Loading...
HomeMy WebLinkAbout3423_INSP_20170919FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 1 of 3 UNIT TYPE: Lined MSWLF LCID YW Transfer Compost X SLAS COUNTY: Forsyth Closed MSWLF HHW White goods Incin T&P X FIRM PERMIT NO.: 34-23 CDLF Tire T&P / Collection Tire Monofill Industrial Landfill DEMO SDTF FILE TYPE: COMPLIANCE Date of Site Inspection: September 19, 2017 Date of Last Inspection: April 20, 2015 FACILITY NAME AND ADDRESS: Forum 52 Yard Waste Facility 180 Northstar Drive Rural Hall, NC 27045 GPS COORDINATES: N: 36.207071° W: -80.288311 ° FACILITY CONTACT NAME AND PHONE NUMBER: Name: Jan McHargue, Solid Waste Administrator Telephone: (336) 747-7310 Email address: janm@cityofws.org FACILITY CONTACT ADDRESS: P. O. Box 2511 Winston-Salem, NC 27102 PARTICIPANTS: Wayne Turner, Yard Waste Processing Project Manager – City/County Utilities Division Ed Gibson, Solid Waste Engineer – City/County Utilities Division Susan Heim, Environmental Senior Specialist – Solid Waste Section STATUS OF PERMIT: Permit to Operate New Large Type 1 Compost Facility issued: July 26, 2005; Permit to Operate renewed: October 6, 2010; Permit to Operate renewed: October 6, 2015; Permit to Operate expires: October 6, 2020. PURPOSE OF SITE VISIT: Comprehensive Inspection STATUS OF PAST NOTED VIOLATIONS: None OBSERVED VIOLATIONS: None The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit, or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules. FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 2 of 2 ADDITIONAL COMMENTS 1. The facility consists of a large Type 1 compost facility that produces compost from leaves and yard waste. In addition, the facility accepts clean wood waste, including unpainted and untreated wood and wood pallets and land clearing debris, which is processed into mulch and boiler fuel. 2. The facility is permitted with a total capacity of 45,000 tons of materials received per year, including both the composting and wood waste operations. 3. In 2015, the city contracted with Wallace Farms to operate the facility on its behalf. Wallace Farms sub- contracts with Wrico, Inc. to handle the day-to-day operation of the site. Wrico’s responsibilities include assisting customers, screening and separating incoming loads, removing and disposing of unacceptable wastes, stockpiling ground materials and loading trailers. 4. City staff man the scale house and ensure that each incoming load is weighed. 5. The facility was observed to be clean and well-maintained, with no windblown material visible outside of the operations areas. 6. The entire facility is paved, including all access roadways and the drainage swale located beside the scale house. 7. All incoming loads proceed across the scales and into the wood waste receiving area, where they are directed by the equipment operator as to the desired unloading location. 8. A chain link fence surrounds the facility, and is secured with a locking gate when the facility is not open to the public. Proper signage was observed at the facility entrance. 9. Required buffers appeared to have been adhered to throughout the site. No wood waste was stockpiled within 25’ of any drainage ditches, swales or berms, as required by the permit. 10. Stockpiles of processed and unprocessed wood waste were sized to comply with the limits specified in the Permit to Operate. 11. The receiving/processing area for wood waste is located on the northern portion of the site, just west of the scale house. A large horizontal grinder is situated near the middle of this area, and was operating at the time of this inspection. 12. No fugitive dust emissions were observed. Mr. Turner stated that dust has never been a problem at the site. 13. A roll-off container was staged on the south end of wood waste processing area to hold segregated unacceptable wastes and other trash accumulated on the site. The container was full, and Mr. Turner indicated that they were awaiting pick-up and replacement of the container. 14. A large drainage swale runs between the wood waste receiving/processing area and the scale house, and directs all storm water to a grated storm drain located in the southern end of the swale. The top edge of the swale was lined with wattles that help slow and direct the storm water. 15. A pile of wood pallets and clean dimensional lumber was located near the grinder. Several pieces of engineered wood had been set aside from the pile awaiting proper disposal. 16. Large stumps and logs were staged for shearing prior to being run through the grinder. 17. As wood waste is processed, it is transported to the Wallace Farms facility in Davie County for further processing and marketing. 18. The southern portion of the facility is dedicated to composting operations. Only a small amount of yard waste was piled on this portion of the site. Mr. Turner explained that this material had come from collection of the city’s yard waste carts, which only hold smaller branches and yard trash. He added that this material would be transported to the Wallace Farms facility after being processed. 19. No compost piles were present at the facility during this inspection. Mr. Turner stated that composting operations would begin in November, with the arrival of leaves from the city’s curbside collection program. 20. No unacceptable materials or trash was observed in the composting area. 21. No ponding of water was observed on the site, and no objectional odors were detected. 22. The current Permit to Operate and approved Operations Plan were available onsite for review, along with a record of the most recent thermometer calibration, which took place on February 1, 2017. 23. Tonnage records and temperature logs were provided by Mr. Turner via email. 24. Tonnage records from fiscal years 2016-17 and 2017-18 to date were reviewed. In July 2017, 699.65 tons of materials were received; and, in August 2017, 814.39 tons of material were received. In FY 2016-17, 8,443.95 tons of materials were received and 3,067.59 tons were composted. FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 3 of 3 25. Temperature logs for FY 2016-17 were reviewed, and temperatures above 131°F were observed for all nine windrows on 3 consecutive dates. No data exists for the current fiscal year, since composting operations will not begin until November. Please contact me if you have any questions or concerns regarding this inspection report. ________________________________________ Phone: 336-776-9672 Susan Heim Environmental Senior Specialist Regional Representative Sent on: September 19, 2017 to Jan McHargue and Wayne Turner. X Email Hand delivery US Mail Certified No. [ ] Copies: Deb Aja, Western District Supervisor – Solid Waste Section Ed Gibson, Solid Waste Engineer – City/County Utilities Division