HomeMy WebLinkAbout6204_UwharrieMSWLF_Phase3PTCell11&12DIN28385_20060124
Facility Permit No: 62-04
Part 1-Permit to Construct
Original Issue: 05/15/94
Modification 1: 01/20/98
Amendment 1: 05/27/99
New Facility Permit: 10/18/00
Amendment 1 Date Phase 3: 08/09/04
Amendment 2 Date Phase 3: 01/24/06
Page 1 of 6
NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL
RESOURCES
Dexter R. Matthews, Director Division of Waste Management Michael F. Easley, Governor
William G. Ross Jr., Secretary
1646 Mail Service Center, Raleigh, North Carolina 27699-1646
Telephone 919-508-8400 \ Fax 919-733-4810 \ Internet http://wastenotnc.org
An Equal Opportunity / Affirmative Action Employer – Printed on Dual Purpose Paper
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENT
AND NATURAL RESOURCES
DIVISION OF WASTE MANAGEMENT
MUNICIPAL SOLID WASTE FACILITY PERMIT
MONTGOMERY COUNTY
and
REPUBLIC SERVICES OF NORTH CAROLINA, LLC
dba UWHARRIE ENVIRONMENTAL
are hereby issued a PERMIT to CONSTRUCT a
MUNICIPAL SOLID WASTE LANDFILL FACILITY
PHASE 3, CELLS 11 &12
located on NCSR 1137, south of Troy, Montgomery County, North Carolina, in accordance with Article 9,
Chapter 130A, of the General Statutes of North Carolina and all rules promulgated thereunder and subject
to the conditions set forth in this permit. Deeds for properties included in the facility boundary are recorded
in Montgomery County Public Registry at Book 313, Page 452, Book 316, page 309, Plat Cabinet C Slide
98-A; Book 394, Page 311 (Tracts 1 and 2 only), Plat Cabinet D Slide 13-D (Tracts 1 and 2 only);
Edward F. Mussler, III, P.E.,
Permitting Branch Supervisor
Permitting Branch
Solid Waste Section
Facility Permit No: 62-04
Part 1-Permit to Construct
Original Issue: 05/15/94
Modification 1: 01/20/98
Amendment 1: 05/27/99
New Facility Permit: 10/18/00
Amendment 1 Date Phase 3: 08/09/04
Amendment 2 Date Phase 3: 01/24/06
Page 1 of 6
ATTACHMENT 1
Approved Documents
GENERAL FACILITY CONDITIONS
1. Permit Application, Montgomery County, Uwharrie Regional Recycling Complex, Sanitary
Landfill Facility, November 11, 1992.
2. Site Application and Facility Plan, Montgomery County, Uwharrie Regional Recycling Complex,
Sanitary Landfill Facility, September 1993.
3. Landfill-Conceptual Design Plan for the Uwharrie Regional Recycling Complex, October 1992,
received December 7, 1992.
4. Uwharrie Regional Recycling Complex, Facility Drawing, Received September 22, 1993.
5. Site Application and Facility Plan, Uwharrie Regional MSW Landfill Expansion, prepared by
Hodges, Harbin, Newberry & Tribble, Inc., as amended through August 18, 2000.
MUNICIPAL SOLID WASTE LANDFILL CONDITIONS
Phase 1
6. Permit Application, Part B, Uwharrie Regional Landfill
• Volume 1 of 3, March 10, 1994, pages IX-1, X-11 revised May 1, 1994
• Volume 2 of 3, March 10, 1994 Operations and Monitoring Plan revised June 13, 1994
• Volume 3 of 3, March 10, 1994, revised May 1994 (see Sedimentation Basin No 1
Revisions)
7. Construction Plans, Uwharrie Regional Landfill, revised May 23, 1994.
8. Design Hydrogeologic Report, Phase I (Cells 1&2), Uwharrie Regional Landfill, Law
Engineering, November 10, 1993.
9. Response to technical Review of Design Hydrogeologic Report, Phase I (Cells 1&2),
Uwharrie Regional Landfill, Law Engineering, May 20, 1994.
10. Response to Questions, Memo Hodges to Hoyt March 9, 1994.
11. Addendum to Analysis of Slope Stability, Flexible Membrane Liner Stress Analysis and
Subsurface Soil Settlement, Law Engineering, March 9, 1994.
12. Response to April 20, 1994 Letter, Hodges to Hoyt, May 11, 1994.
13. Sedimentation Basin No. 1 Revisions sealed May 1994.
14. Response to 01 June 1994 Questions, Memo Newberry to Mussler, June 6, 1994.
Phase 2
15. Phase 2 Construction Permit Application, Uwharrie Regional MSW Landfill, Volumes 1 and
2, prepared by Hodges, Harbin, Newberry & Tribble, Inc., as amended through May 5,
1999.
