points installed by the Contractor prior to excavation and prior to placement of the soil materials. The hydraulic barrier shall be documented based on existing elevations on the alignment, width and depth of trench excavation, grad of pipe installation and thickness of fill media placed in trench by layer. The As-Built finished grades and Record Drawings shall be determined and provided by he Contractor’s licensed surveyor. C.Record Drawings for completed construction shall include at a minimum: 1.Liner system subgrade; 2.Top of compacted soil liner; 3.Top of vegetative cover layer; 4.Constructed and/or modified embankments and basins, 5.Perimeter berms, roads, and stormwater management features; 6.Spillway channels and basin outlet structures; and 7.Interceptor trench piping and clean-outs. D.The thickness of the soil layers (compacted soil liner, erosion and vegetative layer) shall be determined by non-destructive survey methods by comparison of topographic survey and spot elevations of the top of subject layer to the bottom of the subject layer. All anchor trenches, berms, toes, crests and breaks-in-slope shall be surveyed, field referenced and located on Record Drawings. E.The area including the former agricultural pond shall be surveyed to document existing location and elevation of ponds, connecting channel and surrounding berms near the pond banks. The elevation and the design grade shall be marked on grade stakes. Upon completion of construction a final survey for as-built conditions will document existing grades, channel locations and slopes of graded embankments at a one-foot contour interval. 1.5 REFERENCES A.For products or workmanship specified by association, trades, or other consensus standards, comply with requirements of standard, except when more rigid requirements are specified or are required by applicable code. B.Obtain copies of standards where required by product specifications sections. C.When specified reference standards conflict with Contract Documents, request clarification from Engineer before proceeding. D.Neither contractual relationships, duties, nor responsibilities of parties in Contract nor those of Engineer shall be altered from Contract Documents by mention or inference otherwise in reference documents. 1.6 TESTING AND OBSERVATION REQUIREMENTS A.Testing and observation services for the purpose of conducting tests shall be performed by the Engineer as required by the project Construction Quality Assurance (CQA) Plan. All costs of testing shall be paid by the Owner except for those called out in the CQA documents to be the contractor’s responsibility. The entity providing the CQA testing shall be referred to as the CQA agent herein. B.Testing, observations and source quality control may occur on or off project site. Perform off-site testing as required by Engineer or Owner. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 01400-3 Quality Requirements C.CQA Reports will be submitted by the CQA agent to the State Regulatory Solid Waste Section/Department indicating observations and results of tests and indicating compliance or non- compliance with Contract Documents. D.Cooperate with CQA agent; furnish samples of materials, equipment, tools, storage, safe access, and assistance by incidental labor as requested. 1.The Contractor shall give ample advance notice to the CQA agent and Engineer prior to expected time for operations requiring testing services and/or before covering up items that require inspection. 2.Make arrangements with CQA agent and pay for additional samples and tests required for Contractor's use. E.Testing and employment of testing agency or laboratory shall not relieve Contractor of obligation to perform Work in accordance with requirements of Contract Documents. F.Re-testing or observation required because of non-conformance to specified requirements shall be performed by same CQA agent on instructions by Engineer. Payment for re-testing will be charged to Contractor by deducting testing charges from Contract Sum/Price. G.CQA Agent Responsibilities: 1.Provide qualified personnel at site. Cooperate with Engineer and Contractor in performance of services. 2.Perform specified sampling and testing of products in accordance with specified standards. 3.Ascertain compliance of materials with requirements of Contract Documents. 4.Promptly notify Engineer and Contractor of observed irregularities or non-conformance of Work or products. 5.Perform additional tests required by Engineer. 6.Attend preconstruction meetings and progress meetings. PART 2 PRODUCTS Not used. PART 3 EXECUTION 3.1 EXAMINATION A.Contractor shall verify existing site conditions and substrate surfaces are acceptable for subsequent Work. Beginning new Work means acceptance of existing conditions. B.Contractor shall verify existing substrate is capable of structural support or attachment of new Work being applied or attached. C.Contractor shall examine and verify specific conditions described in individual specification sections. 3.2 PREPARATION A.Clean substrate surfaces prior to applying next material or substance. END OF SECTION Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 01500-1 Construction Facilities and Controls SECTION 01500 CONSTRUCTION FACILITIES AND CONTROLS PART 1 GENERAL 1.1 SUMMARY A.Section Includes: 1.Temporary Utilities: a.Temporary electricity. b.Telephone service. c.Facsimile service. d.Temporary water service. e.Temporary sanitary facilities. 2.Construction Facilities: a.Field offices and sheds. b.Vehicular access. c.Parking. d.Progress cleaning and waste removal. 3.Temporary Controls: a.Barriers. b.Water control. c.Dust control. d.Erosion and sediment control. e.Pollution control. 4.Site Security. 5.Removal of utilities, facilities, and controls. 1.2 TEMPORARY UTILITIES A.Temporary Electricity 1.Electricity shall be provided on a temporary basis by connection to existing public utility or by other means acceptable to the Owner. The Contractor shall be responsible for all cost incurred in providing temporary electrical service. B.Telephone Service 1.Provide, maintain, and pay for telephone service to field office at time of project mobilization. C.Temporary Water Service 1.Water shall be provided from the local municipality or county water system or by other means acceptable to the Owner on a temporary basis and paid for by Contractor. D.Temporary Sanitary Facilities 1.Provide and maintain required facilities and enclosures. Existing facility use is not permitted. Provide facilities at time of project mobilization. 2.Sanitary arrangements shall include water closet facilities acceptable to the local Health Department and shall be kept in a sanitary condition at all times. These facilities shall be available to all workers on the job. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 01500-2 Construction Facilities and Controls 1.3 CONSTRUCTION FACILITIES A.Field Offices and Sheds 1.Temporary structures shall include a temporary field office, complete with lights, telephone, air conditioning, and heat. A portion of this office shall be partitioned off, of sufficient size, for the use of the Owner, Engineer and their representatives. 2.Do not use permanent facilities for field offices or for storage. 3.Removal: At completion of Work, remove buildings, foundations, utility services, and debris. Restore areas to satisfaction of Owner. B.Vehicular Access 1.Location as indicated on Drawings approved by Engineer and/or Owner. 2.Use designated existing on-site roads for construction traffic or as directed by Engineer and/or Owner. C.Parking 1.Arrange for and/or provide temporary parking areas to accommodate construction personnel. 2.Locate as approved by Owner. 3.When site space is not adequate, provide additional off-site parking. 4.Tracked vehicles not allowed on existing on-site paved streets and driveways. 5.Do not allow vehicle parking on existing pavement without approval by Owner. 6.Maintain traffic and parking areas in sound condition free of excavated material, construction equipment, products, mud, snow, and ice. 7.Maintain existing paved areas used for construction; promptly repair breaks, potholes, low areas, standing water, and other deficiencies, to maintain paving and drainage in original, or specified condition. 8.Mud from Site Vehicles: Provide means of removing mud from vehicle wheels before entering streets. D.Progress Cleaning and Waste Removal 1.Maintain areas free of waste materials, debris, and rubbish. Maintain site in clean and orderly condition. 2.Provide a dumpster and regular garbage services on-site. 3.On-site burial of waste, debris, and rubbish shall not be permitted. 1.4 TEMPORARY CONTROLS A.Barriers 1.Provide barriers to prevent unauthorized entry to construction areas and to protect existing facilities and adjacent properties from damage from construction operations and demolition. B.Water Control 1.Grade site to drain. Maintain excavations free of water. Provide, operate, and maintain pumping equipment. 2.Provide water barriers as required to protect site from soil erosion according to project’s Erosion and Sedimentation Control Plan. C.Dust Control 1.Execute Work by methods to minimize raising dust from construction operations. 2.Provide positive means to prevent air-borne dust from dispersing into atmosphere. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 01500-3 Construction Facilities and Controls D.Erosion and Sediment Control 1.Follow project’s Erosion and Sedimentation Control Plan. Also see Sections 02374 and 02924. 2.Plan and execute construction by methods to control surface drainage from cuts and fills, from borrow and waste disposal areas. Prevent erosion and sedimentation. 3.Minimize surface area of bare soil exposed at one time. 4.Provide temporary measures including berms, dikes, and drains, and other devices to prevent water flow across disturbed areas. 5.Construct fill and waste areas by selective placement to avoid erosive surface. 6.Periodically inspect earthwork to detect evidence of erosion and sedimentation; promptly apply corrective measures. E.Pollution Control 1.Provide methods, means, and facilities to prevent contamination of soil, water, and atmosphere from discharge of noxious, toxic substances, and pollutants produced by construction operations. 2.Comply with pollution and environmental control requirements. 3.Comply with Owner’s pollution control program. 4.Establish a clear boundary at the existing ash basin drainage features. Material disposal in the active ash basin is not permitted. 1.5 SITE SECURITY: The Contractor is responsible for securing the work area, equipment, and materials. Owner will not be responsible for vandalism, damage, or theft of equipment and materials on the job site. 1.6 REMOVAL OF UTILITIES, FACILITIES, AND CONTROLS A.Remove temporary utilities, equipment, facilities, and materials prior to Substantial Completion inspection. B.Clean and repair damage caused by installation or use of temporary work. C.Restore existing facilities used during construction to original condition. Restore permanent facilities used during construction to specified condition. END OF SECTION Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 01590 - 1 Mobilization and Access SECTION 01590 MOBILIZATION AND ACCESS PART 1GENERAL 1.1 SUMMARY A.Description – Item includes the following: 1.Transport of all labor, equipment, and materials to and from the site. 2.Providing temporary construction access to all work areas. 3.Clean-up of site at completion of work. 4.Removal of all equipment and excess materials from the site at the completion of work. 1.2 MEASUREMENT AND PAYMENT A.Basis of Measurement:Lump Sum for work completed and approved by the Owner. There shall be no final measurement. B.Basis of Payment:Lump Sum bid price. PART 2PRODUCTS 2.1 Not Applicable to this Section. PART 3EXECUTION 3.1 Schedule A.Prior to the start of construction, the Contractor and the Owner shall meet in the field to review the proposed access routes and any field conditions that may limit site access. 3.2 Damage A.Damage to existing facilities along the access route(s) (i.e. pavement, curbing, landscaping, graded slopes, etc.) caused by the Contractor’s operations shall be repaired by the Contractor at no additional cost to the Owner. END OF SECTION Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 01600 - 1 Product Requirements SECTION 01600 PRODUCT REQUIREMENTS PART 1 GENERAL 1.1 SUMMARY A.Section Includes: 1.Products. 2.Product delivery requirements. 3.Product storage and handling requirements. 4.Product options. 5.Product substitution procedures. 1.2 PRODUCTS A.Furnish products of qualified manufacturers suitable for intended use. Furnish products of each type by single manufacturer unless specified otherwise. 1.3 PRODUCT DELIVERY REQUIREMENTS A.Transport and handle products in accordance with manufacturer's instructions and Specifications. When manufacturers’ and/or suppliers’ instructions conflict with Contract Documents, request clarification from Engineer before proceeding. B.Promptly inspect shipments to ensure products comply with requirements, quantities are correct, and products are undamaged. C.Provide equipment and personnel to handle products by methods to prevent soiling, disfigurement, or damage. 1.4 PRODUCT STORAGE AND HANDLING REQUIREMENTS A.Store and protect products in accordance with manufacturers' instructions. When manufacturers’ and/or suppliers’ instructions conflict with Contract Documents, request clarification from Engineer before proceeding. B.Store with seals and labels intact and legible. C.Store sensitive products in weather-tight enclosures in an environment favorable to product. D.Cover products subject to deterioration with impervious sheet covering. Provide ventilation to prevent condensation and degradation of products. E.Materials stored off the site shall be stored in a bonded warehouse and shall be clearly marked as being for this project. When requesting payment for the materials stored, the Contractor shall submit with his request a Certificate of Insurance showing proof of coverage for the materials. Payment will be made for up to 90% of invoice amount only for stored materials. No payment will be made for anticipated overhead and profit. Requests or payments for materials stored shall be accompanied by the Supplier’s invoices, or other indications of the value of the stored materials, satisfactory to the Owner. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 01600 - 2 Product Requirements F.Provide equipment and personnel to store products by methods to prevent soiling, disfigurement, or damage. G.Arrange storage of products to permit access for inspection. Periodically inspect to verify products are undamaged and are maintained in acceptable condition. 1.5 PRODUCT OPTIONS A.Products Specified by Reference Standards or by Description Only: Any product meeting those standards or description. B.Products Specified by Naming One or More Manufacturers with Provision for Substitutions: Submit request for substitution for any manufacturer not named in accordance with the following article. 1.6 PRODUCT SUBSTITUTION PROCEDURES A.Substitutions may be considered when a product becomes unavailable through no fault of Contractor. B.Document each request with complete data substantiating compliance of proposed Substitution with Contract Documents. C.Substitutions will not be considered when they are indicated or implied on Shop Drawing or Product Data submittals, without separate written request, or when acceptance will require revision to Contract Documents. D.Document each request with complete data substantiating compliance of proposed Substitution with Contract Documents. E.A request constitutes a representation that Contractor: 1.Has investigated proposed product and determined that it meets or exceeds quality level of specified product. 2.Will provide same warranty for Substitution as for specified product. 3.Will coordinate installation and make changes to other Work which may be required for the Work to be complete with no additional cost to Owner. 4.Waives claims for additional costs or time extension which may subsequently become apparent. 5.Will reimburse Owner and/or Engineer for review or redesign services associated with re- approval by authorities having jurisdiction. F.Substitutions will not be considered when they are indicated or implied on Shop Drawing or Product Data submittals, without separate written request, or when acceptance will require revision to Contract Documents. G.Substitution Submittal Procedure: 1.Submit three copies of request for Substitution for consideration. Limit each request to one proposed Substitution. 2.Submit Shop Drawings, Product Data, and certified test results attesting to proposed product equivalence. Burden of proof is on proposer. 3.Engineer will notify Contractor in writing of decision to accept or reject request. END OF SECTION Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 01630-1 Product Options and Substitutions SECTION 01630 PRODUCT OPTIONS AND SUBSTITUTIONS PART 1GENERAL 1.1 SUMMARY A.This Section describes CONTRACTOR procedures for securing approval of proposed product options and substitutions. 1.2 PRODUCT OPTIONS A.The Contract is based on standards of quality established in the Contract Documents. 1.In agreeing to the terms and conditions of the Contract, the CONTRACTOR has accepted a responsibility to verify that the specified products will be available and to place orders for all required materials in such a timely manner as is needed to meet his agreed construction schedule. 2.The OWNER and ENGINEER do not agree to the substitution of materials or methods called for in the Contract Documents, except as they may specifically otherwise state in writing. B.Materials and/or methods specified by name: 1.Where materials and/or methods are specified by naming one single manufacturer and/or model number, without stating that equal products will be considered (i.e. No Substitution), only the material and/or method named is approved for incorporation into the Work. 2.Should the CONTRACTOR demonstrate to the approval of the ENGINEER that a specified material or method was ordered in a timely manner and will not be available in time for incorporation into this Work, the CONTRACTOR shall submit to the ENGINEER such data on proposed substitute materials and/or methods as are needed to help the ENGINEER determine suitability of the proposed substitution. C.Where materials and/or methods are specified by name and/or model number, followed by the words "or an equal approved in advance by the OWNER" or similar wording: 1.The material and/or method specified by name establishes the required standard of quality; 2.Materials and/or methods proposed by the CONTRACTOR to be used in lieu of materials and/or methods so specified by name must in all ways be equal or exceed the qualities of the named materials and/or methods; D.The following products do not require further approval except for interface within the Work: 1.Products specified by reference to standard specifications such as ASTM and similar standards; 2.Products specified by manufacturer's name and catalog model number. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 01630-2 Product Options and Substitutions E.Where the phrase "or equal," or "or equal as approved by the ENGINEER," occurs in the Contract Documents, do not assume that the materials, equipment, or methods will be approved as equal unless the item has been specifically so approved in writing for this Work by the ENGINEER. F.The decision of the OWNER, as recommended by the ENGINEER, shall be final. 1.2 DELAYS A.Delays in construction arising by virtue of the non-availability of a specified material and/or method will not be considered by the OWNER as justifying an increase in the agreed Time of Completion. PART 2PRODUCTS Not Used. PART 3EXECUTION Not Used. END OF SECTION Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 01700 - 1 Execution Requirements SECTION 01700 EXECUTION REQUIREMENTS PART 1 GENERAL 1.1 SUMMARY A.Section Includes: 1.Closeout procedures. 2.Final cleaning. 3.Testing 4.Protecting installed construction. 5.Project record documents. 6.Manual for materials and finishes. 7.Manual for equipment and systems. 8.Product warranties and product bonds. 1.2 CLOSEOUT PROCEDURES A.Certificate of Substantial Completion will not be issued until Owner has been provided with written certification that Contract Documents have been reviewed, work has been inspected, and that work is complete in accordance with Contract Documents and ready for Owner and Engineer’s review. B.Final Application for Payment shall be accompanied by the following documents: 1.Record Drawings (reproducible). 2.Guarantees of all materials and workmanship. 3.Contractor’s Affidavit, Release and Waiver of Claims. 4.Consent of Surety (if applicable). 5.Final State/County Sales/Use Tax Statement (if applicable). 6.Complete list of all Subcontractors and areas of work performed. 7.Proof of Compliance with Building Standards. 8.MWBE Documentation of Final Contract Payments (if applicable). 1.3 FINAL CLEANING A.Execute final cleaning prior to final project assessment. B.Clean site; sweep paved areas, rake and clean landscaped surfaces. C.With Owner’s permission, may dispose of waste and surplus materials, and rubbish on-site in Owner designated location. Otherwise remove these items from the site. In addition, remove construction facilities from site. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 01700 - 2 Execution Requirements 1.4 TESTING A.Testing and CQA reports will be submitted by CQA agent to Engineer indicating observations and results of tests and indicating compliance or non-compliance with requirements of Contract Documents. 1.5 PROTECTING INSTALLED CONSTRUCTION A.Protect installed Work and provide special protection where specified in individual specification sections. B.Provide temporary and removable protection for installed products. Control activity in immediate work area to prevent damage. C.Prohibit traffic on landscaped areas. 1.6 PROJECT RECORD DOCUMENTS A.Maintain on site one set of the following record documents; record actual revisions to the Work: 1.Drawings. 2.Specifications. 3.Addenda. 4.Change Orders and other modifications to the Contract. 5.Reviewed Shop Drawings, Product Data, and Samples. 6.Manufacturer's instruction for assembly, installation, and adjusting. B.Ensure entries are complete and accurate, enabling future reference by Owner. C.Store record documents separate from documents used for construction. D.Record information concurrent with construction progress, not less than weekly. E.Specifications: Legibly mark and record at each product section description of actual products installed, including the following: 1.Manufacturer's name and product model and number. 2.Product substitutions or alternates utilized. 3.Changes made by Addenda and modifications. F.Record Drawings: Legibly mark each item to record actual construction including: 1.Measured depths of elevations in relation to site reference datum/benchmarks. 2.Measured horizontal and vertical locations of underground utilities and appurtenances, referenced to permanent surface improvements. 3.Measured locations of internal utilities and appurtenances concealed in construction, referenced to visible and accessible features of the Work. 4.Field changes of dimension and detail. 5.Details not on original Contract drawings. G.Submit documents to Engineer. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 01700 - 3 Execution Requirements 1.7 MANUAL FOR MATERIALS AND FINISHES A.Submit two copies of preliminary draft or proposed formats and outlines of contents before start of Work. Engineer will review draft and return one copy with comments. B.For equipment, or component parts of equipment put into service during construction and operated by Owner, submit documents within ten days after acceptance. C.Building Products, Applied Materials, and Finishes: Include product data, with catalog number, size, composition, and color and texture designations. D.Instructions for Care and Maintenance: Include manufacturer's recommendations for cleaning agents and methods, precautions against detrimental agents and methods, and recommended schedule for cleaning and maintenance. E.Moisture Protection and Weather Exposed Products: Include product data listing applicable reference standards, chemical composition, and details of installation. Include recommendations for inspections, maintenance, and repair. F.Additional Requirements: As specified in individual product specification sections. 1.8 MANUAL FOR EQUIPMENT AND SYSTEMS A.For equipment, or component parts of equipment put into service during construction and operated by Owner, submit documents within ten days after acceptance. B.Operating Procedures: Include start-up, break-in, and routine normal operating instructions and sequences. Include regulation, control, stopping, shut-down, and emergency instructions. Include summer, winter, and special operating instructions. C.Maintenance Requirements: Include routine procedures and guide for preventative maintenance and trouble shooting; disassembly, repair, and reassembly instructions; and alignment, adjusting, balancing, and checking instructions. D.Include servicing schedule. E.Include manufacturer's printed operation and maintenance instructions. F.Include sequence of operation by controls manufacturer. G.Include original manufacturer's parts list, illustrations, assembly drawings, and diagrams required for maintenance. H.Include control diagrams by controls manufacturer as installed. I.Include list of original manufacturer's spare parts, current prices, and recommended quantities to be maintained in storage. J.Include test and balancing reports as specified in Section 01400. K.Additional Requirements: As specified in individual product specification sections. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 01700 - 4 Execution Requirements 1.9 PRODUCT WARRANTIES AND PRODUCT BONDS A.Execute and assemble transferable warranty documents and bonds from subcontractors, suppliers, and manufacturers. B.Verify documents are in proper form, contain full information, and are notarized. C.Co-execute submittals when required. D.Submit prior to final Application for Payment. END OF SECTION Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 01720 - 1 Dewatering SECTION 01720 DEWATERING PART 1 GENERAL 1.1 SUMMARY A.Section Includes: 1.Pond Dewatering 2.Surface Water Control 3.Groundwater Control B.Related Sections 1.Section 02200 – Earthwork 2.Section 02324 – Trenching 3.Section 02374 – Erosion and Sedimentation Controls 4.Section 02610 - Pipes 1.2 MEASUREMENT AND PAYMENT A.Pond Dewatering 1.Basis of Measurement:Lump Sum for work completed and approved by the Owner. There shall be no final measurement. 2.Basis of Payment:Lump Sum bid price. B.Surface Water Control 1.Basis of Measurement:Lump Sum for work completed and approved by the Owner. There shall be no final measurement. 2.Basis of Payment:Lump Sum bid price. C.Groundwater Control 1.Basis of Measurement:Lump Sum for work completed and approved by the Owner. There shall be no final measurement. 2.Basis of Payment:Lump Sum bid price. 1.3 SUBMITTALS A.Informational Submittals 1.Pond Dewatering Plan – Not less than 2 weeks prior to the initiation of pond dewatering activities. 2.Groundwater Control Plan – Not less than 2 weeks prior to the initiation of groundwater dewatering. 3.Well permits – Prior to installation of groundwater dewatering wells. 4.Discharge permits – Prior to discharge of water. 5.Weekly Dewatering Summary Reports - Submit by noon on the Monday following the reporting week. B.Pond Dewatering Plan shall include, at a minimum, the following: 1.Number and types of pumps to be used. 2.Planned pumping rates and methods to control pumping rates 3.Method to measure pumping rates and water level in ponds to be dewatered. 4.Layout of pumps, suction lines, and discharge lines. 5.Description of methods to be used to prevent erosion at discharge points. 6.Qualifications of Contractor to perform dewatering. C.Groundwater Control Plan shall include, at a minimum, the following: Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 01720 - 2 Dewatering 1.Descriptions of proposed groundwater control facilities including, but not limited to, equipment; methods; standby equipment and power supply, means of measuring pumped water, pollution control facilities, discharge locations to be utilized, and provisions for immediate temporary water supply as required by this section. 2.Drawings showing locations, dimensions, and relationships of elements of each system. 3.Design calculations demonstrating adequacy of proposed dewatering systems and components. 4.Qualifications of Contractor to perform dewatering D.If systems are modified during installation or operation, revise or amend and resubmit Plans. E.Acceptance by Owner of Dewatering Control Plans does not relieve the Contractor of his responsibilities as described in this Section. PART 2 PRODUCTS 2.1 Not Applicable to this Section PART 3 EXECUTION 3.1 POND DEWATERING A.Dewatering shall be designed and operated so that removal of existing pond embankments can be completed without uncontrolled release of water and sediment. B.Dewatering rates shall be controlled so as not to induce more than one foot of drop in pond level per day. C.No sediment laden effluent will be discharged downstream of the embankment. D.Contractor is responsible for remediation of sediment discharge resulting from dewatering or failed sediment and erosion control measures. 3.2 SURFACE WATER CONTROL A.Capture and remove, divert, or otherwise control surface water so that excavation and fill placement can be completed on a dry sub-grade. B.Remove surface runoff controls when no longer needed. 3.3 GROUNDWATER CONTROL A.Provide, operate, and maintain groundwater dewatering systems of sufficient size and capacity to permit excavation and subsequent construction in dry. B.Continuously control water during dewatering period, including weekends and holidays and during periods of work stoppages, and provide adequate backup systems to maintain control of water. The dewatering period is the time when excavations, subgrade, or fill surfaces are within 2 feet of the groundwater table. C.Groundwater level shall be maintained a minimum of [2] two feet below the lowest point of excavation or construction grade. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 01720 - 3 Dewatering D.Continuously maintain excavations free of water, regardless of source, and until backfilled to final grade. E.Design and Operate Dewatering Systems so as to: 1.prevent loss of soil as water is removed. 2.avoid inducing settlement or damage to existing facilities, completed Work, or adjacent property. 3.relieve artesian pressures and resultant uplift of excavation bottom. F.Provide sufficient redundancy in each system to keep excavations free of water in event of component failure. G.Provide 100 percent emergency power backup with automatic startup and switchover in event of electrical power failure. H.Remove, or abandon in the event dewatering wells are used, groundwater control components at the completion of dewatering. 3.4 MONITORING AND REPORTING A.Existing monitoring wells and Contractor installed dewatering wells shall be used to monitor groundwater levels. Measure water levels, at a minimum, in accordance with the following schedule: 1 Weekly during the period following mobilization until groundwater dewatering is initiated. 2 Daily during days when contractor personnel are on-site and groundwater is being discharged; and, 3 Bi-weekly after termination of groundwater dewatering through acceptance of the project work. B.Staff gauges or an alternate method approved by the Owner shall be used to monitor water levels in ponds during pond dewatering. Measure water levels, at a minimum, in accordance with the following schedule: 1.Twice per day during pond dewatering; one measurement shall be made within one hour of the start of daily operations and the second measurement shall be made within one hour of the end of daily operations. 2.Turbidity of discharged effluent from basins shall be monitored visually not less than one time per week by the CONTRACOR for sediment discharge downstream of the embankment or control measures. No sediment laden effluent shall be discharged downstream of the embankment or control measures. The CONTRACTOR is responsible for remediation of sediment resulting from dewatering or failed sediment and erosion control measures. C.A weekly dewatering summary report shall be prepared and submitted. The report shall address pond dewatering, surface water control, and groundwater control. The report shall address, for each type of dewatering, the following: 1.Description of activities for the reporting week. 2.Description of planned activities for the upcoming week. 3.Discussion of problems and planned remedial measures or system modifications. 4.Monitoring results in tabular form. 5.Discharge rates. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 01720 - 4 Dewatering 3.5 DISPOSAL OF WATER A.Obtain discharge permit for water disposal from authorities having jurisdiction. B.Treat water collected by dewatering operations, as required by regulatory agencies, prior to discharge. C.Discharge water as required by discharge permit and in manner that will not cause erosion or flooding, or otherwise damage existing facilities, completed Work, or adjacent property. D.Remove solids from treatment facilities and perform other maintenance of treatment facilities as necessary to maintain their efficiency. 3.6 PROTECTION OF PROPERTY A.Make assessment of potential for dewatering induced settlement. Provide and operate devices or systems, including but not limited to reinjection wells, infiltration trenches and cutoff walls, necessary to prevent damage to existing facilities, completed Work, and adjacent property. B.Securely support existing facilities, completed Work, and adjacent property vulnerable to settlement due to dewatering operations. Support shall include, but not be limited to, bracing, underpinning, or compaction grouting. 3.7 REMEDIATION OF GROUNDWATER DEPLETION A.If dewatering reduces quantity or quality of water produced by existing water supply wells, temporarily supply water to affected well owners from other sources. Furnish water of a quality and quantity equal to or exceeding the quality and quantity available to well owner prior to beginning the Work or as satisfactory to each well owner. END OF SECTION Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 01800-1 Health and Safety Plan SECTION 01800 HEALTH AND SAFETY PLAN PART 1 GENERAL The CONTRACTOR shall be responsible for providing a full-time Health and Safety Professional that shall be on site during construction activities. The Contractor shall provide the resume for the full-time Health and Safety Professional. 1.1 DESCRIPTION A. In the event that the ENGINEER or OWNER identify an exclusion zone, the CONTRACTOR will use only site crew members in the identified area that are trained in accordance with the United States Occupational Safety and Health Administration (OSHA) regulations 29 CFR 191.120. The workers also need to have completed the minimum 40-hours Hazardous Materials training course and necessary refresher courses. This applies to both the CONTRACTOR's workers and any Subcontractor site workers. B. All site workers that work in the identified exclusion zone must be under a Medical Monitoring Program as outlined in 29 CFR 1910.120, and be physically capable of wearing a respirator, if necessary. C. Actions that potentially endangered workers shall be stopped immediately and brought to the OWNER's attention. Health and Safety is the responsibility of the CONTRACTOR. 1.2 SITE SPECIFIC HEALTH AND SAFETY PLAN A. The CONTRACTOR shall prepare a written site-specific Health and Safety (Plan) for use by the CONTRACTOR and Subcontractor site workers. This plan must be prepared to meet the 29 CFR 1910.120 OSHA regulations and shall include as a minimum, the following: 1. Organizational Structure: to include general supervision, Health and Safety office, lines of authority and responsibility and communication. The Health and Safety Office shall be a worker who will be present at all times during the site construction, in addition to his/her other site duties. 2. Comprehensive Work Plan: to include the work tasks and objectives, resources needed, and training requirements for workers (health and safety, machine operations license, etc.). This shall include a section on safety procedures to be followed for excavation and earthwork activities in landfill waste and work in areas where exposure to landfill gas and leachate is likely. 3. Health and Safety: to include identification of possible site hazards (e.g., solid waste, landfill gas, and Leachate), training levels for each category of site workers, personal protective equipment and medical surveillance needed, site control measures, and confined space entry procedures. 4. Emergency Response Plans: to include all emergency telephone numbers, a highlighted map showing the quickest route to the nearest emergency care facility and written directions to such facility. 