Loading...
HomeMy WebLinkAbout4117_A1SandrockCDLF_Response_to_comments_CQAPhase2B_DIN28444_201709051 Chao, Ming-tai From:Garrett, David <david.garrett@amecfw.com> Sent:Tuesday, September 05, 2017 2:51 PM To:Chao, Ming-tai; Raup, Michael; 'ronniepetty@a1sandrockinc.com' Cc:Mussler, Ed; Rice, Sarah M Subject:RE: A-1 Sandrock CQCD Report Attachments:Response to SWS emails 9-5-2017.pdf Please see the attached Financial Assurance calculations. Thank you. Please take note: After Sept 11, my corporate email address will change: david.garrett2@amecfw.com All other contact info will remain the same. Thank you. G. David Garrett, P.G., P.E. Senior Engineer Amec Foster Wheeler Environment & Infrastructure, Inc. 4021 Stirrup Creek Drive – Suite 100 Durham, North Carolina 27703 david.garrett@amecfw.com Phone: 919-381-9900 Direct line: 919-765-0070 Cell: 919-418-4375 From: Chao, Ming-tai [mailto:ming.chao@ncdenr.gov] Sent: Wednesday, August 16, 2017 1:03 PM To: Garrett, David <david.garrett@amecfw.com>; Raup, Michael <Michael.Raup@amecfw.com>; 'ronniepetty@a1sandrockinc.com' <ronniepetty@a1sandrockinc.com> Cc: Mussler, Ed <ed.mussler@ncdenr.gov>; Rice, Sarah M <sarah.rice@ncdenr.gov> Subject: RE: A-1 Sandrock CQCD Report Gentlemen: After conducting a quick research of the financial assurance/cost estimates for closure and post closure in the approved PTC -Phases 2 Application (DIN 24958) for A-1 Sandrock CDLF, I found out the PTC application only covered required costs for Phase 1 & Phase 2A, approximately 12.58 acres. The costs for closure and post- closure cares of Phase 2B (with waste footprint about 3.42 acres) is not included in the approved PTC document. Please prepare and submit the update Closure & Post-Closure Plan including cost estimates plus annual inflation adjustment & 1 million dollar PACA. The new FA mechanism to cover the costs over 16-acre Phases1 & 2 must be submitted to the Solid Waste Section for a review and approval prior to issuance of new PTO for Phases 2B. Thank you for your cooperation on this matter. Ming Chao 2 Ming-Tai Chao, P.E. Environmental Engineer Permitting Branch, Solid Waste Section NCDEQ, Division of Waste Management (Mailing Address) 1646 Mail Service Center Raleigh, NC 27699-1646 (Street Address) Green Square, 217 West Jones Street Raleigh, NC 27603 Tel. 919-707-8251 ming.chao@ncdenr.gov http://portal.ncdenr.org/web/wm/sw E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Chao, Ming-tai Sent: Wednesday, August 16, 2017 12:12 PM To: 'Garrett, David' <david.garrett@amecfw.com>; Raup, Michael <Michael.Raup@amecfw.com> Cc: Mussler, Ed <ed.mussler@ncdenr.gov>; Ritter, Christine <christine.ritter@ncdenr.gov> Subject: RE: A-1 Sandrock CQCD Report Gentlemen: The Solid Waste Section (SWS) received the CQA report for A-1 Sandrock CDLF – Phase 2B; this document was scanned and uploaded to the Laserfiche with a DIN 28401. The SWS will review the document shortly. Ming Chao Ming-Tai Chao, P.E. Environmental Engineer Permitting Branch, Solid Waste Section NCDEQ, Division of Waste Management (Mailing Address) 1646 Mail Service Center Raleigh, NC 27699-1646 (Street Address) Green Square, 217 West Jones Street Raleigh, NC 27603 Tel. 919-707-8251 ming.chao@ncdenr.gov http://portal.ncdenr.org/web/wm/sw E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. 3 From: Mussler, Ed Sent: Wednesday, August 16, 2017 11:24 AM To: Chao, Ming-tai <ming.chao@ncdenr.gov> Subject: FW: A-1 Sandrock CQCD Report From: Raup, Michael [mailto:Michael.Raup@amecfw.com] Sent: Monday, August 07, 2017 12:21 PM To: Mussler, Ed <ed.mussler@ncdenr.gov> Cc: Garrett, David <david.garrett@amecfw.com> Subject: A-1 Sandrock CQCD Report Mr. Mussler, Please find the attached CQCD Report for A-1 Sandrock Inc., CDLF. Michael Raup, P.E. Geotechnical Engineer, Amec Foster Wheeler Environment & Infrastructure 4021 Stirrup Creek Drive – Suite 100, Durham, North Carolina 27703, USA T +01 