16. Design Hydrogeologic Report, Uwharrie Regional MSW Landfill, prepared by Bunnell-
Lammons Engineering, Inc., as amended through May 4, 1999.
17. Alternate Liner System Demonstration, Uwharrie Regional MSW Landfill, prepared by G. N.
Richardson & Assoc., as amended through March 1999.
Facility Permit No: 62-04
Part 1-Permit to Construct
Original Issue: 05/15/94
Modification 1: 01/20/98
Amendment 1: 05/27/99
New Facility Permit: 10/18/00
Amendment 1 Date Phase 3: 08/09/04
Amendment 2 Date Phase 3: 01/24/06
Page 1 of 6
18. Revised Construction Plan Drawings and Design Hydrogeology Report for addition of Cell 9
to Phase 2.
19. Installation of Phase 1 of the Landfill Gas Collection System, prepared by Hodges, Harbin,
Newberry & Tribble, submitted October 15, 2001, revised through April 5, 2002.
20. Drawings 1-6, Partial Closure Construction, Cells No. 3, 4, and 5, Uwharrie Regional MSW
Landfill, prepared by Hodges, Harbin, Newberry & Tribble, for Republic Services of North
Carolina, LLC, dated September 20, 2000.
21. Specifications and Contract Documents for Partial Closure Construction, Cells No. 3, 4, and
5, Uwharrie Regional MSW Landfill prepared by Hodges, Harbin, Newberry & Tribble for
Republic Services of North Carolina, LLC, dated August 2001.
22. Alternative Final Cover Evaluation, Uwharrie Regional MSW Landfill Partial Closure,
prepared by GN Richardson & Associates, dated April 22, 2002.
Phase 3, Cell 10A , 11 & 12
23. Phase 3, Cell 10A Construction Permit Application, Uwharrie Regional MSW Landfill,
Volumes 1 and 2, prepared by Hodges, Harbin, Newberry & Tribble, Inc., received
November 19, 2003, revised March 2004, April 2004, and June 2004.
24. Design Hydrogeologic Report, Uwharrie Regional MSW Landfill, prepared by Bunnell-
Lammons Engineering, Inc., as amended through May 4, 2004.
25. Construction Drawings for Cell 10A, Uwharrie Regional MSW Landfill, prepared by Hodges,
Harbin, Newberry & Tribble, Inc., received June 18, 2003.
26. Phase 3, Cell 11 & 12 Construction Permit Application, Uwharrie Regional MSW Landfill, Volumes 1
and 2, prepared by Hodges, Harbin, Newberry & Tribble, Inc., received November 19, 2003 and
revised through January 6, 2006.
27. Resubmitted Design Hydrogeologic Report, Uwharrie Regional MSW Landfill, prepared by Bunnell-
Lammons Engineering, Inc., as amended through May 4, 2004.
PART III: CONSTRUCTION AND DEMOLITION LANDFILL CONDITIONS
PART IV: LAND CLEARING AND INERT DEBRIS LANDFILL CONDITIONS
PART V: YARD WASTE CONDITIONS
PART VI: MISC. TREATMENT AND PROCESSING UNIT CONDITIONS
Facility Permit No: 62-04
Part 1-Permit to Construct
Original Issue: 05/15/94
Modification 1: 01/20/98
Amendment 1: 05/27/99
New Facility Permit: 10/18/00
Amendment 1 Date Phase 3: 08/09/04
Amendment 2 Date Phase 3: 01/24/06
Page 1 of 6
ATTACHMENT 2
PART I:
GENERAL FACILITY CONDITIONS
1. This condition not used.
2. This permit approves the Facility Plan which in accordance with 15 NCAC 13B .1619
defines the comprehensive development of the facility including the total municipal solid
waste landfill capacity, the municipal solid waste stream, all on site solid waste
management facilities and related facility infrastructure.
The approved plans are described in Attachment 1, "Approved Documents". Where discrepancies
may exist, the most recent approved submittal and Conditions of Permit shall govern.
3. This facility has an anticipated total municipal solid waste disposal capacity of 14,402,000
cubic yards consistent with the approved final contours, which will be developed in 4
construction phases of five years each. Construction of cells within each phase and
subsequent phases will be in accordance with the Division approved plans.
4. Phase 3 Landfill Capacities – Total= 5,706,000 c.y., Cell 10A= 13.4 acres - 1,845,000 c.y.,
Cell11= 14.7 acres - 1,881,000c.y., and Cell12= 16.7 acres - 1,980,000c.y.