5. Air Monitoring Procedures: to include frequency and type of air monitoring of exposed refuse, landfill surfaces, boreholes and excavations, and site worker areas, calibration of Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 01800-2 Health and Safety Plan air monitoring equipment, and action levels of air contaminants for site worker protection. All equipment calibration and field gas measurements shall be recorded with the date and time of sample, and the sampler's name. Sampling shall be done by a CONTRACTOR's worker trained in the use of gas sampling equipment. These trained workers shall be designated in the CONTRACTOR's Plan. 6. A signature page for all site workers covered by the Plan (CONRACTOR and Subcontractor site workers.) B. Acceptance of the CONTRACTOR's Plan by the OWNER is necessary prior to the start of site operations. The Plan should incorporate and be consistent with the OWNER's and the LANDFILL OPERATOR's health and safety policies and procedures. C. The CONTRACTOR shall consider the various materials disposed of (municipal solid waste, construction and demolition debris) that may be encountered during excavation in preparing the Health and Safety Plan. 1.3 SITE OPERATIONS A. The Plan will be kept on site in an easily accessible spot during all site operating hours. All site workers will be notified of the location of the Plan. B. A Safety Meeting will be held by CONTRACTOR and attended by all CONTRACTOR site workers prior to starting construction. At this safety meeting, the Plan will be reviewed with the site workers, and all site workers will sign the Plan indicating that they have been apprised of the Plan's contents. New site workers must review the Plan with the CONTRACTOR's Health and Safety Officer prior to beginning work on site, and must sign that they have been apprised of the Plan's contents. C. Site operations will take place in conditions of adequate light only. D. Areas of open refuse (i.e., excavations, trenches and boreholes) will be monitored for combustible gases, methane, volatile organics, hydrogen sulfide and oxygen through the use of field gas meters. Respiratory protection for acid gases and organic vapors will be used by the worker while monitoring gas levels. Appropriate respiratory protection will be taken by other workers as necessary. E. No workers will be allowed in any trench or excavation while excavation of the area is in progress. Entry into the excavation shall be made only after the CONTRACTOR's site worker has monitored the air in the excavation, and determined the appropriate level of personal protection required for entry into the excavation. Site workers in excavations must be supervised at all times. F. Site workers will limit their dermal exposure to excavated refuse. Minimal skin protection includes puncture resistant shoes meeting ANSI standards, long pants, long-sleeved shirts, safety glasses, safety vests, hard hats, and rubber gloves to be used when handling refuse. G. Start-up and shutdown of engines will not be done in areas of excavated refuse or where elevated landfill gas emissions have been documented. PART 2 PRODUCTS (Not used) Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 01800-3 Health and Safety Plan PART 3 EXECUTION A.Work performed shall be consistent with the following guidelines and references and in compliance with all applicable local, state, and federal regulations and standards including, but not limited to, those listed below. In the case that these requirements are conflicting, the one which offers the greatest protection shall be followed. a.CONTRACTOR's approved, site-specific Health and Safety Plan. b.Occupational Safety and Health Administration (OSHA) Construction Industry Standards, 29 CFR1926, and General Industry Standards, 29 CFR 1910. c.National Fire Protection Association (NFPA), 327 B.At a minimum, all workers employed by the contractor or any subcontractors shall wear and/or use the following: • Standard work clothes (long pants, shirts with sleeves) • Hard Hat • High visibility safety shirt, vest, or jacket • Steel toe work boots • Leather work gloves (as work tasks dictate) • Safety glasses with affixed side shields (as work tasks dictate) • Hearing protection (as work tasks dictate) Hazards associated with the work shall be evaluated by the contractor and appropriate measures taken to ensure the safety of contractor employees, County personnel, and the public. END OF SECTION DIVISION 02000 SITE CONSTRUCTION Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02060-1 Aggregate SECTION 02060 AGGREGATE PART 1 GENERAL 1.1 SUMMARY A.Section Includes: 1.Aggregate materials for fill, drainage, erosion and sediment control, and grading purposes. a.Type ABC Stone; b.NCDOT No. 57 Stone (No. 57 Stone) c.Class A Riprap d.Class B Riprap e.NCDOT No. 78M Stone (No. 78M Stone) f.NCDOT No.4 Stone (No.4 Stone) B.Related Sections: 1.Section 02374 – Temporary Construction Erosion and Sediment Control 2.Section 02220 – Earthwork 3.Section 02324 – Interceptor Trenching 1.2 MEASUREMENT AND PAYMENT A.Aggregate Materials: 1.Basis of Measurement: by the ton for material delivered and placed in accordance with the drawings and specifications and approved by the Owner or as otherwise indicated in other Sections of these Specifications. Measurement shall be based on delivery tickets reduced for the following: a.Material delivered but not used; b.Material used for purposes other than those depicted on the Drawing; c.Installation not approved by the Owner or Engineer; and, d.Material installed beyond the lines and grades shown on the Drawings. Tonnage additions or reductions shall be based on field measurements made by the Owner and will use the following volume to weight conversions: For ABC Stone – 1.8 tons per cubic yard For Riprap, No. 57 Stone, No 78m Stone – 1.5 tons per cubic yard. 2.Basis of Payment - Unit Price: Amount equal to the actual installed and approved number of units times the unit price provided in Bid Form Schedule. Requested payment quantities will be submitted by the Contractor with final approval by the Engineer. If a dispute exists relative to payment quantities, the Contractor at his expense will uncover any buried or covered material for re-evaluation. 1.3 REFERENCES A.American Association of State Highway and Transportation Officials: 1.AASHTO T11 – Standard Method of Test for Materials Finer than 75 µm (No. 200) Sieve in Mineral Aggregates by Washing. 2.AASHTO T27 – Standard Method of Test for Sieve Analysis of Fine and Coarse Aggregates. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02060-2 Aggregate 3.AASHTO T88 as Modified for Base Course and Stabilizer 4.AASHTO T180 – Standard Method of Test for Moisture-Density Relations of Soils Using a 4.54-kg (10-lb) Rammer and a 457-mm (18-in.) Drop. B.ASTM International: 1.ASTM C136 – Standard Test Method for Sieve Analysis of Fine and Coarse Aggregate. 2.ASTM D421 – Standard Practice for Dry Preparation of Soil Samples for Particle-Size Analysis and Determination of Soil Constants. 3.ASTM D422 – Standard Test Method for Particle Size Analysis of Soils. 4.ASTM D698 - Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Standard Effort (12 400 ft-lbf/ft3 (600 kN-m/m3)). 5.ASTM D1556 – Standard Test Method for Density and Unit Weight of Soil in Place by the Sand-Cone Method. 6.ASTM D1557 - Test Methods for Moisture-Density Relations of Soils and Soil- Aggregate Mixtures, Using 10 lb Rammer and 18 inch Drop. 7.ASTM D2167 - Standard Test Method for Density and Unit Weight of Soil in Place by the Rubber Balloon Method. 8.ASTM D2922 - Standard Test Methods for Density of Soil and Soil-Aggregate in Place by Nuclear Methods (Shallow Depth). 9.ASTM D3017 - Standard Test Method for Water Content of Soil and Rock in Place by Nuclear Methods (Shallow Depth). 10.ASTM D4253 – Standard Test Methods for Maximum Index Density and Unit Weight of Soils Using a Vibratory Table. 11.ASTM D4254 – Standard Test Method for Minimum Index Density and Unit Weight of Soils and Calculation of Relative Density. C.North Carolina Department of Transportation (NCDOT) Standard specifications for Roads and Structures. 1.4 SUBMITTALS A.Section 01300 – Administrative Requirements: Submittal procedures. B.Materials Source: Submit name of imported materials suppliers and description of material. C.Manufacturer’s/Supplier’s Certificate: Certify materials meet or exceed specified requirements. D.Requested payment quantities will be submitted by the Contractor with final approval by the Engineer. 1.5 QUALITY ASSURANCE A.Furnish each aggregate material type from single source throughout the Work. B.Perform Work in accordance with North Carolina Department of Transportation Standard Specifications for Roads and Structures or as otherwise specified. PART 2 PRODUCTS 2.1.AGGREGATE MATERIALS A.Type ABC Stone – Shall be for roadway subgrades and shall conform to section 1010 of NCDOT Standard Specifications of aggregate base course Type ABC. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02060-3 Aggregate B.No. 57 Stone – Shall be coarse aggregate and shall be subangular, subrounded, rounded, or well rounded particle shaped conforming to NCDOT Standard Specifications sections 1005 and 1006 for No. 57 Stone. C.Class A Riprap – Shall be coarse aggregate conforming to NCDOT Standard Specifications section 1042 for Class A Riprap. D.Class B Riprap – Shall be coarse aggregate conforming to NCDOT Standard Specifications section 1042 for Class B Riprap. E.No. 78M Stone – shall be coarse aggregate and shall be subangular, subrounded, rounded, or well rounded particle shaped conforming to Stone NCDOT Standard Specifications sections 1005 and 1006 for No. 78M Stone. F.No. 4 Stone – shall be coarse aggregate and shall be crushed stone, crushed gravel, uncrushed gravel or other similar material having hard strong durable particles free of adherent coatings particle shaped conforming to Stone NCDOT Standard Specifications sections 1005, 1006, and 1010 for No. 4 Stone. 2.3 SOURCE QUALITY CONTROL A.Section 01400 - Quality Requirements: Testing and observation services. B.Aggregate Material - Testing and Analysis: Perform in accordance with ASTM C136, ASTM D421, ASTM D422, ASTM D4253, ASTM D4254, AASHTO T11, and/or AASHTO T27. C.When tests indicate materials do not meet specified requirements, change material or material source and retest. D.Furnish materials of each type from same source throughout the Work. PART 3 EXECUTION 3.1.STOCKPILING A.Stockpile materials on site at locations designated by Engineer. B.Stockpile in sufficient quantities to meet Project schedule and requirements. C.Separate differing materials with dividers or stockpile apart to prevent mixing. D.Direct surface water away from stockpile site so as to prevent erosion or deterioration of materials. E.Stockpile materials on impervious material and cover to prevent erosion and leaching, until disposed of. 3.2.STOCKPILE CLEANUP A.Remove stockpile, leave area in clean and neat condition. Grade site surface to prevent free standing surface water. 3.3.EXAMINATION A.Verify subgrade has been inspected, is dry, and meets elevation requirements. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02060-4 Aggregate B.Perform proofrolling of roadway or slab subgrades with a pneumatic tired vehicle with a minimum loaded weight of 20 tons under the observation of the Engineer or his representative to help identify subgrade areas that require repair. Proofrolling shall be conducted at the discretion of the Engineer or his representative. Any soft, saturated or yielding areas exhibited by pumping and/or rutting will require removal and replacement with the appropriate compacted soil. 3.4.PREPARATION A.Correct irregularities in subgrade gradient and elevation by scarifying, reshaping, and re- compacting. B.Do not place fill on soft, muddy, or frozen surfaces. C.Repair subgrade areas identified by the Engineer or his representative prior to placing aggregate. 3.5.AGGREGATE PLACEMENT A.Spread aggregate over prepared subgrade as specified on Drawings. B.For roadways place aggregate in layer thicknesses according to NCDOT Standard Specifications section 0520 and compact to specified density. C.Level and contour surfaces to elevations and gradients indicated. D.For Roadways add small quantities of fine aggregate to coarse as appropriate to assist compaction. E.For roadways add water to assist compaction. If excess water is apparent, remove aggregate and aerate to reduce moisture content. F.Use mechanical tamping equipment in areas inaccessible to compaction equipment. 3.6.TOLERANCES A. Section 01400 - Quality Requirements: Tolerances. B. Top Surface: Minus 0.1 to plus 0.1 foot from required elevations shown on Drawings. C. Fill Thickness: Minus 0.1 to plus 0.2 foot from required thickness shown on the Drawings. 3.7.FIELD QUALITY CONTROL A.Section 01400 - Quality Requirements: Testing and observation requirements. B.Compaction testing for roadway stone will be performed in accordance with ASTM D1556, ASTM D1557, ASTM D698, AASHTO T180, ASTM D2167, ASTM D2922, and/or ASTM D3017. 1.If tests indicate Work does not meet specified requirements, remove Work, replace and retest. 2.Frequency of Tests: Minimum of 2,500 square feet, one correction test per compacted lift. 3.Stone Pavement Surface: Compact placed aggregate materials to achieve 98 percent of standard compaction at a moisture content between -2% and +2% of the optimum moisture content. END OF SECTION Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02200-1 Earthwork SECTION 02200 EARTHWORK PART 1 GENERAL 1.1 SUMMARY A.Section Includes: 1.Topsoil Stripping and Replacement; 2.Topsoil Provided; 3.Structural Fill; 4.Compacted Soil Liner; 5.On-Site Soil Disposal; and, 6.General Excavation and Grading B.Related Sections 1.Section 02315 - Excavation 2.Section 02320 – Structural Fill 3.Section 02321 – Backfill - Compacted Soil Liner 4.Section 02324 – Trenching 5.Section 02374 – Erosion and Sediment Control 6.Section 02610 – Pipes 1.2 DESCRIPTION A.Topsoil Stripping and Replacement – This item includes: 1.Excavation of existing topsoil from all areas where excavation is required. 2.Excavation of existing topsoil from all areas where fill placement is required. 3.Temporary stockpiling of excavated topsoil. 4.Re-placement and spreading of stockpiled topsoil prior to establishment of vegetation. B.Topsoil Provided – This Item Includes providing and spreading topsoil obtained from off-site sources to achieve topsoil thicknesses depicted on the Drawings. Item to be used only in the event that an inadequate quantity of existing topsoil is present on-site and only with Owner approval prior to obtaining material. C.Structural Fill – This item includes placement, spreading, and compaction of material identified on the drawings as Structural Fill. D.Compacted Soil Liner – This item includes: 1.Excavation of material from designated borrow areas. 2.Transport of material from designated borrow area to placement area. 3.Placement, spreading, and compaction of material identified on the drawings as Compacted Soil Liner. E.On-Site Soil Disposal – This item includes: 1.Transport to and stockpiling of material identified as unsuitable for use as fill in the disposal area identified on the Drawings. 2.Transport to and stockpiling of excess cut material in the disposal area identified on the Drawings. 3.Grading and shaping of the soil disposal pile to a stable configuration. F.Excavation (includes grading) – This item includes: 1.All excavations, transport of materials, and temporary stockpiling of material which are not specifically identified elsewhere in these Specifications. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02200-2 Earthwork 2.All trenching and backfilling of trenches. 3.Placement and compaction of general or unclassified fill material. 4.Shaping of basins and temporary road surfaces to proposed topography. 5.Fine grading. 6.The item specifically includes, but is not limited to, the following: a.Removal of sediment pond dams; b.Excavation and shaping of sediment ponds and outlet works; c.Excavation and shaping of the northwest perimeter ditch; d.Excavation for installation of pipes. 1.3 MEASUREMENT AND PAYMENT A.Topsoil Stripping and Replacement 1.Basis of Measurement: Cubic Yard of stockpiled material.Measurement shall be made in the field by the Contractor by mean obtaining cross sections of each pile. Cross Section shall be obtained perpendicular to the longest dimension of the piles and shall be spaced on intervals not exceeding 25-feet; in no case shall less than four cross sections of a pile be obtained. End-area calculations shall be made to determine pile volumes. 2.Basis of Payment -Unit Price: Amount equal to the actual installed and approved number of units times the unit price provided in Bid Form Schedule. Requested payment quantities will be submitted by the Contractor with final approval by the Engineer. Payment request shall include survey data of stockpiles, cross-sections, and end area volume calculations. B.Topsoil Provided 1.Basis of Measurement: By the cubic yard for material delivered and placed in accordance with the drawings and specifications and approved by the Owner. Measurement shall be based on delivery tickets with reductions for the following: a.Material delivered but not used; b.Material used for purposes other than those depicted on the Drawings; c.Installation not approved by the Owner or Engineer; and, d.Material installed beyond the lines and grades shown on the Drawings. Tonnage reductions shall be based on field measurements made by the Owner and will use a volume to weight conversion of 1.0 tons per cubic yard. 2.Basis of Payment -Unit Price: Amount equal to the actual installed and approved number of units times the unit price provided in Bid Form Schedule. Requested payment quantities will be submitted by the Contractor with final approval by the Engineer. C.Structural Fill 1.Basis of Measurement: By the cubic yard of compacted material placed in accordance with the drawings and specifications and approved by the Owner. Contractor shall prepare an as-built topographic map of the prepared subgrade for the structural fill and an as-built topographic map of the final structural fill grade. Volume of structural fill shall be based on a comparison of the two topographic maps. 2.Basis of Payment -Unit Price: Amount equal to the actual installed and approved number of units times the unit price provided in Bid Form Schedule. Requested payment quantities will be submitted by the Contractor with final approval by the Engineer. The request for payment shall include the topographic maps as AutoCAD files. D.Compacted Soil Liner 1.Basis of Measurement: By the cubic yard of compacted material placed in accordance with the drawings and specifications and approved by the Owner. Contractor shall prepare an as-built topographic map of the prepared subgrade for the compacted soil liner and an as-built topographic map of the final compacted soil liner grade. Volume of compacted soil liner shall be based on a comparison of the two topographic maps. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02200-3 Earthwork 2.Basis of Payment -Unit Price: Amount equal to the actual installed and approved number of units times the unit price provided in Bid Form Schedule. Requested payment quantities will be submitted by the Contractor with final approval by the Engineer. The request for payment shall include the topographic maps as AutoCAD files. E.On-Site Soil Disposal 1.Basis of Measurement: Cubic Yard of stockpiled material.Measurement shall be made in the field by the Contractor by mean obtaining cross sections of each pile. Cross Section shall be obtained perpendicular to the longest dimension of the piles and shall be spaced on intervals not exceeding 25-feet; in no case shall less than four cross sections of a pile be obtained. End-area calculations shall be made to determine pile volumes. 2.Basis of Payment -Unit Price: Amount equal to the actual installed and approved number of units times the unit price provided in Bid Form Schedule. Requested payment quantities will be submitted by the Contractor with final approval by the Engineer. Payment request shall include survey data of stockpiles, cross-sections, and end area volume calculations. F.General Excavation and Grading 1.Basis of Measurement:Cubic Yard for work completed and approved by the Owner. There shall be no final measurement. 2.Basis of Payment:Unit Price: Amount equal to the actual installed and approved number of units times the unit price provided in Bid Form Schedule. Requested payment quantities will be submitted by the Contractor with final approval by the Engineer. The request for payment shall include the topographic maps as AutoCAD files. 1.4 REFERENCES A.ASTM D422 - Standard test Method for Particle-Size Analysis of Soils (Grain Size with Hydrometer). B.ASTM D698 - Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Standard Effort (12,400 ft-lbf/ft3). C.ASTM D1556 – Standard Test Method for Density of Soil In Place by the Sand-Cone Method. D.ASTM D2216 - Standard Test Method for Laboratory Determination of Water (Moisture) Content of Soil and Rock by Mass. E.ASTM D2922 - Standard Test Method for Density of Soil and Soil-Aggregate in Place by Nuclear Methods (Shallow Depth). F.ASTM D2487 – Standard Practices for Classification of Soil for Engineering Purposes (Unified Soil Classification System) G.ASTM D2937 - Standard Test Method for Density of Soil in place by the Drive-Cylinder Method. H.ASTM D4318 - Standard Test Methods for Liquid Limit, Plastic Limit, and Plasticity Index of Soils I.ASTM D5084 – Standard Test methods for Measurement of Hydraulic Conductivity of Saturated Porous Materials using a Flexible Wall Permeameter. 1.5 SUBMITTALS A.Section 01300 – Administrative Requirements: Submittal procedures. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02200-4 Earthwork B.Samples: Submit, in air-tight containers, 50 lb. per sample of each type of excavated material to testing laboratory to determine suitability for use as compacted soil liner fill material. C.Upon completion of the as-built surveys submit survey results to Engineer for review and approval documenting material thicknesses. D.Results of characterization and nutrient requirements for provided topsoil. 1.6 PROJECT CONDITIONS A.Existing Features: The Drawings show surface features on the landfill and certain underground features. These features include, but are not limited to: buildings and landfill infrastructure, existing landfill gas vents; groundwater and gas monitoring wells; access roads; utilities; and drainage devices. This information has been obtained from a 2011 topographic survey and existing records. It is not guaranteed to be correct or complete and is shown for the convenience of the CONTRACTOR. The CONTRACTOR shall explore ahead of the required excavation to determine the exact location of all features. They shall be protected from damage by the CONTRACTOR. If they are broken or damaged, they shall be restored to their original condition by the CONTRACTOR at no cost to the OWNER. 1.7 PROTECTION A.The CONTRACTOR is solely responsible for protection of the work. Completed work that is damaged by weather or other means shall be repaired by the CONTRACTOR at no additional cost to the OWNER. Earthwork that has been previously accepted, may become degraded due to exposure. Work that has been placed, previously accepted and later becomes degraded or damaged, shall be repaired or reworked at no additional cost to the OWNER and in accordance with the Contract Documents. 1.8 QUALITY ASSURANCE/QUALITY CONTROL A.Quality Control and Quality Assurance will be performed by the ENGINEER. The CONTRACTOR must allow access to all work and provide advance notice to ENGINEER to inspect and determine compliance with the plans and specifications. PART 2PRODUCTS 2.1 TOPSOIL SUITABLE FOR REPLACEMENT A.Owner or Engineer shall observe topsoil stripping and determine, as the work progresses, suitability of stripped material for establishment of vegetative cover. Material determined to be suitable shall be segregated and stockpiled separately from other excavated material. 2.2 TOPSOIL PROVIDED A.Material obtained from off-site sources for the purpose of establishment of a vegetative cover shall be capable of maintaining vegetation and conform to the following criteria. 1.The soil shall have 100% passing the 3-inch sieve. 2. At least 80% shall pass the #4 sieve, at least 15% shall pass the # 200 sieve. 3.The organic content shall be at least 4%. 4.Maximum Liquid Limit is 50% 5.Maximum Plasticity Index is 25% 6. pH range of 5.5 to 7 7.Free of extraneous materials harmful to plant growth Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02200-5 Earthwork B.The CONTRACTOR shall furnish to the ENGINEER for approval at least 10 calendar days prior to the date of anticipated use of such material. Laboratory results demonstrating compliance with the above listed criteria. C.The CONTRACTOR shall furnish a soil analysis made by a qualified independent soil-testing agency stating plant-nutrient content of topsoil. Report suitability of soil for lawn growth. State recommended quantities of nitrogen, phosphorus, and potash nutrients and any limestone, aluminum sulfate, or other soil amendments to be added to produce a satisfactory growth layer. 2.3 STRUCTURAL FILL 1.Natural soil material from designated on-site borrow areas, excavations, and/or stockpiles. 2.Material classified as SP, SM, SW, SC, SW-SM, SW-SC, SP-SM, ML, or CL soils according to the Unified Soil Classification System (ASTM D2487). 3.Free of topsoil, organic material, roots, stumps, brush, rocks larger than 3 inches, subsoil, debris, vegetation, and other foreign matter. 4.Structural fill located within 1-foot of geosynthetics components shall have a maximum particle size of 2 inches. The material shall be screened by the Contractor, if necessary, to remove particle sizes greater than 2 inches in diameter. No more than 5 percent of the material should be retained on the No. 4 sieve. 5.All material clods will be broken down with tillers and/or discs to provide a homogeneous soil that is free of clods greater than 4 inches in diameter with no more than 15% retained on the No. 4 sieve. 2.4 COMPACTED SOIL LINER 1.Material excavated from designated on-site borrow area, Contractor identified off-site borrow area, and or other material approved by the Owner and Engineer. 2.Compacted soil liner material shall be classified as SC, CL, CH, ML, or MH soils according to the Unified Soil Classification System (ASTM D2487). 3.Free of topsoil, roots, stumps, brush, rocks larger than 1-inch, subsoil, debris, vegetation, calcareous concretions or nodules, and other foreign matter. 4.Fill material shall have a maximum size aggregate of 1-inch. The compacted soil liner material shall be raked or sieved by the Contractor, if necessary, to remove all aggregate greater than 1 inch in diameter. No more than 5 percent of the compacted soil liner fill material should be retained on the No. 4 sieve. 5.All material clods will be broken down with tillers and/or discs to provide a homogeneous soil (prior to compaction) that is free of clods greater than 2 inches in diameter. 6.Compacted soil liner material shall have a maximum permeability of 1 x 10 -5 cm/sec or less, minimum Liquid Limit of 30 and a minimum Plasticity Index of 10 or as subsequently specified by the Engineer based on laboratory testing (ASTM D4318). Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02200-6 Earthwork PART 3 EXECUTION 3.1 EXAMINATION A.Section 01300 - Administrative Requirements: Coordination and project conditions B.The Engineer will assist the Contractor in the determination of suitability of materials during excavation operations. The Contractor will be responsible for excavating, transporting, stockpiling, placing and compacting all materials as needed. C.Continuous visual observation of the materials will be performed by the Contractor to ensure proper material is being used. D.Engineer will make frequent observations of the soil placement operations and materials, and will consult with the Engineer’s site representative on determinations of suitable fill and locations of such. All compacted fill proposed shall be observed by the Engineer prior to actual use. 3.2 LIMITATIONS A.The CONTRACTOR shall perform all earthwork so as to minimize the disturbed area. The disturbed area shall not be encroached beyond the boundaries designated on the drawings. The CONTRACTOR shall notify the ENGINEER and OWNER before any encroachment to limits of disturbance are performed. 3.3 EXCAVATIONS A.Stability of Excavations: Slope sides of excavations, when necessary, to comply with codes and ordinances of agencies having jurisdiction. Shore and brace or use trench boxes where sloping is not possible because of space restrictions, location of the landfill or other features, or stability of material excavated. Shoring methods are eligible for ENGINEER comment but are the sole responsibility of the CONTRACTOR. Maintain sides and slopes of excavations in a safe condition until completion of backfilling. 3.4 PREPARATION FOR FILL PLACEMENT A.Where subgrade is prior placed fill, ensure compacted to density requirements of fill are met and subgrade as-built Survey is complete and approved by Engineer. B.Where subgrade is excavation grade, the prepared subgrade shall be proof rolled with a loaded dump truck (minimum 20 tons) or similar rubber tired pneumatic vehicle, a minimum of two passes in each direction. Proofrolling shall be conducted at the discretion of the Engineer or his representative. Any soft, saturated or yielding areas exhibited by pumping and/or rutting will require removal and replacement with structural fill. Ensure subgrade Survey is complete and approved by Engineer. 3.5 COMPACTED FILL A.Place fill to contours and elevations as shown on Drawings with unfrozen materials. B.Where minimum thicknesses are specified, thicknesses shall be measured perpendicular to the slope. C.Loose un-compacted material shall be spread in lifts not exceeding 8-inches. D.Samples of the in-place compacted soil liner shall be tested and evaluated in accordance with provisions of Part 3.7 of this Section prior to final acceptance. All penetrations of compacted soil liner made for testing shall be filled with a mixture of one part bentonite and three parts soil. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02200-7 Earthwork E.Equipment or truck traffic on the fill shall not be permitted during the period between scarifying and compaction of a lift unless approved by the Engineer. F.After the lift to be compacted is conditioned, representative samples will be taken by the ENGINEER and tested for moisture content prior to any compactive efforts. If the moisture content is within the specified moisture range, compaction may begin. If the moisture content is outside of the specified range, the fill shall be wetted or dried and reworked accordingly. The fill should be sprinkled or sprayed with water, utilizing equipment creating a uniform application and dozed, wind-rowed, and/or disc-plowed to uniformly increase the moisture content if the material moisture content is too low. The fill shall be dozed, wind-rowed, and/or disc-plowed to help air dry the soil if the moisture content is too high. G.Compaction of lifts shall be as follows: 1.Compaction of lifts shall be performed with an appropriately heavy, properly ballasted, deep penetrating foot compactor equivalent to a Caterpillar 815 and shall be subject to approval of the Engineer. 2.Dozer equipment shall not be used for primary compaction efforts. 3.The daily work area shall extend a distance so as to maintain moist soil conditions (facilitate bonding) and continuous operations. Desiccation, crusting, or cracking of the lift surface shall be avoided as much as possible. Each lift shall be protected, at all times after placement, from desiccation and crusting. 4.If desiccation, crusting, or cracking of the lift surface occurs before placement of the next lift, this area shall be scarified to a sufficient depth to mix with moist materials, or sprinkled with water and then scarified at the direction of the Engineer. 5.The surface of the underlying lift shall be scarified prior to compaction of each subsequent lift (i.e.: Lift 2 to Lift 3) to facilitate bonding of the lifts. 6.The transition between the bottom and side slopes shall be accomplished by compacting parallel (bottom to top) to the slope. 7.Soil moisture and dry density requirements: a.Laboratory testing of materials shall be completed at the frequencies specified in Part 3.7 B and C of this Section. b.Structural fill: (1)Compaction: Material shall be compacted to an in-placed dry density at or above ninety-five percent of maximum as determined by Standard Proctor (ASTM D698) (2)Moisture Content: Moisture content of compacted material shall be between 2 percent below and 2 percent above the optimum moisture content determined by Standard Proctor (ASTM D698). c.Compacted Soil Liner: Density and moisture content requirements for compacted soil liner shall be those required to meet the permeability specified in Part 4.2 F of this Section as determined by the Laboratory Testing required by Part 3.7 B and C of this Section. For bidding purposes, Contactor shall assume a minimum compaction requirement of 98 percent of the maximum dry density at a moisture Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02200-8 Earthwork content between 2 percent above and 4 percent above optimum as determined by Standard Proctor (ASTM D698). d.Where densities less than the specified density are measured, the compacted soil liner shall be recompacted and/or removed and reworked to meet density criteria. H.Fill shall not be placed or compacted during sustained periods with air temperature below 32°F. Fill may be placed and compacted during periods of early morning and early evening freezing temperatures with warming trends above 45°F during the day. No fill shall be placed on frozen subgrade. If the fill freezes or ices the fill section shall be scarified and recompacted, at the discretion of the Engineer. I.During construction, finished lifts or sections shall be sprinkled with water as needed to avoid excessive cracking or at least twice daily. J.At the end of each construction day's activities, completed lifts or sections shall be sealed by rolling with rubber tired or smooth drum rollers and sprinkled with water as needed to avoid excessive cracking. K.After placement of compacted fill to final grade, the surface of the fill shall be surveyed by the Contractor to ensure the specified thickness. L.The surface of the fill shall be smooth drum rolled and maintained free of rocks, organics, voids and sharp edges. M.Systematically backfill to allow maximum time for natural settlement. Do not backfill over porous, wet, frozen or spongy subgrade surfaces. N.Employ placement method that does not disturb or damage other work. O.Make gradual grade changes. Blend slope into level areas. P.Remove surplus fill materials from site unless authorized by Owner to dispose of on-site in an Owner designated location. 3.6 TOLERANCES A.Section 01400 - Quality Requirements: Tolerances. B.Top Surface: Minus 0.1 to plus 0.1 foot from required elevations shown on Drawings. C.Fill Thickness: Minus 0.1 to plus 0.2 foot from required thickness shown on the Drawings. 3.7 FIELD QUALITY CONTROL A.Section 01400 - Quality Requirements: Testing and observation services. B.The Engineer shall perform the following laboratory classification and/or index testing on bulk samples provided by the Contractor as per Part 1.5 B of this Section: 1.Tests to perform: a.Standard Proctor Test (ASTM D698). b.Atterberg Limits (ASTM D4318). c.Grain Size with Hydrometer (ASTM D421 and ASTM D422). Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02200-9 Earthwork 2.Frequency to perform tests: a.Once per every 3,000 cubic yards obtained from stockpile or borrow area; b.When there is an apparent change in the material type; and/or c.As directed by Engineer or Engineer’s representative. C.Compacted Soil Liner Permeability 1.The Engineer shall determine laboratory permeability of remolded compacted soil liner material in accordance with ASTM D5084 at a frequency of consistent with Part 3.7 B of this Section on bulk samples provided by the Contractor in accordance with Part 1.5 B of this Section. a.Maximum hydraulic gradient of 30 and a maximum confining pressure of 10 psi shall be used for remolded permeability testing b.Analyze multiple samples to determine compaction and moisture content to be used during material placement. Initial sample to be remolded to 95 percent of maximum dry density at a moisture content near 2 percent above optimum as determined by Standard Proctor (ASTM D698). 2.The Engineer may require undisturbed permeability tests (ASTM D5084) on the in-place compacted soil liner material for areas that are not consistent in density, moisture content, or classification with previously approved compacted soil liner material. 3.The Engineer may require in-situ permeability tests be performed on the in-place compacted soil liner material if the material being placed is not consistent with the material previously tested and approved for construction. D.The Owner or his designated representative will perform in place compaction tests for compacted soil liner in accordance with the following: 1.Density Tests (ASTM D2937) at frequency of one test per lift in each 100 foot by 100 foot grid. 2.Natural Moisture Content Tests (ASTM D2216) at frequency of at every density location and at least once per every 800 cubic yards placed. E.The Owner or his designated representative will perform in place compaction tests for structural fill at a frequency in accordance with the following: 1.Area placement. a.Density Tests (ASTM D2937) at frequency of one test per lift per acre. b.Natural Moisture Content Tests (ASTM D2216) at frequency of at every density location and at least once per every 1600 cubic yards placed. 2.Trench fill a.Density Tests (ASTM D2937) at frequency of one test per lift per 50 linear feet of trench. b.Natural Moisture Content Tests (ASTM D2216) at frequency of at every density location and at least once per every 800 cubic yards placed. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02200-10 Earthwork F.When tests indicate Work does not meet specified requirements, remove Work, replace and retest. 3.8 PROTECTION OF FINISHED WORK A.Section 01700 - Execution Requirements: Protecting finished work. B.The compacted soil liner shall be overbuilt a thickness of 3 inches or covered with a sacrificial 10 mil plastic sheeting where required to protect the finished surface from erosion, desiccation, or other damage. 1.If the overbuild option is selected for protecting the liner, upon removal of the overbuild, the surface of the compacted soil liner will be re-rolled with a smooth drum roller to achieve the surface condition specified in Part 3.3 L of this Section. The rolled surface shall then be surveyed in accordance with Part 1.2A of this Section. 2.If excessive desiccation cracking becomes evident, as determined by the Engineer, the surface will require rewetting and rerolling prior to geomembrane liner placement. If excessive desiccation cracking remains evident after rerolling, the surface shall be scarified on the top 3-inches and reworked as specified in Part 3.3 of this Section 02321. C.Reshape and re-compact fills subjected to vehicular traffic. END OF SECTION Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02230-1 Site Clearing and Tree Protection SECTION 02230 SITE CLEARING AND TREE PROTECTION PART 1 GENERAL 1.1 SUMMARY A.Section Includes: 1.Site Clearing and Grubbing. 2.Protection of trees designated to remain. B.Related Sections: 1.NOT APPLICABLE 1.2 MEASUREMENT AND PAYMENT A. Site Clearing and Grubbing 1. Basis of Measurement: Per acre for the limits if disturbance depicted on the Drawings; there shall be no final measurement. 2.Basis of Payment: Unit Price: Amount equal to the approved number of units times the unit price provided in Bid Form Schedule. If a dispute exists relative to payment quantities, the Contractor at his expense will survey actual area cleared and grubbed. B. Protection of trees designated to remain 1. Field marking of areas where trees are designated to remain and protection of those areas shall be incidental to clearing and grubbing; no separate payment will be made. 1.3 SUBMITTALS A. NOT APPLICABLE 1.4 QUALITY ASSURANCE A. Perform Work in accordance with State and local standards and ordinances. B. Conform to applicable codes for environmental requirements and disposal of debris. Burning debris on site is not permitted. PART 2 PRODUCTS 2.1 MATERIALS A.NOT APPLICABLE PART 3 EXECUTION 3.1 EXAMINATION A.Verify existing plant life designated to remain is tagged or identified. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02230-2 Site Clearing and Tree Protection 3.2 PREPARATION A.Call Local Utility Line Information service not less than three working days before performing Work. 1.Request underground utilities to be located and marked within and surrounding construction areas. 3.3 PROTECTION A.Locate, identify, and protect from damage utilities indicated to remain. B.Protect trees, plant growth, and features designated to remain as final landscaping as specified on Drawings. C.Protect bench marks, survey control points, groundwater monitoring wells, and existing structures from damage or displacement. 3.4 REMOVAL A.Remove debris, rock, and extracted vegetation from site. If permitted by Owner, may dispose of on-site in Owner specified location. B.Remove construction debris and other materials that can not be used in earthwork construction or final vegetation. Materials shall be disposed off-site unless permitted by Owner to dispose of on- site in Owner designated location. C.Do not burn or bury materials on-site unless permitted by State and local ordinances and laws and given permission by Owner to do so. Leave site in clean condition. END OF SECTION Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02231-1 Temporary Haul Road SECTION 02231 TEMPORARY HAUL ROAD PART 1 GENERAL 1.1 SUMMARY A.Section Includes: 1.Grading and Base Preparation 2.Fabric Placement 3.Aggregate materials placement and compaction for road base. B.Related Sections: 1.Section 02374 – Erosion and Sediment Control 2.Section 02200 – Earthwork 3.Section 02320 – Structural Fill 4.Section 02060 – Aggregate 5.Section 02673 – Woven Geotextiles – General 1.2 UNIT PRICE, MEASUREMENT AND PAYMENT A.Excavation/Grading and Base Preparation for Temporary Haul Road designated on the Specification Drawings 1.Basis of Measurement: Unit Price based on volume needed to achieve proposed temporary haul road designated on the plans. 2.Basis of Payment: a.Unit Price: Amount equal to each unit times the unit price provided in Bid Form Schedule of Unit Price Work for each structure added to or subtracted from the lump sum Contract Price. Requested payment quantities will be submitted by the Contractor with final approval by the Engineer. If a dispute exists relative to payment quantities, the Contractor at his expense will uncover any buried or covered material for re-evaluation. b.Includes removal, loading, hauling, and either stockpiling material approved by the ENGINEER for re-use as structural fill material or topsoil at the designated stockpile location, or removing waste materials not approved by the ENGINEER to an OWNER approved on-site disposal location. B.Fabric Placement 1.Basis of Measurement: In square yards to be prepared of proposed temporary haul road designated on the plans. 2.Basis of Payment: By the square yard installed times the unit price for installation or as otherwise indicated in these specifications. a.Includes all labor, tools, geotextile material, placement, supervision, transportation, installation, equipment, sewing, repairs, and all incidentals necessary to complete the work as specified on the Drawings and in these Specifications and in accordance with the CQA Plan for the installation of geotextiles. b.Excludes overlaps, scrap, wastage, or extension of material beyond required limits. c.Includes additional quantities necessary to provide a complete item of Work. d.Measurements will be based upon the survey conducted for construction of roadways as indicated in the As-Built Survey. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02231-2 Temporary Haul Road e.Requested payment quantities for in-place geotextile will be submitted by the Contractor with final approval by the Engineer C.Coarse Aggregate: 1.Basis of Measurement: Coarse Aggregate ABC Stone, by the ton or as otherwise indicated in other Sections of these Specifications. Installation quantities shall not include quantities placed beyond the lines and grades for temporary haul road shown on the Drawings. The quantity of aggregate fill will be based upon the in-place volume as determined by surveys after completion of the placement of the aggregate fill. A grid pattern, as approved by the Engineer, of ground surface elevations in the area shall be surveyed and reference points installed by the CONTRACTOR prior to structural backfill placement and prior to placement of any overlying material. The Engineer shall check the as-built finished grades and determine the backfilled volume based on survey data provided by the CONTRACTOR. 2.Basis of Payment: a.Unit Price: Amount equal to each unit times the unit price provided in Bid Form Schedule of Unit Price Work. Requested payment quantities will be submitted by the Contractor with final approval by the Engineer. If a dispute exists relative to payment quantities, the Contractor at his expense will uncover any buried or covered material for re-evaluation. 1.3 REFERENCES A.American Association of State Highway and Transportation Officials: 1.AASHTO T11 – Standard Method of Test for Materials Finer than 75 µm (No. 200) Sieve in Mineral Aggregates by Washing. 2.AASHTO T27 – Standard Method of Test for Sieve Analysis of Fine and Coarse Aggregates. 3.AASHTO T180 – Standard Method of Test for Moisture-Density Relations of Soils Using a 4.54-kg (10-lb) Rammer and a 457-mm (18-in.) Drop. B.ASTM International: 1.ASTM C136 – Standard Test Method for Sieve Analysis of Fine and Coarse Aggregate. 2.ASTM D421 – Standard Practice for Dry Preparation of Soil Samples for Particle-Size Analysis and Determination of Soil Constants. 3.ASTM D422 – Standard Test Method for Particle Size Analysis of Soils. 4.ASTM D698 - Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Standard Effort (12 400 ft-lbf/ft3 (600 kN-m/m3)). 5.ASTM D1556 – Standard Test Method for Density and Unit Weight of Soil in Place by the Sand-Cone Method. 6.ASTM D1557 - Test Methods for Moisture-Density Relations of Soils and Soil- Aggregate Mixtures, Using 10 lb Rammer and 18 inch Drop. 7.ASTM D2167 - Standard Test Method for Density and Unit Weight of Soil in Place by the Rubber Balloon Method. 8.ASTM D2922 - Standard Test Methods for Density of Soil and Soil-Aggregate in Place by Nuclear Methods (Shallow Depth). 9.ASTM D3017 - Standard Test Method for Water Content of Soil and Rock in Place by Nuclear Methods (Shallow Depth). 10.ASTM D4253 – Standard Test Methods for Maximum Index Density and Unit Weight of Soils Using a Vibratory Table. 11.ASTM D4254 – Standard Test Method for Minimum Index Density and Unit Weight of Soils and Calculation of Relative Density. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02231-3 Temporary Haul Road C.North Carolina Department of Transportation (NCDOT) Standard Specifications for Roads and Structures. 1.4 SUBMITTALS A.Section 01300 – Administrative Requirements: Submittal procedures. B.Materials Source: Submit name of imported materials suppliers and description of material. C.Manufacturer’s/Supplier’s Certificate: Certify materials meet or exceed specified requirements. D.Requested payment quantities will be submitted by the Contractor with final approval by the Engineer. 1.5 QUALITY ASSURANCE A.Furnish each aggregate material type from single source throughout the Work. B.Perform Work in accordance with North Carolina Department of Transportation Standard Specifications for Roads and Structures or as otherwise specified. PART 2 PRODUCTS 2.1.STRUCTURAL FILL MATERIALS A.Structural Fill: Refer to Section 02320 B.Woven Geotextile Fabric: Refer to Section 02673. Coarse Aggregate Roadways: Refer to Section 02060. C.Coarse Aggregate Roadways: Refer to Section 02060. 2.2 SOURCE QUALITY CONTROL A.Section 01400 - Quality Requirements: Testing and observation services. B.Aggregate Material - Testing and Analysis: Perform in accordance with ASTM C136, ASTM D421, ASTM D422, ASTM D4253, ASTM D4254, AASHTO T11, and/or AASHTO T27. C.When tests indicate materials do not meet specified requirements, change material or material source and retest. D.Furnish materials of each type from same source throughout the Work. PART 3 EXECUTION 3.1.STOCKPILING A.Stockpile materials on site at locations designated by Engineer. B.Stockpile in sufficient quantities to meet Project schedule and requirements. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02231-4 Temporary Haul Road C.Separate differing materials with dividers or stockpile apart to prevent mixing. D.Direct surface water away from stockpile site so as to prevent erosion or deterioration of materials. E.Stockpile materials on impervious material and cover to prevent erosion and leaching, until disposed of. 3.2.STOCKPILE CLEANUP A.Remove stockpile, leave area in clean and neat condition. Grade site surface to prevent free standing surface water. 3.3.EXAMINATION A.Verify substrate has been inspected, gradients and elevations are correct and no water or saturated or frozen conditions are present on the substrate or in the work area. B.Perform proofrolling of roadway or slab subgrades with a pneumatic tired vehicle with a minimum loaded weight of 20 tons under the observation of the Engineer or his representative to help identify subgrade areas that require repair. Proofrolling shall be conducted at the discretion of the Engineer or his representative. Any soft, saturated or yielding areas exhibited by pumping and/or rutting will require removal and replacement with the appropriate compacted soil. 3.4.PREPARATION A.Correct irregularities in subgrade gradient and elevation by scarifying, reshaping, and re- compacting. B.Do not place fill on soft, muddy, or frozen surfaces. C.Repair subgrade areas identified by the Engineer or his representative prior to placing aggregate or structural fill. 3.5.STRUCTURAL FILL PLACEMENT Refer to Section 02320. Temporary Haul Road base structural fill shall be placed according to the dimensions specified on the Drawings. 3.6.WOVEN GEOTEXTILE PLACEMENT Refer to Section 02673. Woven fabric shall be placed over the structural fill for the road base according to the dimensions on the Drawings. The placed fabric shall underlie the dimensions of the aggregate road base. 3.7.AGGREGATE PLACEMENT Refer to Section 02060. Temporary Haul Road aggregate base shall be prepared according to the dimensions specified on the Drawings. 3.8.TOLERANCES A.Section 02320 B.Section 02673 Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02231-5 Temporary Haul Road C.Section 02060 3.9.FIELD QUALITY CONTROL A.Section 02320 B.Section 02673 C.Section 02060 END OF SECTION Technical Specifications S&ME Project No. 4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02315-1 Excavation SECTION 02315 EXCAVATION PART 1 GENERAL 1.1 SUMMARY A.Section Includes: 1.Excavating Soil Materials. 2.Excavating Unsuitable Material (Undercut). 3.Stockpiling Excavated Material. B.Related Sections: 1.Section 02230 – Site Clearing and Tree Protection 2.Section 02320 – Structural Fill 3.Section 02321 – Backfill – Compacted Soil Liner 4.Section 02324 – Trenching 5.Section 02374 – Erosion and Sediment Control 1.2 MEASUREMENT AND PAYMENT A.General Excavation and Grading 1.Basis of Measurement:Cubic Yard for work completed and approved by the Owner. There shall be no final measurement. 2.Basis of Payment:Unit Price: Amount equal to the actual installed and approved number of units times the unit price provided in Bid Form Schedule. Requested payment quantities will be submitted by the Contractor with final approval by the Engineer. The request for payment shall include the topographic maps as AutoCAD files. PART 2 PRODUCTS 2.1 Not Applicable. PART 3 EXECUTION 3.1 PREPARATION A.Call Local Utility Line Information service not less than three working days before performing Work. 1.Have the underground utilities to be located and marked within and surrounding construction areas. B.The Contractor shall protect all existing facilities, including, but not limited to existing electrical lines and poles, and monitoring wells during excavations and stockpiling. Damaged facilities shall be promptly replaced at the Contractor's expense. C.Notify utility company to remove and relocate any utilities. D.Perform site clearing, grubbing, rotary mowing, necessary surveys, and topsoil excavation per Section 02230 – Site Clearing. Any depths of removal of twelve inches or less shall be considered Site Clearing and Grubbing. Technical Specifications S&ME Project No. 4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02315-2 Excavation E.Identify required lines, levels, contours, and datum locations. F.Protect bench marks, survey control points, and existing structures from excavating equipment and vehicular traffic. 3.2 EXCAVATION A.Install erosion control measures as specified on the Drawings. B.Excavate subsoil to accommodate site structures and construction operations. C.Landfill subgrade shall be excavated to the lines and grades shown on the Drawings. D.Slope banks with machine to angle of repose or less unless shored as per OSHA standards. E.Remove lumped subsoil, boulders, and rock. F.Notify Engineer of unexpected subsurface conditions and discontinue affected Work in area until notified to resume Work. G.Materials determined unsuitable by the Engineer shall be excavated from a depth of 12 inches below the existing ground surface within the area, the area 10 feet beyond the area and any other area designated by the Engineer. (Depths of removal of 12 inches or less in areas designated above shall be considered stripping.) The lateral extent and required depth of undercutting will be determined by the Engineer. H.Excavated unsuitable areas shall be replaced with structural fill, lean concrete, or aggregate as recommended by the Engineer. I.If necessary, the area of excavation/undercutting shall be dewatered to a depth of at least two feet below the bottom of the excavation and shall be maintained in the dewatered condition until compacted earth fill is placed to at least three feet above the original water level or to original ground level, whichever is higher. J.Perform temporary dewatering as necessary during excavation to minimize softening of exposed subgrade soils. A temporary sump may be constructed for accumulation of impounded waters resulting from rain or seepage. A pump with adequate capacity shall be provided and operated to maintain a low water level in the sump. K.Correct over-excavated areas with select backfill and compact replacement as specified for authorized excavation per Section 02320 – Backfill - Structural. No payment will be made for over-excavation or corrections made to over-excavated areas. L.All reconditioning of structural fill to obtain the required compaction will be the responsibility of the Contractor. M.Furnish all labor, materials, supervision, and equipment required for constructing and maintaining temporary diversion measures as required for construction of the landfill and all structures. Furnish, install, maintain, and operate all pumping equipment for diversion or removal of water and maintaining the work area free from water throughout construction including temporary ditches and sump construction. N.Protect and or divert stormwater flows from the work area utilizing Stormwater and Erosion Control Structures referenced in Section 02374. Technical Specifications S&ME Project No. 4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02315-3 Excavation O.Provide survey information before and after excavation. 3.3 FIELD QUALITY CONTROL A.Request visual inspection of bearing surfaces by Engineer before installing subsequent work. B.Excavation is complete when the Engineer approves the Final Subgrade Survey. 3.4 PROTECTION A.Prevent displacement or loose soil from falling into excavation; maintain soil stability. B.Protect bottom of excavations and soil adjacent to and beneath structures from freezing. C.Protect structures, utilities and other facilities from damage caused by settlement, lateral movement, undermining, stormwater, groundwater and other hazards created by earth operations. D.Grade top perimeter of excavation to prevent surface water from draining into excavation. E.Protect outlet of excavations from potential sediment deposit by placing sediment control measures such as silt fence and/or temporary sediment traps. END OF SECTION Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02320-1 Structural Fill and Vegetative Cover SECTION 02320 STRUCTURAL FILL AND VEGETATIVE COVER PART 1 GENERAL 1.1 SUMMARY A.Section Includes: 1.Structural fill defined as compacted fill for perimeter berms, surface water control systems, roadways, area fill not within the landfill cells, or other systems not intended to function as a migration barrier. 2.Vegetative cover layer defined as fill placed for cover system construction. B.Related Sections: 1.Section 02200 - Earthwork 2.Section 02321 – Backfill - Compacted Soil Liner 3.Section 02374 – Erosion and Sediment Control 1.2 MEASUREMENT AND PAYMENT A.Fill Type- Structural Fill: 1.Basis of Measurement:By the in place cubic yard filled or as otherwise indicated in other Sections of these Specifications and Drawings. Installation quantities shall not include quantities placed beyond the lines and grades shown on the Drawings. The quantity of structural fill and erosion layer will be based upon the in-place volume between the prepared subgrade and the structurally filled surface as determined by surveys after completion of the placement of the structural fill. A grid pattern with 25 feet maximum spacing, or an alternate spacing as approved in advance by the ENGINEER of ground surface elevations in the area shall be surveyed and reference points installed by the CONTRACTOR prior to structural backfill placement and prior to placement of any overlying material. The ENGINEER shall check the as-built finished grades and determine the backfilled volume based on survey data provided by the CONTRACTOR. 2.Basis of Payment: By the cubic yard placed times the unit price for fill placement. a.Unit Price: Amount equal to each unit times the unit price provided in Bid Form Schedule. Requested payment quantities will be submitted by the CONTRACTOR with final approval by the ENGINEER. If a dispute exists relative to payment quantities, the CONTRACTOR at his expense will uncover any buried or covered material for re-evaluation. B.Fill Type-Vegetative Cover Layer: 1.Basis of Measurement:By the in place cubic yard filled or as otherwise indicated in other Sections of these Specifications and Drawings. Installation quantities shall not include quantities placed beyond the lines and grades shown on the Drawings. The quantity of vegetative soil layer will be based upon the in-place volume between the prepared subgrade and the filled surface as determined by surveys after completion of the placement of the vegetative soil layer. A grid pattern with 25 feet maximum spacing, or an alternate spacing as approved in advance by the ENGINEER, of ground surface elevations in the area shall be surveyed and reference points installed by the CONTRACTOR prior to structural backfill placement and prior to placement of any overlying material. The ENGINEER shall check the as-built finished grades and determine the backfilled volume based on survey data provided by the CONTRACTOR. Includes excavating, screening to particle size requirements, hauling, scraping, stockpiling, dust control, scarifying substrate Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02320-2 Structural Fill and Vegetative Cover surface, moisture conditioning, placing where required, compacting, maintenance, and removing accumulated water during construction. 2.Basis of Payment: By the cubic yard placed times the unit price for vegetative cover placement. a.Unit Price: Amount equal to each unit times the unit price provided in Bid Form Schedule. Requested payment quantities will be submitted by the CONTRACTOR with final approval by the ENGINEER. If a dispute exists relative to payment quantities, the CONTRACTOR at his expense will uncover any buried or covered material for re-evaluation. 1.3 REFERENCES A.ASTM D422 - Standard test Method for Particle-Size Analysis of Soils (Grain Size with Hydrometer). B.ASTM D698 - Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Standard Effort (12,400 ft-lbf/ft3). C.ASTM D1556 – Standard Test Method for Density of Soil In Place by the Sand-Cone Method. D.ASTM D2216 - Standard Test Method for Laboratory Determination of Water (Moisture) Content of Soil and Rock by Mass. E.ASTM D2922 - Standard Test Method for Density of Soil and Soil-Aggregate in Place by Nuclear Methods (Shallow Depth). F.ASTM D2487 – Standard Practices for Classification of Soil for Engineering Purposes (Unified Soil Classification System) G.ASTM D2937 - Standard Test Method for Density of Soil in place by the Drive-Cylinder Method. H.ASTM D4318 - Standard Test Methods for Liquid Limit, Plastic Limit, and Plasticity Index of Soils. 1.4 SUBMITTALS A.Section 01300 – Administrative Requirements: Submittal procedures. B.Samples: Submit, in air-tight containers, 50 lb sample of each type of excavated material to testing laboratory to determine suitability for use as structural fill material. PART 2 PRODUCTS 2.1 FILL MATERIALS A.Fill Type-Structural Fill: 1.Structural fill is defined as compacted fill for perimeter berms, surface water control systems, roadways, or other systems not intended to function as a migration barrier. 2.Natural soil material from designated on-site borrow areas and/or stockpiles. 3.Structural fill shall be classified as SM, SC, SW-SC, or CL soils according to the Unified Soil Classification System (ASTM D2487). 4.Free of topsoil, organic material, roots, stumps, brush, rocks larger than 3 inches, subsoil, debris, vegetation, and other foreign matter. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02320-3 Structural Fill and Vegetative Cover 5.Structural fill located within 1-foot of geosynthetics components shall have a maximum particle size of 2 inches. The material shall be screened by the Earthwork Contractor, if necessary, to remove particle sizes greater than 2 inches in diameter. No more than 5 percent of the material should be retained on the No. 4 sieve. 6.All material clods will be broken down with tillers and/or discs to provide a homogeneous soil that is free of clods greater than 4 inches in diameter with no more than 15% retained on the No. 4 sieve. B.Fill Type-Vegetative Cover Layer: 1.Topsoil and vegetative cover is defined as fill placed to achieve final grades on the final cover system or to otherwise support vegetation establishment in areas not within the landfill cells. 2.Excavated and reused materials from designated on-site or off-site borrow areas and/or stockpiles and/or approved soil from trenching operations. 3.Shall be classified as SM, SC, SW-SM, SW-SC, SP-SM, ML, or CL soils according to the Unified Soil Classification System (ASTM D2487). 4.Free of roots, stumps, brush, rocks larger than 3 inches, debris, and other foreign matter. 5.Topsoil material shall have nutrient content and pH capable of supporting vegetation. 6.Shall have a minimum organic content of 3 percent by weight. 7.All material clods will be broken down with tillers and/or discs to provide a homogeneous soil that is free of clods greater than 2 inches in diameter with no more than 15 percent retained on the No. 4 sieve. PART 3 EXECUTION 3.1 EXAMINATION A.Section 01300 - Administrative Requirements: Coordination and Project Conditions B.The CONTRACTOR shall place Structural Fill and non-select material during excavation operations per the Specifications and Drawings or per advance approved alternate by the ENGINEER. The CONTRACTOR will be responsible for excavating, transporting, stockpiling, placing and compacting all materials as needed. 3.2 PREPARATION A.Prepare and compact subgrade to density requirements for subsequent backfill materials. B.Cut out soft areas of subgrade not capable of compaction in place. Backfill with Structural fill and compact to density equal to or greater than requirements for structural fill material. C.Scarify subgrade surface to depth of 6 inches. D.Proof-roll sub-grade with a pneumatic tired vehicle with a minimum weight of 20 tons to identify sub-grade areas that require repair; fill and compact to density equal to or greater than requirements for structural fill material. Any soft, saturated or yielding areas exhibited by pumping and/or rutting will require removal and replacement with the appropriate specified compacted soil. 3.3 BACKFILLING A.Backfill areas to contours and elevations as shown on Drawings. The CONTRACTOR shall not use frozen backfill materials. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02320-4 Structural Fill and Vegetative Cover B.Systematically backfill to allow maximum time for natural settlement. Do not backfill over porous, wet, frozen or spongy subgrade surfaces. C.Fill Type Structural Fill: Place and compact material in loose lifts not exceeding 8 inches in thickness or compacted thickness of 6 inches. Manually compacted fill near pipes and other structures shall be placed in loose lifts not exceeding 6 inches in thickness. D.Fill Type Structural Fill placed over geosynthetic materials will be compacted by tracking with a low ground pressure bulldozer or other approved equipment with a ground pressure of less than 5 psi. E.Fill Type Vegetative Cover: Scarify subgrade, place material in one lift and track in with backhoe or other equipment approved in advance by ENGINEER. F.Fill Type Structural Fill, backfill for drop inlets, and culverts: 1.Backfill of the drop inlets and culverts shall be placed and compacted in 6 inch thick loose lifts around the drop inlets to a minimum of 2 feet above the culverts. 2.Compaction shall be performed by hand tampers or small hand operated compactors. G.Employ placement method that does not disturb and damage other work, equipment, and products. H.Backfill against supported structures. Do not backfill against unsupported structures. I.Backfill simultaneously on each side of unsupported structures until supports are in place. J.Protect backfill from desiccation, crusting, or cracking. K.Make gradual grade changes. Blend slope into level areas. L.Remove surplus backfill materials from site unless authorized by OWNER to dispose of on-site in an OWNER designated location. M.Leave fill material stockpile areas free of excess fill materials. 3.4 TOLERANCES A.Section 01400 - Quality Requirements: Tolerances. B.Top Surface: Minus 0.1 to plus 0.1 foot from required elevations shown on Drawings. C.Fill Thickness: Minus 0.1 to plus 0.2 foot from required thickness shown on the Drawings. 3.5 FIELD QUALITY CONTROL A.Section 01400 - Quality Requirements: Testing and observation services. B.Laboratory Testing 1.Perform laboratory material tests in accordance with ASTM D422, ASTM D698, ASTM D2216, and ASTM D4318. 2.Test at a frequency of: a.10,000 cubic yards of type Structural Fill placed; b.When materials using for structural fill change; and/or c.When directed by the ENGINEER. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02320-5 Structural Fill and Vegetative Cover 3.Sample size shall be 50-lb. C.In Place Compaction and Natural Moisture Content Tests 1.Perform in place compaction tests in accordance with ASTM D1556, ASTM D2922, or ASTM D2937. 2.Perform in place natural moisture content test in accordance with ASTM D2216. 3.Frequency of compaction/natural moisture content tests: a.Cover system fills, area fills outside landfill cells, surface water control systems, or other systems not intended to function as a migration barrier, in- place density and moisture: Each lift at a minimum frequency of 1 per acre per lift. b.Perimeter berms and roadways: Each lift at a minimum frequency of 1 per 5000 sq. ft. 4.Landfill and Embankments: a.Type Structural Fill shall be compacted to minimum 95 percent of its Standard Proctor (ASTM D 698) maximum dry density. b.Testing of the first compacted lift shall be limited to the top 6 inches of the lift thickness. c.Fill Type Vegetative Soil Layer shall be placed in one continuous loose lift and tracked in by backhoe or other equipment approved by ENGINEER. d.Compacted moisture content shall be within 3 percent of optimum moisture content for all fill placed, or as otherwise approved by ENGINEER. 5.Drop Inlets and Culverts: a.Compaction shall be at a minimum 95 percent of the Standard Proctor maximum dry density. b.Compacted moisture content shall be within 3 percent of optimum moisture content for all fill placed, or as otherwise approved by ENGINEER. D.When tests indicate Work does not meet specified requirements, remove Work, replace and retest. 3.6 PROTECTION OF FINISHED WORK A.Section 01700 - Execution Requirements: Protecting finished work. B.Reshape and re-compact fills subjected to vehicular traffic. END OF SECTION Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02321-1 Backfill – Compacted Soil Liner SECTION 02321 BACKFILL – COMPACTED SOIL LINER PART 1 GENERAL 1.1 SUMMARY A.Section Includes: 1.Fill Type Compacted Soil Liner, structural fill designated for construction of compacted soil liner for use in sediment basins and as specified in the Specifications and Drawings. 2.Consolidation and compaction as scheduled. B.Related Sections: 1.Section 02200 - Earthwork 2.Section 02320 – Structural Fill 3.Section 02374 – Erosion and Sediment Control 1.2 MEASUREMENT AND PAYMENT A.Fill Type Compacted Soil Liner: 1.Basis of Measurement: By the in place cubic yard filled or as otherwise indicated in other Sections of these Specifications and Drawings. Installation quantities shall not include quantities placed beyond the lines and grades shown on the Drawings. The quantity of compacted soil liner low permeability fill shall be based upon the in-place volume between the liner system subgrade surface and top of compacted soil liner as determined by the difference between the Subgrade Survey and the Soil Liner Survey. A grid pattern with a maximum spacing of 25 feet or alternate spacing as approved in advance by the ENGINEER, of ground surface elevations in the fill area shall be surveyed and reference points installed by the CONTRACTOR prior to placement of compacted soil liner and subsequent to placement of the compacted soil liner. The grid pattern shall be conducted at the same points for each layer and shall include points at the top and bottom of slopes with a minimum of one point on the slope in between. The ENGINEER shall verify the as-built finished grades and volume of the compacted soil liner based on survey data provided by the CONTRACTOR. Quantities shall not include overbuild or replacement volumes of defective areas resulting from erosion or insufficient density and/or permeability test results. 2.Basis of Payment: By the cubic yard filled times the unit price for Soil Liner Low Permeability Fill as approved by the Owner and ENGINEER. a.Unit Price: Amount equal to each unit times the unit price provided in Bid Form Schedule. Requested payment quantities will be submitted by the CONTRACTOR with final approval by the ENGINEER. If a dispute exists relative to payment quantities, the CONTRACTOR at his expense will uncover any buried or covered material for re-evaluation. b.The entire compacted soil liner must meet or exceed the specified thickness, density and permeability requirements prior to payment. 1.3 REFERENCES A.ASTM D421 - Standard Practices for Dry Preparation of Soil Samples for Particle-Size Analysis and Determination of Soil Constants. B.ASTM D422 - Standard test Method for Particle-Size Analysis of Soils (Grain Size with Hydrometer). C.ASTM D698 - Standard Test Method for Laboratory Compaction Characteristics of Soil Using Standard Effort (12,400 ft-lbf/ft3) (Standard Proctor Test). Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02321-2 Backfill – Compacted Soil Liner D.ASTM D2216 - Standard Test Method for Natural Moisture Content. E.ASTM D2487 – Standard Practices for Classification of Soils for Engineering Purposes (Unified Soil Classification System). F.ASTM D2937 - Standard Test Method for Density of Soil in place by the Drive-Cylinder Method Test. G.ASTM D4318 - Standard Test Method for Atterberg Limits. H.ASTM D5084 - Standard Test Methods for Measurement of Hydraulic Conductivity of Saturated Porous Materials Using a Flexible Wall Permeameter (Remolded and Undisturbed Permeability). 1.4 SUBMITTALS A.Section 01300 – Administrative Requirements: Submittal procedures. B.Samples: Submit, in air-tight containers, 50 lb. per sample of each type of excavated material to testing laboratory to determine suitability for use as compacted soil liner fill material. C.Upon completion of the Soil Liner Survey submit survey results to ENGINEER for review and approval documenting the thickness of the compacted soil liner. PART 2 PRODUCTS 2.1 FILL MATERIALS A.Compacted Soil Liner: 1.Excavated and reused material, and/or material from designated on-site borrow area and/or stockpile and/or off-site borrow area approved in advance by the OWNER and ENGINEER. 2.Compacted soil liner material shall be classified as SC, CL, CH, ML, or MH soils according to the Unified Soil Classification System (ASTM D2487). 3.Free of ash, gypsum, ferrous material, topsoil, roots, stumps, brush, rocks larger than 1- inch, subsoil, debris, vegetation, calcareous concretions or nodules, and other foreign matter. 4.Fill material shall have a maximum size aggregate of 1-inch. The compacted soil liner material shall be raked or sieved by the CONTRACTOR, if necessary, to remove all aggregate greater than 1 inch in diameter. No more than 5 percent of the compacted soil liner fill material should be retained on the No. 4 sieve. 5.All material clods will be broken down with tillers and/or discs to provide a homogeneous soil (prior to compaction) that is free of clay clods greater than 2 inches in diameter. 6.Borrow area(s) shall be graded to slopes as shown on the Drawings. 7.Compacted soil liner material shall have a maximum permeability of 1 x 10 -5 cm/sec or less, minimum Liquid Limit of 30 and a minimum Plasticity Index of 10 or as subsequently specified by the ENGINEER based on laboratory testing (ASTM D4318). PART 3 EXECUTION 3.1 EXAMINATION A.Section 01300 - Administrative Requirements: Coordination and project conditions B.The ENGINEER will assist the CONTRACTOR in the determination of compacted soil liner material and non-select material during excavation operations (see Section 02315). The CONTRACTOR shall be responsible for excavating, transporting, stockpiling, placing and compacting all materials as needed. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02321-3 Backfill – Compacted Soil Liner C.Continuous visual observation of the materials shall be performed by the CONTRACTOR to ensure proper material is being used. D.ENGINEER will make frequent observations of the compacted soil liner placement operations and materials, and shall consult with the ENGINEER’s site representative on determinations of suitable liner fill and locations of such. All compacted soil liner fill proposed shall be observed by the ENGINEER prior to actual use. 3.2 PREPARATION A.Ensure subgrade compacted to density requirements specified in Section 02320 and Subgrade Survey is complete and approved by ENGINEER. B.Prior to compacted soil liner placement, the prepared subgrade shall be proof rolled with a loaded dump truck (minimum 20 tons) or similar rubber tired pneumatic vehicle, a minimum of two passes in each direction. Proofrolling shall be conducted at the discretion of the ENGINEER or his representative. Any soft, saturated or yielding areas exhibited by pumping and/or rutting will require removal and replacement with the appropriate compacted soil as specified in Section 02320. 3.3 FILLING A.Place fill to contours and elevations as shown on Drawings. The CONTRACTOR shall not use frozen backfill materials. B.The compacted soil liner shall be a minimum of 12 inches thick. Thickness of the compacted soil liner on the side slopes shall be measured perpendicular to the slope. C.Soil liner low permeability fill placement shall be in a maximum of 8-inch loose lifts. Compacted soil liner fill lift thickness shall be 6 in. ± 1 in. Thinner lifts are permissible to achieve design grade. D.Lift thickness may be sampled upon completion (but prior to subsequent lift placement) by hand augering through the lift and measuring the thickness. The resulting penetration shall be promptly backfilled by the CONTRACTOR with a hand tamped clayey soil mixture of one part bentonite and three parts compacted soil liner material. E.Samples of the in-place compacted soil liner shall be tested and evaluated in accordance with provisions of Part 3.5 of this Section prior to final acceptance of the compacted soil liner. All compaction or permeability test locations shall be filled with a mixture of one part bentonite and three parts soil. F.Equipment or truck traffic on the compacted soil liner shall not be permitted during the period between scarifying and compaction of a lift unless approved by the ENGINEER. G.After the lift to be compacted is conditioned, representative samples will be taken by the ENGINEER and tested for moisture content prior to any compactive efforts. If the moisture content is within the range specified in Part 3.5 D of this Section 02321, compaction may begin. If the moisture content is outside of this range, the compacted soil liner fill shall be wetted or dried and reworked accordingly. The compacted soil liner fill should be sprinkled or sprayed with water, utilizing equipment creating a uniform application and dozed, wind-rowed, and/or disc-plowed to uniformly increase the moisture content of the compacted soil liner if the material moisture content is too low. The compacted soil liner fill shall be dozed, wind-rowed, and/or disc-plowed to help air dry the soil if the moisture content is too high. H.Each lift shall be thoroughly compacted and satisfy the moisture and density criteria established from the test pad results. Field testing shall be completed according to Part 3.5 D of this Section before a subsequent lift is placed. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02321-4 Backfill – Compacted Soil Liner I.Compaction of lifts shall be as follows: 1.Compaction of lifts shall be performed with an appropriately heavy, properly ballasted, deep penetrating foot compactor equivalent to a Caterpillar 815 and shall be subject to approval of the ENGINEER. 2.Dozer equipment shall not be used for primary compaction efforts. 3.A minimum number of passes will be required on each lift as determined by the test pad. A pass is defined as one trip of the compacting equipment over the lift and back to the starting point by a single drum roller or one trip across the lift surface from one side to the other if the compacting equipment has front and back compacting rollers. This requirement is to allow thorough remolding of the soil by kneading action. 