919 381 9343 M +01 423 943 1038 michael.raup@amecfw.com amecfw.com This message is the property of Amec Foster Wheeler plc and/or its subsidiaries and/or affiliates and is intended only for the named recipient(s). Its contents (including any attachments) may be confidential, legally privileged or otherwise protected from disclosure by law. Unauthorised use, copying, distribution or disclosure of any of it may be unlawful and is strictly prohibited. We assume no responsibility to persons other than the intended named recipient(s) and do not accept liability for any errors or omissions which are a result of email transmission. If you have received this message in error, please notify us immediately by reply email to the sender and confirm that the original message and any attachments and copies have been destroyed and deleted from your system. If you do not wish to receive future unsolicited commercial electronic messages from us, please forward this email to: unsubscribe@amecfw.com and include “Unsubscribe” in the subject line. If applicable, you will continue to receive invoices, project communications and similar factual, non-commercial electronic communications. Please click http://amecfw.com/email-disclaimer for notices and company information in relation to emails originating in the UK, Italy or France. MSE Wall PTC and Facility Plan Rev 2.0 Amec Foster Wheeler Project No. 6468-17-7032 A-1 Sandrock C&D Landfill (4117-CDLF) Phase 2 September 5, 2017 Facility Plan Page 5 PERMITTED CAPACITY A-1 Sandrock, Inc., CDLF (Permit #41-17) CDLF Phases/Sub-Phases 1 1A (Built) 1B (Built) 1C (Built) Approved Footprint Acreage 1 2.54 ac 3.18 ac 2.46 ac >>> 8.18 ac Interim Capacities (Sub-Phases) 2 62,370 cy 186,242 cy 221,720 cy >>> 470,332 cy Interim Elevations (Sub-Phases) EL. 810 EL. 830 EL. 840 New CDLF Phases/Sub-Phases 1 2A (Built) 2B (Pending) 3 4 Approved Footprint Acreage, 1 ac 4.40 3.42 5.89 0 Interim Capacities (Sub-Phases), 2 cy 250,383 357,810 647,787 505,536 Interim Elevations (Sub-Phases) EL. 846 EL. 846 EL. 854 EL. 904 Volumetric Capacity (Phase 2 only) ........................................................................ 608,193 cy Permitted Disposal Acreage (Phases 1&2) .............................................................. 16.00 acres Permitted Capacity (Phases 1&2) 3 .......................................................................... 1,078,524 cy Original Approved CDLF Footprint Acreage ......................................................... 21.89 acres Original Approved Total Capacity (Phases 1-4) 2 .................................................... 2,240,000 cy Operational Life Expectancy .................................................................................... 20 - 25 years 1 Corresponding to 5-year Operating Capacity 2 Includes Final Cap System and Operational Cover 3 This is what is now permitted pending approval of the Phase 2B PTO REVISED CAPACITY A-1 Sandrock, Inc., CDLF (Permit #41-17) CDLF Phases/Sub-Phases 1 1 (Built) 2 (Pending) 3 (Future) 4 4 Approved Footprint Acreage 1 8.18 ac 7.82 ac 5.89 0 3 Interim Capacities (Sub-Phases) 2 470,332 cy 608,192 cy 647,787 <505,536> Interim Elevations (Sub-Phases) EL. 840 EL. 846 EL. 854 EL. 904 Vertical Expansion/Sub-Phases 1 Stage 1 (under Review) New Ground Footprint Acreage, 1 ac 0 3 Interim Capacities (Sub-Phases), 2 cy 446,200 cy Interim Elevations (Sub-Phases) EL. 930 Permitted Disposal Acreage (Phases 1 – 2 Expansion) ........................................... 16.00 acres Estimated Capacity (Phases 1&2 + Stage 1 Expansion) ......................................... 1,524,727 cy Estimated Capacity (Phases 1-3 + Stage 1 Expansion) ........................................... 2,172,511 Approved CDLF Footprint Acreage ........................................................................ 21.89 acres Approved Total Capacity (Phases 1-4) 2 .................................................................. 