HomeMy WebLinkAbout41J_INSP_20170926FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Page 1 of 3
UNIT TYPE:
Lined
MSWLF LCID X YW Transfer Compost SLAS COUNTY: Guilford
Closed
MSWLF HHW White
goods Incin T&P FIRM PERMIT NO.: 41-J
CDLF Tire T&P /
Collection Tire
Monofill Industrial
Landfill DEMO SDTF FILE TYPE: COMPLIANCE
Date of Site Inspection: September 26, 2017 Date of Last Inspection: September 27, 2016
FACILITY NAME AND ADDRESS:
Heritage Farm Properties LLC LCID Landfill
2124 Scalesville Road
Summerfield, NC 27358
GPS COORDINATES:
N: 36.22962 W: -79.89201
FACILITY CONTACT NAME AND PHONE NUMBER:
Mark Doggett, President - Doggett Construction Company, Inc.
w. 336-643-4103 x212 or 336-643-9437
c. 336-681-3333
dccmarkd@gmail.com
FACILITY CONTACT ADDRESS:
Doggett Construction Company, Inc.
Mark Doggett - President
2124 Scalesville Road
Summerfield, NC 27358
PARTICIPANTS:
John Patrone, Environmental Senior Specialist - Solid Waste Section (SWS)
Mark Doggett, President - Doggett Construction Company, Inc.
STATUS OF PERMIT:
Permit To Operate (PTO) issued December 10, 2015
PTO expiration date October 8, 2020
PURPOSE OF SITE VISIT:
Comprehensive Inspection
STATUS OF PAST NOTED VIOLATIONS:
None
OBSERVED VIOLATIONS:
None
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Page 2 of 3
ADDITIONAL COMMENTS
On September 26, 2017, John Patrone met with Mark Doggett to conduct a comprehensive inspection of the Heritage
Farm Properties LLC LCID Landfill on Scalesville Road in Summerfield, Guilford County.
1. The facility is a land clearing and inert debris (LCID) landfill.
2. The facility is not open to the public. The landfill is used by the Doggett Construction Company, Inc.
3. The facility permit, site plan, and operations plan were discussed.
4. The facility is operating in Phase 1.
5. Ensure Attachment 2 – Conditions of Permit to Construct are met prior to the operation of Phase 2 and Phase 3.
6. The facility is permitted to receive waste generated within Forsyth, Guilford and Rockingham Counties.
7. The facility is permitted to receive land clearing waste, yard trash, untreated and unpainted wood, uncontaminated
soil, inert debris, and (used) asphalt.
8. Mr. Doggett stated that uncovered land clearing debris (LCD) has been received within the last 30 days.
9. Per 15A NCAC 13B .0566(3), “Solid waste shall be restricted to the smallest area feasible and compacted as densely
as practical into cells.”
10. Per 15A NCAC 13B .0566(4), “Adequate soil cover shall be applied monthly, or when the active area reaches one
acre in size, whichever occurs first.”
11. Excavation, grading, and fill material side slopes shall not exceed three to one (3:1).
12. A ready supply of soil shall be available for cover material.
13. Permanent edge of waste markers have been installed along the working face area. The area to the right of the
active landfill area is dedicated to concrete and gravel storage and the area to the left will be future Phases 2 and 3.
14. The area adjacent to the LCID landfill is used for equipment, supplies, etc. associated with the operation of the
Doggett Construction Company.
15. The facility stockpiles concrete to be crushed. Crushed concrete is primary used by the Doggett Construction
Company.
16. The facility stockpiles used asphalt to be crushed. Used asphalt is primarily used by the Doggett Construction
Company.
17. Per the operations plan, the facility conducts a land clearing debris (LCD) passive compost operation.
18. The facility annual report (FAR) was received by the SWS, dated July 27, 2017. Estimated facility throughput for
July 2016 through June 2017 is 27,872 yd3. Contact Christine Ritter, SWS – Permitting Hydrogeologist, at 919-
707-8254 to discuss increasing the facility disposal rate.
19. There was no indication of erosion or runoff.
20. Access roads are of all-weather construction.
21. The facility is secured by a locked gate.
22. The facility has a proper sign.
23. The PTO expiration date is October 8, 2020.
24. The facility permit renewal application shall be submitted to the SWS by June 8, 2020.
The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance
with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an
administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit,
or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to
enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any
such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules.
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Page 3 of 3
Please contact me if you have any questions or concerns regarding this inspection report.
Phone: 336-776-9673
John Patrone
Environmental Senior Specialist
Regional Representative
Sent on: September 30, 2017 X Email Hand delivery US Mail Certified No. [ _]
Copies: Deb Aja, Western District Supervisor – SWS
Christine Ritter, Permitting Hydrogeologist – SWS
Gary Swing, Vice-President - Doggett Construction Company, Inc.
(w. 336-643-4103 x227, c. 336-681-3300 dcc4103@bellsouth.net)
Digital pictures taken September 26, 2017
by John Patrone, DWM – SWS
LCID landfill – view towards working face area (edge of waste markers in background)