4.The daily work area shall extend a distance so as to maintain moist soil conditions (facilitate bonding) and continuous operations. Desiccation, crusting, or cracking of the lift surface shall be avoided as much as possible. Each lift shall be protected, at all times after placement, from desiccation and crusting. 5.If desiccation, crusting, or cracking of the lift surface occurs before placement of the next lift, this area shall be scarified to a sufficient depth to mix with moist materials, or sprinkled with water and then scarified at the direction of the ENGINEER. 6.The surface of the underlying lift shall be scarified prior to compaction of each subsequent lift (i.e.: Lift 2 to Lift 3) to facilitate bonding of the lifts. 7.The transition between the bottom and side slopes shall be accomplished by compacting parallel (bottom to top) to the slope. 8.Soil moisture and dry density requirements: a.To determine the moisture content and dry density requirements of the compacted soil are being satisfied, field and laboratory tests shall be performed at the frequencies specified in Part 3.5 B, C, and D of this Section. b.Compacted moisture content shall be between 1 and 3 percent wet of optimum moisture content or as determined by the results of the compacted soil liner test pad. c.The compacted soil liner shall be compacted to a minimum dry density of 95 percent (or as determined by the results of the compacted soil liner test pad) of the maximum dry density determined from the standard Proctor test (ASTM D-698). Where densities less than the specified density are measured, the compacted soil liner shall be recompacted and/or removed and reworked to meet density criteria. J.Compacted soil liner fill shall not be placed or compacted during sustained periods with air temperature below 32°F. Compacted soil liner fill may be placed and compacted during periods of early morning and early evening freezing temperatures with warming trends above 45°F during the day. No fill shall be placed on frozen subgrade. If the compacted soil liner or structural fill freezes or ices the fill section shall be rescarified and recompacted, at the discretion of the ENGINEER. K.During construction, finished lifts or sections of compacted soil liner shall be sprinkled with water as needed to avoid excessive cracking or at least twice daily. L.At the end of each construction day's activities, completed lifts or sections of compacted soil liner shall be sealed by rolling with rubber tired or smooth drum rollers and sprinkled with water as needed to avoid excessive cracking. M.After completion of a segment of compacted soil liner, but before installation of the overlying Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02321-5 Backfill – Compacted Soil Liner geosynthetics, the surface of the compacted soil liner shall be surveyed by the CONTRACTOR to ensure the specified thickness of compacted soil liner (18 inches). N.The surface of the compacted soil liner shall be smooth drum rolled and maintained free of rocks, organics, voids and sharp edges. O.The as-built thickness of the compacted soil liner shall be determined by survey methods (non-destructive) as described in Part 1.2 A of this Section. P.Systematically backfill to allow maximum time for natural settlement. Do not backfill over porous, wet, frozen or spongy subgrade surfaces. Q.Employ placement method that does not disturb or damage other work. R.Make gradual grade changes. Blend slope into level areas. S.Remove surplus fill materials from site unless authorized by OWNER to dispose of on-site in an OWNER designated location. T.Leave fill material stockpile areas free of excess fill materials. 3.4 TOLERANCES A.Section 01400 - Quality Requirements: Tolerances. B.Top Surface: Minus 0.1 to plus 0.1 foot from required elevations shown on Drawings. C.Fill Thickness: Minus 0.1 to plus 0.2 foot from required thickness shown on the Drawings. 3.5 FIELD QUALITY CONTROL A.Section 01400 - Quality Requirements: Testing and observation services. B.Perform the following laboratory classification and/or index material tests : 1.Tests to perform: a.Standard Proctor Test (ASTM D698). b.Atterberg Limits (ASTM D4318). c.Grain Size with Hydrometer (ASTM D421 and ASTM D422). 2.Frequency to perform tests: a.Once per every 3,000 cubic yards obtained from stockpile or borrow area; b.When there is an apparent change in the material type; and/or c.As directed by ENGINEER or ENGINEER’s representative. C.Compacted soil liner material must achieve a coefficient of permeability not greater than 1.0x10-5 cm/sec in accordance with laboratory testing (ASTM D5084). 1.Bulk samples will be taken by the ENGINEER at intervals of 1 sample per 3,000 cubic yards of material to be placed from the stockpile/borrow area(s). Samples will be transported to a soils laboratory for permeability testing. a.The samples will be compacted to at least 95 percent of standard Proctor at moisture contents similar to field conditions and/or as subsequently specified based on laboratory testing results (ASTM D2216) b.Remolded Permeability Tests (ASTM D5084) shall be run with a maximum hydraulic gradient of 30 and a maximum confining pressure of 10 psi. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02321-6 Backfill – Compacted Soil Liner 2.Undisturbed Permeability Tests (ASTM D5084) will be performed as directed by ENGINEER or ENGINEER’s representative. Areas that are not consistent in density, moisture content, or classification with previously approved compacted soil liner material will require additional undisturbed permeability testing of the in-place compacted soil liner material prior to final acceptance. 3.The ENGINEER may request an in-situ permeability test be performed on the in-place compacted soil liner material if the material being placed is not consistent with the material previously tested and approved for construction. D.Perform in place compaction tests for compacted soil liner in accordance with the following: 1.Density Tests (ASTM D2937) at frequency of once per every other lift in each 100 foot by 100 foot grid. Adjacent grids shall have alternate lifts tested. The compacted soil liner shall be compacted to a minimum dry density of 95 percent (or as determined by the results of the compacted soil liner test pad) of the maximum dry density determined from the standard Proctor test (ASTM D698). 2.Natural Moisture Content Tests (ASTM D2216) at frequency of at every density location and at least once per every 800 cubic yards placed. Compacted moisture content shall be between 2 and 5 percent wet of optimum moisture content or as determined by the results of the compacted soil liner test pad. E.Perform in place compaction tests for groundwater interceptor trench in accordance with Section 02324 - Trenching: F.When tests indicate Work does not meet specified requirements, remove Work, replace and retest. 3.6 PROTECTION OF FINISHED WORK A.Section 01700 - Execution Requirements: Protecting finished work. B.The compacted soil liner shall be overbuilt a thickness of 3 inches or covered with a sacrificial 10 mil plastic sheeting where required to protect the finished surface from erosion, desiccation, or other damage. 1.If the overbuild option is selected for protecting the liner, upon removal of the overbuild, the surface of the compacted soil liner will be re-rolled with a smooth drum roller to achieve the surface condition specified in Part 3.3 L of this Section. The rolled surface shall then be surveyed in accordance with Part 1.2A of this Section. 2.If excessive desiccation cracking becomes evident, as determined by the ENGINEER, the surface will require rewetting and rerolling prior to geomembrane liner placement. If excessive desiccation cracking remains evident after rerolling, the surface shall be scarified on the top 3-inches and reworked as specified in Part 3.3 of this Section 02321. C.Reshape and re-compact fills subjected to vehicular traffic. END OF SECTION Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02324 - 1 Trenching SECTION 02324 TRENCHING PART 1 GENERAL 1.1 SUMMARY A.Section Includes: 1.Trenching for spillway structures. 2.Groundwater interceptor trench. B.Related Sections: 1.Section 01720 - Dewatering. 2.Section 02060 - Aggregate. 3.Section 02200 - Earthwork. 4.Section 02610 – Pipes. 5.Section 02673 - Geosynthetics 1.2 MEASUREMENT AND PAYMENT A.Trenching for spillway structures: 1.All trenching and backfilling of trenches required for the project shall be included for payment as part of Section 02200. 2.Aggregate, geosynthetics, and pipe installed in trenches shall be included for payments as part of Sections 02060, 02610, and 02673. B.Trenching for Groundwater Interceptor Drain: 1.Basis of Measurement: The entire Groundwater Interceptor trench must meet or exceed the specified design including but not limited to width, depth, grade, and length requirements prior to payment. a.Aggregate, structural fill, geosynthetics, and pipe installed in the groundwater interceptor trench shall be included for payments as part of Sections 02060, 02200, 02610, and 02673. b.Cleanouts installed in the groundwater interceptor trenches shall be paid unit cost per cleanout including: •Solid HDPE Pipe •Cast in Place Concrete •Concrete Form •8” Diameter x 8” Long Bolt Down Manhole •HDPE 45° Bend •HDPE 45° Branch 2.Basis of Payment: Unit price. 1.3 SUBMITTALS A.Section 01300 – Administrative Requirements: Requirements for submittals. B.Excavation Protection Plan: Describe sheeting, shoring, and bracing materials and installation required to protect excavations and adjacent structures and property; include structural calculations to support plan. Plan shall be prepared under the direct supervision of Professional Engineer experienced in design of this Work and licensed in State of project. 1.4 COORDINATION Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02324 - 2 Trenching A.Section 01300 - Administrative Requirements: Coordination and project conditions. B.Verify Work associated with lower elevation utilities is complete before placing higher elevation utilities. PART 2 PRODUCTS 2.1 NOT APPLICABLE PART 3 EXECUTION 3.1 LINES AND GRADES A.Grades: 1.Excavate trenches to lines and grades indicated on Drawings or as required to achieve specified pipe inverts. 2.Maintain grade alignment using string line parallel with grade line and vertically above centerline of trench or other survey method as approved by the Engineer. 3.2 PREPARATION A.Call Local Utility Line Information service and the Owner not less than three working days before performing Work. 1.Underground utilities must be located and marked within and surrounding construction areas. B.Identify required lines, levels, contours, and datum locations. C.Protect bench marks and existing structures from excavating equipment and vehicular traffic. D.Maintain and protect above and below grade utilities indicated to remain. 3.3 TRENCHING A.Implement temporary dewatering measures to reduce caving of trench walls and softening of exposed subgrade soils as excavation advances, until trenching or foundation construction is complete, and until backfilling is complete. See Section 01720. B.Do not advance open trench more than 100 feet ahead of installed pipe. C.Cut trenches sufficiently wide to enable installation and allow inspection. Remove water or materials that interfere with Work. D.Excavate bottom of trenches maximum 15 inches wider than outside diameter of pipe or structure (max width of trench is 3’). E.Excavate trenches to depth indicated on Drawings. Provide uniform and continuous bearing and support for pipe. F.Do not disturb subgrade soils within a 45 degree zone of influence with depth of foundations, if applicable. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02324 - 3 Trenching G.When Project conditions permit, slope side walls of excavation starting 2 feet above top of pipe. When side walls can not be sloped, provide sheeting and shoring to protect excavation as specified in this Section. All trenches are to be excavated in accordance with OSHA trenching requirements H.When subsurface materials at bottom of trench are loose or soft, excavate to greater depth as directed by Engineer until suitable material is encountered. Backfill according to Part 3.5 of this Section. I.Cut out soft areas of subgrade not capable of compaction in place. Backfill with structural fill and compact to density equal to or greater than requirements for subsequent backfill material. J.Hand trim excavation if required. Remove loose matter. K.Correct over excavated areas with compacted backfill as specified for authorized excavation, additional bedding stone, or replace with lean concrete as directed by Engineer. Corrections for over excavation shall be conducted at no cost to the Owner. L.Stockpile excavated material in area designated on site and remove excess material not being used from site unless authorized by Owner to dispose of on-site in an Owner designated location. 3.4 SHEETING AND SHORING A.Comply with all OSHA trench safety requirements. B.Sheet, shore, and brace excavations to prevent danger to persons, structures and adjacent properties and to prevent caving, erosion, and loss of surrounding subsoil. C.Support trenches more than 4 feet deep excavated through unstable, loose, or soft material. Provide sheeting, shoring, bracing, or other protection to maintain stability of excavation. D.Design sheeting and shoring to be removed at completion of excavation work. E.Repair damage caused by failure of the sheeting, shoring, or bracing and for settlement of filled excavations or adjacent soil at no cost to the Owner. F.Repair damage to pipe bedding work from settlement, water or earth pressure or other causes resulting from inadequate sheeting, shoring, or bracing. 3.5 BACKFILLING A.See Sections 02060 and 02200 B.Backfill trenches to contours and elevations as indicated in the drawings. B.Systematically backfill to allow maximum time for natural settlement. Do not backfill over porous, wet, frozen, or spongy subgrade surfaces. C.Employ placement method that does not disturb or damage utilities in trench. D.Do not leave more than 50 feet of trench open at end of working day. Protect open trench to prevent danger to the public. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02324 - 4 Trenching E.Remove surplus fill materials from site unless authorized by Owner to dispose of on-site in an Owner designated location. F.Protect open trench to prevent danger to Owner. 3.6 TOLERANCES A.Section 01400 - Quality Requirements: Tolerances B.Top Surface of General Backfilling: Plus or minus 1/2 inch from required elevations. 3.7 PROTECTION OF INSTALLED CONSTRUCTION A.Section 01700 - Execution Requirements: Protecting Installed Construction. B.Reshape and re-compact fills subjected to vehicular traffic during construction. C.General construction traffic shall be limited to areas designated by the Engineer that have been protected by at least 24 inches of compacted fill material. 3.8 SCHEDULE A.Trenches with Piping: 1.Cover pipe with structural fill in loose 8 inch lifts, compacted as specified in Section 02200. B.Groundwater Interceptor Trenches: Backfill according to Section 02200 1.Install geosynthetics, aggregate, pipe, and cleanouts 2.Backfilled with structural fill in loose 8 inch lifts, compacted as specified in Section 02200. 3.The time schedules for excavation and backfilling of the groundwater interceptor trenches are to be approved by the Engineer so that desiccation of trench soils does not occur prior to backfilling. 4.The Contractor shall be responsible for keeping the groundwater interceptor trenches from accumulating ponding surface water. This may be accomplished by supplying temporary drainage outlets along the outside edge of the groundwater interceptor trenches. END OF SECTION Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02374-1 Erosion and Sediment Control SECTION 02374 EROSION AND SEDIMENT CONTROL PART 1 GENERAL 1.1 SUMMARY A.Section Includes: 1.Wattles 2.Silt Fencing. 3.Silt Fence Outlets. 4.Check Dams. 5.Slope Matting 6.Porous Baffle 7.Stabilized Outlet B.Related Sections: 1.Section 02060 - Aggregate. 2.Section 02924 - Seeding and Soil Supplements. C.Scope: 1.For all items described in this Section work shall include all labor, equipment, excavation, fill, and materials, unless otherwise specified, to install and maintain the controls during the period of the work and for temporary controls the removal and off- site disposal of the controls at the completion of the work. 1.2 MEASUREMENT AND PAYMENT A.Wattles: 1.Basis of Measurement: Linear foot of installed and approved wattle. Measurement shall be made in the field by the Owner or his designated representative. Replacement sections of wattle shall not be included in measurement for payment. 2.Basis of Payment -Unit Price: Amount equal to the actual installed and approved number of units times the unit price provided in Bid Form Schedule. Requested payment quantities will be submitted by the Contractor with final approval by the Engineer. B.Silt Fencing: 1.Basis of Measurement: Linear foot of installed and approved silt fence. Measurement shall be made in the field by the Owner or his designated representative. Replacement sections of silt fence shall not be included in measurement for payment. 2.Basis of Payment -Unit Price: Amount equal to the actual installed and approved number of units times the unit price provided in Bid Form Schedule. Requested payment quantities will be submitted by the Contractor with final approval by the Engineer. C.Silt Fence Outlets: 1.Basis of Measurement: Each installed and approved silt fence outlet. Measurement shall be made in the field by the Owner or his designated representative. No payment shall be made for silt fence outlets installed beyond the limits depicted on the drawings and replacement sections of silt fence outlet shall not be included in measurement for payment. a.Aggregate used for silt fence outlet shall be included in silt fence outlet unit price. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02374-2 Erosion and Sediment Control 2.Basis of Payment -Unit Price: Amount equal to the actual installed and approved number of units times the unit price provided in Bid Form Schedule. Requested payment quantities will be submitted by the Contractor with final approval by the Engineer. D.Check Dams: 1.Basis of Measurement: Each check dam installed and approved by the Owner. Measurement shall be made in the field by the Owner or his designated representative by counting the number of check dams installed and approved. a.Aggregate used for check dams shall be included in check dam unit price. b.Geotextile used for check dams shall be included in check dam unit price. 2.Basis of Payment -Unit Price: Amount equal to the actual installed and approved number of units times the unit price provided in Bid Form Schedule. Requested payment quantities will be submitted by the Contractor with final approval by the Engineer. E.Slope Matting: 1.Basis of Measurement: Square yard of matting installed and approved by the owner. Measurement shall be completed by the Contractor by means of surveying. Measurement shall not include any areas which were not been approved by the Owner for matting installation prior to installation of the matting and shall not include any areas beyond those identified on the drawings unless material was installed at the direction of the Owner. a.Establishment of vegetation on the matting shall be included as part of Section 02924 Seeding and Soil Supplements. 2.Basis of Payment -Unit Price: Amount equal to the actual installed and approved number of units times the unit price provided in Bid Form Schedule. Requested payment quantities will be submitted by the Contractor with final approval by the Engineer. F.Porous Baffle: 1.Basis of Measurement: Linear foot of installed and approved silt fence. Measurement shall be made in the field by the Owner or his designated representative. Replacement sections of silt fence shall not be included in measurement for payment. 2.Basis of Payment -Unit Price: Amount equal to the actual installed and approved number of units times the unit price provided in Bid Form Schedule. Requested payment quantities will be submitted by the Contractor with final approval by the Engineer. G.Stabilized Outlet: 1.Basis of Measurement: Each stabilized outlet installed and approved by the Owner. Measurement shall be made in the field by the Owner or his designated representative by counting the number of stabilized outlets installed and approved. a.Aggregate used for stabilized outlets shall be included in the stabilized outlet unit price. b.Geotextile used for stabilized outlet shall be included in the stabilized outlet unit price. 2.Basis of Payment -Unit Price: Amount equal to the actual installed and approved number of units times the unit price provided in Bid Form Schedule. Requested payment quantities will be submitted by the Contractor with final approval by the Engineer. 1.3 REFERENCES A.NCDOT Standard Specifications for Roads and Structures B.American Welding Society (AWS) D1.1 Structural Welding Code Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02374-3 Erosion and Sediment Control 1.4 SUBMITTALS A.Section 01300 – Administrative Requirements: Requirements for submittals. B.Manufacturer's Certificate: Certify Products meet or exceed specified requirements. 1.5 CLOSEOUT SUBMITTALS A.Section 01700 - Execution Requirements: Project record documents. 1.6 QUALITY ASSURANCE A.Perform Work in accordance with requirements of these Project Specifications. B.Perform Work in accordance with NCDOT standards. PART 2 PRODUCTS 2.1 CHECK DAMS A.Aggregate - As shown on the Drawings and specified in Section 02060. B.Geotextile Fabric - Non-woven filter fabric as specified in Section 02673. 2.2 SILT FENCING A.Posts – Self-fastening angle steel of lengths depicted on the Drawings B.Geotextile Fabric – Woven as specified in Section 02673 of widths depicted on the Drawings. 2.3 SILT FENCE OUTLETS A.Hardware Cloth – 24 gauge wire mesh with ¼-inch mesh openings B.Posts – Self-fastening angle steel of lengths depicted on the Drawings. C.Aggregate - As shown on the Drawings and specified in Section 02060. 2.4 WATTLE MATERIALS A.As specified on Drawings 2.5 SLOPE MATTING A.North American Green Type C-150 or approved equal. 2.6 POROUS BAFFLES A.Posts – Self-fastening angle steel of lengths depicted on the Drawings B.Porous Material – Jute backed by Coir material with open area between five and ten percent. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02374-4 Erosion and Sediment Control 2.7 STABILIZED OUTLETS A.Aggregate - As shown on the Drawings and specified in Section 02060. B.Geotextile Fabric - Non-woven filter fabric as specified in Section 02673. 2.8 SOURCE QUALITY CONTROL (AND TESTS) A.Section 01400 - Quality Requirements: Testing and observation requirements. PART 3 EXECUTION 3.1 WATTLES A.Proper site preparation is essential to ensure complete contact of the Wattle (fiber roll) with the soil. B.Remove all rocks, clods, vegetation or other obstructions so that the installed wattles will have direct contact with the soil. C.A small trench 2-3 inches (8-10 cm) in depth should be excavated on the slope contour and perpendicular to water flow. Soil from the excavation should be placed down-slope next to the trench. D.Install the wattles in the trench, insuring that no gaps exist between the soil and the bottom of the wattle. The ends of adjacent wattles should be tightly abutted so that no opening exists for water or sediment to pass through. Alternately, wattles may be lapped, 6" minimum to prevent sediment passing through the field joint. E.Wooden stakes should be used to fasten the wattles to the soil. When conditions warrant, a straight metal bar can be used to drive a hole through the Wattle and into the soil. F.Wooden stakes should be placed 6" from the Wattle end angled towards the adjacent Wattle and spaced at 4 feet leaving less than 1-2 inches of stake exposed above the Wattle. Alternately, stakes may be placed on each side of the Wattle tying across with a natural fiber twine or staking in a crossing manner ensuring direct soil contact at all times. G.Terminal ends of wattles shall be dog legged up slope to help ensure containment and prevent channeling of sedimentation. H.Backfill the upslope length of the Wattle with the excavated soil and compact. I.Care shall be taken during installation so as to avoid damage occurring to the Wattle as a result of the installation process. Should the Wattle be damaged during installation, a wooden stake shall be placed either side of the damaged area terminating the log segment. J.Field monitoring shall be performed to verify that the placement does not damage the Wattle. K.Any Wattle damaged during placement or operations shall be replaced as recommended by the Engineer or his representative, at the Contractor's expense. 3.2 SILT FENCING A.Install as specified on Drawings. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02374-5 Erosion and Sediment Control 3.3 SILT FENCE OUTLETS A.Install as specified on Drawings. 3.4 CHECK DAMS A.Install as specified on Drawings. 3.5 SLOPE MATTING A.Install as specified on Drawings. 3.6 POROUS BAFFLE A.Install as specified on Drawings B.Porous material shall be supported by posts; use of sawhorses shall not be permitted. 3.7 STABILIZED OUTLETS A.Install as specified on Drawings. 3.8 FIELD QUALITY CONTROL A.Section 01400 - Quality Requirements and Section 1700 - Execution Requirements: Testing, adjusting, and balancing. B.Inspect erosion control devices on a weekly basis and after each runoff event. Make necessary repairs to ensure erosion and sediment controls are in good working order. 3.9 CLEANING A.Section 01700 - Execution Requirements: Final cleaning. B.When sediment accumulation in sediment control structures has reached a point one-half depth of sediment structure or device, remove and dispose of sediment. C.Do not damage structure or device during cleaning operations. D.Do not permit sediment to erode into construction or site areas or natural waterways. E.Clean channels when depth of sediment reaches approximately one half channel depth. F.Do not damage channel or channel lining material during cleaning operations. 3.10 PROTECTION A.Section 01700 - Execution Requirements: Protecting installed construction. END OF SECTION Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02500-1 HDPE Piping and Misc. Items SECTION 02500 HDPE PIPING AND MISCELLANEOUS ITEMS PART 1 GENERAL 1.1 SUMMARY A.Section Includes: 1.Materials, placement, and installation of perforated and solid HDPE pipe for groundwater barrier trench. B.Related Sections 1.Section 02610 - Pipes. 1.2 UNIT PRICE - MEASUREMENT AND PAYMENT A.Pipe and Fittings 1.Basis of Payment: Not applicable. HDPE pipe payment included in other sections. 1.3 REFERENCES A.American Society for Testing and Materials: 1.ASTM D638 - Standard Test Method for Tensile Properties of Plastics. 2.ASTM D695 - Standard Test Method for Compressive Properties of Rigid Plastics. 3.ASTM D696 - Standard Test Method for Coefficient of Thermal Expansion of Plastics Between (-30o)C and 30oC With a Vitreous Silica Dilatometer. 4.ASTM D746 - Standard Test Method for Brittleness Temperature of Plastics and Elastomers by Impact. 5.ASTM D790 - Standard Test Method for Flexural Properties of Unreinforced and Reinforced Plastics and Electrical Insulating Materials. 6.ASTM D1238 - Standard Test Method for Flow Rates of Thermoplastics by Extrusion Plastometer. 7.ASTM D1248 - Standard Specification for Polyethylene Plastics Extrusion Materials for Wire and Cable. 8.ASTM D1505 - Standard Test Method for Density of Plastics by the Density Gradient Technique. 9.ASTM D1603 - Standard Test Method for Carbon Black in Olefin Plastics. 10.ASTM D1693 - Standard Test Method for Environmental Stress Cracking of Ethylene Plastics. 11.ASTM D2240 - Standard Test Method for Rubber Property - Durometer Hardness. 12.ASTM D2513 - Standard Specification for Thermoplastic Gas Pressure Pipe, Tubing, and Fittings. 13.ASTM D2657 - Standard Practice for Heat Fusion Joining of Polyolefin Pipe and Fittings. 14.ASTM D 2837 - Standard Test Method for Obtaining Hydrostatic Design Basis for Thermoplastic Pipe materials. 15.ASTM D3261 - Standard Specification for Butt Fusion Polyethylene (PE) Plastic Fittings for Polyethylene (PE) Plastic Pipe and Tubing. 16.ASTM D3350 - Standard Specification for Polyethylene Plastics Pipe and Fittings Materials. 17.ASTM F405 Standard Specification for Corrugated Polyethylene (PE) Pipe and Fittings. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02500-2 HDPE Piping and Misc. Items 18.ASTM F667 Standard Specification for Large Diameter Corrugated Polyethylene Pipe and Fittings. 19.ASTM F714 - Standard Specification for Polyethylene (PE) Plastic Pipe (SDR-PR) Based on Outside Diameter. 20.ASTM F1473 - Standard Test Method for Notch Tensile Test to Measure the Resistance to Slow Crack Growth of Polyethylene Pipes and Resins. B.Plastics Pipe Institute (PPI): 1.PPI TR4 - Recommended Hydrostatic Strengths and Design Stresses for Thermoplastic Pipe and Fittings Compound. 1.4 SUBMITTALS A.Section 01300 Administrative Requirements: Submittal procedures. B.HDPE Pipe 1.Shop Drawings: Submit shop drawings for HDPE Pipe. Indicate piece numbers and locations. 2.Product Data: The Contractor or Supplier shall submit a complete description of and data indicating pipe material used, and pipe accessories and fittings proposed for use to the Engineer for approval at least two weeks prior to installation. Pipe data shall conform to the standards set in Table 02500-A found in Part 2.1 of this Section. 3.Shop drawings for fabricated fittings shall be submitted to the Engineer at least two weeks prior to fabrication for approval. 4.Manufacturer's Certificates: a.Certification of the analysis for the HDPE resin. b.Certify products meet or exceed specified requirements specified in Table 02500-A found in Part 2.1 of this Section 02500. c.Certifications must be submitted to Engineer for approval at least two weeks prior to installation. C.Manufacturer's Installation Instructions: Indicate special procedures required to install products specified. 1.5 CLOSEOUT SUBMITTALS A.Section 01700 - Execution Requirements: Closeout Procedures. B.Project Record Documents: Record location and elevations of groundwater barrier trench pipe. C.Identify and describe unexpected variations to subsoil conditions or discovery of uncharted utilities. 1.6 QUALITY ASSURANCE A.The pipe, outlet structure, and/or fitting manufacturer’s production facilities shall be open for inspection by the owner or his designated agents with a reasonable advanced notice. B.During inspection, the manufacturer shall demonstrate that it has facilities capable of manufacturing and testing the pipe, manholes, sumps and/or fittings to standards required by this Specification. C.Pipe which has been tested by the manufacturer and falls outside of the appropriate limits set forth in Table 02500-A contained in this specification will be cause for rejection. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02500-3 HDPE Piping and Misc. Items D.The owner or the specifying engineer may request certified lab data to verify the physical properties of materials not meeting the requirements of this specification. 1.7 PRE-INSTALLATION MEETINGS A.Convene meeting a minimum of one week prior to commencing work pertaining to this Section 02500. 1.8 FIELD MEASUREMENTS A.Verify field measurements and elevations are as indicated on the Drawings. 1.9 DELIVERY, STORAGE, AND HANDLING A.Section 01600 - Product Requirements: Product Delivery Requirements; Product Storage and Handling Requirements. B.Packaging, handling, and shipment shall be in accordance with the manufacturer’s standards, instructions, and recommendations. C.Transportation to Site: 1.The manufacturer shall package the pipe, fittings, structures, and/or other miscellaneous HDPE items in a manner designed to deliver it or them to the project neatly, intact, and without physical damage. 2.The transportation carrier shall use appropriate methods and intermittent checks to ensure the materials are properly supported, stacked, and restrained during transport such that it is not nicked, gouged, or physically damaged. D.Storage: 1.Pipe, structures, and other miscellaneous HDPE items shall be stored on clean, level ground to prevent undue scratching or gouging and as needed to protect them from being covered with excessive dirt, water, moisture, and mechanical abrasion. 2.The handling of pipe, structures, and other miscellaneous HDPE items shall be done in such a manner that there is no damage. Nylon slings are often used. 3.If the pipe must be stacked for storage, such stacking shall be done in accordance with the pipe manufacturer’s recommendations. 4.Store gaskets for mechanical and push-on joints in cool, dry location out of direct sunlight and not in contact with petroleum products. E.Care shall be taken to minimize the amount of soil collected inside the pipe, structures, and other miscellaneous HDPE items while handling and installing. F.The pipe, structures, and other miscellaneous HDPE items shall be handled in such a manner that it is not pulled over sharp objects or cut by chokers or lifting equipment, and care shall be exercised during installation not to damage the pipes and fittings. G.Any pipe section, structure, fitting, joint or other miscellaneous HDPE items that become broken, cracked, crushed, cut, scratched, gouged or otherwise rendered unsuitable, as determined by the Engineer, shall be removed and replaced by the Contractor. Scratches greater than 6 inches in length and gouges exhibiting a depth in excess of 8 percent of the wall thickness of the pipe shall be cause for rejection of pipe or fittings to the extent designated by the Engineer. H.Fused Pipe Segment Handling: 1.Fused segments of pipe shall be handled so as to avoid damage to the pipe. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02500-4 HDPE Piping and Misc. Items 2.Chains or cable type chokers must be avoided when lifting fused sections of pipe. Nylon slings are preferred. 3.Spreader bars are recommended when lifting long fused sections. 4.Pipe shall be fused in lengths not to exceed that which can be moved and placed easily and safely, causing no damage to the fused pipe or welds. 1.10 COORDINATION A.Coordinate the Work with construction of other elements of passive gas vents and with construction of the soil cover system. PART 2 PRODUCTS 2.1 HIGH DENSITY POLYETHYLENE (HDPE) PIPING A.Base Resin (HDPE Material) 1.HDPE material used for the manufacture of HDPE pipe and fittings under this specification shall be produced from approved pipe material base resin that is high density, high molecular weight polyethylene (HDPE) pipe grade resin with the nominal physical properties: a.Equivalent to Type III, Category 5, Class C, Grade PE 3408 in accordance with ASTM D1248. b.Equivalent to cell classification PE345464C in accordance with ASTM D3350. c.As outlined in Table 02500-A below. 2.The material shall be listed by PPI (Plastics Pipe Institute, a division of the Society of the Plastics Industry) in PPI TR-4 with a 73ºF hydrostatic design basis of 1,600 psi and a 140ºF hydrostatic design basis of 800 psi. The PPI listing shall be in the name of the pipe manufacturer and shall be based on ASTM D 2837 testing. 3.The resin shall contain not less than 97% of the base polymer and not less than 2% carbon black as defined in ASTM D1248, Class C to impart maximum weather resistance. 4.The pipe material shall contain no more than 3% carbon black, anti-oxidants, and heat stabilizers combined, and no other additives, fillers or extenders. 5.The pipe shall contain no recycled compound except that generated in the manufacturer’s own plant from resin of the same raw material, including both the base resin and the co- extruded resin. B.Physical Appearance 1.All pipes shall have good appearance qualities. 2.The pipe shall be homogeneous throughout and the surfaces shall be smooth and uniform with no visible defects. 3.The pipes shall be free of visible cracks, holes, voids, nicks, cuts, gouges, scratches, blisters, gels, undispersed ingredients, any signs of contamination by foreign inclusions, or other defects that may affect the wall integrity or the pipe’s serviceability. 4.Holes for perforated HDPE pipes shall be cleanly cut, identical in geometry, and evenly spaced. C.Physical Properties 1.Pipe and fitting dimensions, workmanship, standard dimension ratio (SDR) and corresponding pressure rating shall be in accordance with the requirements of ASTM F714. 2.HDPE piping shall have a Standard Dimension Ratio (SDR) of 26 unless otherwise specified on the Drawings. 3.Pipe supplied under this Specification shall have a nominal OD indicated on the Drawings unless otherwise specified. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02500-5 HDPE Piping and Misc. Items 4.The chemical and corrosion resistance of the PE pipe and all fittings shall be in keeping with typical properties of high quality polyethylene products currently available through commercial sources. 5.All mechanical fasteners or fittings shall be stainless steel. 6.At a minimum, the pipe material shall meet the properties presented in Table 02500-A below: TABLE 02500-A REQUIRED PIPE AND BASE RESIN PHYSICAL PROPERTIES Property Test Method Unit Nominal Value Material Designation PPI-TR4 PE 3408 Cell Classification ASTM D3350 345464C Material Classification ASTM D1248 Type III, Category 5, Class C Density ASTM D1505 ≥0.945 g/cm3 Melt Index ASTM D1238 (Condition E) g/10min <0.1 Carbon Black Content/Color; UV Stabilzer ASTM D1603 % range 2 to 3 Flexural Modulus ASTM D790 2% Secant psi >125,000 Tensile Strength @ Ultimate ASTM D638 psi 3,200 Tensile Strength @Yield ASTM D638 (Type IV, 2 ipm)1 psi >3,000 Elongation @ Yield ASTM D638 (Type IV, 2 ipm)1 %>8 Ultimate Elongation @ Break ASTM D638 %>750 Modulus of Elasticity ASTM D638 (Type IV, 2 ipm)1 psi >100,000 Environmental Stress Crack Resistance (ESCR) ASTM D1693 Fo, Condition C hrs >5,000 Hardness ASTM D2240 Shore “D”>60 Compressive Strength at Yield ASTM D695 psi >1,600 Slow Crack Resistance (SCG) (PENT test) ASTM F1473 hours >100 Hydrostatic Design Basis @ 73.4°F (23°C) 140°F (60°C) ASTM D2837 psi >1,600 >800 Low Temperature Brittleness ASTM D746 °F(°C)< - 180 (-117) Linear Thermal Expansion Coefficient ASTM D696 in/in/°F 9 x 10-5 Notes: 1.Dumb-bell tested at a rate of strain of 2 inches/minute (ipm) D.Pipe Fittings 1.All fittings specified on the Drawings, or otherwise, needed to make pipe connections (ex: 90º elbow) shall be in accordance with ASTM D2513 and ASTM D3261 and shall be manufactured by injection molding, a combination of extrusion and machining, or fabrication from HDPE pipe conforming to this specification. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02500-6 HDPE Piping and Misc. Items 2.The fittings shall be fully pressure rated and provide a working pressure equal to that of the pipe with an included 2:1 safety factor. 3.The fittings shall be manufactured from the same base resin type and cell classification as the pipe itself as specified in Parts 2.1A, 2.1B, and 2.1C of this Section 02500. The fittings shall be homogeneous throughout and free from cracks, holes, foreign inclusions, voids, or other injurious defects. 4.Molded socket fittings shall not be used. 5.Pre-fabricated fittings: a.Shall not be permitted unless molded fittings are not available from the pipe Manufacturer, and only after obtaining specific approval from the Engineer. b.Shall be made using pipe segments meeting all base resin, physical, and property requirements presented in Parts 2.1A, 2.1B, and 2.1C of this Section 02500. c.All pipe segments in a pre-fabricated fitting shall be pressure rated to exceed by 20% the highest pipe pressure rating to which they are intended to be connected. E.HDPE Joints 1.The method of joining for high density polyethylene pipe shall be the heat butt fusion method of high density polyethylene pipe per ASTM D2657 and shall be performed in strict accordance with the pipe manufacturer’s recommendations, subject to the Engineer’s approval. The heat fusion equipment used in the joining procedures should be capable of meeting all conditions recommended by the pipe manufacturer. 2.All joints shall be made by trained technicians qualified by the Manufacturer and using equipment and controlled procedures approved by the Manufacturer. 3.All pipe joints shall be stronger than the pipe itself under both tension and hydrostatic loading conditions. 4.The joints shall be leak-tight, homogeneous and uniform throughout. 5.Properly executed electrofusion fittings may be used. Extrusion welding or hot gas welding of HDPE shall not be used for pressure pipe applications or fabrications where shear or structural strength is important, as determined by the Engineer. Mechanical joint adapters, flanges, unions, grooved-couplers, transition fittings, and some mechanical couplings may be used to mechanically connect HDPE pipe. Refer to the manufacturer’s recommendations. F.Perforated Pipes 1.The HDPE pipe sections shall be perforated as shown on the Drawings. 2.Perforations shall be cleanly cut, identical in geometry, and evenly spaced. G.Bedding And Cover Materials 1.Bedding: Fill Type as specified in Section 02060 and as shown on the Drawings. 2.Cover: Fill Type as specified in Section 02320 and as shown on the Drawings. H.Identification 1.The following shall be continuously indent printed on the pipe, or spaced at intervals not exceeding 5 feet: a.Name and/or trademark of the pipe manufacturer. b.Pipe series designation. c.Nominal pipe size. d.Standard dimension ratio (SDR). e.The letters PE followed by the polyethylene grade per ASTM D1248, followed by the Hydrostatic Design basis in 100's of psi (e.g., PE 3408). f.Manufacturing Standard Reference (e.g., ASTM F714-1). g.A production code from which the date and place of manufacture can be determined. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02500-7 HDPE Piping and Misc. Items PART 3 EXECUTION 3.1 EXAMINATION A.Verify passive gas vent location is ready to receive work and excavations, dimensions, and elevations are as indicated on the Drawings. 3.2 PREPARATION A.Correct over excavation with fill material. 3.3 INSTALLATION A.Pipe and Outlet Structures 1.Excavate to accommodate installation of passive gas vent system. 2.Place bedding material at trench bottom, level materials in continuous layer not exceeding 8 inches (if applicable). 3.Maintain optimum moisture content of bedding material to attain required compaction density. 4.Install pipe, fittings, and accessories in accordance with the Drawings, these Specifications, and the Manufacturer’s recommendations. 5.Route piping in straight line. 6.Pipe shall be fused in lengths not to exceed that which can be moved and placed easily and safely, causing no damage to the fused pipe or welds. 7.Care shall be taken not to drop the pipe while moving it, and to avoid excess stress or strain during installation. 8.Pipe installation and placement of backfill around pipes shall be performed when the pipe is in a contracted state, i.e., during the cool of the morning, at night, or during periods of over-cast skies. 9.Install bedding at sides of pipe as shown on the Drawings. 10.Immediately after placement, the pipe shall be thoroughly and completely embedded and supported. 11.Refer to Section 02320 for backfilling and compacting requirements. Do not displace or damage pipe when compacting. 12.HDPE pipe shall be joined using butt fusion. All butt fusion welds shall be made as described in ASTM D 2657. Electrofusion welding can be used for making pipe welds. Hot air and extrusion welding are not permitted for pipe joining. B.Miscellaneous HDPE Items 1.Install in accordance with the Drawings and the Manufacturer’s recommendations. 3.4 FIELD QUALITY CONTROL A.Section 01400 - Quality Requirements and 01700 - Execution Requirements B.The Engineer or his representative will undertake observations and inspections to determine compliance of the materials and work with this Specification. C.Quality control by the Engineer will include monitoring and/or inspecting: 1.The HDPE pipe and fittings for correct size, SDR rating workmanship, and fabrication. 2.Damage during installation. 3.The installation, alignment and welding of all pipe, and fittings. D.Contractor shall request inspection prior to and immediately after placing bedding. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02500-8 HDPE Piping and Misc. Items E.Compaction Testing: In accordance with Section 02320. F.When tests indicate Work does not meet specified requirements, remove work, replace and retest. G.HDPE pipes and other miscellaneous items shall be subject to rejection on account of failure to conform to these Specifications. In addition, individual sections of these items may be rejected because of any of following reasons: 1.Any pipe section, fitting, joint, or outlet structure that becomes broken, cracked, crushed, cut, scratched, gouged or otherwise rendered unsuitable, as determined by the Engineer, shall be removed and replaced by the Contractor. 2.Scratches greater than 6 inches in length and gouges exhibiting a depth in excess of 8 percent of the wall thickness of the pipe, fitting, or outlet structure shall be cause for rejection of a pipe section, fitting, or outlet structure to the extent designated by the Engineer. 3.5 PROTECTION OF FINISHED WORK A.Section 01700 - Execution Requirements: Protecting installed construction. B.Protect pipe, aggregate cover, and outlet structures from damage or displacement until backfilling operation is in progress. C.Care shall be exercised during construction not to damage the pipes and fittings. END OF SECTION Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02610-1 Pipes SECTION 02610 PIPES PART 1 GENERAL 1.1 SUMMARY A.Section includes: 1.Spillway Risers. 2.Spillway Barrels 3.Sediment Pond Skimmers 4.Interceptor Trench Collector Pipe 5.Interceptor Outlet Pipe 6.Interceptor Trench Clean-Outs B.Related Sections 1.Section 02200 - Earthwork. 2.Section 02060 – Aggregate. 3.Section 02324 – Trenching. 4.Section 02500 – HDPE Piping and Miscellaneous Items 1.2 MEASUREMENT AND PAYMENT A.General 1.Payment for all items in this Section includes all labor, equipment, materials, and incidentals necessary for the installation of the items. Incidentals include, but are not limited to, couplings, end caps, end sections, trash racks, anti-vortex plate, anti-seep collars, and other fittings. B.Spillway Risers 1 Basis of Measurement: Linear foot of installed and approved pipe. Measurement shall be made in the field by the Owner or his designated representative. Trash racks and anti- vortex plate shall be considered incidental to the work. a.Anti-flotation block shall be included for payment as part of Section 03330 2.Basis of Payment - Unit Price: Amount equal to the actual installed and approved number of units times the unit price provided in Bid Form Schedule. Requested payment quantities will be submitted by the Contractor with final approval by the Engineer. C.Spillway Barrels 1 Basis of Measurement: Linear foot of installed and approved pipe. Measurement shall be made in the field by the Owner or his designated representative. Anti-seep collars shall be considered incidental to the work. Trenching shall be considered incidental to the work. 2.Basis of Payment - Unit Price: Amount equal to the actual installed and approved number of units times the unit price provided in Bid Form Schedule. Requested payment quantities will be submitted by the Contractor with final approval by the Engineer. D.Sediment Pond Skimmers 1 Basis of Measurement: Each unit installed and approved. Measurement shall be made in the field by the Owner or his designated representative. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02610-2 Pipes a.Resting Pad shall be included for measurement and payment as part of Section 2060 Aggregate. 2.Basis of Payment - Unit Price: Amount equal to the actual installed and approved number of units times the unit price provided in Bid Form Schedule. Requested payment quantities will be submitted by the Contractor with final approval by the Engineer. E.Interceptor Trench Collector Pipe 1 Basis of Measurement: Linear foot of installed and approved pipe. Measurement shall be made in the field by the Owner or his designated representative. Non-compacted soils backfill shall be considered incidental to the work. . a.Trenching for pipe installation shall be included for measurement and payment as part of Section 02324 Trenching. 2.Basis of Payment - Unit Price: Amount equal to the actual installed and approved number of units times the unit price provided in Bid Form Schedule. Requested payment quantities will be submitted by the Contractor with final approval by the Engineer. F.Interceptor Trench Outlet Pipe 1 Basis of Measurement: Linear foot of installed and approved pipe. Measurement shall be made in the field by the Owner or his designated representative. 2.Basis of Payment - Unit Price: Amount equal to the actual installed and approved number of units times the unit price provided in Bid Form Schedule. Requested payment quantities will be submitted by the Contractor with final approval by the Engineer. G.Interceptor Trench Clean-Outs 1 Basis of Measurement: Each unit installed and approved. Measurement shall be made in the field by the Owner or his designated representative. Skirt bolt down shall be considered incidental to the work. a.Concrete pad shall be included for payment as part of Section 02324. 2.Basis of Payment - Unit Price: Amount equal to the actual installed and approved number of units times the unit price provided in Bid Form Schedule. Requested payment quantities will be submitted by the Contractor with final approval by the Engineer. 1.3 REFERENCES A.The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only. 1.AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM) ASTM D 1248 Specification for Polyethylene Plastics Molding and Extrusion Materials ASTM D 1784 Specification for Rigid Poly (Vinyl Chloride) (PVC) Compounds and Chlorinated Poly (Vinyl Chloride) (CPVC) Compounds ASTM D 1785 Specification for Poly (Vinyl Chloride) (PVC) Plastic Pipe, Schedules 40, 80, and 120 ASTM D 2321 Practice for Underground Installation of Flexible Thermoplastic Sewer Pipe ASTM D 2467 Specification for Socket-Type Poly (Vinyl Chloride) (PVC) Plastic Pipe Fittings, Schedule 80 Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02610-3 Pipes ASTM D 2513 Specification for Thermoplastic Gas Pressure Pipe Tubing and Fittings ASTM D 2564 Specification for Solvent Cements for Poly (Vinyl Chloride) (PVC) Plastic Piping Systems ASTM D 2774 Practice for Underground Installation of Thermoplastic Pressure Piping ASTM D 2855 Practice for Making Solvent-Cemented Joints with Poly (Vinyl Chloride) (PVC) Pipe and Fittings ASTM D 3350 Specification for Polyethylene Plastics Pipe and Fittings Materials 2.AMERICAN NATIONAL STANDARD INSTITUTE (ANSI) ANSI B 31.8 Code for Pressure Piping, Appendix N 3.PLASTICS PIPING INSTITUTE (PPI) PPI TR-31/9-79 Technical Report 1.4 QUALITY ASSURANCE A.Provide only pipe and fittings conforming to the requirements of the referenced ASTM standards, ANSI standards, or PPI standards. B.Utilize only factory trained and certified welders, equipment, and installers. C.Follow all ASTM practices and standards in the manufacture and fabrication of piping and fittings. D.Follow manufacturer’s written instructions for handling, storage, and installation. 1.5 QUALITY CONTROL A.Provide permanent markings on piping, clearly showing ASTM conformance, size and SDR, pressure rating, cell classification number, and the manufacturer’s name. B.Provide certification of all welders and installers. C.Certify compliance with ASTM practices and standards during manufacture and fabrication. D.Remove from site any pipe and fittings damaged during shipment, construction, or rejected during testing and/or inspection. Replace with acceptable products without additional expense to OWNER. 1.6 SUBMITTALS A.Section 01300 – Administrative Requirements: Requirements for submittals. B.Product Data: Submit data on pipe, fittings and accessories. C.Manufacturer's Installation Instructions: Submit special procedures required to install Products specified. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02610-4 Pipes D.Shop drawing for sediment pond riser pipe to include: anti-flotation block; connector for inlet end of barrel; connector for skimmer, trash rack; anti-vortex plate; all fittings; and connections. 1.7 CLOSEOUT SUBMITTALS A.Section 01700 - Execution Requirements: Closeout procedures B.Project Record Documents: 1.Accurately record actual locations of pipe runs, connections, and invert elevations. C.Operation and Maintenance Data: Procedures for submittals. 1.8 PRE-INSTALLATION MEETING A.Section 01300 - Administrative Requirements: Pre-installation meeting. PART 2 PRODUCTS 2.1 SLOPE DRAINS A.HDPE corrugated, smooth interior pipe of the diameter indicated on the drawings. Pipe shall be as manufactured by ADS (N-12) or engineer approved equivalent. 2.2 SPILLWAY RISERS AND BARRELS A.HDPE corrugated pipe of the diameter and standard dimension ratio (SDR) value indicated on the drawings. Standard Dimension Ratio (SDR) of 26 shall be used unless otherwise specified on the Drawings. B.All pipe connections shall be water tight and be made by means of fusion, welding, or approved equal. 2.3 SEDIMENT POND SKIMMERS A.HDPE materials of the size, dimension, and configuration indicated on the Drawings. Skimmers shall be manufactured by Faircloth or approved equivalent. 2.4 INTERCEPTOR TRENCH COLLECTOR PIPE A.Perforated HDPE pipe of the diameter, schedule, and perforation pattern indicated on the Drawings. B.Pipe connections shall be slip coupled and glued or by approved alternate means. 2.5 INTERCEPTOR TRENCH OUTLET PIPE AND CLEAN-OUTS A.Non-perforated HDPE pipe of the diameter and schedule indicated on the Drawings. B.Pipe connections shall be slip coupled and glued or by approved alternate means. PART 3 EXECUTION 3.1 LINES AND GRADES Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02610-5 Pipes A.Grades: 1.Lay pipes to lines and grades indicated on Drawings. 2.Maintain grade alignment of pipe using string line (or Engineer approved equivalent) parallel with grade line and vertically above centerline of pipe. a.Establish string line on level batter boards at intervals of not more than 25 feet. b.Install batter boards spanning trench, rigidly anchored to posts driven into ground on both sides of trench. c.Set three adjacent batter boards before laying pipe to verify grades and line. d.Determine elevation and position of string line from elevation and position of offset points or stakes located along pipe route. e.Do not locate pipe using side lines for line or grade. 3.As an alternative method, use laser-beam instrument with qualified operator to establish lines and grades. B.Location of Pipe Lines: 1.Location and approximate depths of proposed pipe lines are shown on Drawings. 2.Engineer or Owner reserves right to make changes in lines, grades, and depths of pipe lines and structures when changes are required for Project conditions. 3.2 PREPARATION A.Call Local Utility Line Information service and the Owner not less than three working days before performing Work. Coordinate with and hire a private utility location firm, as needed. 1.Underground utilities must be located and marked within and surrounding construction areas. B.Identify required lines, levels, contours, and datum locations. C.Protect bench marks and existing structures from excavating equipment and vehicular traffic. D.Maintain and protect above and below grade utilities indicated to remain. 3.3 TRENCHING A.See Section 02324. B.Cut trenches sufficiently wide to enable installation and allow inspection. C.Excavate bottom of trenches maximum 16 inches wider than outside diameter of pipe or structure. D.When subsurface materials at bottom of trench are loose or soft, excavate to greater depth as directed by Engineer until suitable material is encountered. Replace undercut with structural fill conforming to Section 02200. 3.4 BACKFILL AND BURIAL A.See Sections 02060 and 02200. B.Test backfill in accordance with Section 02200 at a frequency of 1 test per lift for each 50 linear feet of pipe installed. C.Place a minimum of two feet of hand compacted backfill over pipes before crossing the pipe with compaction equipment or construction equipment. In no case should the spillway pipes be Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02610-6 Pipes installed by cutting a trench through the dam after the embankment is complete. 3.5 PIPE HANDLING A.Pipe and pipe fittings shall be handled carefully in loading and unloading. They shall be lifted by hoists and lowered on skidways in such a manner as to avoid shock. Cables, safety straps, ropes, or other suitable equipment shall be used for lowering the pipe into trenches without shock. Pipe and pipe fittings shall not be dropped or dumped. 3.6 JOINING OF PVC PIPE A.Joining of pipe shall be in accordance with ASTM D 2855. B.Preparation: 1.All pipe shall be inspected for cuts, scratches, or other damage prior to installation. Pipe with imperfections shall not be used. All burrs, chips, etc. shall be removed from pipe interior and exterior. All loose dirt and moisture shall be wiped from the interior and exterior of the pipe end and the interior of the fitting. All pipe cuts shall be square, perpendicular to the center line of pipe. Pipe ends shall be beveled prior to applying primer and solvent cement so that the cement does not get wiped off during insertion into the fitting socket. C.Solvent Welding: 1.A coating of primer as recommended by pipe supplier shall be applied to the entire interior surface of the fitting socket and to an equivalent area on the exterior of the pipe prior to applying solvent cement. The solvent cement shall comply with the requirements of ASTM D 2564 and shall be applied in strict accordance with manufacturer's specifications. Pipe shall not be primed or solvent welded when it is raining, when atmospheric temperature is below 40 degrees F, or above 90 degrees F. D.Curing: 1.After solvent welding, the pipe shall remain undisturbed until cement has thoroughly set. As a guideline for joint setting time, use 1 hour for ambient temperatures of 60 to 90 degrees F, or 2 hours when ambient temperature is 40 to 60 degrees F. E.Alignment: 1.Pipe and pipe fittings shall be selected so that there will be as small a linear deviation as possible at the joints, and so that inverts present a smooth surface. Pipe and fittings which do not fit together to form a tight fitting will be rejected. 3.7 JOINING OF HDPE PIPE A.Only three methods shall be utilized to joining HDPE pipe: heat fusion, mechanical joining, and electrofusion. 1.Mechanical Joining shall be accomplished with HDPE flange adapters, neoprene gaskets, and ductile iron back-up flanges, and shall be used only where shown on the Drawings. 2.Heat Fusion joints shall be made in accordance with the manufacturer's recommendations and step by step procedures. The CONTRACTOR shall provide fusion equipment and a Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02610-7 Pipes trained operator. Pipe fusion equipment shall be of the size and nature to adequately weld all pipe sizes and fittings necessary to complete the project. Branch saddle fusions shall be made in accordance with manufacturer's recommendations and step-by-step procedures. Branch saddle fusion equipment shall be of the size to facilitate saddle fusion within the trench. Please note that all branch saddle fusions must be pre-approved by the ENGINEER. Heat fusion shall be performed outside of the trench whenever practical. Before heat fusing pipe, each length shall be inspected for the presence of dirt, sand, mud, shavings, and other debris. Any foreign material shall be completely removed. At the end of each day, all open ends of fused pipe shall be capped or otherwise covered to prevent entry by animals or debris. 3.No HDPE heat fusion shall be performed in the rain. 4.Electrofusion welding will (at a minimum) be performed at all connections to the existing LFG collection system. Electrofusion welding will be performed in accordance with the manufacturer’s recommendations and procedures. The CONTRACTOR shall provide a certified and trained electrofusion welder for any electrofusion over 12-inches in diameter. 3.8 HDPE PIPE INSTALLATION A.Pipe installation shall comply with the requirements of ASTM D 2321, PPI TR-31/9-79, and the manufacturers’ recommendations. B.Lengths of fused pipe to be handled as one section shall not exceed 500 feet, without prior approval from the ENGINEER. C.The ENGINEER shall be notified at least 24 hours prior to any pipe being installed in a trench in order for him/her to have an opportunity to inspect the following items: 1.All butt, saddle, and electrofusion fusions. 2.Pipe integrity. 3.Trench excavation for rocks and foreign material. 4.Proper trench slope. 5.Trench contour to ensure the pipe will have uniform and continuous support. D.Any irregularities found by the ENGINEER must be corrected before lowering the pipe into the trench. Pipe shall be allowed sufficient time to adjust to trench temperature prior to any testing, segment tie-ins, and/or backfilling. E.Any landfilled waste encountered during excavation shall be removed and hauled by the CONTRACTOR to the active landfill working face daily for disposal or temporarily stored in covered roll-off containers for up to 24 hours, as approved by the OWNER. F.CONTRACTOR shall have a survey level and survey rod and trained personnel available to check pipe grade and slope at the discretion of the ENGINEER. G.Header and lateral HDPE piping will be installed on-grade to allow for future phasing with landfill operations. The on-grade piping must be set at appropriate grade and fully supported in all areas. Re-bar stakes placed on opposing sides of the piping will be required at a spacing of every 25 feet throughout the length of the on-grade sections. Additional measures may be required by the ENGINEER to prevent pipe movement (i.e., soil, berms, etc.) and will direct the CONTRACTOR in the field. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02610-8 Pipes 3.9 PIPE SUPPORTS A.All piping and valves shall be supported so as to prevent stress being transmitted between sections and connected equipment and appurtenances. B.Release of any joint shall result in no transverse piping movement and shall allow easy removal and replacement of any piping component. 3.10 SEGMENT TESTING A.All PE pipes shall be subjected to an air test as described herein to detect any leaks in the piping. Testing shall be performed below grade (inside the trench). The CONTRACTOR shall be responsible for locating, uncovering (if previously backfilled), and repairing any leaks detected during testing. B.Like sizes of polyethylene piping shall be butt welded together into testing segments not to exceed 1,000 feet without the ENGINEER’s approval. Segments shall be connected to a testing apparatus on one end and fitted with caps on all openings. C.The segment to be tested shall be allowed time to reach constant and/or ambient temperature before initiating the test. D.Tests shall be performed during periods when the pipe segments will be out of direct sunlight when possible; i.e., early morning, late evening, or cloudy days. This will reduce the pressure changes that will occur due to temperature fluctuations. E.The test pressure shall be a minimum of 5 psig (138.5 inches, w.c.) and the CONTRACTOR shall use a digital gauge. F.Pressure drop during the test shall not exceed one percent of the testing gauge pressure over a period of one hour. This pressure drop shall be corrected for temperature changes before determining pass or failure. (See Section 3.10 for test failures). The ENGINEER shall sign off on the test form to indicate test compliance. G.The ENGINEER shall be notified at least 24 hours prior to commencement of the testing procedure and shall be present during the test. H.All equipment for this testing procedure shall be furnished by the CONTRACTOR. This shall consist of a portable air compressor, generator, air hoses, and polyethylene flange adapter with a blind flange. Tapped and threaded into the blind flange will be a temperature gauge 0 to 100 degrees C: a Schraeder tire valve to facilitate pressurization with an air compressor hose; a ball valve to release pipe pressure upon completion of the test; and a pressure measuring device. The pressure measuring device shall be a digital manometer capable of measuring positive or differential pressures of air and other non-corrosive gasses over a range of 0 to 100 PSI. 3.11 TEST FAILURE A.The following steps shall be performed when a pipe segment fails the one percent - one-hour test described in Section 3.10 F above. 1.The pipe and all fusions shall be inspected for cracks, pinholes, or perforations. 2.All blocked risers and capped ends shall be inspected for leaks. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02610-9 Pipes 3.Leaks shall be located and/or verified by applying a soapy water solution and observing soap bubble formation. B.All pipe and fused joint leaks shall be repaired by cutting out the leaking area and re-fusing the pipe. C.After all leaks are repaired, a retest shall be performed in accordance with Section 3.10. END OF SECTION Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02673-1 Geosynthetic Materials SECTION 02673 GEOSYNTHETIC MATERIALS PART 1 GENERAL 1.1 SUMMARY A.Section Includes: 1.Geotextile for roadway subgrades 2.Geotextile for silt fence 3.Geotextile filter fabric 4.Geomembrane B.Related Sections: 1.Section 02060 – Aggregate 2.Section 02200 – Earthwork 3.Section 02324 – Trenching 4.Section 02374 – Erosion and Sediment Control 5.Section 02674 – Nonwoven Geotextiles 1.2 MEASUREMENT AND PAYMENT A.Geotextile for Roadway Subgrade 1.Basis of Measurement: By the square yard of installed and approved material. Measurements to be made in the field by Owner or his designated representative. Overlaps, scrap, wastage, or extension of material beyond required limits shall not be included in measurement for payment. 2.Basis of Payment:Unit Price: Amount equal to the actual installed and approved number of units times the unit price provided in Bid Form Schedule. Requested payment quantities will be submitted by the Contractor with final approval by the Engineer. B.Geotextile for Silt Fence 1.Payment for geotextiles used for silt fence shall be included for payment as part of Section 02374. C.Geotextile for Filter Fabric 1.Basis of Measurement: By the square yard of installed and approved material. Measurements to be made in the field by Owner or his designated representative. Overlaps, scrap, wastage, or extension of material beyond required limits shall not be included in measurement for payment. 2.Basis of Payment:Unit Price: Amount equal to the actual installed and approved number of units times the unit price provided in Bid Form Schedule. Requested payment quantities will be submitted by the Contractor with final approval by the Engineer. D.Geomembrane 1.Basis of Measurement: By the square yard of installed and approved material. Measurements to be made in the field by Owner or his designated representative. Overlaps, scrap, wastage, or extension of material beyond required limits shall not be included in measurement for payment. 2.Basis of Payment:Unit Price: Amount equal to the actual installed and approved number of units times the unit price provided in Bid Form Schedule. Requested payment quantities will be submitted by the Contractor with final approval by the Engineer. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02673-2 Geosynthetic Materials 1.3 REFERENCES: A.American Society for Testing and Materials (ASTM) standards 1.ASTM D3786 Standard Test Method for Hydraulic Burst Strength of Knitted Goods and Non-woven Fabrics (Diaphragm Bursting Strength Tester Method). 2.ASTM D4354 Practice for Sampling of Geosynthetics for Testing. 3.ASTM D4355 Test Method for Deterioration of Geotextiles from Exposure to Ultraviolet Light and Water (Xenon-Arc Type Apparatus). 4.ASTM D4491 Standard Test Method for Water Permeability of Geotextiles by Permittivity. 5.ASTM D4751 Standard Test Method for Determining Apparent Opening Size of a Geotextile. 6.ASTM D4533 Test Method for Trapezoidal Tearing Strength of Geotextiles. 7.ASTM D4632 Test Method for Grab Breaking Load and Elongation of Geotextiles. 8.ASTM D4759 Practice for Determining the Specification Conformance of Geosynthetics. 9.ASTM D4833 Test Method for Index Puncture Resistance of Geotextiles, Geomembranes and Related Products. 10.ASTM D4873 Guide for Identification, Storage and Handling of Geotextiles. B.North Carolina Department of Transportation (NCDOT) Standard specifications for Roads and Structures. 1.4 SUBMITTALS A.Section 01300 – Administrative Requirements: Requirements for Submittals. B.Manufacturer’s Product Information 1.As part of their bid, the Contractor shall submit for each geosynthetic material to be used: a.Sample: Submit two samples of each geosynthetic material to be used 6 inches x 6 inches in size to the Engineer. b.Name of Manufacturer. c.Product name. d.Style number. e.Chemical composition of the filaments and yarns. f.Product data sheets. g.Manufacturer’s installation instructions. 2.The Contractor or Supplier shall submit data demonstrating conformance to the requirements of Part 2 of this Section. Data shall be submitted to the Engineer for approval at least two weeks prior to installation. Approval by the Owner and Engineer shall not relieve the Contractor from his responsibility to provide material required by this specification. 1.5 QUALITY ASSURANCE A.Any geosynthetic sample that does not comply with this Section shall result in rejection of the roll. The Contractor shall replace any rejected rolls at no additional cost to Owner. B.General manufacturing procedures shall be performed in accordance with the Manufacturer’s internal quality control guide and/or documents. C.The Manufacturer shall be a well-established firm with more than two years experience in the manufacture of geosynthetics. D.The Installer shall be trained and qualified to install geosynthetics. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02673-3 Geosynthetic Materials E.The Engineer shall examine the geosynthetic rolls upon delivery to the site and report any deviations from these Specifications to the Contractor. F.The need for conformance testing shall be determined by the Engineer for rolls delivered to the site. 1.For this purpose, the Engineer shall take a sample three feet (along roll length) by roll width according to ASTM D4354. The sample shall be properly marked, wrapped and sent to an independent laboratory for conformance testing. 2.The pass or fail of the conformance test results shall be determined according to ASTM D4759. 1.6 DAILY PRE-INSTALLATION MEETINGS A.At the beginning of each work day the Earthwork Contractor's Superintendent, the Geosynthetic Contractor's Superintendent, and the CQAO will meet to discuss the upcoming work plan for all parties to ensure cooperation, communication and understanding. 1.7 DELIVERY, STORAGE AND HANDLING A.Section 01600 - Product Requirements: Product delivery requirements and Product storage and handling requirements. B.Geosynthetic labeling, shipment, and storage shall follow ASTM D 4873. C.Product labels shall clearly show: 1.Manufacturer or Supplier name. 2.Product identification. 3.Lot or batch number. 4.Roll number. 5.Roll dimensions (length and width). D.Each shipping document shall include a notation certifying that the material is in accordance with the Manufacturer’s Certificate. E.Each geosynthetic roll shall be wrapped with a material that will protect the geosynthetic, including the ends of the roll, from damage due to shipment, water, ultraviolet sunlight, mud, dust, puncture, and other damaging deleterious conditions. The protective wrapping shall be maintained during periods of shipment and storage. F.During storage, geosynthetic rolls shall be elevated off the ground and adequately covered to protect them from the following: site construction damage, precipitation, extended ultraviolet radiation including sunlight, chemicals that are strong acids or strong bases, flames including welding sparks, temperatures in excess of 160°F (71°C), and any other environmental condition that may damage the property values of the geosynthetic. G.Transport and handle geosynthetic with equipment designed to protect it from damage. Equipment used to unload, stack or transport geosynthetic shall not damage protective wrap. H.Upon delivery at the job site, the Contractor shall ensure that the geosynthetic rolls are handled and stored in accordance with the Manufacturer’s instructions as to prevent damage. I.The geosynthetic rolls shall not be stacked more than three rolls high or as otherwise recommended by the Manufacturer. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02673-4 Geosynthetic Materials J.Do not use materials damaged during storage or handling. If the geosynthetic is not packaged and a roll is damaged during shipment, it shall be rejected. K.If only the outermost surface of the roll is affected, it may be peeled back, cut, and wasted if approved by the Engineer (i.e., it shall be treated as if it were the protective packaging for the remainder of the roll). L.The geosynthetic shall be relatively free of holes or any sign of contamination by foreign matter. The Engineer may reject all or portions of units (or rolls) of the geosynthetic if significant quantities of production flaws are observed. 1.8 WARRANTY A.Section 01700 - Execution Requirements: Requirements for warranties. B.Furnish 1 Year Manufacturer’s Warranty from date of installation for repair or replacement of geosynthetics that fail in materials and workmanship or that deteriorates under conditions of normal weather. Warranty does not include deterioration or failure of geosynthetic due to exposure to harmful chemicals, gases or vapors, abnormal and severe weather phenomena, fire, earthquakes, floods, vandalism, or abuse by persons, animals, or equipment. PART 2 PRODUCTS 2.1 GEOTEXTILE FOR ROADWAY SUBGRADES A.Material shall conform to the requirements of NDOT Standard Specifications for Roadways and Structures, Section 1056 for Type 4. Use Mirafi® HP 370 (or approved equal). B.The material shall be woven and comprised of 100 percent polypropylene or 100 percent polyester material. 2.2 GEOTEXTILE FOR SILT FENCE A.Material shall conform to the requirements of NDOT Standard Specifications for Roadways and Structures, Section 1056 for Type 3. B.The material shall be woven and comprised of 100 percent polypropylene or 100 percent polyester material. 2.3 GEOTEXTILE FOR FILTER FABRIC A.Material shall conform to the requirements of NDOT Standard Specifications for Roadways and Structures, Section 1056 for Type 1. B.The material shall be non-woven and comprised of 100 percent polypropylene or 100 percent polyester material. 2.4 GEOMEMBRANE A.The geomembrane shall be polyethylene plastic sheeting with a minimum thickness of 30 mils, as manufactured by Agru America or approved equal. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02673-5 Geosynthetic Materials PART 3 EXECUTION 3.1 EXAMINATION A.Section 01300 - Administrative Requirements: Verification of existing conditions before starting work. B.Prior to implementing any geosynthetic work, the Installer shall carefully inspect the subgrade and verify that all work is complete to the point where the installation of the geosynthetic may properly commence without adverse impact. C.If the Contractor has any concerns regarding the installed work, the Engineer and/or Owner shall be notified in writing within 48-hours of his site inspection. Failure to inform the Engineer and/or Owner in writing or installation of the geosynthetic will be construed as Contractor's acceptance of all prior related work. D.Any geosynthetic that does not comply with this Section shall be rejected and replaced with new material in accordance with these Specifications, at no additional cost to Owner. 3.2 PREPARATION A.Prior to implementing any of the work described in this Section, the Installer shall become thoroughly familiar with all portions of the work within this Section or related work, as necessary for successful completion of the Work. 3.3 INSTALLATION A.The Installer shall handle all geosynthetic in such a manner as to ensure they are not damaged in any way. B.The geosynthetic shall be rolled down slopes and grades in such a manner as to continuously keep the geosynthetic in tension by self weight. In the presence of wind, all geosynthetics shall be weighted by sandbags or approved equivalent. Such anchors shall be installed during placement and shall remain in place until replaced with cover material. C.After unwrapping the geosynthetic from its cover, the geosynthetic shall not be left exposed for a period in excess of 20 days unless a longer exposure period is approved by the Engineer based on a formal demonstration from the Contractor that the geosynthetic is stabilized against UV degradation for the proposed period of exposure. D.Overlap and Seaming 1.Adjacent panels of woven geotextile shall be overlapped a minimum of 6 inches and sewn. 2.Adjacent panels of non-woven geotextile shall overlap a minimum of 12 inches. Where used for encapsulation of drainage stone, overlap shall be on the top of the stone. 