2,240,000 cy Operational Life Expectancy .................................................................................... 25 - 30 years 5 1 Corresponding to 5-year Operating Capacity 2 Includes Final Cap System and Operational Cover 3 Vertical Expansion – not actual ground disturbance (does not add to total footprint area) 4 Subtract this volume to keep the total volume with the Stage 1 Expansion within the original permit volume 5 Time counted from beginning of the facility in 2009; the Stage 1 Expansion is projected to add 5 years MSE Wall PTC and Facility Plan Rev 2.0 Amec Foster Wheeler Project No. 6468-17-7032 A-1 Sandrock C&D Landfill (4117-CDLF) Phase 2 September 5, 2017 Closure/Post-Closure Page 77 require excelsior or turf-reinforcement mat (TRM), as specified in the Channel Schedule. Alternative erosion control products may be substituted with the engineer’s consent. Rolled erosion control materials should be installed according to the generalized layout and staking plan found in the Construction Plans or the manufacturer’s recommendations. Irrigation for landfill covers is not a typical procedure, but consideration to temporary irrigation may be considered if dry weather conditions prevail during or after the planting. Care should be taken not to over-irrigate in order to prevent erosion. Collected storm water will be suitable for irrigation water. Maintenance of the final cover vegetation, described in the Post-Closure Plan (see below), is critical to the overall performance of the cover. 8.2.1.6 Documentation – The Owner shall complete an “as-built” survey to depict final elevations of each final cover layer, i.e., top of the intermediate cover layer, top of the compacted soil barrier, and top of the vegetated soil layer, along with construction narrative to document any problems, amendments or deviations from the plan drawings. Records of all testing, including maps with test locations, shall be prepared by the third-party CQA testing firm. All materials pertaining to the closure shall be placed in the Operational Record for the facility. Whereas the closure will be incremental, special attention shall be given to keeping the closure records separate from the normal operational records. 8.2.2 Maximum Area/Volume Subject to Closure The largest anticipated area that will require final closure at any one time within the next 5-year period – including all of Phase 1 and half of Phase 2 is 11.6 acres. Intermediate cover shall be used on areas that have achieved final elevations until the final cover is installed. An annual adjustment is required by the Division for the open area (and the bond requirement). Based on the volumetric analysis (Appendix 1), the volume of Phase 1 and half of Phase 2 is 782,580 cubic yards (Section 1.3). 8.2.3 Closure Schedule Refer to the requirements outlined in Section 8.1.5 (above). 8.2.4 Closure Cost Estimate The following cost estimate is considered suitable for the Financial Assurance requirements (see Section 10.0). The Owner intends to build the second half of Phase 2, designated as Phase 2B (Cell 2B), which adds 3.42 acres to the previously permitted 12.58 acre footprint, for a total of 16.00 acres permitted within an approved 22-acre footprint. No area currently has a certified final cover in place. MSE Wall PTC and Facility Plan Rev 2.0 Amec Foster Wheeler Project No. 6468-17-7032 A-1 Sandrock C&D Landfill (4117-CDLF) Phase 2 September 5, 2017 Closure/Post-Closure Page 78 TABLE 8A ESTIMATED FINAL CLOSURE COSTS FOR PHASES 1 and 2 (2017 dollars) 1 VSL (topsoil)2 – 16.0 ac 38720 c.y. @ $4 / cubic yard $ 154,880 CSB (barrier)2 – 16.0 ac 44,528 c.y. @ $8 / cubic yard $ 356,224 Establish Vegetation 16.0 acres @ $1,500 per acre $ 24,000 Storm Water Piping 3 400 LF @ $35.00 / LF $ 14,000 Erosion Control Stone 3 18 tons @ $40.00 / ton $ 720 Cap Gas Vents (3/acre) 48 @ $100 ea $ 4,800 Testing and Surveying 4 Estimated 20 percent of above $ 110,925 Contingency Estimated 15 percent of above $ 83,194 Total Construction Cost (if contracted out) $ 748,743 Notes: 1 The calculation is intended to represent likely third-party construction costs for a hired contractor, not the Owner/Operator, based on knowledge of local construction costs for similar projects. These estimates meet NCDEQ Division of Waste Management financial assurance requirements; actual costs may be lower for construction by the Owner/Operator. Final closure work will be performed incrementally, spreading out the costs over the life of the project. 2 Includes soil work for regulatory requirements of 15A NCAC 13B .0543, i.e., a minimum of 18 inches of compacted soil barrier (max. permeability of 1 x 10-5 cm/sec) and 18 inches of topsoil (total soil thickness is 36 inches). For the compacted soil barrier, use a shrinkage factor of 15%; costs include surface preparation, soil procurement and transport costs, soil placement and compaction, machine/equipment costs, fuel costs 3 Conservative estimate based on similar project history; includes materials and installation 4 Includes Construction document and bidding, construction administrative fee, CQA field monitoring and lab testing, CQA reporting and certification, final survey for as-built drawings, recordation/notation fee MSE Wall PTC and Facility Plan Rev 2.0 Amec Foster Wheeler Project No. 6468-17-7032 A-1 Sandrock C&D Landfill (4117-CDLF) Phase 2 September 5, 2017 Closure/Post-Closure Page 81 TABLE 8B POST-CLOSURE MONITORING AND MAINTENANCE SCHEDULE Activity Frequency Yrs. 1 - 5 Frequency Yrs. 6-15 Frequency Yrs. 16-30 General - Inspect access gates, locks, fences, signs, site security Quarterly Quarterly Quarterly Maintain access roads, monitoring well access As needed As needed As needed Final Cover Systems/Stability - Inspect cap and slope cover for erosion, sloughing, bare spots in vegetation, make corrections as needed (1) Quarterly Semi- Annually Annually Storm Water/Erosion Control Systems - Inspect drainage swales and sediment basin for erosion, excess sedimentation (1) Quarterly Semi- Annually Annually Mow cover vegetation and remove thatch Semi-Annually Annually None (2) Inspect vegetation cover and remove trees Annually Annually Annually Landfill Gas Monitoring Quarterly (3) Quarterly (3) Quarterly (3) Ground Water Monitoring System - Check well head security, visibility Semi-Annually Semi- Annually Semi- Annually Ground Water Monitoring (4) Semi-Annually Semi- Annually Semi- Annually Notes: 1. Inspect after every major storm event, i.e., 25-year 24-hour design storm 2. Dependent on vegetation type, periodic mowing may be required 3. The Solid Waste Section may be petitioned for discontinuation of gas monitoring if no detections occur in gas sampling locations or on-site buildings 4. See current Ground Water Sampling and Analysis Plan MSE Wall PTC and Facility Plan Rev 2.0 Amec Foster Wheeler Project No. 6468-17-7032 A-1 Sandrock C&D Landfill (4117-CDLF) Phase 2 September 5, 2017 Closure/Post-Closure Page 82 8.3.2 Responsible Party Contact Mr. R.E. ‘Gene’ Petty, Sr. – Owner Mr. Ronnie E. Petty, III – Operator A-1 Sandrock, Inc. 2091 Bishop Road Greensboro, NC 27406 Tel. 336-855-8195 8.3.3 Planned Uses of Property Currently, there is no planned use for the landfill area following closure. The closed facility will be seeded with grass to prevent erosion. Any post-closure use of the property considered in the future will not disturb the integrity of the final cover or the function of the monitoring systems unless necessary (and to be accompanied by repairs or upgrades). Future uses shall not increase the potential threat to human health and the environment. 