Loading...
HomeMy WebLinkAbout7904_INSP_20170825FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 1 of 7 UNIT TYPE: Lined MSWLF X LCID YW Transfer Compost SLAS COUNTY: Rockingham Closed MSWLF HHW White goods X Incin T&P X FIRM PERMIT NO.: 7904-MSWLF-1995 CDLF Tire T&P / Collection X Tire Monofill Industrial Landfill DEMO SDTF FILE TYPE: COMPLIANCE Date of Site Inspection: 08/25/2017 Date of Last Inspection: 07/25/2017 FACILITY NAME AND ADDRESS: Rockingham County Landfill 281 Shuff Road Madison, NC 27025 GPS COORDINATES: N: 36.36455° W: - 79.84336° FACILITY CONTACT NAME AND PHONE NUMBER: Name: Ronnie Tate, Engineering and Public Utilities Director Telephone: 336-342-8104 (office) – 336-634-7111 (mobile) Email address: rtate@co.rockingham.nc.us FACILITY CONTACT ADDRESS: P. O. Box 132 Wentworth, NC 27375 PARTICIPANTS: Martie Neugent, Landfill Supervisor – Rockingham County Kathryn Jolly, Solid Waste Program Manager – Rockingham County Ronnie Tate, Engineering & Public Utilities Director – Rockingham County Butch Joyce – Joyce Engineering Larry Frost, Permit Engineer – Solid Waste Section Susan Heim, Environmental Senior Specialist – Solid Waste Section STATUS OF PERMIT: 7904-MSWLF: Original Permit to Construct: Issued August 16, 1994 7904-MSWLF: Original Permit to Operate: Issued May 5, 1995 Permit Amendment 1: Issued July 21, 1997 Permit Amendment 2: Issued March 21, 2000 Permit to Operate Phase 2: Issued May 2, 2002 Permit to Construct Phase 3: January 23, 2006 Permit to Operate Phase 3: Issued May 23, 2007 Permit to Operate (Modification of Permitted Side Slopes): Issued April 9, 2009 Permit to Operate (Authorization to Construct Landfill Gas System): Issued April 25, 2011 Permit to Operate Phase 3 Vertical Expansion: Issued August 27, 2013 Permit Expires August 27, 2018 PURPOSE OF SITE VISIT: Partial Inspection STATUS OF PAST NOTED VIOLATIONS: FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 2 of 7 1. CORRECTIVE MEASURES IN PROGRESS: 15A NCAC 13B .1626(2)(a) cited for failure to completely cover all disposed solid waste with six inches of earthen material or the facility’s approved alternative daily cover (tarps) at the end of each operating day. Based on the county’s corrective action plan, the working face and all exposed waste at the facility would be adequately covered by June 30, 2017, and covered daily at the end of each operating day thereafter. Landfill operations were observed at the working face for about half an hour, beginning at approximately 4:30 pm. The working face was again found to be compact and well controlled, as it has been since the July 5, 2017 inspection. This represents a significant and successful change in landfill operating procedures that has helped to reduce windblown litter throughout the facility, and also to make the job of covering the day’s waste a much easier and shorter process. Landfill staff had covered the working face with one section of tarp, and one equipment operator was observed applying clean soil to areas surrounding it. When the equipment operator had finished, the working face was observed to be covered as required. Additional repairs to the side slopes and perimeter ditch were underway. Areas of the ditch that had been rip- rapped or matted, then overrun with sediment from unrepaired slopes above, had been cleaned again and protection had been increased around the inlets. Areas of the northern slopes were being prepared for seeding that Mr. Tate advised was scheduled to take place on August 30, 2017. In some areas where the side slopes still had erosion rills, uncovered waste was still visible. Follow-up inspections will be made to determine that all waste across the entire landfill unit is being covered as required by 15A NCAC 13B .1626(2)(a) in order to resolve this violation. Compact working face and operational area covered with tarp and clean soil. (Photo taken by S. Heim 8/25/17.) FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 3 of 7 2. CORRECTIVE MEASURES IN PROGRESS: 15A NCAC 13B .1626(7)(a) cited for failing to prevent silt from leaving the MSWLF facility. A great deal of work had been accomplished to control erosion at the landfill. In some cases, ditch line and inlet repairs were still being compromised due to water flow from unrepaired slopes above. Erosion and sedimentation were also observed on areas of the side slopes where repairs had not yet been completed. However, new vegetation was observed to be filling in some areas of the landfill that had been recently seeded, helping to stabilize those slopes. Runoff from the side slope has overtaken the rip-rap berm that functions as protection for the drop inlet below it. (Photo taken by S. Heim 8/25/17.) Erosion rills with exposed waste on an unrepaired section of landfill slope. Note sediment flow at the toe of the slope and the ditch line. (Photo taken by S. Heim 8/25/17.) FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 4 of 7 3. CORRECTIVE MEASURES IN PROGRESS: 15A NCAC 13B .1626(7)(b) cited for failing to prevent on-site erosion. Based on the revised corrective action plan submitted by Joyce Engineering, surface water diversion berms and slope drains will be constructed, and repairs will be made to the existing perimeter drainage ditch by mid-September 2017. Erosion was observed on several of the side slopes that had been previously repaired. Berms were being installed at several levels in various areas of the landfill slopes to slow the flow of surface water and help to curb erosion. New slope drains had been installed since the previous inspection on July 25, 2017. However, some of these slope drains were not tied in to the stormwater conveyance system at the toe of the landfill, and emptied onto the slope itself. In a site report, issued on September 1, 2017 by Joyce Engineering, photos indicated that seeding had taken place. Based on observations made during the inspection and conditions seen in these photos, it appears that there is the potential for additional erosion on the side slopes. 