3.Adjacent panels of geomembranes shall be overlapped a minimum of 36 inches. Geomembrane panels shall be installed with no horizontal seams. 3.4 FIELD QUALITY CONTROL A.Section 01400 - Quality Requirements: Field inspecting, testing, adjusting, and balancing. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02673-6 Geosynthetic Materials B.The Contractor shall be aware of the activities outlined in the CQA Plan and shall account for these CQA activities in the Work Schedule. C.The need for conformance testing shall be determined by the Engineer. D.The finished geosynthetic shall have good appearance qualities. It shall be free from such defects that would affect the specific properties of the geosynthetic, or its proper functioning. E.Defects and Repairs: 1.Any holes or tears in the geosynthetic shall be repaired with a patch made from the same geosynthetic. The patch shall be placed with a minimum of 12 inches overlap in all directions. 2.Care shall be taken to remove any soil or other material, which may have penetrated the torn geosynthetic. 3.5 PROTECTION OF FINISHED WORK A.Section 01700 - Execution Requirements: Requirements for protecting finished Work. B.The Contractor shall use all means necessary to protect all prior Work and all materials and completed work of other Sections of these Specifications. C.The geosynthetic shall be covered as soon as possible after installation and approval. The geosynthetic shall not be exposed to precipitation prior to being installed and shall not be exposed to direct sun light for more than 20 days after installation. D.Placement of Cover Material: 1.Placement of the cover material shall proceed immediately following placement and inspection of the geosynthetic 2.The cover material shall be placed on the geosynthetic in such a manner that ensures that: a.The geosynthetic and underlying materials are not damaged. b.Minimal slippage occurs between the geosynthetic and underlying layers. c.Wrinkling of geosynthetics does not occur. E.In the event of damage, the Installer shall immediately make all repairs and replacements necessary at the expense of the responsible party, to the approval of the Engineer. F.Protect installed geosynthetic according to the Manufacturer’s instructions. END OF SECTION Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02674-1 Nonwoven Geotextiles SECTION 02674 NONWOVEN GEOTEXTILES PART 1 - GENERAL 1.1 SUMMARY A.Section Includes: 1.Nonwoven geotextile for: a.Erosion control and stormwater conveyance devices. b.Filtration in below-ground drainage applications. B.Related Sections: 1.Section 02374 – Erosion and Sediment Control 2.Section 02673 – Geosynthetic Materials 1.2 MEASUREMENT AND PAYMENT A.Geotextile 1.Basis of Payment: Not applicable, included in other sections of the specifications. 2.Basis of Measurement: Not applicable, included in other sections of the specifications. 1.3 REFERENCES: A.American Society for Testing and Materials (ASTM) standards 1.ASTM D698 Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Standard Effort (12 400 ft-lbf/ft3 (600 kN-m/m3)). 2.ASTM D3786 Standard Test Method for Hydraulic Burst Strength of Knitted Goods and Non-woven Fabrics (Diaphragm Bursting Strength Tester Method). 3.ASTM D4354 Practice for Sampling of Geosynthetics for Testing. 4.ASTM D4355 Test Method for Deterioration of Geotextiles from Exposure to Ultraviolet Light and Water (Xenon-Arc Type Apparatus). 5.ASTM D4491 Standard Test Method for Water Permeability of Geotextiles by Permittivity. 6.ASTM D4751 Standard Test Method for Determining Apparent Opening Size of a Geotextile. 7.ASTM D4533 Test Method for Trapezoidal Tearing Strength of Geotextiles. 8.ASTM D4632 Test Method for Grab Breaking Load and Elongation of Geotextiles. 9.ASTM D4759 Practice for Determining the Specification Conformance of Geosynthetics. 10.ASTM D4833 Test Method for Index Puncture Resistance of Geotextiles, Geomembranes and Related Products. 11.ASTM D4873 Guide for Identification, Storage and Handling of Geotextiles. 12.ASTM D5261 Test Method for Measuring Mass per Unit Area of Geotextiles. 13.ASTM D5321 Standard Test Method for Determining the Coefficient of Soil and Geosynthetic or Geosynthetic and Geosynthetic Friction by the Direct Shear Method. 1.4 SUBMITTALS A.Manufacturer’s Product Information 1.Product Data: The Contractor or Supplier shall submit a complete description of and data indicating geotextile material used, to the Engineer for approval at least two weeks prior Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02674-2 Nonwoven Geotextiles to installation. Geotextile data shall conform to the standards set in Table 02674-A found in Part 2.1 of this Section. 1.5 QUALITY ASSURANCE A.Perform Work in accordance with these Specifications. B.Any geotextile sample that does not comply with this Section 02674 shall result in rejection of the roll from which the sample was obtained. The Contractor shall replace any rejected rolls at no additional cost to Owner. C.If a geotextile sample fails to meet the quality control requirements of this Section 02674, the Contractor shall require that the Geotextile Manufacturer sample and test each roll manufactured in the same lot or batch, or at the same time, as the failing roll. Sampling and testing of rolls shall continue until a pattern of acceptable test results is established. D.General manufacturing procedures shall be performed in accordance with the manufacturer’s internal quality control guide and/or documents. E.The Manufacturer shall be a well-established firm with more than two years experience in the manufacture of geotextiles. F.The Installer shall be trained and qualified to install geotextiles. G.The Engineer shall monitor the geotextile rolls upon delivery to the site and report any deviations from project specifications to the contractor. H.The need for conformance testing shall be determined by the Engineer for rolls delivered to the site. 1.For this purpose, the Engineer shall take a sample three feet (along roll length) by roll width according to ASTM Practice D4354. The sample shall be properly marked, wrapped and sent to an independent laboratory for conformance testing. 2.The pass or fail of the conformance test results shall be determined according to ASTM Practice D4759. 1.6 DELIVERY, STORAGE AND HANDLING A.Geotextile labeling, shipment, and storage shall follow ASTM D 4873. B.Product labels shall clearly show: 1.Manufacturer or supplier name. 2.Product identification. 3.Lot or batch number. 4.Roll number. 5.Roll dimensions (length and width). C.If any special handling is required, it shall be so marked on the geotextile itself; e.g., "This Side Up" or "This Side Against Soil to be Retained.” D.Each shipping document shall include a notation certifying that the material is in accordance with the manufacturer’s certificate. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02674-3 Nonwoven Geotextiles E.Each geotextile roll shall be wrapped with a material that will protect the geotextile, including the ends of the roll, from damage due to shipment, water, ultraviolet sunlight, mud, dust, puncture, and other damaging deleterious conditions. The protective wrapping shall be maintained during periods of shipment and storage. F.During storage, geotextile rolls shall be elevated off the ground and adequately covered to protect them from the following: site construction damage, precipitation, extended ultraviolet radiation including sunlight, chemicals that are strong acids or strong bases, flames including welding sparks, temperatures in excess of 160°F (71°C), and any other environmental condition that may damage the property values of the geotextile. G.Transport and handle geotextile with equipment designed to protect it from damage. Equipment used to unload, stack or transport geotextile shall not damage protective wrap or geonet layers. H.Upon delivery at the job site, the contractor shall ensure that the geotextile rolls are handled and stored in accordance with the manufacturer’s instructions as to prevent damage. I.The geotextile rolls shall not be stacked more than three rolls high or as otherwise recommended by the Manufacturer. J.Do not use materials damaged during storage or handling. If the geotextile is not packaged and a roll is damaged during shipment, it shall be rejected. K.If only the outermost surface of the roll is affected, it may be peeled back, cut, and wasted if approved by the Engineer (i.e., it shall be treated as if it were the protective packaging for the remainder of the roll). L.The geotextile shall be relatively free of holes or any sign of contamination by foreign matter. The Engineer may reject all or portions of units (or rolls) of the geotextile if in his opinion significant quantities of production flaws are observed. M.Responsibility 1.Contractor a.The Contractor shall provide the services of a Geotextile Manufacturer, and Installer, who shall meet the following qualifications. The Contractor shall, however, accept and retain full responsibility for all materials and installation and shall be held responsible for any defects in the completed system. b.Unloading of geotextile from delivery vehicle. c.The Contractor shall be liable for all damages to the geotextile materials incurred during and after unloading them at the site. 2.Manufacturer of Geotextiles a.The Geotextile Manufacturer shall be responsible for the production and delivery of geotextile rolls. b.The Manufacturer shall submit to the Engineer: 1)Those items listed in Part 1.4 of this Section 02674. 2)Production capacity available and projected delivery dates for this project. 3.Geosynthetic Installer (may be same as Contractor) a.The Installer shall be responsible for field handling, storing, deploying, seaming or connecting, temporary restraining (against wind), anchoring, and other site aspects of the geotextiles. N.The Installer shall take any necessary precautions to prevent damage to other portions of the Work during placement of the geotextile. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02674-4 Nonwoven Geotextiles 1.7 ENVIRONMENTAL REQUIREMENTS A.Conduct operations not to interfere with, interrupt, damage, destroy, or endanger integrity of surface or subsurface structures or utilities, and landscape in immediate or adjacent areas. 1.8 FIELD MEASUREMENTS A.Verify field measurements prior to fabrication. PART 2 PRODUCTS 2.1 GEOTEXTILE A.Nonwoven geotextile shall be that which is specified on the Drawings. Unless otherwise noted on the Drawings, geotextile suppliers shall furnish materials whose Minimum Average Roll Values meet or exceed the criteria specified in Table 02674-B. The Manufacturer shall provide test results for these procedures, as well as a certification that the material properties meet or exceed the specified values. 1.Minimum Average Roll Value (MARV) shall be based on Manufacturer's data and shall be calculated as the mean value of the property of interest plus or minus two standard deviations, as appropriate. 2.Where material properties vary among the machine and cross-machine directions, the MARV shall apply to the direction providing the lowest value (when a minimum is specified) or the highest value (when a maximum value is specified). B.The geotextiles provided by the supplier shall be stock products. C.The geotextile shall be: 1.Nonwoven, needlepunched, continuous filament polyester material; or 2.Nonwoven, needlepunched, continuous filament polypropylene material; or 3.Nonwoven, needlepunched, polypropylene staple or continuous fiber material. D.The geotextile shall be manufactured from first quality virgin polymer. E.The supplier shall not furnish products specifically manufactured to meet the specifications of this project unless authorized by the Owner and Engineer. F.In addition to the property values listed in Table 02674-A, the geotextiles shall: 1.Retain its structure during handling, placement, and long-term service. 2.Be capable of withstanding outdoor exposure for a minimum of 30 days with no measurable deterioration. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02674-5 Nonwoven Geotextiles TABLE 02674-A GEOTEXTILE REQUIRED PHYSICAL AND HYDRAULIC PROPERTIES PROPERTIES AND REQUIREMENTS(1,2)UNITS SPECIFIED VALUES 6 oz. SPECIFIED VALUES 8 oz. SPECIFIED VALUES 10 oz. SPECIFIED VALUES 12 oz. TEST METHOD Type ---Nonwoven Nonwoven Nonwoven Nonwoven --- Mass Per Unit Area oz/yd2 6.0 8.0 10.0 12.0 ASTM D5261 Grab Tensile Strength lb 160 200 230 300 ASTM D4632 Grab Tensile Elongation %50 50 50 50 ASTM D4632 Trapezoid Tear Strength lb 65 80 95 115 ASTM D4533 Mullen Burst Strength lb/in2 310 380 520 550 ASTM D3786 Puncture Strength lb 85 110 120 140 ASTM D4833 Apparent Opening Size (AOS)US Sieve/ mm 70/0.212 80/0.18 100/0.15 100/0.15 ASTM D4751 Permeability cm/sec 0.25 0.3 0.3 0.3 ASTM D4491 UV Resistance(3) % strength retained 70 70 70 70 ASTM D4355 Notes: (1) All values represent minimum average roll values (i.e., any roll in a lot should meet or exceed the values in this table) except for UV resistance, which is a minimum value. (2) Polymer composition of 95 % polypropylene or polyester by weight (3) Evaluation to be on 2.0 inch strip tensile specimen after 500 hours of exposure. 2.2 ACCESSORIES A.Sewing materials: Types recommended by manufacturer for sewing seams in geotextile. PART 3 EXECUTION 3.1 EXAMINATION A.Prior to implementing any geotextile work, the Geosynthetic Installer shall carefully inspect the subgrade and verify that all work is complete to the point where the installation of the geotextile may properly commence without adverse impact. B.If the Contractor has any concerns regarding the installed work, the Engineer and/or Owner shall be notified in writing within 48-hours of his site inspection. Failure to inform the Engineer and/or Owner in writing or installation of the geotextile will be construed as Contractor's acceptance of all prior related work. C.Any geotextile that does not comply with Table 02674-A of this Section 02674 shall be rejected and replaced with new material in accordance with the Specifications, at no additional cost to Owner. 3.2 PREPARATION A.Prior to implementing any of the work described in this Section 02674, the Geosynthetic Installer shall become thoroughly familiar with all portions of the work within this Section 02674 or related work, as necessary for successful completion of the Work. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02674-6 Nonwoven Geotextiles 3.3 INSTALLATION A.The Geosynthetic Installer shall handle all geotextile in such a manner as to ensure they are not damaged in any way. B.The Geosynthetic Installer shall take any necessary precautions to prevent damage to underlying layers during placement of the geotextile. C.In the presence of wind, all geotextiles shall be weighted by sandbags or approved equivalent. Such anchors shall be installed during placement and shall remain in place until replaced with cover material. D.After unwrapping the geotextile from its opaque cover, the geotextile shall not be left exposed for a period in excess of 20 days unless a longer exposure period is approved by the Engineer based on a formal demonstration from the CONTRACTOR that the geotextile is stabilized against U.V. degradation for the proposed period of exposure. E.The CONTRACTOR shall take care not to entrap stones, excessive dust, or moisture in the geotextile during placement. F.Nonwoven geotextile shall be shall be overlapped a minimum of 6 inches, or as otherwise specified in the Specifications. 3.4 FIELD QUALITY CONTROL A.The Contractor shall be aware of the activities outlined in the CQA Plan and shall account for these CQA activities in the installation schedule. B.The need for conformance testing shall be determined by the Engineer. C.The finished geotextile shall have good appearance qualities. It shall be free from such defects that would affect the specific properties of the geotextile, or its proper functioning. D.Defects and Repairs: 1.Any holes or tears in the geotextile shall be repaired with a patch made from the same geotextile. The patch shall be sewn in place with a minimum of 12 inches overlap in all directions. 2.Care shall be taken to remove any soil or other material, which may have penetrated the torn geotextile. E.Before initial placement of overlying materials, inspect geotextile for rips, tears, and overlaps. Repair damaged system and re-inspect repaired work. 3.5 PROTECTION OF FINISHED WORK A.The Geosynthetic Installer and Contractor shall use all means necessary to protect all prior work and all materials and completed work of other Sections. B.In applying fill material, no equipment can drive directly across the geotextile. The specified fill material shall be placed and spread utilizing vehicles with a low ground pressure. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02674-7 Nonwoven Geotextiles C.The geotextile shall be covered as soon as possible after installation and approval. The geotextile shall not be exposed to precipitation prior to being installed and shall not be exposed to direct sun light for more than 20 days after installation. D.Placement of Overlying Material: 1.Placement of the overlying material shall proceed immediately following placement and inspection of the geotextile 2.The overlying material shall be placed on the geotextile in such a manner that ensures that: a.The geotextile and underlying lining materials are not damaged. b.Minimal slippage occurs between the geotextile and underlying layers. c.Wrinkling of geosynthetics does not occur. E.In the event of damage, the Geosynthetic Installer shall immediately make all repairs and replacements necessary at the expense of the responsible party, to the approval of the Engineer. F.Protect installed geotextile according to manufacturer’s instructions. Repair or replace areas of damaged by scuffing, punctures, traffic, rough subgrade, or other unacceptable conditions. G.The contractor shall not use heavy equipment to traffic above the geotextile without approved protection. END OF SECTION Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02677 - 1 Geosynthetic Clay Liner (GCL) SECTION 02677 GEOSYNTHETIC CLAY LINER (GCL) PART 1 GENERAL 1.1 SUMMARY A.Section Includes: 1.Installation of geosynthetic clay liner (GCL) in conjunction with other components of the liner system. The liner system consists of the following components, from bottom to top: compacted soil liner, geosynthetic clay liner (GCL), secondary geomembrane, secondary geocomposite drainage layer, primary geomembrane, and primary geocomposite drainage layer. 2.Option 1: Enhanced GCL product with polymers added to the bentonite matrix to decrease the probability of increased hydraulic conductivity over time due to cationic reaction between the bentonite and coal ash leachate. Although the GCL for this project has been prequalified, the contractor may propose an alternate material, provided testing as described is conducted with site specific leachate to determine if standard reinforced GCL or polymer enhanced GCL is required for this site. Certification shall be provided by professional engineer that alternative composite liner meets the requirements of the rule. B.Related Sections: 1.Section 02320 – Backfill – Structural. 2.Section 02321 – Backfill – Compacted Soil Liner. 3.Section 02324 – Trenching. 4.Section 02670 - High Density Polyethylene (HDPE) Geomembrane. 1.2 UNIT PRICE - MEASUREMENT AND PAYMENT A.Geosynthetic clay liner (GCL): 1.Basis of Measurement: By square yard of GCL installed, in-place, excluding scrap and overlap. 2.Basis of Payment: By the square yard (2-dimensional quantity) of GCL installed times the unit price for GCL installation. a.Includes furnishing GCL, installation, labor, supervision, transportation, equipment, removal of rainwater and removal of all previously placed material rendered unsuitable due to weather conditions or construction operations, final grading and sealing of the compacted soil liner and all necessary and incidental items as required to complete the GCL installation as specified on Drawings and in accordance with CQA Plan. b.Measurement will be made based on the total two-dimensional (plan view) surface area in square yards covered by the GCL as shown on the Drawings. Final quantities will be based on as-built conditions. Allowance will be made for GCL in anchor and drainage trenches but no allowance will be made for waste, overlap, repairs, or materials used for the convenience of the Contractor. Pay limits shall be measured to the lower inside corner of exterior anchor trenches and/or to tie-in seams. c.GCL installed and accepted will be paid for at the respective contract unit price in the bidding schedule. Requested payment quantities of in-place GCL will be submitted by the Contractor with final approval by the Engineer. B.Option 1 – Enhanced Geosynthetic clay liner (GCL): 1.Basis of Measurement: By square yard of enhanced GCL installed, in-place, excluding scrap and overlap. 2.Basis of Payment: By the square yard (2-dimensional quantity) of enhanced GCL installed times the unit price for enhanced GCL installation. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02677 - 2 Geosynthetic Clay Liner (GCL) a.Includes furnishing GCL, installation, labor, supervision, transportation, equipment, removal of rainwater and removal of all previously placed material rendered unsuitable due to weather conditions or construction operations, final grading and sealing of the compacted soil liner and all necessary and incidental items as required to complete the enhanced GCL installation as specified on Drawings and in accordance with CQA Plan. b.Measurement will be made based on the total two-dimensional (plan view) surface area in square yards covered by the enhanced GCL as shown on the Drawings. Final quantities will be based on as-built conditions. Allowance will be made for enhanced GCL in anchor and drainage trenches but no allowance will be made for waste, overlap, repairs, or materials used for the convenience of the Contractor. Pay limits shall be measured to the lower inside corner of exterior anchor trenches and/or to tie-in seams. c.Enhanced GCL installed and accepted will be paid for at the respective contract unit price in the bidding schedule. Requested payment quantities of in-place enhanced GCL will be submitted by the Contractor with final approval by the Engineer. 1.3 REFERENCES A.Construction Quality Assurance (CQA) Plan B.ASTM International: 1.ASTM D2216 Standard Test Method for Laboratory Determination of Water (Moisture) Content of Soil and Rock by Mass. 2.ASTM D4354 Standard Practice for Sampling of Geosynthetics for Testing. 3.ASTM D4643 Standard Test Method for Determination of Water (Moisture) Content of Soil by the Microwave Oven Method. 4.ASTM D4759 Standard Practice for Determining the Specification Conformance of Geosynthetics. 5.ASTM D5321 Standard Test Method for Determining the Coefficient of Soil and Geosynthetic or Geosynthetic and Geosynthetic Friction by the Direct Shear Method. 6.ASTM D5887 Standard Test Method for Measurement of Index Flux Through Saturated Geosynthetic Clay Liner Specimens Using a Flexible Wall Permeameter. 7.ASTM D5888 Standard Guide for Storage and Handling of Geosynthetic Clay Liners. 8.ASTM D5889 Standard Practice for Quality Control of Geosynthetic Clay Liners. 9.ASTM D5890 Standard Test method for Swell Index of Clay Mineral Component of Geosynthetic Clay Liners. 10.ASTM D5891 Standard Test method for Fluid Loss of Clay Component of Geosynthetic Clay Liners. 11.ASTM D5993 Standard Test method for Measuring Mass Per Unit of Geosynthetic Clay Liners. 12.ASTM D 6243 Standard Test Method for Determining the Internal and Interface Shear Resistance of Geosynthetic Clay Liner by the Direct Shear Method. 13.ASTM D 6496 Standard Test Method for Determining Average Bonding Peel Strength Between the Top and Bottom Layers of Needle-Punched Geosynthetic Clay Liners. 14.ASTM D 6766-12 Standard Test Method for Evaluation of Hydraulic Properties of Geosynthetic Clay Liners Permeated with Potentially Incompatible Aqueous Solutions. 15.ASTM D 6768 Standard Test Method for Tensile Strength of Geosynthetic Clay Liners. 16.ASTM D 7626 Mod. Standard Test Methods for Determining the Organic Treat Loading of Organophilic Clay (Loss on Ignition). 17.API 13A mod - FANN Viscosity. 1.4 SUBMITTALS A.Manufacturer’s Product Information 1.At least five (5) working days prior to shipment, the Contractor shall furnish the Engineer with the GCL Manufacturer's notarized Manufacturer Quality Control (MQC) Certifications signed by an authorized representative of the Manufacturer to verify that the materials supplied for the project are in accordance with the requirements of this Specification. The Certificate(s) shall include: Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02677 - 3 Geosynthetic Clay Liner (GCL) a.Roll and lot numbers and identification. b.Sampling procedures. c.Results of quality control tests that are to include those presented in Part 2.1 of this Section and description of test methods used. d.If needle punching or stitch bonding is used in construction of GCL, the Certification shall indicate that the GCL has been continuously inspected for broken needles using an in-line metal detector and all broken needles have been removed. e.Uncertified material shall be removed and replaced with certified material by the Contractor at no cost to Owner. B.The GCL Manufacturer’s Quality Control (MQC) Plan for documenting compliance to Part 2 of this Section that describes testing procedures, frequency of testing and acceptance/rejection criteria for QC testing. C.Manufacturer’s Installation Instructions. 1.5 CLOSEOUT SUBMITTALS A.The Geosynthetic Contractor’s installation supervisor shall observe and check all phases of the GCL installation. When the GCL is finally accepted by the Owner, the Geosynthetic Contractor shall submit a Letter of Acceptance to the Owner that the installation conforms to the requirements of the Manufacturer. 1.6 QUALITY ASSURANCE A.Perform Work in accordance with these Specifications and the CQA Plan. B.Interface Friction Angle Requirements and Testing 1.The effective interface shear strength envelope at the interface between the GCL and the materials in direct in contact with the GCL (i.e., compacted soil liner and geomembrane) shall be verified by the CQA Officer (CQAO) by performing interface friction testing on representative materials to be used for construction of the liner system. 2.Interface friction testing shall be conducted by the methods and meeting the criteria defined in Specification Section 02670, HDPE Geomembrane. C.The Manufacturer shall sample and test the GCL material, at minimum frequencies specified in Table 02677-A. General manufacturing procedures shall be performed in accordance with the Manufacturer’s internal quality control guide and/or documents. D.Conformance Testing: 1.Conformance testing shall be performed by an independent laboratory at a frequency of at least 1 per 100,000 square feet of GCL manufactured for this project. Conformance testing shall consist of the following tests: a.Bentonite mass per unit area (ASTM D5993). b.Hydraulic conductivity (ASTM D5887). c.Peel strength (ASTM D6496). d.Tensile Strength (ASTM D6768). e.Interface Friction of GCL to Compacted Soil Liner (or other textured geomembrane) (ASTM D6243 f.Other tests as required by Engineer. 2.Sampling for conformance testing shall be performed at the manufacturing facility whenever possible, and in accordance with the CQA Plan. E.The Engineer shall examine the rolls upon delivery to the site and report any deviations from these Specifications to the Contractor. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02677 - 4 Geosynthetic Clay Liner (GCL) F.If a GCL sample fails to meet the quality control requirements of this Section, the Contractor shall require that the Manufacturer sample and test each roll manufactured in the same lot or batch, or at the same time, as the failing roll. Sampling and testing of rolls shall continue until a pattern of acceptable test results is established. G.Any GCL sample that does not comply with this Section shall result in rejection of the roll from which the sample was obtained. The Contractor shall replace any rejected rolls at no additional cost to Owner. 1.7 QUALIFICATIONS A.GCL Manufacturer: Must have produced at least 10 million square feet of the proposed GCL for at least 5 completed projects and with at least 8 million square feet installed. B.Geosynthetics Installer: Must either have installed GCL at a minimum of 5 projects of comparable scope and complexity and shall have installed a minimum of 1 million square feet of GCL, or must provide to the Engineer satisfactory evidence, through similar experience in the installation of other types of geosynthetics, that the GCL will be installed in a competent, professional manner. PART 2 PRODUCTS 2.1 GEOSYNTHETIC CLAY LINER (GCL) A.Materials: Reinforced GCL 1.GCL hydraulic conductivity testing (ASTM D6766) shall be conducted on various samples of GCL (standard reinforced GCL and polymer enhanced GCL) using leachate obtained from the site. 2.Chemical analysis shall also be performed on the site specific leachate used in the hydraulic conductivity testing to evaluate it for the following parameters: calcium, magnesium, sodium, potassium, electrical conductivity, sulfate, pH, and chloride. 3.Flow rates analyses shall be conducted using Darcy’s Law for gravity flow through a porous media to compare the standard reinforced GCL and/or the polymer enhanced GCL with the standard 2-foot thick compacted clay liner. Certification shall be provided by professional engineer that the alternative recommended composite liner meets the requirements of the Disposal of Combustion Coal Residuals (CCR) from Electric Utilities rule. 4.Shall be a manufactured product consisting of a sodium montmorillonite clay (bentonite) layer evenly distributed between two geotextiles. 5.Shall conform to the property requirements listed in Table 02677-A of this Section 02677. 6.Shall be free of tears, holes, or other defects which may affect its serviceability. 7.Encapsulating geotextiles shall be mechanically bonded together using a needle punch or stitch bonding process. Needle punched and stitch bonded GCLs shall be continuously inspected for broken needles using an in-line metal detector and broken needles shall be removed. 8.A 6-inch (150 mm) overlap guideline shall be imprinted on both edges of the upper geotextile component of the GCL as a means for providing quality assurance of the overlap dimension. Lines shall be printed in easily visible, non-toxic ink. B.Table 02677-A: Manufacturer’s Required Pre-Shipping Testing and Properties of GCL: Table 02677-A Manufacturer’s Required Pre-Shipping Testing and Properties of GCL Material Property Test Method Test Frequency Required Values Bentonite Bentonite Swell Index ASTM D5890 1 per 50 tons >24mL/2g Bentonite Fluid Loss ASTM D5891 1 per 50 tons <18 mL Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02677 - 5 Geosynthetic Clay Liner (GCL) FANN Viscosity3 API-13A mod or ASTM3 1 per 200,000 ft2 See manufacturer’s required values3 Composite Bentonite Mass/Area1 ASTM D5993 5,000 yd2 > 0.75 lb/ft2 MARV2 GCL Tensile Strength ASTM D6768 25,000 yd2 > 23 lb/in MARV2 GCL Peel Strength (Reinforced) ASTM D6496 5,000 yd2 > 2.1 lb/in Flux ASTM D5887 30,000 yd2 < 1 x 10-6 cm3/sec-cm2 GCL Hydraulic Conductivity ASTM D6766 30,000 yd2 < 3 x 10-9 cm/sec Hydrated Internal Shear Strength ASTM D6243 Periodic > 500 psf 1 Bentonite mass/unit area shall be computed at 0 percent moisture content. Moisture content shall be determined by ASTM D2216 or ASTM D 4643. Bentonite mass/unit area is exclusive of glues added to the bentonite. 2 MARV = Minimum Average Roll Value. 3 FANN viscosity testing shall be performed in accordance with the most current ASTM specification (currently under development) on the polymer enhanced bentonite and compared with FANN viscosity test results of non-polymer enhanced bentonite. C.Tests, Inspections, and Verifications 1.GCL and its components shall be sampled and tested in accordance with the Manufacturer's approved QC Manual. 2.The Manufacturer's QC procedures shall be in accordance with ASTM D 5889. 3.Test results not meeting the requirements specified in Table 02677-A of this Section shall result in the rejection of applicable rolls. 4.The Manufacturer's QC Manual shall describe procedures used to determine rejection of applicable rolls. 5.As a minimum, rolls produced immediately prior to and immediately after the failed roll shall be tested for the same failed parameter. 6.Testing shall continue until a minimum of three successive rolls on both sides of the original failing roll pass the failed parameter. 2.2 ACCESSORIES A.Accessory Bentonite: The granular bentonite or bentonite sealing compound used for seaming, penetration sealing and repairs shall be made from the same natural sodium bentonite as used in the GCL and shall be as recommended by the GCL Manufacturer. PART 3 EXECUTION The Geosynthetics Installer shall furnish all labor, materials, supervision and equipment to complete the GCL for the project including, but not limited to, layout, patching, and all necessary and incidental items required to complete the work, in accordance with the Drawings and these Specifications. 3.1 DELIVERY, STORAGE AND HANDLING A.Delivery, storage, and handling of GCL shall be in accordance with ASTM D 5888. B.Packaging 1.Wound around a rigid core whose diameter is sufficient to facilitate handling. The core is not necessarily intended to support the roll for lifting but should be sufficiently strong to prevent collapse during transit. 2.Supplied in rolls wrapped in relatively impermeable, waterproof, and opaque protective cover that is resistant to photo degradation by ultraviolet (UV) light. 3.Tears in the packaging shall be repaired to restore a waterproof protective barrier around the GCL. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02677 - 6 Geosynthetic Clay Liner (GCL) 4.Marked or tagged with the following information: a.Product identification information: b.Manufacturer’s name. c.Manufacturer’s address. d.Brand product code. e.Lot and/or batch number. f.Roll number. C.Shipping and Handling 1.The Contractor and/or Geosynthetics Installer shall be liable for all damages to the materials incurred prior to and during transportation to the site and during the unloading of the material. 2.The Party responsible for unloading the GCL should contact the Manufacturer prior to shipment to ascertain the appropriateness of the proposed unloading methods and equipment. 3.The Contractor and/or Geosynthetics Installer is responsible for unloading on-site. Unloading of the rolls from the delivery vehicles shall be done in a manner which prevents damage to the GCL and its packaging. 4.The GCL shall be dry and free of holes or any sign of contamination by foreign matter. The Engineer may reject all or portions of the GCL if significant quantities of production flaws are observed 5.Rolls shall not be dragged, lifted by one end, or dropped to the ground from the delivery vehicle. A pipe or solid bar of sufficient strength to support the full weight of the roll without significant bending shall be used for all unloading and handling activities. The diameter of the pipe shall be small enough to be easily inserted through the core of the GCL roll. Chains shall be used to link the ends of the core pipe to the ends of a spreader bar. The spreader bar shall be wide enough to prevent the chains from rubbing against the ends of the GCL roll. 6.Alternatively, a stinger bar protruding from the end of a forklift or other equipment may be used. The stinger bar shall be at least three-fourths the length of the core and also must be capable of supporting the full weight of the GCL without significant bending. If recommended by the Manufacturer, a sling handling method utilizing appropriate loading straps may be used. 7.The CQAO shall be present during delivery and unloading of the GCL. A visual inspection of each roll should be made during unloading to identify if any packaging has been damaged. Rolls with damaged packaging should be marked and set aside for further inspection. The packaging should be repaired prior to being placed in storage. D.Storage 1.Storage of the GCL rolls shall be the responsibility of the Contractor and/or Geosynthetics Installer. 2.A dedicated storage area shall be selected at the job site that is away from high traffic areas and is level, dry and well-drained. 3.Shall be protected from excessive heat or cold, puncture, or other damaging deleterious conditions. 4.Shall be stored off the ground. 5.Shall be stored out of direct sunlight. 6.Rolls should be stored in a manner that prevents sliding or rolling from the stacks and may be accomplished by the use of chock blocks or by use of the dunnage shipped between rolls. 7.Storage of the rolls on blocks or pallets will not be allowed unless the GCL rolls are fully supported. 8.Rolls should be stacked at a height no higher than that at which the lifting apparatus can be safely handled, no higher than the manufacturer’s storage recommendations, or no higher than 3, whichever is less. 9.All stored GCL materials and the accessory bentonite must be covered with a water proof plastic sheet or tarpaulin until their installation if stored outdoors. 10.The integrity and legibility of the labels shall be preserved during storage. 3.2 PRE-INSTALLATION MEETINGS A.A pre-installation meeting shall be held to coordinate the installation of the GCL with the installation of other components of the liner system. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02677 - 7 Geosynthetic Clay Liner (GCL) 3.3 PREPARATION A.Ensure completion and acceptance of compacted soil liner survey in accordance with Section 02321. B.Immediately prior to GCL deployment, the compacted soil liner shall be final-graded to fill in all voids or cracks and then smooth-rolled to provide the best practicable surface for the GCL. At completion of this activity, no wheel ruts, footprints or other irregularities shall exist in the compacted soil liner. Furthermore, all protrusions extending more than one-half inch from the surface and other deleterious conditions including standing water shall be removed from the surface. C.Remove angular and sharp rocks, rubble, roots, sticks, vegetation, debris, ice, voids, protrusions, abrupt elevation changes, cracks larger than ¼ - inch in width, and standing water; and other conditions or foreign matter that could contact and affect the performance of GCL. D.Verify anchor trench excavation, where GCL is to be secured, is in correct location and configuration. E.On a continuing basis, the project CQAO shall certify acceptance of the compacted soil liner subgrade before GCL placement. 3.4 INSTALLATION A.Placement 1.GCL shall be installed as soon as practical after completion and approval of the compacted soil liner. 2.The GCL shall cover the cell bottom and side slopes in accordance with the Drawings. 