5. The landfill is permitted to receive solid waste generated from within the State of North
Carolina consistent with local government waste management plan(s), the franchise
agreement and as defined in North Carolina General Statutes Article 9 Chapter 130A-
290(a)(35), except where prohibited by North Carolina General Statutes Article 9 of
Chapter 130A, and rules adopted by the Commission for Health Services. The owner or
operator of a municipal solid waste management facility that is owned or operated by a unit
of local government shall not knowingly dispose of any type or form of municipal solid
waste that is generated within the boundaries of a unit of local government that by
ordinance:
(1) Prohibits generators or collectors of municipal solid waste from disposing of
that type or form of municipal solid waste.
(2) Requires generators or collectors of municipal solid waste to recycle that type
or form of solid waste.
6. This facility is subject to the requirements of all applicable sections of the most recent
version of the North Carolina Solid Waste Management Rules, 15A NCAC 13B and the
specific conditions contained herein.
Facility Permit No: 62-04
Part 1-Permit to Construct
Original Issue: 05/15/94
Modification 1: 01/20/98
Amendment 1: 05/27/99
New Facility Permit: 10/18/00
Amendment 1 Date Phase 3: 08/09/04
Amendment 2 Date Phase 3: 01/24/06
Page 1 of 6
7. This facility shall conform to the specific conditions set forth in this permit and the
provisions of 15A NCAC 13B .1604(b)(2).This facility permit is issued under the
criteria set forth in 15A NCAC 13B.1603(a)(1). Any facility changes that affect these
criteria may require a new permit.
8. The permittee shall submit an amendment to this permit pursuant to 15A NCAC
13B.1603(a)(2) for subsequent cells within Phase 3.
FACILITY CONSTRUCTION CONDITIONS
9. The permittee shall conduct a pre-construction meeting prior to initiating construction of any
unit at the site and shall notify the Solid Waste Section 10 days prior to said meeting.
10. Construction of all solid waste management units within this facility shall be in accordance
with the pertinent approved plans and only for those phases of development approved for
construction as described in Attachment 1, "Approved Documents".
11. Additional conditions and revisions of the approved documents or changes during
construction of any landfill unit require approval by the North Carolina Solid Waste Section.
12. Any modifications in sedimentation and erosion control activities require approval by the
Land Quality Section. The Section shall be notified of any sedimentation and erosion
control modifications.
FACILITY PRE-OPERATIVE CONDITIONS
13. Prior to receiving waste at any unit of this facility, a Permit to Operate must be obtained
from the Solid Waste Section in accordance with 15A NCAC 13B .0201(b).
14. The following requirements shall be met prior to waste disposal for any unit of this facility:
a. Site preparation shall be in accordance with the approved plans, and the conditions
specified herein.
b. Site inspection shall be made by a representative of the Solid Waste Section.
c. Prior to waste disposal for any unit, a pre-operative meeting shall be held on-site
with key landfill personnel and representatives of the Solid Waste Section.
Facility Permit No: 62-04
Part 1-Permit to Construct
Original Issue: 05/15/94
Modification 1: 01/20/98
Amendment 1: 05/27/99
New Facility Permit: 10/18/00
Amendment 1 Date Phase 3: 08/09/04
Amendment 2 Date Phase 3: 01/24/06
Page 1 of 6
PART II:
MUNICIPAL LANDFILL UNIT SPECIFIC CONDITIONS
PRE-OPERATIONAL CONDITIONS
15. Ground water monitoring wells and surface water sampling locations shall be sampled for
the Appendix I constituent list prior to issuing the Permit to Operate.
CONSTRUCTION CONDITIONS
16. The owner's geologist shall examine the cell excavation and note any pertinent geologic
features exposed during the construction process and shall notify the Solid Waste Section
Hydrogeologist of these findings prior to the placement of any liner materials.
17. The owner's geologist shall be in the field to supervise all well installations. Any
modifications to the approved water quality monitoring plan require approval by the Section
Hydrogeologist. Documentation of all changes to the approved plan shall be submitted with
the well construction records.
18. For each monitoring well constructed, a well construction record, well schematic, boring log
and a description of well development activities shall be submitted to the Section within 30
days upon well completion.
PART III: CONSTRUCTION AND DEMOLITION DEBRIS UNIT SPECIFIC CONDITIONS
PART IV: LAND CLEARING AND INERT DEBRIS UNIT SPECIFIC CONDITIONS
PART V: YARD WASTE UNIT SPECIFIC CONDITIONS
PART VI: MISCELLANEOUS TREATMENT AND PROCESSING UNIT SPECIFIC CONDITIONS
(Specify Unit Type)