4. CORRECTIVE MEASURES IN PROGRESS: 15A NCAC 13B .1626(7)(c) cited for failing to provide for a vegetative cover sufficient to restrain erosion within 30 working days or 120 calendar days of completion of any phase of MSWLF development. New vegetation was in evidence on some of the previously seeded slopes, and additional seeding, including some spot seeding, had been scheduled for August 30, 2017. Mr. Neugent stated that the spot seeding would serve to repair areas that had been previously seeded but damaged by rain. Based on the revised corrective action plan submitted by Joyce Engineering, temporary seeding will be applied to the side slopes between now and mid-September, with permanent seeding scheduled to take place by September 30, 2017. 5. RESOLVED: 15A NCAC 13B .0203(d) cited for storing wood wastes in a single large pile with insufficient fire breaks and lanes. The wood waste storage area was observed. Most of the wood waste stockpile had been ground and a much of the newly processed material had been removed. Based on the greatly reduced size of the pile, adequate access was available for emergency workers or landfill staff. No grinding equipment was in evidence, and Ms. Jolly stated that the grinding contractor was currently hauling processed material. She did not know when the remaining grinding would be completed. 6. CORRECTIVE MEASURES IN PROGRESS: 15A NCAC 13B .0203(d) cited for accepting waste that the facility is not permitted to receive. During this inspection, some unacceptable materials, including fiberboard and Side slope and perimeter ditch repairs, with slope berm installed to slow water flow. Minor damage from recent rainfall can be seen, along with newly sprouted vegetation. (Photo taken by S. Heim 8/25/17.) FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 5 of 7 engineered wood, were again observed on the wood waste stockpile. Compliance cannot be demonstrated until the existing wood waste pile containing the unacceptable material is removed and disposed of properly. 7. RESOLVED: 15A NCAC 13B .1626(11)(c) cited for failure to collect and return all windblown material to the active landfill at the end of each day. A vast improvement was observed in the overall cleanliness of the facility. Windblown litter had been removed from landfill slopes, the perimeter ditch and along access roadways. Windscreens were also observed to be free from windblown trash. Mr. Tate stated that two full-time temporary employees work to police the landfill daily. View of the side slopes along the working face access roadway. An area of previous concern, no windblown litter is visible on the slopes or along the access roadway. (Photo taken by S. Heim 8/25/17.) Wind screens placed in the operational area near the working face are free from windblown litter and debris. (Photo taken by S. Heim 8/25/17.) FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 6 of 7 8. CORRECTIVE MEASURES IN PROGRESS: 15A NCAC 13B .1626(8)(d) cited for failure to contain leachate within a lined disposal cell or leachate collection and storage system, or to treat all leachate prior to discharge. No leachate seeps were observed during this inspection. The new holding tanks had been installed, as approved, near the french drain. Mr. Neugent stated that the tanks were being emptied daily, to ensure that overflow was not an issue. Mr. Joyce stated that sampling was taking place and the results would be provided when they became available. Rockingham County must continue to work with Ervin Lane, Compliance Hydrogeologist, to monitor and resolve any issues relating to the leachate collection system, and to undertake any corrective actions that may be required. OBSERVED VIOLATIONS: No additional violations were observed during this inspection. ADDITIONAL COMMENTS 1. The revised corrective action plan, submitted by Joyce Engineering and dated June 22, 2017, continued to be implemented at the site. See the Status of Past Observed Violations section of this report for more detailed information about steps being taken to bring the facility into compliance. 2. Current landfill operations were observed to be taking place in the Phase 3 Vertical Expansion. The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit, or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules. New holding tanks installed at french drain. (Photo taken by S. Heim 8/25/17.) FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 7 of 7 3. The working face was again observed to be compact and well-controlled. At the close of the work day, the working face was observed to be properly covered. 4. No grinding equipment was observed in the wood waste collection area. Most of the wood waste stockpile had been processed, and much of processed material had been removed from the site. 5. Some unacceptable materials were still visible in the remainder of the unprocessed wood waste pile. 6. The inert debris stockpile was still very large in size. Ensure that any painted or treated concrete is removed from the inert debris storage and operations area and properly disposed of by the end of every working day. 7. Mr. Joyce stated that repairs were on track to be completed on schedule, as set forth in the June 22, 2017 revised corrective actions plan. Please contact me if you have any questions or concerns regarding this inspection report. __________________________________________ Phone: 336-776-9672 Susan Heim Environmental Senior Specialist Regional Representative Sent on: September 1, 2017 to Lance Metzler, County Manager. X Email Hand delivery US Mail Certified No. Copies: Jason Watkins, Field Operations Branch Head – Solid Waste Section Deb Aja, Western District Supervisor – Solid Waste Section Butch Joyce, President – Joyce Engineering Jenny Johnson, Director of Operations – Joyce Engineering Ervin Lane, Compliance Hydrogeologist – Solid Waste Section Larry Frost, Permit Engineer – Solid Waste Section Ronnie Tate, Engineering & Public Utilities Director – Rockingham County Kathryn Jolly, Solid Waste Program Manager – Rockingham County Martie Neugent, Landfill Supervisor – Rockingham County