3.The Contractor shall handle all GCL's in such a manner as to ensure they are not damaged in any way. 4.Deliver GCL rolls to the working area of the site in their original packaging. Immediately prior to deployment, carefully remove the packaging without damaging the GCL. Orient GCL (i.e., which side faces up) in accordance with the Manufacturer’s and/or Engineer’s recommendations. 5.The GCL shall be installed as indicated by the Manufacturers guidelines as approved by the Engineer. 6.Reinforced GCL shall be placed wherever GCL is specified on the Drawings. 7.The GCL panels shall be placed so that the carrier geotextile side is placed down onto the compacted soil liner. 8.Equipment which could damage the GCL shall not be allowed to travel directly on it. If the installation equipment causes rutting of the compacted soil liner, the compacted soil liner must be restored to its originally accepted condition before placement continues. 9.GCL panels on the side slopes shall extend the full length of the slope. No horizontal overlapping on the side slopes will be permitted. If a horizontal seam is required, a seaming method must be approved by the Engineer before placement. 10.On side slopes, reinforced GCL shall be placed in an anchor trench and anchored with sand bags at the top and deployed down the slope to minimize wrinkles. 11.The reinforced GCL panels in the cell bottom shall be placed from the upgradient end of the cell and progress downgradient in order to keep runoff from accumulating under the GCL. The panels on the bottom shall be placed so that the upgradient edge is on top of the downgradient edge so that potential silt run-off does not accumulate under a lapped seam. 12.Take care to minimize the extent to which the GCL is dragged across the compacted soil liner in order to avoid damage to the bottom surface of the GCL. A temporary geosynthetic subgrade covering (slip sheet or rub sheet) may be used to reduce friction damage during placement. 13.Lay all GCL panels flat on the underlying surface, with no wrinkles or fold, especially at the exposed edges of the panels. 14.After panels are initially in place, remove wrinkles as directed by the Engineer. Unroll several panels and allow the GCL to “relax” before beginning adjacent panels. The purpose of this is to make the edges that are to be overlapped as smooth and free of wrinkles as possible. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02677 - 8 Geosynthetic Clay Liner (GCL) 15.Geomembrane shall not be placed on a GCL which is hydrated. Hydrated GCL is defined as material which has become soft as determined by squeezing the material with finger pressure or material which has exhibited swelling. 16.The GCL shall be installed in a way that prevents hydration of the mat prior to completion of construction of the liner system. 17.The GCL shall not be installed during precipitation, high winds or other conditions that may cause hydration of or damage to the GCL. 18.In the presence of wind, all GCL's shall be sufficiently weighted with sandbags or the equivalent. Such sandbags shall be installed during placement and shall remain until replaced with cover material. 19.If the GCL is hydrated from rainfall or other surface water run-on and exhibits any bentonite swelling prior to placement of the geomembrane, it may be necessary to remove and replace the hydrated material. The project Engineer, CQAO, and GCL Supplier should be consulted for specific guidance if premature hydration occurs. Any GCL replaced shall be done so at the Contractor’s expense. 20.Unless otherwise directed by the Engineer or Technical Representative, HDPE geomembrane installation shall immediately follow the GCL installation. All GCL that is placed during a day's work shall be covered with geomembrane before the Contractor leaves the site at the end of the day. Deploy only as much GCL as can be anchored and covered at the end of the working day with geomembrane, or a temporary waterproof tarpaulin. The GCL shall not be left uncovered overnight. 21.If exposed GCL cannot be permanently covered before the end of a working day, it shall be temporarily covered with plastic or other waterproof material and ballasted to prevent hydration until geomembrane placement can commence. B.Anchorage 1.As directed by the Drawings and these Specifications, place end of the reinforced GCL roll in an anchor trench at the top of the slope. 2.Refer to Drawings and Section 02324 of these Specifications for anchor trench installation locations and details. 3.When utilizing an anchor trench design, the front edge of the trench should be rounded so as to eliminate any sharp corners. 4.No loose soil or other materials will be allowed to underlie the reinforced GCL in anchor trench. Remove all loose materials from the floor of the trench. 5.The reinforced GCL shall extend down the front wall of anchor trench. 6.The time schedule for excavation of the anchor trenches is to be approved by the Engineer so that desiccation of trench soils does not occur prior to backfilling. 7.Backfill and compact with soil materials as described in Section 02324 of these Specifications and as shown on the Drawings immediately following installation of all liner system components. 8.The Engineer may require a temporary cover over the open trenches to keep the reinforced GCL dry prior to backfilling. C.Seaming 1.Overlap adjacent GCL edges. Take care to ensure that the overlap zone is not contaminated with loose soil or other debris immediately prior to seaming. 2.Granular bentonite of the same type as the bentonite used for the GCL shall be placed along the entire overlap width at a minimum rate of 0.25 lbs/linear foot or as recommended by the Manufacturer. If using a GCL product with self-seaming edges, this qualification may be omitted with the Engineer approval. 3.The overlaps shall not be nailed or stapled to the underlying materials. 4.Minimum longitudinal overlap shall be 6 inches after shrinkage or as specified by the Manufacturer and/or Engineer. End-of-roll (along width) overlapped seams shall be similarly constructed, with a minimum overlap of 24 inches after shrinkage or as specified by the Manufacturer and/or Engineer. 5.Shingle seams at the ends of the panels such that they are shingled in the direction of the grade to prevent the potential for runoff flow to enter the overlap zone (seam). Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02677 - 9 Geosynthetic Clay Liner (GCL) 6.GCL shall be placed with seams oriented parallel to the line of maximum slope and shall be free of tension or stress upon completion of the installation on side-slopes. 7.Seams should be located at least 10 feet from the toe and crest of slopes steeper than 10%. D.Damage Repair 1.Any GCL repairs shall be made at no additional cost to the Owner. 2.All hydrated GCL shall be removed and replaced with new material by the Contractor at no additional cost to the Owner. 3.If GCL is damaged (torn, punctured, perforated, etc.) during installation, repair by cutting a patch to fit over the damaged area. The patch shall be obtained from a new GCL roll and shall be cut to size such that a minimum overlap of 12 inches (300 mm) is achieved around all of the damaged area. If recommended by Manufacturer, dry bentonite or bentonite mastic shall be applied around the damaged area prior to placement of the patch. Patches shall be secured with a construction adhesive or other Manufacturer approved method, such as a water-based adhesive approved by the Manufacturer to affix the patch in place so that it is not displaced during cover placement. 4.Patches shall not be nailed or stapled. 5.Care shall be taken to remove any soil or other material which may have penetrated the torn GCL. E.Cover Placement 1.Although direct vehicular contact with the GCL is to be avoided, lightweight, low-ground pressure vehicles (such as 4-wheel all-terrain vehicles) may be used to facilitate the installation of any geosynthetic material placed over the GCL. Contact GCL Supplier or CQAO with specific recommendations on the appropriate procedures in this situation. 2.GCL shall not be covered prior to inspection and approval by the Engineer. 3.For textured geomembrane installation over the GCL, use a temporary geosynthetic covering (slip sheet or rub sheet) so as to minimize friction during placement and to allow the textured geomembrane to be more easily moved into its final position. 4.Protective cover soil overlying the liner system shall immediately follow the installation of the geomembrane and other geosynthetics. The GCL shall be removed and replaced if it becomes hydrated before the protective cover soil is placed. 3.5 FIELD QUALITY CONTROL A.Before placement of geomembrane liner, inspect seams and repaired areas to ensure tight, continuously bonded installation. Repair damaged GCL and seams and reinspect repaired work. 3.6 PROTECTION OF FINISHED WORK A.The Contractor shall place all materials above the GCL in such a manner as to ensure that the GCL is not damaged. B.The Contractor shall use all means necessary to protect all prior Work, and all materials and completed Work of other Sections of these Specifications. C.Requirements for traffic over HDPE geomembrane shall govern. Refer to Section 02670. D.In the event of damage, the Contractor shall immediately make all repairs and replacements necessary to the approval of the Engineer and at no additional cost to the Owner. END OF SECTION Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02924 - 1 Seeding and Soil Supplements SECTION 02924 SEEDING AND SOIL SUPPLEMENTS PART 1 GENERAL 1.1 SUMMARY A.Section includes: 1.Permanent Seeding. 2.Temporary Erosion Control Seeding. B.Related Sections: 1.Section 02200 – Earthwork. 2.Section 02374 – Erosion and Sedimentation Control. 1.2 MEASUREMENT AND PAYMENT A.Permanent Seeding: 1.Basis of Measurement: Acres seeded based on Contractor completed survey of actual area. Measurement shall not include any areas beyond the limits of disturbance depicted on the Drawings which have not been approved by the Owner for seeding prior to sowing of seed 2.Basis of Payment -Unit Price: Amount equal to the actual installed and approved number of units times the unit price provided in Bid Form Schedule. Requested payment quantities will be submitted by the Contractor with final approval by the Engineer. B.Temporary Erosion Control Seeding: 1.Basis of Measurement: Acres seeded for temporary erosion and sedimentation control. Measurement shall be completed by the Contractor by means of surveying. Measurement shall not include any areas which have not been approved by the Owner for temporary seeding prior to sowing of seed 2.Basis of Payment -Unit Price: Amount equal to the actual installed and approved number of units times the unit price provided in Bid Form Schedule. Requested payment quantities will be submitted by the Contractor with final approval by the Engineer. 1.3 REFERENCES A.The State of North Carolina Erosion and Sediment Control Planning and Design Manual. 1.4 DEFINITIONS A.Weeds: Vegetative species other than specified species to be established in given area. B.Permanent Seeding: Establishment of a vegetative cover at final design grades. C.Temporary Erosion Control Seeding shall be establishment of vegetative cover on any grade other than final so as to minimize erosion during periods of suspension of disturbance in any area. 1.5 SUBMITTALS A.Product Data: Submit data for seed mix, fertilizer, mulch, and other accessories. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02924 - 2 Seeding and Soil Supplements 1.6 CLOSEOUT SUBMITTALS A.NOT APPLICABLE 1.7 QUALITY ASSURANCE A.Provide seed mixture in containers showing percentage of seed mix, germination percentage, inert matter percentage, weed percentage, year of production, net weight, date of packaging, and location of packaging. B.Perform Work in accordance with North Carolina Erosion and Sedimentation Control Planning and Design Manual. 1.8 DELIVERY, STORAGE, AND HANDLING A.Deliver grass seed mixture in sealed containers. Seed in damaged packaging is not acceptable. B.Deliver fertilizer in waterproof bags showing weight, chemical analysis, and name of manufacturer. PART 2 PRODUCTS 2.1 SEED MIXTURE A.Temporary Seed Mixture: As specified on Drawings. B.Permanent Seed Mixture: As specified on Drawings. 2.2 SOIL MATERIALS A.Topsoil: Excavated from site, imported, and/or a blend thereof reasonably free of weeds as specified in Section 02200. 2.3 ACCESSORIES A.Mulching Material: Oat or wheat straw, free from weeds, foreign matter detrimental to plant life, and dry and as described in the North Carolina Erosion and Sediment Control Planning and Design Manual. B.Fertilizer: Commercial grade; recommended for grass; of proportion necessary to eliminate deficiencies of topsoil as described in the North Carolina Erosion and Sediment Control Planning and Design Manual and as indicated on Drawings. C.Lime: Agricultural grade; recommended for grass; of proportion necessary to promote germination of seed as described in the North Carolina Erosion and Sediment Control Planning and Design Manual and as indicted on the Drawings. D.Water: Clean, fresh and free of substances or matter capable of inhibiting vigorous growth of grass. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02924 - 3 Seeding and Soil Supplements PART 3 EXECUTION 3.1 EXAMINATION A.Verify prepared soil base is ready to receive the Work of this Section. 3.2 PREPARATION OF SUBSOIL A.Prepare sub-soil to eliminate uneven areas and low spots. Maintain lines, levels, profiles and contours. Make changes in grade gradual. Blend slopes into level areas. B.Remove foreign materials, weeds and undesirable plants and their roots. Remove contaminated sub-soil. C.Tracked soil surface shall be oriented up and down slopes and not parallel to slopes to help prevent erosion. 3.3 FERTILIZING A.Provide minimum fertilizer, lime, and nutrient addition as recommend by soil testing results to promote vigorous vegetative growth. B.Apply fertilizer after smooth raking of topsoil. C.Mix fertilizer thoroughly into upper 2 to 4 inches of soil. D.Lightly water soil to aid dissipation of fertilizer. Irrigate top level of soil uniformly. 3.4 SEEDING A.Stabilization and/or seeding must be completed per the erosion and sediment control permit requirements. This is understood that disturbed areas are to be stabilized or seeded within 15 working days or 90 calendar days. B.Apply seed at rate as indicated on Drawings evenly in two intersecting directions and in accordance with the North Carolina Erosion and Sediment Control Planning and Design Manual. Rake in lightly. C.Do not seed areas in excess of that which can be mulched on same day. D.Planting Season: As indicated on Drawings and in accordance with the North Carolina Erosion and Sediment Control Planning and Design Manual. E.Do not sow immediately following rain, when ground is too dry, or when winds are over 12 mph. F.Immediately following seeding, apply mulch to thickness as specified on Drawings and in accordance with the North Carolina Erosion and Sediment Control Planning and Design Manual. Maintain clear of shrubs and trees. G.Apply water with fine spray immediately after each area has been mulched. Saturate to 2 inches of soil. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 02924 - 4 Seeding and Soil Supplements 3.5 HYDROSEEDING A.Apply fertilizer, mulch and seeded slurry with hydraulic seeder at rate of 2000 lbs per acres evenly in one pass. B.After application, apply water with fine spray immediately after each area has been hydroseeded. Saturate to 4 inches of soil and maintain moisture levels two to four inches. 3.6 SCHEDULE A.As indicated on Drawings. END OF SECTION DIVISION 03000 CONCRETE Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 03100-1 Concrete Forms and Accessories SECTION 03100 CONCRETE FORMS AND ACCESSORIES PART 1 GENERAL 1.1 SUMMARY A.Section Includes: 1.Forms and accessories. B.Related Sections: 1.Section 03300 - Cast-in-Place Concrete. 1.2 MEASUREMENT AND PAYMENT A.Basis of Measurement: Not applicable, included in other sections of the specifications. B.Basis of Payment: Not applicable, included in other sections of the specifications. 1.3 REFERENCES A.American Concrete Institute: 1.ACI 301 - Specifications for Structural Concrete. 2.ACI 318 - Building Code Requirements for Structural Concrete. 3.ACI 347 - Guide to Formwork for Concrete. 1.4 DESIGN REQUIREMENTS A.NOT APPLICABLE. 1.5 SUBMITTALS A.NOT APPLICABLE 1.6 QUALITY ASSURANCE A.Perform Work in accordance with ACI 301, ACI 318, and ACI 347. B.Perform Work in accordance with NCDOT standards. 1.7 COORDINATION A.Coordinate this Section with other sections of work, requiring attachment of components to formwork. PART 2 PRODUCTS 2.1 PREFABRICATED FORMS A.Use Sonotube® formwork for cast-in-place concrete where applicable, or Engineer-approved equivalent. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 03100-2 Concrete Forms and Accessories PART 3 EXECUTION 3.1 EXAMINATION A.Verify lines, levels, and centers before proceeding with formwork. Verify dimensions agree with Drawings. 3.2 INSTALLATION A.Earth Forms: 1.Earth forms are not permitted. B.Formwork - General: 1.Unload and store pre-fabricated forms in accordance with Manufacturer specifications. 2.Construct forms to correct shape and dimensions, mortar-tight, braced, and of sufficient strength to maintain shape and position under imposed loads from construction operations. 3.Camber forms where necessary to produce level finished soffits unless otherwise shown on Drawings. 4.Carefully verify horizontal and vertical positions of forms. Correct misaligned or misplaced forms before placing concrete. 5.Complete wedging and bracing before placing concrete. C.Erect formwork, shoring, and bracing to achieve design requirements, in accordance with requirements of ACI 301. D.Arrange and assemble formwork to permit dismantling and stripping. Do not damage concrete during stripping. E.Install void forms in accordance with manufacturer's recommendations. 3.3 FORM REMOVAL A.Do not remove forms or bracing until concrete has gained sufficient strength to carry its own weight and imposed loads and removal has been approved by formwork design Engineer. B.Remove pre-fabricated forms in accordance with Manufacturer specifications. 3.4 ERECTION TOLERANCES A.Construct formwork to maintain tolerances required by ACI 301. 3.5 FIELD QUALITY CONTROL A.Inspect erected formwork, shoring, and bracing to ensure that work is in accordance with formwork design, and that supports, fastenings, wedges, ties, and items are secure. B.Notify Engineer after placement of reinforcing steel in forms, but prior to placing concrete. C.Schedule concrete placement to permit formwork inspection before placing concrete. END OF SECTION Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 03300-1 Cast-In-Place Concrete SECTION 03300 CAST-IN-PLACE CONCRETE PART 1 GENERAL 1.1 SUMMARY A.Section includes: 1.Cast-in-place concrete. B.Related Sections: 1.Section 02200 – Earthwork. 2.Section 02610 – Pipes. 3.Section 03100 – Concrete Forms and Accessories 1.2 MEASUREMENT AND PAYMENT A.Cast-In-Place Concrete: 1.Basis of Measurement:by the cubic yard for material placed in accordance with the drawings and specifications and approved by the Owner. Basis of measurement shall be dimensions depicted on the drawings. No payment shall be made for material placed beyond the design configuration unless Owner approves design modification prior to installation. Excavation and forming associated with the concrete placement shall be considered incidental to the work. 2.Basis of Payment -Unit Price: Amount equal to the actual installed and approved number of units times the unit price provided in Bid Form Schedule. Requested payment quantities will be submitted by the Contractor with final approval by the Engineer. 3.Alternate – The Contractor at his discretion may use pre-cast concrete for any and all structures. If pre-cast concrete is used, the material must meet all requirements of this Section and there shall be no adjustments to Unit Price Bid. 1.3 REFERENCES A.American Concrete Institute: 1.ACI 301 - Specifications for Structural Concrete. 2.ACI 305R - Hot Weather Concreting. 3.ACI 306.1 - Standard Specification for Cold Weather Concreting. 4.ACI 308 (American Concrete Institute) - Standard Practice for Curing Concrete. 5.ACI 318 - Building Code Requirements for Structural Concrete. B.ASTM International: 1.ASTM C33 - Standard Specification for Concrete Aggregates. 2.ASTM C94 - Standard Specification for Ready-Mixed Concrete. 3.ASTM C150 - Standard Specification for Portland Cement. 4.ASTM C260 - Standard Specification for Air-Entraining Admixtures for Concrete. 5.ASTM C494 - Standard Specification for Chemical Admixtures for Concrete. 6.ASTM C618 - Standard Specification for Coal Fly Ash and Raw or Calcined Natural Pozzolan for Use as a Mineral Admixture in Portland Cement Concrete. 7.ASTM C1017 - Standard Specification for Chemical Admixtures for Use in Producing Flowing Concrete. 8.ASTM C1107 - Standard Specification for Packaged Dry, Hydraulic-Cement Grout (Nonshrink). 9.ASTM C1116 - Standard Specification for Fiber-Reinforced Concrete. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 03300-2 Cast-In-Place Concrete C.North Carolina Department of Transportation (NCDOT) Standard specifications for Roads and Structures. 1.4 SUBMITTALS A.Not Applicable. 1.5 QUALITY ASSURANCE A.Perform Work in accordance with ACI 301. B.Acquire cement and aggregate from one source for Work. C.Conform to ACI 305R when concreting during hot weather. D.Conform to ACI 306.1 when concreting during cold weather. PART 2 PRODUCTS 2.1 CONCRETE MATERIALS A.Cement: ASTM C150, Type I or Type II. B.Fine and Coarse Aggregates: ASTM C33. C.Water: Clean and not detrimental to concrete. 2.2 ADMIXTURES (Engineer’s approval required prior to using any admixtures). A.Furnish materials in accordance with NCDOT standards. B.Air Entrainment: ASTM C260. C.Chemical: ASTM C494; Type F - Water Reducing, High Range, Type G - Water Reducing, High Range and Retarding. D.Fly Ash, Calcined Pozzolan: ASTM C618; Class Type C or F, limit fly ash to maximum 25 percent of cement content by weight. E.Plasticizing: ASTM C1017. 2.3 ACCESSORIES A.Non-Shrink Grout: ASTM C1107; premixed compound consisting of non-metallic aggregate, cement, water reducing and plasticizing agents; capable of developing minimum compressive strength of 4,000 psi in 72 hours. B.Concrete Reinforcing Fibers: ASTM C1116 Type III, synthetic fiber reinforced concrete. Fibers shall be synthetic fiber consisting of 100 percent virgin polypropylene fibrillated fibers containing no reprocessed olefin materials. Fibers shall have a specific gravity of 0.9, a minimum tensile strength of 70 ksi, graded per manufacturer, and specifically manufactured to an optimum gradation for use as concrete secondary reinforcement. A minimum of 1.5 pounds of fiber per Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 03300-3 Cast-In-Place Concrete cubic yard of concrete shall be used. Fibers shall be added at the batch plant. Toughness indices shall meet requirements for performance Level I. 2.4 CONCRETE MIX A.Mix concrete in accordance with ACI 301. Deliver concrete in accordance with ASTM C94. B.Select proportions for normal weight concrete (if applicable) in accordance with ACI 301. C.Select aggregate proportions for light weight concrete (if applicable) in accordance with ACI 301. D.Provide concrete to the following criteria: Unit Measurement Compressive Strength (7 day)3,000 psi (minimum) Compressive Strength (28 day)4,000 psi (minimum) Water/Cement Ratio (maximum)0.45 by weight (mass) Air Entrained 4 - 6 percent Slump 3 - 5 inches E.Admixtures: Include admixture types and quantities indicated in concrete mix designs approved by Engineer through submittal process. 1.Use accelerating admixtures in cold weather. Use of admixtures will not relax cold weather placement requirements. 2.Use set retarding admixtures during hot weather. 3.Add air entraining agent to normal weight concrete mix for work exposed to exterior. 4.Air Entrainment: ASTM C260. 5.Chemical: ASTM C494 Type A - Water Reducing, Type B – Retarding, Type C – Accelerating, Type D - Water Reducing and Retarding, Type E - Water Reducing and Accelerating, Type F - Water Reducing, High Range, Type G - Water Reducing, High Range and Retarding. 6.Fly Ash, Calcined Pozzolan: ASTM C618. 7.Plasticizing: ASTM C1017. PART 3 EXECUTION 3.1 EXAMINATION A.Verify requirements for concrete cover over reinforcement. B.Verify anchors, seats, plates, reinforcement and other items to be cast into concrete are accurately placed, positioned securely, and will not interfere with placing concrete. C.Verify substrate surfaces are smooth, free of honeycomb or pitting, and not detrimental to full contact bond of waterproofing materials. D.Verify items penetrating surfaces to receive waterproofing are securely installed. E.Verify substrate surface slopes to drain for horizontal waterproofing applications. 3.2 PREPARATION A.Prepare previously placed concrete by cleaning with steel brush and applying bonding agent. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 03300-4 Cast-In-Place Concrete B.In locations where new concrete is doweled to existing work, drill holes in existing concrete, insert steel dowels and pack solid with non-shrink grout. C.Seal cracks and joints with sealant materials using depth to width ratio as recommended by sealant manufacturer. 3.3 PLACING CONCRETE A.Place concrete in accordance with ACI 318. B.Notify Engineer minimum 24 hours prior to commencement of operations. C.Ensure reinforcement, inserts, and embedded parts are not disturbed during concrete placement. D.Do not interrupt successive placement; do not permit cold joints to occur. 3.4 CONCRETE FINISHING A.Provide formed concrete surfaces to be left exposed with smooth rubbed finish. 3.5 CURING AND PROTECTION A.Immediately after placement, protect concrete from premature drying, excessively hot or cold temperatures, and mechanical injury. B.Maintain concrete with minimal moisture loss at relatively constant temperature for period necessary for hydration of cement and hardening of concrete. C.Cure all concrete in accordance with ACI 308 unless otherwise directed by Engineer. 3.6 BACKFILLING A.Notify engineer prior to backfilling against concrete structures. B.Concrete should have a minimum of 75 percent of design 28-day compressive strength prior to backfilling concrete structures unless approved by the Engineer 3.7 FIELD QUALITY CONTROL A.Not Applicable. 3.8 PATCHING A.Allow Engineer to inspect concrete surfaces immediately upon removal of forms. B.Excessive honeycomb or embedded debris in concrete is not acceptable. Notify Engineer upon discovery. C.Patch imperfections in accordance with ACI 301. 3.9 DEFECTIVE CONCRETE A.Defective Concrete: Concrete not conforming to required lines, details, dimensions, tolerances or specified requirements. Technical Specifications S&ME Project No.4305-15-173A Edgecombe County Landfill Corrective Measures Installation Issued for Construction 2017 June 2017 03300-5 Cast-In-Place Concrete B.Repair or replacement of defective concrete will be determined by Engineer. C.Do not patch, fill, touch-up, repair, or replace exposed concrete except upon express direction of Engineer for each individual area. END OF SECTION CORRECTIVE MEASURES FOR SURFACE AND GROUNDWATER IMPROVEMENTS EDGECOMBE COUNTY LANDFILL TARBORO, NORTH CAROLINA PROJECT NUMBER OF:DRAWING:DRAWING PATH: q:\4305\15\173a edgecome\DWG\COVER SHEET.dwgWWW.SMEINC.COM9751 SOUTHERN PINE BLVDCHARLOTTE, NC 28273(704) 523-4726ENGINEERING FIRM LICENSE NUMBER: F-0176BYDESCRIPTIONDATENO.CHKAPVSURFACE & GROUNDWATER IMPROVEMENTSEDGECOMBE COUNTY LANDFILLTARBORO, NORTH CAROLINA4305-15-173A 1 9COVER SHEETWWW.SMEINC.COM 9751 SOUTHERN PINE BLVD CHARLOTTE, NC 28273 (704) 523-4726 JUNE 7, 2017 REFERENCE: ERSI STREET MAP DATA SET. PROJECT LOCATION PROJECT LOCATION INDEX OF DRAWINGS Sheet Number Sheet Title 1 COVER SHEET 2 EXISTING CONDITION PLAN 3 PROPOSED NORTHWEST INTERCEPTOR TRENCH - GRADING PLAN 4 PROPOSED NORTHWEST INTERCEPTOR PROFILE 5 PROPOSED NORTHWEST INTERCEPTOR CROSS SECTIONS 6 PROPOSED SOUTHEAST INTERCEPTOR TRENCH - GRADING PLAN 7 DETAILS (SHEET 1 OF 3) 8 DETAILS ( SHEET 2 OF 3) 9 DETAILS (SHEET 3 OF 3) REFERENCE: USGS OLD SPARTA, NORTH CAROLINA QUADRANGLE 2016SCALE: 1 " = 5000'SCALE: 1 " = 2000'0 06/07/17 ISSUED FOR CONSTRUCTION CLD MAT CJS APP R O X . L O C A T I O N APPROX. LOC AT ION APP R O X . L O C A T I O NPROPERTY LINEJER R Y ' S C R E E K CREEKPROPERTY LINE PROPERTY LINE PROPERTY LINE JERRY ' S C R E E K WR I G H T ' S C R E E K SOUTHERN LANDFILL EXISTING LANDFILL W R I G H T ' S 60 70 70 80 80 90 90 100 100 110 110 70 80 9070 80 8090 90100 100110110 120 120130 130 80 90 100 1 1 0 120 60 7 0 80 54 56 58 626466 68 6868 72 7 476 78 82 84 EXISTING GRASS LINED DITCH EXISTING BASIN 2 EXISTING BASIN 1 8090CLEARING AND GRUBBING 5.38 AC. CLEARING AND GRUBBING 0.75 AC. CLEARING AND GRUBBING 0.52 AC. CLEARING AND GRUBBING 0.30 AC. CLEARING AND GRUBBING 0.10 AC. CLEARING AND GRUBBING 1.33 AC. PROPERTY LINE GROUND SURFACE ELEVATION CONTOUR - 2-FOOT INTERVAL GROUND SURFACE ELEVATION CONTOUR - 10-FOOT INTERVAL 1.TOPOGRAPHIC MAP DEVELOPED BY GEODATA CORPORATION OF ZEBULON, NC USING PHOTOGRAMETRIC METHODS FROM AERIAL PHOTOGRAPHY FLOWN ON FEBRUARY 5, 2007. 2.TOPOGRAPHIC MAP UPDATED WITH GROUND SURVEY BY BATEMAN CIVIL SURVEY COMPANY, PC OF HOLLY SPRINGS, NC ON OCTOBER 26, 2008. 3.PROPERTY BOUNDARY OBTAINED FROM EDGECOMBE COUNTY GIS DEPARTMENT. LIMIT OF DISTURBANCE LEGEND 50-FOOT STREAM BUFFER (NO CONSTRUCTION EQUIPMENT OR DISTURBANCE ALLOWED) 0 100 200 300 (IN FEET)GRAPHIC SCALE PROJECT NUMBER OF:DRAWING:DRAWING PATH: q:\4305\15\173a edgecome\DWG\Existing Conditions PLAN.dwgWWW.SMEINC.COM9751 SOUTHERN PINE BLVDCHARLOTTE, NC 28273(704) 523-4726ENGINEERING FIRM LICENSE NUMBER: F-0176BYDESCRIPTIONDATENO.CHKAPVSURFACE & GROUNDWATER IMPROVEMENTSEDGECOMBE COUNTY LANDFILLTARBORO, NORTH CAROLINA4305-15-173A 2 9EXISTING CONDITION PLANCLEARING AND GRUBBING AREA 0 06/07/17 ISSUED FOR CONSTRUCTION CLD MAT CJS PROPERTY LINE CREEKPROPERTY LINE JERR Y ' S C R E E K WRI G H T ' S C R E E K 5+00.0010+00.0015+00.0020+ 0 0 . 0 0 25+ 0 0 . 0 0 30+ 0 0 . 0 0 SOUTHERN LANDFILL EXISTING LANDFILL W R I G H T ' S ■■■■■■■■■■■■■■■■PROPERTY LINE GROUND SURFACE ELEVATION CONTOUR - 2-FOOT INTERVAL GROUND SURFACE ELEVATION CONTOUR - 10-FOOT INTERVAL 1.TOPOGRAPHIC MAP DEVELOPED BY GEODATA CORPORATION OF ZEBULON, NC USING PHOTOGRAMETRIC METHODS FROM AERIAL PHOTOGRAPHY FLOWN ON FEBRUARY 5, 2007. 2.TOPOGRAPHIC MAP UPDATED WITH GROUND SURVEY BY BATEMAN CIVIL SURVEY COMPANY, PC OF HOLLY SPRINGS, NC ON OCTOBER 26, 2008. 3.PROPERTY BOUNDARY OBTAINED FROM EDGECOMBE COUNTY GIS DEPARTMENT. 4.PRESERVE OR REPAIR-REBUILD ACCESS ROAD THAT PASSES THROUGH THE PROPOSED GRADING FOR SEDIMENTATION BASIN SB-2. LIMIT OF DISTURBANCE ■■SILT FENCE COIR BAFFLE FIGURE NUMBER DETAIL NUMBER 7 1 LEGEND 50-FOOT STREAM BUFFER (NO CONSTRUCTION EQUIPMENT OR DISTURBANCE ALLOWED) PROP. GROUND SURFACE ELEV. CONTOUR - 2-FOOT PROP. GROUND SURFACE ELEV. CONTOUR - 10-FOOT PROPOSED INTERCEPTOR TRENCH 0 100 200 300 (IN FEET)GRAPHIC SCALE PROJECT NUMBER OF:DRAWING:DRAWING PATH: q:\4305\15\173a edgecome\DWG\Existing Conditions.dwgWWW.SMEINC.COM9751 SOUTHERN PINE BLVDCHARLOTTE, NC 28273(704) 523-4726ENGINEERING FIRM LICENSE NUMBER: F-0176BYDESCRIPTIONDATENO.CHKAPVSURFACE & GROUNDWATER IMPROVEMENTSEDGECOMBE COUNTY LANDFILLTARBORO, NORTH CAROLINA4305-15-173A 3 9PROPOSED NORTHWEST INTERCEPTORTRENCH - GRADING PLANEXISTING GRASS LINED DITCH5 7 PROPOSED INTERCEPTOR TRENCH1 6 EXISTING GRASS LINED DITCH5 7 PROPOSED INTERCEPTOR TRENCH 1 6 TEMPORARY ROAD OVER LANDFILL CAP15 9 BAFFLES16 9 BAFFLES16 9 SILT FENCE OUTLET PLUNGE POOL13 9 EMERGENCY SPILLWAY 11 8 BAFFLES16 9 SILT FENCE10 8 PROPOSED SEDIMENTATION BASIN CHECK DAM3 7 SKIMMER14 9SLOPE MATTING 9 8 SEDIMENTATION BASIN 2 SEDIMENTATION BASIN 1 SLOPE MATTING 0 06/07/17 ISSUED FOR CONSTRUCTION CLD MAT CJS ELEVATION (IN FEET)ELEVATION (IN FEET)PROPOSED NORTHWEST INTERCEPTOR PROFILE SCALE H:1"=10'; V:1"=2' 46 50 55 60 65 70 75 46 50 55 60 65 70 75 -0+25 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00 9+50 10+00 10+50 11+00 11+50 12+00 12+50 13+00 PROPOSED INTERCEPTOR TRENCH EL. 67.69' APPROXIMATE EXISTING GROUND SURFACE 1 6 SLOPE 0.65%ELEVATION (IN FEET)ELEVATION (IN FEET)PROPOSED NORTHWEST INTERCEPTOR PROFILE SCALE H:1"=10'; V:1"=2' 46 50 55 60 65 70 75 46 50 55 60 65 70 75 13+00 13+50 14+00 14+50 15+00 15+50 16+00 16+50 17+00 17+50 18+00 18+50 19+00 19+50 20+00 20+50 21+00 21+50 22+00 22+50 23+00 23+50 24+00 24+50 25+00 25+50 26+00 SLOPE 0.65%ELEVATION (IN FEET)ELEVATION (IN FEET)PROPOSED NORTHWEST INTERCEPTOR PROFILE SCALE H:1"=10'; V:1"=2' 46 50 55 60 65 70 75 46 50 55 60 65 70 75 26+00 26+50 27+00 27+50 28+00 28+50 29+00 29+50 30+00 30+50 31+00 31+50 32+00 32+50 33+00 33+50 34+00 34+50 35+00 35+50 36+00 36+38 SLOPE 0.65% 0 10 20 30 (IN FEET)GRAPHIC SCALE APPROXIMATE EXISTING GROUND SURFACE APPROXIMATE EXISTING GROUND SURFACE PROJECT NUMBER OF:DRAWING:DRAWING PATH: q:\4305\15\173a edgecome\DWG\Existing Conditions.dwgWWW.SMEINC.COM9751 SOUTHERN PINE BLVDCHARLOTTE, NC 28273(704) 523-4726ENGINEERING FIRM LICENSE NUMBER: F-0176BYDESCRIPTIONDATENO.CHKAPVSURFACE & GROUNDWATER IMPROVEMENTSEDGECOMBE COUNTY LANDFILLTARBORO, NORTH CAROLINA4305-15-173A 4 9PROPOSED NORTHWEST INTERCEPTOR PROFILEPROPOSED INTERCEPTOR TRENCH EL. 49.00' PROPOSED INTERCEPTOR TRENCH 1 6 1 6 0 06/07/17 ISSUED FOR CONSTRUCTION CLD MAT CJS ELEVATION (FEET)ELEVATION (FEET)SECTION 5+00 SCALE : H : 1" =10' ; V : 1" =10' 50.00 60.00 70.00 80.00 50.00 60.00 70.00 80.00 0.00 10.00 20.00 30.00 40.00 50.000.00-10.00-20.00-30.00-40.00-50.00 PROPOSED NORTHWEST INTERCEPTOR TRENCH APPROXIMATE EXISTING GROUND SURFACE 1 6 DITCH ℄ELEVATION (FEET)ELEVATION (FEET)SECTION 10+00 SCALE : H : 1" =10' ; V : 1" =10' 50.00 60.00 70.00 80.00 50.00 60.00 70.00 80.00 0.00 10.00 20.00 30.00 40.00 50.000.00-10.00-20.00-30.00-40.00-50.00 APPROXIMATE EXISTING GROUND SURFACE PROPOSED NORTHWEST INTERCEPTOR TRENCH 1 6 DITCH ℄ELEVATION (FEET)ELEVATION (FEET)SECTION 20+00 SCALE : H : 1" =10' ; V : 1" =10' 40.00 50.00 60.00 70.00 40.00 50.00 60.00 70.00 0.00 10.00 20.00 30.00 40.00 50.000.00-10.00-20.00-30.00-40.00-50.00 APPROXIMATE EXISTING GROUND SURFACE PROPOSED NORTHWEST INTERCEPTOR TRENCH 1 6 DITCH ℄ELEVATION (FEET)ELEVATION (FEET)SECTION 15+00 SCALE : H : 1" =10' ; V : 1" =10' 50.00 60.00 70.00 80.00 50.00 60.00 70.00 80.00 0.00 10.00 20.00 30.00 40.00 50.000.00-10.00-20.00-30.00-40.00-50.00 APPROXIMATE EXISTING GROUND SURFACE PROPOSED NORTHWEST INTERCEPTOR TRENCH 1 6 DITCH ℄ELEVATION (FEET)ELEVATION (FEET)SECTION 25+00 SCALE : H : 1" =10' ; V : 1" =10' 40.00 50.00 60.00 70.00 40.00 50.00 60.00 70.00 0.00 10.00 20.00 30.00 40.00 50.000.00-10.00-20.00-30.00-40.00-50.00 APPROXIMATE EXISTING GROUND SURFACE PROPOSED NORTHWEST INTERCEPTOR TRENCH 1 6 DITCH ℄ELEVATION (FEET)ELEVATION (FEET)SECTION 30+00 SCALE : H : 1" =10' ; V : 1" =10' 40.00 50.00 60.00 70.00 40.00 50.00 60.00 70.00 0.00 10.00 20.00 30.00 40.00 50.000.00-10.00-20.00-30.00-40.00-50.00 APPROXIMATE EXISTING GROUND SURFACE PROPOSED NORTHWEST INTERCEPTOR TRENCH 1 6 DITCH ℄ 0 10 20 30 (IN FEET)GRAPHIC SCALE PROJECT NUMBER OF:DRAWING:DRAWING PATH: q:\4305\15\173a edgecome\DWG\Existing Conditions.dwgWWW.SMEINC.COM9751 SOUTHERN PINE BLVDCHARLOTTE, NC 28273(704) 523-4726ENGINEERING FIRM LICENSE NUMBER: F-0176BYDESCRIPTIONDATENO.CHKAPVSURFACE & GROUNDWATER IMPROVEMENTSEDGECOMBE COUNTY LANDFILLTARBORO, NORTH CAROLINA4305-15-173A 5 9PROPOSED NORTHWEST INTERCEPTORCROSS SECTIONS0 06/07/17 ISSUED FOR CONSTRUCTION CLD MAT CJS GATE EXISTING POND EXISTING POND EXISTING STORAGE 1 EXISTING STORAGE 2 LIMITS OF DISTURBANCE B-7 B-8 B-6 B-9 B-10 B-11 B-12 B-13 B-1 B-2 B-3 B-4 B-5 0+00 1+00 2+00 3+00 4+00 5+00 6+00 6+01 7+00 8+00 9+00 10+00 11+00 12+00 12+16.5 EXISTING 30" RCP STREAM BUFFER ENERGY DISSIPATER SOUTHERN LANDFILL LIMIT OF DISTURBANCE PROPOSED SOIL STOCKPILE AREA AND CONTRACTOR STAGING AREA (MATERIAL TO BE SPREAD TO DRAIN TO EAST) CLEAN OUT ACCESS PORTS EXISTING SEPTIC TANK 707070 70 80 8 0 80 80 90 90 100 100 110 11070 70 80 80 90 100 110 70 6 7 2"X12" CMP TOP SOUTHEAST INTERCEPTOR TRENCH 1 6 60 60 BERM MATERIAL SHALL BE REMOVED AND SPREAD OVER STOCKPILE AREA BREACH EXPANSION ■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■■SILT FENCE OUTLET 11 8 SILT FENCE10 8 WATTLES8 8 COLONIAL ROAD■■SILT FENCE11 8 SLOPE MATTING9 8 SLOPE MATTING 9 8 LANDFILL SIDE UPGRADIENT SIDE GEOMEMBRANE PLACED TO LAP 2 FEET ON BOTTOM OF TRENCH, COVER LANDFILL SIDEWALL OF EXCAVATION. VARIES (6' TO 20') MIN. 2' MAX. 3'BOTTOM OF TRENCH EXCAVATION 6" DIA. PERFORATED ADS N12 PIPE SEE GRANULAR FILL SCHEDULE ~5 TRENCH CONFIGURATION IS FOR ILLUSTRATIVE PURPOSES ONLY; CONTRACTOR SHALL DESIGN AND CONSTRUCT THE TRENCH AS PER OSHA REQUIREMENTS. BACKFILL - EXCAVATED SOIL MATERIAL TRENCH SIDEWALL VARIES WASHED PEA GRAVEL #78M 6" DIA. PERFORATED ADS N12 PIPE BACKFILL EXCAVATED SOIL MATERIAL APPROXIMATE EXISTING GROUND SURFACE SLOPE TO POSITIVE GRADE OF 0.5% TO DRAIN TO POND. SEE GRANULAR FILL SCHEDULE TRENCH CONFIGURATION IS FOR ILLUSTRATIVE PURPOSES ONLY; CONTRACTOR SHALL DESIGN AND CONSTRUCT THE TRENCH AS PER OSHA REQUIREMENTS. 6 OZ/SY NONWOVEN GEOTEXTILE TO WRAP GRANULAR FILL 6 OZ/SY NONWOVEN GEOTEXTILE DRAINAGE SWALE OVER TRENCH GEOMEMBRANE PLACED ON BOTTOM OF TRENCH, LANDFILL SIDEWALL OF EXCAVATION. 2' x 2' x 5" FORMED CONCRETE PAD 8" DIA. x 8" LONG BOLT DOWN MANHOLE WITH H-20 LOAD RATING SPACE APPROX. 200' (SOUTHWEST) 400' (NORTHWEST) STARTING AT STA. 0+00, CLEAN OUT 6" DIA. HDPE CORRUGATED SOLID PIPE, LENGTH VARIES GRANULAR FILL SCHEDULE SE TRENCH: GRANULAR FILL THICKNESS 6 FEET FROM STATION 0+00 TO STATION 11+75 COMPOSED OF #78M NW TRENCH & AFTER 11+75 IN SE TRENCH: GRANULAR FILL SLOPED TO MATCH EXISTING GRADE 1 FOOT BELOW BELOW THE GROUND SURFACE UNTIL PIPE DAYLIGHT. SEED & STRAW LANDFILL SIDE UPGRADIENT SIDE GEOMEMBRANE PLACED TO LAP 2 FEET ON BOTTOM OF TRENCH, COVER LANDFILL SIDEWALL OF EXCAVATION. 2' - 5' VARIES MIN. 2' MAX. 3'BOTTOM OF TRENCH EXCAVATION 6" DIA. PERFORATED ADS N12 PIPE TRENCH CONFIGURATION IS FOR ILLUSTRATIVE PURPOSES ONLY; CONTRACTOR SHALL DESIGN AND CONSTRUCT THE TRENCH AS PER OSHA REQUIREMENTS. 1' BACKFILL - EXCAVATED SOIL MATERIAL TRENCH SIDEWALL 6 OZ/SY NONWOVEN GEOTEXTILE TO WRAP GRANULAR FILL 6" DIA. ADS DUAL WALL 45° BEND AND 45° WYE6"6"WASHED PEA GRAVEL #78 6" DIA. SOLID ADS N12 PIPE B-11B-10GW-2RB-9B-6B-8B-5B-7MW-3BB-4B-390 70 50 60 80 100 12+0011+0010+009+008+007+006+005+004+003+002+001+00 40 90 70 50 60 80 100 12+50 40 0.5 % SLOPE NOTE: IF THE INVERT OF THE TRENCH IS LESS THAN 1 FOOT INTO LOW PERMEABILITY CLAY THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER OR THEIR DESIGNATED REPRESENTATIVE SO THAT THE TRENCH INVERT CAN BE ADJUSTED. 