8.3.4 Post-Closure Cost Estimate The following cost estimate is considered representative of post-closure care costs for the Financial Assurance (see Section 10.0). This calculation includes all of Phase 1 and Phase 2, totaling 16.0 acres. TABLE 8C ESTIMATED POST-CLOSURE COSTS FOR PHASES 1 and 2 (in 2017 dollars) Annual Events Units Unit Cost Cost/ Event Annual Costs Reseeding/mulching and erosion repair (Assume 5% of 16.0 ac., once per year) 0.80 ac. $1,600 $1,280.00 $1,280.00 Mow final cap (twice per year) 16.0 ac. $25 $400.00 $800.00 Ground Water (semi-annual, 5 wells)* 6 ea. $400 $2400.00 $4800.00 Surface Water (semi-annual, 4 locations)* 4 ea. $350 $1400.00 $2800.00 Water quality analysis and reporting 2 ea. $2250 $4500.00 $4500.00 Landfill Gas Monitoring (quarterly) 4 ea. $500 $2000.00 $2000.00 Engineering inspection (annual basis) 1 ea. $1,500 $1,500.00 $1,500.00 Maintain storm water conveyances 1 ea. $1,000 $1,000.00 $1,000.00 Maintain access roads, gates, buildings 1 ea. $500 $500.00 $500.00 *Appendix I Detection Monitoring (Section 9.0) Total Estimated Annual Cost $19,180.00 30 years * $19,180.00 = $575,400.00 (See Section 10) MSE Wall PTC and Facility Plan Rev 2.0 Amec Foster Wheeler Project No. 6468-17-7032 A-1 Sandrock C&D Landfill (4117-CDLF) Phase 2 September 5, 2017 Financial Assurance Page 87 10.0 FINANCIAL ASSURANCE (15A NCAC 13B .0546) 15A NCAC 13B .0546 requires that Owners/Operators demonstrate financial assurance for closure and post-closure activities. Typically, for local government-owned facilities, said demonstration is based on a local government test. For private facilities, the posting of a performance bond or insurance policy is typically acceptable to the Division. Cost estimates for closure and post-closure of CDLF Phases 1 and 2 are presented in Sections 8.2.4 and 8.3.4, respectively. The following is a detailed analysis of the closure and post closure costs, based on the preceding, all in 2017 dollars, projected over the anticipated life of the landfill and 30 years of post-closure care. The Financial Assurance obligation should be recalculated for future years to account for inflation using annual multipliers furnished by NCDENR. It should be realized that the bond requirement is for the whole landfill that has a Permit to Operate – the liabilities both increase and decrease with time as phases are opened and others are closed. Thus, the amount of the post-closure instrument should be adjusted on an annual basis, consistent with Division policy. Acceptable financial assurance instruments include performance bonds, insurance policies, cash deposits and irrevocable letters of credit. SUMMARY OF CLOSURE AND POST-CLOSURE COST (2017 dollars) 1. Final Closure Construction (see Table 8A) $ 748,743.00 2. Projected Post-Closure Costs (see Table 8C)* $ 575,400 TOTAL CLOSURE/POST-CLOSURE COST $1,324,143.00 3. PACA** $1,000,000 TOTAL REQUIRED FINANCIAL ASSURANCE $2,324,143.00 Per Division rules, Owners/Operators must furnish an acceptable financial assurance instrument (e.g., performance bond, irrevocable letter of credit, insurance policy, other fiduciary instrument) within 30 days of notification of approval. *Assumes 30 years *Statutory changes enacted ca. 2008 and revised ca. 2010 require a separate bond for Potential Assessment and Corrective Action, also referred to as PACA. The minimum bond amount is currently $1M. MSE Wall PTC and Facility Plan Rev 2.0 Amec Foster Wheeler Project No. 6468-17-7032 A-1 Sandrock C&D Landfill (4117-CDLF) Phase 2 September 5, 2017 Plan Certification Page 88 11.0 CERTIFICATION This engineering plan for the A-1 Sandrock, Inc., C&D Landfill Phases 1 and 2 disposal unit has been prepared by, or under the responsible charge of, a North Carolina Licensed Professional Engineer to meet the requirements of 15A NCAC 13B .0539. The individual signature and seal below attests to compliance with this rule requirement. Signed ______________________ Printed G. David Garrett . Date September 5, 2017 . Not valid without the seal of the above-named licensed professional.