62' ELEVATION OF GROUNDWATER BARRIER TRENCH BOTTOM AT STATION 0+00 INVERT 6" DIA. HDPE PERFORATED PIPE, SEE DETAIL THIS SHEET APPROXIMATE EXISTING GROUND SURFACE 56' ELEVATION OF GROUNDWATER BARRIER TRENCH BOTTOM AT POND APPROX. STATION 12+17 APPROXIMATE WATER TABLE MEASURED 1-6-2011 ~ EXISTING POND (BREACHED) CLEANOUT (TYP.) 200' O.C. PROJECT NUMBER OF:DRAWING:DRAWING PATH: q:\4305\15\173a edgecome\DWG\PROPOSED SOUTHEAST INTERCEPTOR TRENCH - GRADING PLAN.dwgWWW.SMEINC.COM9751 SOUTHERN PINE BLVDCHARLOTTE, NC 28273(704) 523-4726BYDESCRIPTIONDATENO.CHKAPVHORIZONTAL GRAPHIC SCALE LEGENDNOTES: 1.TOPOGRAPHIC MAP DEVELOPED BY GEODATA CORPORATION OF ZEBULON, NC USING PHOTOGRAMETRIC METHODS FROM AERIAL PHOTOGRAPHY FLOWN ON FEBRUARY 5, 2007. 2.GROUNDWATER MONITOR WELL, PIEZOMETER, AND METHANE GAS MONITOR WELL LOCATIONS SURVEYED BY SPRUILL & ASSOCIATES ON MAY 26, 2002, DECEMBER 23, 2004, AND SEPTEMBER 4, 2007 AND BY BATEMAN CIVIL SURVEY COMPANY, PC, ON OCTOBER 26, 2008. 3.TOPOGRAPHIC MAP UPDATED WITH GROUND SURVEY BY BATEMAN CIVIL SURVEY COMPANY, PC OF HOLLY SPRINGS, NC ON OCTOBER 26, 2008. 4.PROPERTY BOUNDARY OBTAINED FROM EDGECOMBE COUNTY GIS DEPARTMENT. VERTICAL GRAPHIC SCALE SOUTHEAST INTERCEPTOR TRENCH / HYDRAULIC BARRIER PROFILE SURFACE & GROUNDWATER IMPROVEMENTSEDGECOMBE COUNTY LANDFILLTARBORO, NORTH CAROLINA4305-15-173A 6 9PROPOSED SOUTHEAST INTERCEPTOR TRENCH- GRADING PLAN0 100 200 300 (IN FEET)GRAPHIC SCALE 0 20 40 60 (IN FEET)GRAPHIC SCALE 0 40 80 120 (IN FEET)GRAPHIC SCALE BORING LOCATION CLEAN OUT PORT SILT FENCE SLOPE MATTING INTERCEPTOR TRENCH DETAIL1 6 SOUTHEAST SECTIONNORTHWEST SECTION ■■0 06/07/17 ISSUED FOR CONSTRUCTION CLD MAT CJS DEFINITION CONTROL RUNOFF AND EROSION ON DISTURBED AREAS. ESTABLISH PERENNIAL VEGETATIVE COVER WITH SEED. PURPOSE REDUCE EROSION AND DECREASE SEDIMENT YIELD FROM DISTURBED AREAS AND PERMANENTLY STABILIZE SUCH AREAS FOR PLANT MATERIALS. SPECIFICATIONS SEEDBED REQUIREMENTS PREPARE SEEDBED FOR VEGETATION. ADD TOPSOIL LAYER TO COMPOSTED AREAS OF SOIL WITH POOR SOIL TEXTURE. ALLOW NO CONCENTRATED OVERLAND FLOW THROUGH SEEDBED AREAS. STABILIZE STEEP SLOPES TO ALLOW VEGETATION TO ESTABLISH ON SEEDBED. ESTABLISHMENT OF VEGETATION SHALL NOT BE ATTEMPTED ON SITES THAT ARE UNSUITABLE DUE TO EXCESSIVE SOIL COMPACTION, INAPPROPRIATE SOIL TEXTURE, POOR DRAINAGE, CONCENTRATED OVERLAND FLOW, OR STEEPNESS OF SLOPE UNTIL MEASURES HAVE BEEN TAKEN TO CORRECT THESE PROBLEMS. TO MAINTAIN A GOOD STAND OF VEGETATION, THE SOIL SHALL MEET CERTAIN MINIMUM REQUIREMENTS AS A GROWTH MEDIUM. THE SOIL SHALL HAVE THESE CRITERIA: ·4 INCHES OF FINE-GRAINED (SILT AND CLAY) MATERIAL TO MAINTAIN ADEQUATE MOISTURE AND NUTRIENT SUPPLY (AVAILABLE WATER CAPACITY OF AT LEAST .05 INCHES WATER TO 1 INCH OF SOIL). ·THE DEPTH TO ROCK OR IMPERMEABLE LAYERS SUCH AS HARDPANS SHALL BE 12 INCHES OR MORE, EXCEPT ON SLOPES STEEPER THAN 2:1 WHERE THE ADDITION OF SOIL IS NOT FEASIBLE. ·PH RANGE FOR PLANT GROWTH, OF 6.0 - 6.5. ·NO LARGE ROOTS, BRANCHES, STONES, LARGE CLODS OF EARTH, OR TRASH OF ANY KIND. CLODS AND STONES MAY BE LEFT ON SLOPES STEEPER THAN 3:1 IF THEY ARE TO BE HYDRO SEEDED. WHEN EXISTING SOIL IS TOO COARSE, DENSE, SHALLOW OR ACIDIC TO FOSTER VEGETATION - SPECIAL AMENDMENTS ARE REQUIRED. SEEDBED PREPARATION INSTALL MECHANICAL EROSION AND SEDIMENTATION CONTROL PRACTICES BEFORE SEEDING, AND COMPLETE GRADING ACCORDING TO THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN. DETERMINE LIME AND FERTILIZER AMENDMENTS BY SOIL TEST. USE COUNTY AGRICULTURAL EXTENSION OFFICES OR COMMERCIAL LABORATORIES FOR SOIL TEST. EXAMPLE AMENDMENT RATES FOR SEEDING SHALL BE BASED ON RESULTS OF SOIL TEST. ·GROUND AGRICULTURAL LIMESTONE: LIGHT-TEXTURED, SANDY SOILS: 1 TO 1-1/2 TONS/ACRE HEAVY-TEXTURED, CLAYEY SOILS: 2-3 TONS/ACRE ·FERTILIZER: GRASSES: 800-1200 LB/ACRE OF 10-10-10 (OR THE EQUIVALENT) GRASS-LEGUME MIXTURES: 800-1200 LB/ACRE OF 5-10-10 (OR THE EQUIVALENT) APPLY LIME AND FERTILIZER EVENLY AND INCORPORATE INTO THE TOP 4-6 INCHES OF SOIL BY DISKING OR OTHER SUITABLE MEANS. OPERATE MACHINERY ON THE CONTOUR. WHEN USING A HYDRO SEEDER, APPLY LIME AND FERTILIZER TO A ROUGH, LOOSE SURFACE. ROUGHEN SURFACES PRIOR TO SEEDING. COMPLETE SEEDBED PREPARATION BY BREAKING UP LARGE CLODS AND RAKING INTO A SMOOTH, UNIFORM SURFACE (SLOPES LESS THAN 3:1). FILL IN OR LEVEL DEPRESSIONS THAT CAN COLLECT WATER. BROADCAST SEED INTO A FRESHLY LOOSENED SEEDBED THAT HAS NOT BEEN SEALED BY RAINFALL. SEEDING CONTRACTOR SHALL SCHEDULE SEEDING FOR DATES GIVEN IN THE SEEDING MIXTURE SPECIFICATIONS DESIGNATED AS "BEST" OR "POSSIBLE". SEEDINGS PROPERLY CARRIED OUT WITHIN THE "BEST" DATES HAVE A HIGH PROBABILITY OF SUCCESS. IT IS ALSO POSSIBLE TO HAVE SATISFACTORY ESTABLISHMENT WHEN SEEDING OUTSIDE THESE DATES. HOWEVER, AS YOU DEVIATE FROM THEM, THE PROBABILITY OF FAILURE INCREASES RAPIDLY. SEEDING ON THE LAST DATE SHOWN UNDER "POSSIBLE" MAY REDUCE CHANGES OF SUCCESS BY 30-50%. USE CERTIFIED SEED FOR PERMANENT SEEDING WHENEVER POSSIBLE. LABELING OF NON-CERTIFIED SEED IS ALSO REQUIRED BY LAW. LABELS CONTAIN IMPORTANT INFORMATION ON SEED PURITY, GERMINATION, AND PRESENCE OF WOOD SEEDS. SEEDS MUST MEET STATE STANDARDS FOR CONTENT OF NOXIOUS WEEDS. DO NO USE SEED CONTAINING "PROHIBITED" NOXIOUS WEED SEED. INOCULATE LEGUME SEED WITH THE RHIZOBIUM BACTERIA APPROPRIATE TO THE SPECIES OF LEGUME. APPLY SEED UNIFORMLY WITH A CYCLONE SEEDER, DROP-TYPE SPREADER, DRILL, CULTIPACKER SEEDER, OR HYDRO SEEDER ON A FIRM, FRIABLE SEEDBED. WHEN USING A DRILL OR CULTIPACKER SEEDER, PLANT SMALL GRAINS NO MORE THAN 1 INCH DEEP, GRASSES AND LEGUMES NO MORE THAN 1/2 INCH. EQUIPMENT SHALL BE CALIBRATED IN THE FIELD FOR THE DESIRED SEEDING RATE. WHEN USING BROADCAST-SEEDING METHODS, SUBDIVIDE THE AREA INTO WORKABLE SECTIONS AND APPLY THE AMOUNT OF SEED NEEDED FOR EACH SECTION. APPLY ONE-HALF THE SEED WHILE MOVING BACK AND FORTH ACROSS THE AREA, MAKING A UNIFORM PATTERN: THEN APPLY THE SECOND HALF IN THE SAME WAY, BUT MOVING AT RIGHT ANGLES TO THE FIRST PASS. MULCH ALL PLANTINGS IMMEDIATELY AFTER SEEDING. HYDRO SEEDING SURFACE ROUGHENING IS REQUIRED BEFOR HYDRO SEEDING, TO PROVIDE SOME NATURAL COVERAGE FOR LIME, FERTILIZER, AND SEED. THE SURFACE SHALL NOT BE COMPACTED OR SMOOTH. FINE SEEDBED PREPARATION IS NOT NECESSARY FOR HYDRO SEEDING OPERATIONS: LARGE CLODS, STONES, AND IRREGULARITIES PROVIDE CAVITIES IN WHICH SEEDS CAN LODGE. RATE OF WOOD FIBER (CELLULOSE) APPLICATION SHALL BE AT LEAST 2,000 LB/ACRE. APPLY LEGUME INOCULANTS AT FOUR TIMES THE RECOMMENDED RATE WHEN ADDING INOCULANT TO A HYDRO SEEDER SLURRY. IF A MACHINERY BREAKDOWN OF 1/2 TO 2 HOURS OCCURS, ADD 50% MORE SEED TO THE TANK, BASED ON THE PROPORTION OF THE SLURRY REMAINING. THIS SHOULD COMPENSATE FOR DAMAGE TO SEED. BEYOND 2 HOURS, A FULL RATE OF NEW SEED MAY BE NECESSARY. LIME IS NOT NORMALLY APPLIED WITH A HYDRAULIC SEEDER BECAUSE IT IS ABRASIVE. IT CAN BE BLOWN ONTO STEEP SLOPES IN DRY FORM. MAINTENANCE GENERALLY, A STAND OF VEGETATION CANNOT BE DETERMINED TO BE FULLY ESTABLISHED UNTIL SOIL COVER HAS BEEN MAINTAINED FOR ONE FULL YEAR FROM PLANTING. ENGINEER WILL INSPECT SEEDED AREAS FOR FAILURE AND THE CONTRACTORS SHALL MAKE NECESSARY REPAIRS AND RESEEDINGS WITHIN THE SAME SEASON, IF POSSIBLE. RESEEDING--IF A STAND HAS INADEQUATE COVER, RE-EVALUATE CHOICE OF PLANT MATERIALS AND QUANTITIES OF LIME AND FERTILIZER. CONTRACTOR SHALL RE-ESTABLISH THE STAND AFTER SEEDBED PREPARATION OR OVER- SEED THE STAND. CONTRACTOR TO PERFORM TEMPORARY SEEDING TEMPORARY, ANNUAL SPECIES IF THE TIME OF YEAR IS NOT APPROPRIATE FOR PERMANENT SEEDING. IF VEGETATION FAILS TO GROW, CONTRACTOR SHALL TEST SOIL TO DETERMINE IF ACIDITY OR NUTRIENT IMBALANCE IS RESPONSIBLE. FERTILIZATION--ON THE TYPICAL DISTURBED SITE, FULL ESTABLISHMENT USUALLY REQUIRES RE-FERTILIZATION IN THE SECOND GROWING SEASON. FINE TURF REQUIRES ANNUAL MAINTENANCE FERTILIZATION. USE SOIL TESTS IF POSSIBLE OR FOLLOW THE GUIDELINES GIVEN FOR THE SPECIFIC SEEDING MIXTURE. TEMPORARY SEEDING SPECIFICATIONS Seeding mixture (fall) Species* Rate (lb/acre) Rye Grain (Secale cereale)120 Seeding Mixture (late winter early spring) Species* Rate (lb/acre) Rye Grain (Secale cereale)120 Annual (Korean) Lespedeza (Kummerowia stipulacea)50 Seeding mixture (summer) Species* Rate (lb/acre) German Millet (Setaria italica)40 Seeding dates (Piedmont) Fall:Aug. 15 - Dec. 30 Late winter (early spring): Jan. 1 - May 1 Late Summer:May 1 - Aug. 15 Soil amendments Amend based on results of soil tests. MULCH APPLY 4,000 LB/ACRE STRAW. ANCHOR MULCH TO PREVENT MOVEMENT. MAINTENANCE CONTRACTOR TO RE-FERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, RE-FERTILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. PURSUANT TO G.S. 113A-57(2), THE ANGLE FOR GRADED SLOPES AND FILLS SHALL BE NO GREATER THAN THE ANGLE THAT CAN BE RETAINED BY VEGETATIVE COVER OR OTHER ADEQUATE EROSION-CONTROL DEVICES OR STRUCTURES. IN ANY EVENT, SLOPES LEFT EXPOSED WILL, WITHIN 21 CALENDAR DAYS OF COMPLETION OF ANY PHASE OF GRADING, BE PLANTED OR OTHERWISE PROVIDED WITH TEMPORARY OR PERMANENT GROUND COVER, DEVICES, OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION. PURSUANT TO G.S. 113A-57(3), PROVISIONS FOR PERMANENT GROUNDCOVER SUFFICIENT TO RESTRAIN EROSION MUST BE ACCOMPLISHED FOR ALL DISTURBED AREAS WITHIN 15 WORKING DAYS OR 90 CALENDAR DAYS (WHICHEVER IS SHORTER) FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT. *REF: 6.10 A,B AND C, NC EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, 2006 PERMANENT SEEDING SPECIFICATIONS Seeding mixture Species*Rate (lb/acre) Centipede Grass (Eremochloa ophiuroides) (Grass lined Channels) 200 Centipede Grass (Eremochloa ophiuroides) (Other Areas)100 Nurse plants Between May 1 and Aug. 15, add 10 lb/acre German millet (Setaria italica) or 15 lb/acre Sudan grass. Prior to May 1 or after Aug. 15, add 40 lb/acre Rye Grain (Festuca arundinacea). Seeding dates Best Possible Fall: Aug. 25 - Sept. 15 Aug. 20 - Oct. 25 Late winter:Feb. 15 - Mar. 21 Feb. 1 -Apr. 15 Soil amendments APPLY LIME AND FERTILIZER ACCORDING TO SOIL TESTS. MULCH APPLY 4,000-5,000 LB/ACRE GRAIN STRAW OR EQUIVALENT COVER OF ANOTHER SUITABLE MULCHING MATERIAL. ANCHOR MULCH TO PREVENT MOVEMENT. MAINTENANCE PURSUANT TO G.S. 113A-57(3), PROVISIONS FOR PERMANENT GROUNDCOVER SUFFICIENT TO RESTRAIN EROSION MUST BE ACCOMPLISHED FOR ALL DISTURBED AREAS WITHIN 15 WORKING DAYS OR 90 CALENDAR DAYS (WHICHEVER IS SHORTER) FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT. *REF: 6.11L NC EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, 2006 Contact Person Responsible for Maintenance Mr. Mike Cummings Telephone: (252) 827-4253 Cell: (252) 813-3947 Fax: (252) 827-6618 GENERAL NOTES: 1.DITCH LINES IMPACTED DURING CONSTRUCTION OR CONSTRUCTED AS PART OF PROJECT WORK MUST BE MATTED WITH NORTH AMERICAN GREEN MATTING TYPE SC-150, OR ENGINEER APPROVED EQUIVALENT. 2.APPLY SEED BEFORE LAYING THE NET OR MAT. IF OPEN-WEAVE NETTING IS USED, LIME MAY BE INCORPORATED BEFORE INSTALLING THE NET AND FERTILIZER AND SEED MAY BE SPRAYED ON AFTERWARD. 3.START LAYING THE NET FROM THE TOP OF THE CHANNEL OR SLOPE AND UNROLL IT DOWN THE GRADE. ALLOW NETTING TO LAY LOOSELY ON THE SOIL BUT WITHOUT WRINKLES-DO NOT STRETCH. 4.TO SECURE THE NET, BURY ONLY THE UPSLOPE END IN A SLOT OR TRENCH NO LESS THAN 12 INCHES DEEP, COVER WITH SOIL, AND TAMP FIRMLY. STAPLE THE NET EVERY 12 INCHES ACROSS THE TOP END EVERY 3 FEET AROUND THE EDGES AND BOTTOM. WHERE 2 STRIPS OF NET ARE LAID SIDE BY SIDE, THE ADJACENT EDGES SHALL BE OVERLAPPED 3 INCHES AND STAPLED TOGETHER. EACH STRIP OF MATTING SHALL ALSO BE STAPLED DOWN THE CENTER, EVERY 3 FEET. MAINTENANCE NOTES: 1.INSPECT ROLLED EROSION CONTROL PRODUCTS (RECP) AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (0.5" OR GREATER) RAIN FALL EVENT. 2.GOOD CONTACT WITH THE GROUND MUST BE MAINTAINED, AND EROSION MUST NOT OCCUR BENEATH THE RECP. 3.ANY AREAS OF THE RECP THAT ARE DAMAGED OR NOT IN CLOSE CONTACT WITH THE GROUND SHALL BE REPAIRED AND STAPLED. 4.IF EROSION OCCURS DUE TO POORLY CONTROLLED DRAINAGE, THE PROBLEM SHALL BE FIXED AND THE ERODED AREA PROTECTED. 5.MONITOR AND REPAIR THE RECP AS NECESSARY UNTIL GROUND COVER IS ESTABLISHED, *REF: 6.17.12 NC Erosion and Sediment Control Planning and Design Manual, 2006 ANCHOR MATTING IN A 12" TRENCH JOIN STRIPS BY ANCHORING AND OVERLAPPING 12" OVERLAP IN CHANNELS, ROLL OUT STRIPS OF MATTING PARALLEL TO THE DIRECTION OF FLOW. DIRECTION OF STREAM FLOW SLOT OR TRENCH DEFINITION A CHANNEL WITH VEGETATIVE LINING CONSTRUCTED TO DESIGN CROSS SECTION AND GRADE FOR CONVEYANCE OF RUNOFF. PURPOSE TO CONVEY AND DISPOSE OF CONCENTRATED SURFACE RUNOFF WITHOUT DAMAGE FROM EROSION, DEPOSITION, OR FLOODING. CONSTRUCTION SPECIFICATIONS 1.REMOVE ALL TREES, BRUSH, STUMPS, AND OTHER OBJECTIONABLE MATERIAL FROM THE FOUNDATION AREA AND DISPOSE OF PROPERLY. 2.EXCAVATE OR PLACE FILL AND COMPACT AS SPECIFIED TO CONSTRUCT THE CHANNEL AND SHAPE IT TO DIMENSIONS SHOWN ON THE PLANS PLUS A 0.2-FT OVERCUT AROUND THE CHANNEL PERIMETER TO ALLOW FOR BULKING DURING SEEDBED PREPARATIONS AND SOD BUILDUP. 3.REMOVE AND PROPERLY DISPOSE OF ALL EXCESS SOIL SO THAT SURFACE WATER MAY ENTER THE CHANNEL FREELY. 4.VEGETATE THE CHANNEL AS PER PROJECT SPECIFICATIONS. MAINTENANCE DURING THE ESTABLISHMENT PERIOD, CHECK GRASS-LINED CHANNELS AFTER ONE HALF INCH OR MORE RAIN EVENTS. AFTER GRASS IS ESTABLISHED, PERIODICALLY CHECK THE CHANNEL; CHECK IT AFTER EVERY HEAVY RAINFALL EVENT. IMMEDIATELY MAKE REPAIRS. IT IS PARTICULARLY IMPORTANT TO CHECK THE CHANNEL OUTLET AND ALL ROAD CROSSINGS FOR BANK STABILITY AND EVIDENCE OF PIPING OR SCOUR HOLES. REMOVE ALL SIGNIFICANT SEDIMENT ACCUMULATIONS TO MAINTAIN THE DESIGN CARRYING CAPACITY. KEEP THE GRASS IN A HEALTHY, VIGOROUS CONDITION AT ALL TIMES, SINCE IT IS THE PRIMARY EROSION PROTECTION FOR THE CHANNEL (SEE SEEDING SPECIFICATIONS). INSPECT ALL MULCHES PERIODICALLY AND AFTER RAINSTORMS TO CHECK FOR RILL EROSION, DISLOCATION, OR FAILURE. WHERE EROSION IS OBSERVED, APPLY ADDITIONAL MULCH. IF WASHOUT OCCURS, REPAIR THE SLOPE GRADE, RESEED, AND REINSTALL MULCH. CONTINUE INSPECTIONS UNTIL VEGETATION IS FIRMLY ESTABLISHED. 1 3 OR 4 VARIES 1 3 OR 4 VARIES 10' CHANNELS ARE TO BE LINED WITH NORTH AMERICAN GREEN C-150 (OR EQUAL). CHANNEL SOUTH AND WEST OF LANDFILL TO BE CONSTRUCTED AT A 0.65% SLOPE.A'A9" (MIN) 15" MAX AT CENTER 8 OZ/SY NON-WOVEN GEOTEXTILE 8 OZ/SY NON-WOVEN GEOTEXTILE CLASS B RIPRAP GENERAL NOTES : MAINTENANCE NOTES : 1.SPACE CHECK DAM IN A CHANNEL SO THAT THE CREST OF DOWNSTREAM DAM IS AT ELEVATION OF THE TOE OF UPSTREAM CHECK DAM. PLACE CHECK DAMS BETWEEN STA. 1+00 AND STA. 26+00. 2.CLASS B RIPRAP SHALL BE PLACED OVER THE CHANNEL BANKS TO KEEP WATER FROM CUTTING AROUND THE DAM. 1.INSPECT CHECK DAMS AND CHANNELS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (0.5" OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. CLEAN OUT SEDIMENT, STRAW, LIMBS, OR OTHER DEBRIS THAT COULD CLOG THE CHANNEL WHEN NEEDED. 2.ANTICIPATE SUBMERGENCE AND DEPOSITION ABOVE THE CHECK DAM AND EROSION FROM HIGH FLOWS AROUND THE EDGES OF THE DAM. CORRECT ALL DAMAGE IMMEDIATELY. IF SIGNIFICANT EROSION OCCURS BETWEEN DAMS, ADDITIONAL MEASURES CAN BE TAKEN SUCH AS, INSTALLING A PROTECTIVE RIPRAP LINER IN THAT PORTION OF THE CHANNEL (PRACTICE 6.31, RIPRAP-LINE AND PAVED CHANNELS). 3.REMOVE SEDIMENT ACCUMULATED BEHIND THE DAMS AS NEEDED TO PREVENT DAMAGE TO CHANNEL VEGETATION, ALLOW THE CHANNEL TO DRAIN THROUGH THE STONE CHECK DAM, AND PREVENT LARGE FLOWS FROM CARRYING SEDIMENT OVER THE DAM. ADD STONES TO DAMS AS NEEDED TO MAINTAIN DESIGN HEIGHT AND CROSS SECTION. *REF: 6.83.3 NC Erosion and Sediment Control Planning and Design Manual, 2006 FLARED-END SECTION OUTLET CLASS A RIPRAP UNDERLAIN WITH 8 OZ/SY NON-WOVEN GEOTEXTILE CLASS A RIPRAP SEE TABLE BELOW 8 OZ/SY NON-WOVEN GEOTEXTILE DEFINITION A STRUCTURE DESIGNED TO CONTROL EROSION AT THE INLET OR OUTLET OF A CHANNEL OR CONDUIT. PURPOSE TO PREVENT EROSION AT THE OUTLET OF A CHANNEL OR CONDUIT BY REDUCING THE VELOCITY OF FLOW AND DISSIPATING THE ENERGY. CONSTRUCTION SPECIFICATIONS 1.ENSURE THAT THE SUBGRADE FOR THE FILTER AND RIPRAP FOLLOWS THE REQUIRED LINES AND FINAL GRADES SHOWN IN THE PLAN. COMPACT ANY FILL REQUIRED TO THE PROJECT SPECIFICATIONS. LOW AREAS IN THE SUBGRADE ON UNDISTURBED SOIL MAY ALSO BE FILLED BY INCREASING THE RIPRAP THICKNESS. 2.THE RIPRAP AND GRAVEL FILTER MUST CONFORM TO THE SPECIFIED GRADING LIMITS SHOWN ON THE PLANS. 3.FILTER CLOTH, MUST MEET DESIGN REQUIREMENTS AND BE PROTECTED FROM PUNCHING OR TEARING DURING INSTALLATION. REPAIR ANY DAMAGE BY REMOVING THE RIPRAP AND PLACING ANOTHER PIECE OF FILTER CLOTH OVER THE DAMAGED AREA. ALL CONNECTING JOINTS SHOULD OVERLAP A MINIMUM OF 1 FT. IF THE DAMAGE IS EXTENSIVE, REPLACE THE ENTIRE FILTER CLOTH. 4.RIPRAP MAY BE PLACED BY EQUIPMENT, BUT TAKE CARE TO AVOID DAMAGING THE FILTER. 5.THE MINIMUM THICKNESS OF THE RIPRAP SHOULD BE 1.5 TIMES THE MAXIMUM STONE DIAMETER. 6.RIPRAP SHALL MEET THE REQUIREMENTS OF THE CURRENT VERSION OF THE NCDOT STANDARD SPECIFICATIONS FOR ROAD AND STRUCTURES, ITEM 1042. 7.CONSTRUCT THE APRON ON ZERO GRADE WITH NO OVERFALL AT THE END. MAKE THE TOP OF THE RIPRAP AT THE DOWNSTREAM END LEVEL WITH THE RECEIVING AREA OR SLIGHTLY BELOW IT. 8.ENSURE THAT THE APRON IS PROPERLY ALIGNED WITH THE RECEIVING STEAM AND PREFERABLY STRAIGHT THROUGHOUT ITS LENGTH. IF A CURVE IS NEEDED TO FIT SITE CONDITIONS, PLACE IN THE UPPER SECTION OF THE APRON. 9.IMMEDIATELY AFTER CONSTRUCTION, STABILIZE ALL DISTURBED AREAS WITH VEGETATION. MAINTENANCE INSPECT RIPRAP OUTLET STRUCTURES AFTER ONE HALF INCH OR MORE RAIN EVENTS TO SEE IF ANY EROSION AROUND OR BELOW THE RIPRAP HAS TAKEN PLACE OR IF STONES HAVE BEEN DISLODGED. IMMEDIATELY MAKE ALL NEEDED REPAIRS TO PREVENT FURTHER DAMAGE. REFERENCE N.C. EROSION AND SEDIMENTATION CONTROL PLANNING AND DESIGN MANUAL, 2006. MAX. SUMMARY OF PROTECTION APRONS DISCHARGE P (FT) D (FT) LA P (FT) W A (FT) W (IN) T 50 (IN) D (IN)PIPE LOCATION APRON LABEL HYDRAULIC BARRIER 0.50 6 3.00 9.00 9.00 4.00 6.00HB-1 PROJECT NUMBER OF:DRAWING:DRAWING PATH: q:\4305\15\173a edgecome\DWG\D1249.dwgWWW.SMEINC.COM9751 SOUTHERN PINE BLVDCHARLOTTE, NC 28273(704) 523-4726BYDESCRIPTIONDATENO.CHKAPVEXISTING GRASS LINED DITCH DETAIL5 7 TYPICAL TEMPORARY MATTING DETAIL4 7 6 7 LEGEND FIGURE NUMBER DETAIL NUMBER CHECK DAM DETAIL3 7 ENERGY DISSIPATER6 7 SURFACE & GROUNDWATER IMPROVEMENTSEDGECOMBE COUNTY LANDFILLTARBORO, NORTH CAROLINA4305-15-173A 7 9DETAILS (SHEET 1 OF 3)GENERAL SEEDING SPECIFICATIONS2 7 0 06/07/17 ISSUED FOR CONSTRUCTION CLD MAT CJS GENERAL NOTES: 1.DISTURBED SLOPES SHALL BE STABILIZED POST-CONSTRUCTION WITH NORTH AMERICAN GREEN SC-150 MATTING AS PER DETAIL ABOVE. 2.START LAYING THE NET FROM THE TOP OF THE SLOPE AND UNROLL IT DOWN THE GRADE. ALLOW NETTING TO LAY LOOSELY ON THE SOIL BUT WITHOUT WRINKLES-DO NOT STRETCH. 3.TO SECURE THE NET, BURY ONLY THE UPSLOPE END IN A SLOT OR TRENCH NO LESS THAN 12 INCHES DEEP, COVER WITH SOIL, AND TAMP FIRMLY. STAPLE THE NET EVERY 12 INCHES ACROSS THE TOP END EVERY 3 FEET AROUND THE EDGES AND BOTTOM. WHERE 2 STRIPS OF NET ARE LAID SIDE BY SIDE, THE ADJACENT EDGES SHALL BE OVERLAPPED 3 INCHES AND STAPLED TOGETHER. EACH STRIP OF MATTING SHALL ALSO BE STAPLED DOWN THE CENTER, EVERY 3 FEET. TOE IN THE UPSTREAM EDGE OF MATTING. 4.APPLY SEED BEFORE LAYING THE NET OR MAT. IF OPEN-WEAVE NETTING IS USED, SEED MAY BE SPRAYED ON AFTERWARD. MAINTENANCE NOTES: 1.INSPECT ROLLED EROSION CONTROL PRODUCTS (RECP) AT LEAST ONCE EVERY 7 CALENDAR DAYS AND AFTER EACH RAINFALL EVENT THAT EXCEEDS 0.5 INCHES. 2.GOOD CONTACT WITH THE GROUND MUST BE MAINTAINED, AND EROSION MUST NOT OCCUR BENEATH THE RECP. 3.ANY AREAS OF THE RECP THAT ARE DAMAGED OR NOT IN CLOSE CONTACT WITH THE GROUND SHALL BE REPAIRED AND STAPLED. 4.IF EROSION OCCURS DUE TO POORLY CONTROLLED DRAINAGE, THE PROBLEM SHALL BE FIXED AND THE ERODED AREA PROTECTED. 5.MONITOR AND REPAIR THE RECP AS NECESSARY UNTIL GROUND COVER IS ESTABLISHED. *REF: 6.17.12 NC Erosion and Sediment Control Planning and Design Manual, 2006 1. 12" (30 cm) (15 cm) 6" 3. 2"-5" 4. (5cm-12.5cm) 5. (7.5cm) 3" 2. (15 cm) 6" FLOW TOE IN UPSTREAMEDGE OF MATTING FABRICGENERAL NOTES: 1.PREFABRICATED SILT FENCE IS NOT ACCEPTABLE ON THIS PROJECT. 2.STEEL POSTS SPACED NOT MORE THAN 8 FEET APART SHALL BE USED ON THIS PROJECT INSTEAD OF WOOD POSTS. 3.FILTER FABRIC FENCE SHALL BE A MINIMUM OF 32" IN WIDTH AND SHALL HAVE A MINIMUM OF 6 LINE WIRES WITH 12" STAY SPACING. 4.WOVEN FILTER FABRIC SHALL BE USED WHERE SILT FENCE IS TO REMAIN FOR A PERIOD OF MORE THAN 30 DAYS. 5.STEEL POSTS SHALL BE 5'-0" IN HEIGHT AND BE OF THE SELF-FASTENER ANGLE STEEL TYPE. 6.TURN SILT FENCE UP SLOPE AT ENDS. 7.SILT FENCE SHALL BE STANDARD STRENGTH FILTER FABRIC WITH WIRE MESH REINFORCEMENT OR EXTRA STRENGTH FILTER FABRIC. 8.WHEN FABRIC IS USED WITH WIRE MESH, 8' CENTERED POSTS MAY BE USED. 9.THE USE OF SILT FENCE IN AREAS OF CONCENTRATED FLOW IS INAPPROPRIATE ANCHOR SKIRT 4" MINIMUM FILTER FABRIC STEEL POST 20-24" FILTER36"STEEL 24"WOVEN FILTER FABRIC 8" MAINTENANCE NOTES: 1.INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. 2.SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. 3.REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. 4.REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. *REF: 6.62.7 NC Erosion and Sediment Control Planning and Design Manual, 2006 (8' MAX) RUNOFF FLOW GENERAL NOTES: 1.SPACE WATTLES ACCORDING TO TABLE 1 ALONG ANY PORTION OF DITCHLINE WITH A SLOPE OF 5 PERCENT OR GREATER AND A SLOPE LENGTH OF 50 FEET OR GREATER. TABLE 1: WATTLE SPACING SPACING DISTANCE (FT. O.C.) SLOPE (%) 12" DIA. 18" DIA. 5 20 30 6 17 25 7 14 21 8 13 19 9 11 17 10 10 15 2.PLACE FIRST WATTLE 1/2 SPACING DISTANCE FROM CREST OF QUALIFYING SLOPE. 3.SPACE WOODEN STAKES 3 FEET O.C. ON DOWNSTREAM SIDE THROUGH A MINIMUM OF 2 APERTURES. 4.PLACE CHECK DAMS OR WATTLES AT THE LOWER LIMITS OF EACH DAYS WORK. MAINTENANCE NOTES: 1.WATTLES SHALL BE INSPECTED AFTER INSTALLATION AND SIGNIFICANT (0.5" OR GREATER) RAINFALL EVENTS. 2.THERE ARE TO BE NO GAPS BETWEEN ADJACENT WATTLES OR BETWEEN SOIL SURFACE AND WATTLE BOTTOM. 3.REPAIR ANY UPSLOPE OR UNDERCUTTING DEFICIENCIES FOR PROPER PERFORMANCE. 4.REMOVE ALL FILTRATION IMPEDIMENTS INCLUDING SEDIMENT DEPOSITS AND LOOSE DEBRIS WHEN SUCH CONDITIONS IMPACT WATTLE FUNCTIONALITY. 5.SEDIMENT BUILD UP SHOULD NOT BE ALLOWED TO EXCEED ONE THIRD OF WATTLE HEIGHT. 6.MONITOR CHANGING CONDITIONS TO ANTICIPATE WATTLE REMOVAL OR REPLACEMENT. *REF: EASTCOAST EROSIONBLANKETS INSPECTION AND MAINTENANCE WWW.EROSIONBLANKETS.COM 36" MAX SPACING 12" MINIMUM 6" MAXIMUM 34" x 34" x 24" (MIN) WOOD STAKE WATTLE WATTLE 12" DIA. MINIMUM 3/4" x 3/4" WOOD STAKE BURY SILT FENCE AND HARDWARE CLOTH IN TRENCH 3'3'3' HARDWARE CLOTH (NO SILT FENCE) FLOW FLOW GENERAL NOTES: 1.USE NO. 5 OR NO. 57 STONE FOR SEDIMENT CONTROL 2.USE HARDWARE CLOTH 24 GAUGE WIRE MESH WITH 14" MESH OPENINGS. 3.INSTALL 5' SELF FASTENER ANGLE STEEL POST 2' DEEP MINIMUM 4.SPACE POST A MAXIMUM OF 3'. MAINTENANCE NOTES: 1.INSPECT OUTLETS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (0.5" OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. CLEAN OUT SEDIMENT, STRAW, LIMBS, OR OTHER DEBRIS THAT COULD CLOG THE OUTLET WHEN NEEDED. 2.SHOULD THE FABRICS OF THE OUTLET COLLAPSE, TEAR, OR BECOME INEFFECTIVE REPLACE THEM PROMPTLY. 3.REMOVE SEDIMENT ACCUMULATED BEHIND THE OUTLET AS NEEDED TO PREVENT DAMAGE SILT FENCE AND OUTLET MEASURES. ADD STONE TO OUTLET AS NEEDED TO MAINTAIN DESIGN HEIGHT AND CROSS SECTION. 4.REMOVE ALL FENCING AND OUTLET MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. *REF: NC DOT Roadway Standard Detail 1606.01 - Special Sediment Control Fence, 2006 1' 2' 2: 1 STEEL POST TOP OF SILT FENCE TO BE AT LEAST 1' ABOVE TOP OF STONE SILT FENCE STEEL POST NCDOT #57 WASHED STONE ANCHOR SKIRT 4" MINIMUM END SILT FENCE HEREEND SILT FENCE HERE 2H:1V2H : 1 V 8" END HARDWARE CLOTH HERE HARDWARE CLOTH ONLY NCDOT #57 WASHED STONE SILT FENCE ONLY SILT FENCE ONLY 12" COMPACTED SOIL LINER SUBGRADE SOILS 6" VEGETATIVE COVER 8 OZ NON-WOVEN GEOTEXTILE (SB-1 & SB-2) GENERAL NOTES: 1.SIDE SLOPES AND BOTTOM SHOULD BE EXCAVATED TO PROVIDE THE REQUIRED 12 INCHES OF COMPACTED SOIL LINER OR GCL, AND VEGETATIVE COVER FROM THE PROPOSED POND PLAN GRADES. FINAL GRADES ARE SHOWN ON THE PLAN VIEW. 2.COMPACTED SOIL LINER MATERIAL SHALL BE CLASSIFIED AS SC, CL, CH, ML, OR MH SOILS ACCORDING TO THE UNIFIED SOIL CLASSIFICATION SYSTEM. MATERIAL CAN BE OBTAINED FROM LANDFILL'S BORROW AREAS. MATERIAL SHALL HAVE A MAXIMUM SIZE ROCK FRAGMENT OF 1-INCH. THE COMPACTED SOIL LINER MATERIAL SHALL BE RAKED OR SIEVED BY THE CONTRACTOR, IF NECESSARY, TO REMOVE ALL ROCK FRAGMENTS GREATER THAN 1 INCH IN DIAMETER. NO MORE THAN 5 PERCENT OF THE COMPACTED SOIL LINER FILL MATERIAL SHOULD BE RETAINED ON THE NO. 4 SIEVE. 3.GEOSYNTHETIC CLAY LINER (ALTERNATIVE B) SHALL BE CETCO BENTOMAT DN OR EQUIVALENT. 4.COMPACTED SOIL LINER MATERIAL SHALL HAVE A MINIMUM LIQUID LIMIT OF 30 AND A MINIMUM PLASTICITY INDEX OF 10 OR AS SUBSEQUENTLY SPECIFIED BY THE ENGINEER BASED ON LABORATORY TESTING (ASTM D4318). 5.FIELD MOISTURE AND FIELD DENSITY TESTS WILL ALSO BE PERFORMED BY THE ENGINEER DURING SOIL PLACING AND COMPACTION TO DOCUMENT THE CONDITIONS OBTAINED BY THE CONSTRUCTION METHOD. 6.VEGETATIVE COVER SOIL CAN BE EXCAVATED SOIL (BACKFILL). SUBGRADE SOILS 12" VEGETATIVE COVER GEOSYNTHETIC CLAY LINER (GCL) PROJECT NUMBER OF:DRAWING:DRAWING PATH: q:\4305\15\173a edgecome\DWG\D1249.dwgWWW.SMEINC.COM9751 SOUTHERN PINE BLVDCHARLOTTE, NC 28273(704) 523-4726BYDESCRIPTIONDATENO.CHKAPVSURFACE & GROUNDWATER IMPROVEMENTSEDGECOMBE COUNTY LANDFILLTARBORO, NORTH CAROLINA4305-15-173A 8 9DETAILS ( SHEET 2 OF 3)7 8 TYPICAL POND COMPACTED SOIL LINER SCALE: NTS 8 8 TYPICAL WATTLE DETAIL SCALE: NTS 9 8 TYPICAL SLOPE MATTING DETAIL SCALE: NTS 10 8 SILT FENCE DETAIL SCALE: NTS 11 8 SILT FENCE OUTLET DETAIL SCALE: NTS 0 06/07/17 ISSUED FOR CONSTRUCTION CLD MAT CJS RIPRAP BASIN AND DIMENSIONS BASIN DIMENSIONS (FT.)GEOTEXTILE FABRIC (S.V.)RIPRAP CLASS WB WO HS LS LA D2D1 SB-3 1.5 1.5 8 OZ/SY NON-WOVEN NCDOT CLASS B16.0 3.5 1.25 12.5 6.25 RIPRAP DEPTHS (FT.) SEE NOTE B CLASS B RIPRAP (TYP.) 8 OZ / SQ. YD. NON-WOVEN GEOTEXTILE FABRIC DISSIPATOR POOLCULVERT CULVERT INVERT ELEVATION OR FLOWLINE ELEVATION EXIST CHANNEL LS APRON LA D C B A D C B A SECTION E - E 2:1 HS D1D1D12:1 D2FLATBOTTOM1 SEE NOTE A VAR./ M A X. 2: 1 CULVERT WOD1 SECTION D - D ℄ SECTION C - CD1CLASS B RIPRAP (TYP.) 8 OZ / SQ. YD. NON-WOVEN GEOTEXTILE FABRIC FLATBOTTOM 1 ℄ 1 2 1 2 1 2 D2SECTION B - B EXCAVATE TO THIS LINE AND BACKFILL WITH RIPRAP (TYP.) FLATBOTTOM 1 D2EMBANKMENT AS REQUIRED TO SUPPORT RIPRAP (TYP.) 1 2 ℄D20.45 (TYP. FOR 2:1 SLOPE) SECTION A - A 8 OZ / SQ. YD. NON-WOVEN GEOTEXTILE FABRIC CLASS B RIPRAP TOE OF EMBANKMENT SLOPE USUAL/MAX. 2:1USUAL/MAX. 2:1USUALMAX. 2:1SEE NOTE A 3 1 3 1 A BC D A BC D 2:1 2:1 LALS 2:1 2:1 E WOUSUAL/MAX. 2 :1USUAL/MAX. 2 :1USUALMAX. 2 :1 E TOP OF RIPRAP LIMITS OF RIPRAP BASIN PLAN VIEW ℄ OF BASIN TOP OF RIPRAP APRON FLATBOTTOM 1DISSIPATOR POOL FLATBOTTOM 1 ℄ EXISTING CHANNEL WBSEE NOTE A WARP BASIN TO CONFORM TO THE NATURAL STREAM CHANNEL. TOP OF RIPRAP IN FLOOR OF BASIN DISSIPATOR POOL OR APRON SHALL BE AT THE SAME OR LOWER ELEVATION THAN THE NATURAL CHANNEL BOTTOM SECTION A-A. MODIFY FLATBOTTOM WIDTH IF THE OPTIONAL EXTENDED TRANSITION IS REQUIRED. A SPECIAL NOTE 1 GENERAL NOTE DESIRABLE SLOPE IS 0.0% IN DISSIPATOR POOL FLATBOTTOM AND IN APRON FLATBOTTOM. HDPE RISER - - - 49.5 45.5 46 - - EX. SB-2EX. SB-1 ANTI SEEP COLLAR (PLASTIC) ANTI FLOTATION BLOCK (CONCRETE) EMERGENCY SPILLWAY WIDTH (ft) EMERGENCY SPILLWAY ELEV. (ft.) TOP OF DAM ELEV. (ft.) RISER CREST ELEV. (ft.) BARREL INVERT @ OUTLET (ft.) BARREL INVERT @ RISER (ft.) BARREL DIAMETER (in) RISER DIAMETER (in) SKIMMER ORIFICE (in) WITH VEGETATION EMBANKMENT STABILIZED 3:1 SLOPE MAX PRINCIPAL 1:1 BARREL SPILLWAY AND COMPACTED PLACED IN LAYERS SELECTED FILL EMERGENCY SPILLWAY COVERED WITH NAG P300 PERM MATTING ANTI-FLOTATION BLOCK TRASH RACK 2' DEEP MIN COLLAR ANTI-SEEP CUT-OFF TRENCH,CONC. ANTI-FLOTATION BLOCK HDPE SEE DETAIL BELOW SCHEDULE FOR SEDIMENT BASINS 50.8 52 - - 38.5 38 44 46.0 44.7 - - - PLASTIC SEDIMENTATION BASIN CONSTRUCTION SPECIFICATIONS 1.ALL BASIN PREPARATIONS: PLACE TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES PER THE PLANS. CLEAR, GRUB AND STRIP TOPSOIL FROM THE EMBANKMENT TO REMOVE VEGETATION, STUMPS, ROOTS, ORGANIC MATERIAL, TRASH, ROCK MATERIAL AND OTHER OBJECTIONABLE MATERIAL. REMOVE SEDIMENT, PERVIOUS MATERIAL, ORGANIC MATERIAL TO THE DESIGN ELEVATION AND DIMENSIONS OF THE BASIN KEEP BASIN DRY DURING CONSTRUCTION ACTIVITIES. STOCKPILE OR DISPOSE OF EXCAVATED MATERIAL IN DESIGNATED APPROVED LOCATIONS SHOWN ON THE PLANS. NOTE: TOPSOIL, ORGANIC RICH MATERIAL, MATERIAL SUITABLE FOR GENERAL FILL, AND MATERIAL THAT MEET THE PERMEABILITY REQUIREMENT OF 1 X 10-5 CM/SEC OR LESS AT 95 % COMPACTION TEST USING THE ASTM D-698 METHOD A WILL BE STOCKPILED FOR RE-USE. THE SEDIMENTATION BASIN FLOOR CONDITION SHALL BE OBSERVED AND EVALUATED BY THE ENGINEER OR HIS REPRESENTATIVE BEFORE COMPACTING. THE FLOOR OF THE BASIN SHALL BE GRADED TO THE FINAL ELEVATION SHOWN ON THE DRAWINGS AND GRADED BASIN SHALL BE COMPACTED WITH A MINIMUM 10-TON SMOOTH DRUM (NON-VIBRATORY) COMPACTOR AND THEN PROOF-ROLLED. PROOF-ROLL THE ENTIRE SEDIMENTATION BASIN FLOOR. THE PROOF ROLLING SHALL BE OBSERVED AND EVALUATED BY THE ENGINEER OR HIS REPRESENTATIVE. 2.CUT OFF TRENCH (SEDIMENTATION BASIN SB-3): EXCAVATE THE CUT-OFF TRENCH ALONG THE CENTERLINE OF THE EARTHEN FILL EMBANKMENT. CUT THE TRENCH TO STABLE SOIL MATERIAL BUT IN NO CASE MAKE IT LESS THAN TWO FEET DEEP. THE CUT-OFF TRENCH MUST EXTEND INTO BOTH ABUTMENTS TO AT LEAST THE ELEVATION OF THE RISER CREST. MAKE THE MINIMUM BOTTOM TRENCH WIDTH WIDE ENOUGH TO PERMIT OPERATION OF EXCAVATION AND COMPACTION EQUIPMENT BUT IN NO CASE LESS THAN A DIMENSION OF TWO FEET WIDE. MAKE SIDE SLOPES OF THE TRENCH NO STEEPER THAN 1:1. FILL MATERIAL PLACED FOR THE CUT-OFF TRENCH WILL BE PLACED IN NOT MORE THAN SIX INCH CONTINUOUS LOOSE LIFTS OVER THE ENTIRE TRENCH AREA. MACHINE COMPACT THE FILL USING A JUMPING JACK, RAMAX® SHEEP-FOOT ROLLER, (OR EQUAL) TO 95 PERCENT COMPACTION BY STANDARD PROCTOR DENSITY TESTING (ASTM D-698 METHOD A). PERMEABILITY OF THE COMPACTED FILL WILL NOT BE GREATER THAN 1 X 10-5 CM/SEC. EVALUATE DENSITY ON FILL MATERIAL IN THE CUT OFF TRENCH AT A FREQUENCY OF ONE TEST PER 100 LINEAR FEET OF TRENCH PER LIFT BUT NOT LESS THAN TWO TESTS PER LIFT. FAILED TESTS SHALL REQUIRE RE-COMPACTING AND RE-TESTING THE FAILED LIFT UNTIL ALL COMPACTION TESTS ARE 95% OR GREATER. SCARIFY THE COMPACTED FILL SURFACE BEFORE PLACING THE NEXT LIFT. 3.PRINCIPAL SPILLWAY BARREL AND RISER (SB-3): CONSTRUCT THE BARREL AND RISER ACCORDING TO THE SCHEDULE FOR SEDIMENT BASINS WITH THE EXCEPTION OF CREATING A 4" ORIFICE IN THE RISER. SECURELY ATTACH THE RISER TO THE BARREL OR BARREL STUB TO MAKE A WATER TIGHT CONNECTION. SECURE THE RISER TO THE ANTI-FLOATATION BLOCK. SECURE ALL CONNECTIONS BETWEEN BARREL SECTIONS BY APPROVED WATERTIGHT ASSEMBLIES. ATTACH BASIN SKIMMER TO RISER BY APPROVED WATERTIGHT ASSEMBLIES WITH AN 8" ORIFICE IN RISER. PLACE THE BARREL ON A FIRM SMOOTH FOUNDATION OF IMPERVIOUS SOIL (1 X 10-5 CM/SEC OR LESS). DO NOT USE PERVIOUS MATERIAL SUCH AS SAND, GRAVEL, SILT, OR CRUSHED STONE AS BACKFILL MATERIAL AROUND THE PIPE OR ANTI-SEEP COLLAR. PLACE THE FILL MATERIAL AROUND THE PIPE SPILLWAY IN 4-INCH LOOSE LAYERS AND COMPACT IT AROUND THE PIPE TO 95 PERCENT OR GREATER AS THE REST OF THE EMBANKMENT FILL. CARE MUST BE TAKEN NOT TO RAISE THE PIPE FROM FIRM CONTACT WITH ITS FOUNDATION WHEN COMPACTING UNDER THE PIPE HAUNCHES. PLACE A MINIMUM DEPTH OF TWO FEET OF HAND COMPACTED BACKFILL OVER THE PIPE SPILLWAY BEFORE CROSSING THE PIPE WITH COMPACTION EQUIPMENT OR CONSTRUCTION EQUIPMENT. ANCHOR THE RISER IN PLACE BY CONCRETE OR OTHER SATISFACTORY MEANS TO PREVENT FLOTATION (SB-3). IN NO CASE SHOULD THE PIPE CONDUIT BE INSTALLED BY CUTTING A TRENCH THROUGH THE DAM AFTER THE EMBANKMENT IS COMPLETE. 4.EMBANKMENT CONSTRUCTION: USE CLEAN FILL MATERIAL WITH PERMEABILITY OF 1 X 10-5 CM/SEC OR LESS EXCAVATED FROM THE APPROVED AREAS DESIGNATED ON THE PLANS. IT SHALL BE CLEAN MINERAL SOIL, FREE OF ROOTS, WOODY VEGETATION, ROCKS AND OTHER OBJECTIONABLE MATERIAL. SCARIFY AREAS AND EACH COMPACTED LIFT ON WHICH FILL IS TO BE PLACED BEFORE PLACING THE FILL. THE FILL OPTIMUM MOISTURE CONTENT SHALL BE MAINTAINED BETWEEN OPTIMUM AND THREE PERCENT ABOVE OPTIMUM. FILL SHALL BE COMPACTED NOT LESS THAN 95 PERCENT OF THE MAXIMUM DRY DENSITY AS DETERMINED BY ASTM D698 METHOD A. THE CONTRACTOR SHALL DEMONSTRATE SOIL DENSITY BY SOIL COMPACTION PER THE PLANS AND SPECIFICATIONS WITH A MINIMUM OF TWO DENSITY TESTS PER LIFT WITH TESTS SPACED EVENLY AND REPRESENTATIVE OF THE EMBANKMENT FILL. ONE FAILED TEST REQUIRES THAT THE LIFT BE RE-COMPACTED AND RE-TESTED AT TWO LOCATIONS UNTIL REQUIRED COMPACTION IS ACHIEVED. NO VEGETATIVE COVER MATERIAL SHALL BE PLACED ON COMPACTED FILL LAYERS BEFORE THE ENGINEER REVIEWS AND APPROVES THE DENSITY DATA FROM THE TESTING PERFORMED. THE ENGINEER MAY EVALUATE COMPACTION AND REPORT THE RESULTS TO THE CONTRACTOR. FAILED SOIL DENSITY TESTS PERFORMED BY THE ENGINEER WILL REQUIRE THAT THE COMPACTED MATERIAL BE REMOVED AND RE-INSTALLED PER THE PLANS AND SPECIFICATIONS. 5.SPILLWAY DISCHARGE: EFFLUENT TO FROM THE PRINCIPAL SPILLWAY BARREL (SB-3) SHALL DISCHARGE TO PLUNGE POOL ENERGY DISSIPATERS LINED WITH 8 OUNCE PER SQUARE YARD NON-WOVEN GEOTEXTILE (OR EQUAL) COVERED WITH COARSE AGGREGATE TYPE A3 (NCDOT CLASS B OR EQUAL RIP RAP) THAT WILL DISCHARGE THROUGH A SILT FENCE OUTLET. 6.EMERGENCY SPILLWAY: INSTALL THE EMERGENCY SPILLWAY IN THE UNDISTURBED SOIL. TOLERANCE TO DESIGN ELEVATIONS IS +/- 0.2 FEET; TOLERANCE TO DESIGN GRADES IS +/- 1.0 PERCENT; AND TOLERANCE FOR WIDTHS AND LENGTHS IS +/- 1.0 FOOT. NO DEVIATION FROM THE SPECIFIED TOLERANCES SHALL BE ALLOWED. MAT THE SPILLWAY WITH NAG P300 PERM MATTING. THE MATTING SHALL HAVE DIMENSIONS LARGE ENOUGH TO COVER THE BOTTOM AND SIDES AND EXTEND ONTO THE TOP OF THE DAM FOR ANCHORING IN A TRENCH. THE EDGES SHALL BE SECURED WITH 8-EINCH STAPLES OR PINS. THE FABRIC MUST BE LONG ENOUGH TO EXTEND DOWN THE SLOPE AND EXIT ONTO STABLE GROUND. THE WIDTH OF THE FABRIC SHALL BE ONE PIECE, TO PREVENT WATER FROM ACCESS BENEATH THE FABRIC; JOINING OR SPLICING OF SECTIONS ACROSS THE WIDTH SHALL NOT BE ALLOWED. THE LENGTH OF THE FABRIC MAY BE COMPOSED OF SECTIONS SPANNING THE ENTIRE SPILLWAY WIDTH. UPPER SECTIONS SHALL OVERLAP LOWER SECTIONS SO THAT WATER CANNOT FLOW UNDER THE FABRIC. SECURE THE UPPER EDGE AND SIDES OF THE FABRIC IN A TRENCH WITH STAPLES OR PINS. 7.INLETS: DISCHARGE WATER INTO THE BASIN IN A MANNER TO PREVENT EROSION. USE DIVERSIONS WITH OUTLET PROTECTION TO DIVERT SEDIMENT-LADEN WATER TO THE UPPER END OF THE POOL AREA TO IMPROVE BASIN TRAP EFFICIENCY (REFERENCES: RUNOFF CONTROL MEASURES AND OUTLET PROTECTION). 8.EROSION CONTROL: CONSTRUCT THE STRUCTURE SO THAT THE DISTURBED AREA IS MINIMIZED. DIVERT SURFACE WATER AWAY FROM THE BARE AREAS. COMPLETE THE EMBANKMENT BEFORE ADDITIONAL UPSTREAM AREA IS CLEARED. STABILIZE THE EMERGENCY SPILLWAY EMBANKMENT AND ALL SLOPED DISTURBED AREAS IMMEDIATELY AFTER CONSTRUCTION (REFERENCES: SURFACE STABILIZATION). 9.SAFETY: SEDIMENT BASINS MAY ATTRACT CHILDREN AND CAN BE DANGEROUS. AVOID STEEP SIDE SLOPES, FENCE AND MARK BASINS WITH WARNING SIGNS THAT STATE “NO TRESPASSING”. FOLLOW ALL STATE AND LOCAL REQUIREMENTS. 10.AFTER SB-3 IS STABILIZED: REMOVE SKIMMER, PATCH 8" ORIFICE IN RISER AND CREATE A 4" ORIFICE IN RISER AT SAME ELEVATION. MAINTENANCE CHECK SEDIMENT BASINS AFTER PERIODS OF SIGNIFICANT RUNOFF. REMOVE SEDIMENT AND RESTORE THE BASIN TO ITS ORIGINAL DIMENSIONS WHEN SEDIMENT ACCUMULATES TO ONE-HALF THE DESIGN DEPTH. CHECK THE EMBANKMENT, SPILLWAYS AND OUTLET FOR EROSION DAMAGE AND EVALUATE THE EMBANKMENT FOR PIPING AND SETTLEMENT. MAKE ALL NECESSARY REPAIRS IMMEDIATELY. REMOVE ALL TRASH AND DEBRIS FROM THE RISER AND POOL AREA. 2' MIN SEE DETAIL SEDIMENT BASIN SKIMMER 14 9 SB-3 6'x6' 2'x6'x6' 20 52 48 48.5 42 54 53.5 56 --4 14 9 SEE DETAIL SEDIMENT BASIN SKIMMER 12" STABILIZED OUTLET CLASS A RIPRAP LENGTH 4.5' WIDTH 5' MIN. PERSPECTIVE VIEW PVC TEE FLEXIBLE HOSE SCHEDULE 40 PVC PIPE PVC TEE PVC ELBOW PVC VENT PIPE PVC PIPE ½" HOLES IN UNDERSIDE PVC END CAP PVC END CAP “C” ENCLOSURE WATER ENTRY UNIT ARM ASSEMBLYFaircloth Skimmer Skimmer Size Orifice Size SB-3 8"6.2" 4' ~1 <4 INCH DIA. CLASS A RIPRAP RESTING PAD 2.0' SUPPORT ROPE TO WIRE TO PREVENT SAGGING COIR MESH OR SIMILAR, STAPLED OR TRENCHED INTO BOTTOM OR SIDE 4.0' STAKE TO SUPPORT WIRE CONSTRUCTION SPECIFICATION : MAINTENANCE : 1.GRADE THE BASIN SO THAT THE BOTTOM IS LEVEL FRONT TO BACK AND SIDE TO SIDE. 2.INSTALL POSTS ACROSS THE WIDTH OF THE SEDIMENT TRAP (PRACTICE 6.62, SEDIMENT FENCE). 3.STEEL POSTS SHOULD BE DRIVEN TO A DEPTH OF 24 INCHES, SPACED A MAXIMUM OF 4 FEET APART, AND INSTALLED UP THE SIDES OF THE BASIN AS WELL. THE TOP OF THE FABRIC SHOULD BE 6 INCHES HIGHER THAN THE INVERT OF THE SPILLWAY. TOPS OF BAFFLES SHOULD BE 2 INCHES LOWER THAN THE TOP OF THE BERMS. 4.INSTALL AT LEAST THREE ROWS OF BAFFLES BETWEEN THE INLET AND OUTLET DISCHARGE POINT. BASINS LESS THAN 20 FEET IN LENGTH MAY USE 2 BAFFLES. 5.INSTALL A SUPPORT WIRE ACROSS THE TOP OF THE MEASURE TO PREVENT SAGGING. 6.WRAP POROUS MATERIAL, LIKE JUTE BACKED BY COIR MATERIAL, OVER THE TOP WIRE. THE FABRIC SHALL HAVE FIVE TO TEN PERCENT OPENINGS IN THE WEAVE. ATTACH FABRIC TO A ROPE AND A SUPPORT STRUCTURE WITH ZIP TIES, WIRE, OR STAPLES. 7.THE BOTTOM AND SIDES OF THE FABRIC SHALL BE ANCHORED IN A TRENCH OR PINNED WITH 8-INCH EROSION CONTROL MATTING STAPLES. 8.DO NOT SPLICE THE FABRIC, BUT USE A CONTINUOUS PIECE ACROSS THE BASIN. INSPECT BAFFLES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL OF ONE HALF INCH OR MORE. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. MAINTAIN ACCESS TO THE BAFFLES. SHOULD THE FABRIC OF A BAFFLE COLLAPSE, TEAR, DECOMPOSE, OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. REMOVE SEDIMENT DEPOSITS WHEN IT REACHES HALF FULL TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE BAFFLES. AVOID DAMAGING THE BAFFLES DURING CLEANOUT. SEDIMENT DEPTH SHOULD NEVER EXCEED HALF THE DESIGNED STORAGE DEPTH. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED, REMOVE ALL BAFFLE MATERIALS AND UNSTABLE SEDIMENT DEPOSITS, BRING THE AREA TO GRADE, AND STABILIZE IT. 12' MIN.6" MIN.6" MIN.EXISTING GRADE 6" MIN. ABC STONE 6" MIN. NO.4 STONE NON-WOVEN GEOTEXTILE FABRIC MIRAFI HP370 OR EQUAL 14' MIN. REMOVE VEGETATION, PROOF ROLL, PLACE ONE LAYER 0F MIRAFI HP370 GEOTEXTILE, PLACE 6 INCHES MINIMUM OF NO. 4 STONE, PLACE 6 INCHES MINIMUM ABC STONE PER SPECIFICATIONS. THE CONTRACTOR SHALL NOT REMOVE LANDFILL CAP MATERIAL. 12 9 14 9 LEGEND FIGURE NUMBER DETAIL NUMBER PROJECT NUMBER OF:DRAWING:DRAWING PATH: q:\4305\15\173a edgecome\DWG\D1249.dwgWWW.SMEINC.COM9751 SOUTHERN PINE BLVDCHARLOTTE, NC 28273(704) 523-4726BYDESCRIPTIONDATENO.CHKAPVSURFACE & GROUNDWATER IMPROVEMENTSEDGECOMBE COUNTY LANDFILLTARBORO, NORTH CAROLINA4305-15-173A 9 9DETAILS (SHEET 3 OF 3)SEDIMENT BASIN DETAIL SCALE: NTS 16 9 POROUS BAFFLE DETAIL SCALE: NTS 14 9 SKIMMER DETAIL SCALE: NTS 13 9 PLUNGE POOL DETAIL SCALE: NTS 15 9 TEMPORARY ROAD OVER LANDFILL CAP SCALE: NTS 0 06/07/17 ISSUED FOR CONSTRUCTION CLD MAT CJS