HomeMy WebLinkAbout74D_INSP_20170727FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
UNIT TYPE:
Lined
MSWLF LCID X YW Transfer Compost SLAS COUNTY: Pitt
Closed MSWLF HHW White goods Incin T&P FIRM PERMIT NO.: 74D-LCID-1994
CDLF Tire T&P /
Collection Tire
Monofill Industrial
Landfill DEMO SDTF FILE TYPE: COMPLIANCE
Date of Inspection: 27 July 2017 Date of Last Inspection: 12 July 2017
FACILITY NAME AND ADDRESS:
ER Lewis LCID Landfill #2
3034 Highway 33
Greenville, NC
GPS COORDINATES: N: 35.684294 E: -077.427102
FACILITY CONTACT NAME AND PHONE NUMBER:
Curt Williford; Safety & Environmental Compliance Officer
252.321.1101
FACILITY CONTACT ADDRESS:
ER Lewis Construction Company
PO Box 565
Greenville, NC 27835
Attn: Curt Williford
E-mail: curt@erlewisconstruction.com
PARTICIPANTS:
Curt Williford; ER Lewis Construction
Ray Williams; NCDEQ-Solid Waste
Ray Williams; NCDEQ-Solid Waste
STATUS OF PERMIT:
Expired; Permit to Construct (PTC) and Permit to Operate (PTO) a Landclearing and Inert Debris Landfill issued 1
September 2010. PTO expired 1 September 2015. *A complete permit review request for the next five-year phase of
construction and/or operations was due on or before 15 May 2015. A permit review request has been submitted and is
currently under review.
PURPOSE OF SITE VISIT:
Comprehensive Facility Compliance Inspection
STATUS OF PAST NOTED VIOLATIONS:
1) 15A NCAC 13B .0563 (a) states “The facility is to be operated for the disposal of land clearing waste, inert
debris, untreated wood, and yard trash.” RESOLVED: All unpermitted waste materials have been removed
and properly disposed.
2) 15A NCAC 13B .0566 (1) states “Operational plans shall be approved and followed as specified for the
facility.”
-LAND CLEARING AND INERT DEBRIS (LCID) LANDFILL NO. 1 PERMIT NO. 74-C
ATTACHMENT 2 CONDITIONS OF PERMIT TO CONSTRUCT PART I: FACILITY SPECIFIC
CONDITIONS (2)(c) states “The disposal unit boundary must be accurately identified with permanent
markers.” RESOLVED: Markers have been installed identifying the disposal unit boundary.
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
74D_INSP_20170727
Page 2 of 4
-LAND CLEARING AND INERT DEBRIS (LCID) LANDFILL NO. 1 PERMIT NO. 74-C
ATTACHMENT 3 CONDITIONS OF PERMIT TO OPERATE PART I: FACILITY SPECIFIC
CONDITIONS (2) states “This Facility must conform to the operations requirements of the NC Solid Waste
Management Rules, 15A NCAC 13B .0566, and to the operational plan required by 15A NCAC 13B
.0565(4).” UNRESOLVED: This Facility is not operating in compliance with the approved operational plan.
-LAND CLEARING AND INERT DEBRIS (LCID) LANDFILL NO. 1 PERMIT NO. 74-C
ATTACHMENT 3 CONDITIONS OF PERMIT TO OPERATE PART I: FACILITY SPECIFIC
CONDITIONS (4) states “This facility is permitted to receive land clearing waste; yard trash; untreated and
unpainted wood; uncontaminated soil; inert debris such as unpainted rock, brick, concrete, and concrete
block; and asphalt in accordance with NCGS 130-294(m). RESOLVED: All unpermitted waste materials
have been removed and properly disposed.
-LAND CLEARING AND INERT DEBRIS (LCID) LANDFILL NO. 1 PERMIT NO. 74-C
ATTACHMENT 3 CONDITIONS OF PERMIT TO OPERATE PART I: FACILITY SPECIFIC
CONDITIONS (7) states “The permanent markers that accurately delineate the waste disposal boundary
must be maintained.” RESOLVED: Markers have been installed identifying the disposal unit boundary.
-LAND CLEARING AND INERT DEBRIS (LCID) LANDFILL NO. 1 PERMIT NO. 74-C
ATTACHMENT 3 CONDITIONS OF PERMIT TO OPERATE PART I: FACILITY SPECIFIC
CONDITIONS (8) states “Excavation, grading and fill material side slopes must not exceed a ratio of three
horizontal feet to on vertical feet (3:1).” RESOLVED: The outside slopes of the landfill have been
constructed and are being maintained at a ratio not greater than three horizontal feet to on vertical feet (3:1).
-LAND CLEARING AND INERT DEBRIS (LCID) LANDFILL NO. 1 PERMIT NO. 74-C
ATTACHMENT 3 CONDITIONS OF PERMIT TO OPERATE PART I: FACILITY SPECIFIC
CONDITIONS Cover Material Requirements (15) states “Solid waste must be covered with 1 foot of
suitable soil cover at least once per month or when the active working area reaches 1 acre in size, whichever
occurs first, or more often when necessary to prevent the site from becoming a nuisance or to mitigate
conditions associated with fire, windblown materials, vectors or excessive water infiltration.” RESOLVED:
Solid waste disposed in this landfill is currently being covered with one foot of suitable soil cover at least
once per month or when the active working area reaches 1 acre in size.
-LAND CLEARING AND INERT DEBRIS (LCID) LANDFILL NO. 1 PERMIT NO. 74-C
ATTACHMENT 3 CONDITIONS OF PERMIT TO OPERATE PART I: FACILITY SPECIFIC
CONDITIONS Cover Material Requirements (17) states “Vegetative ground cover sufficient to control
erosion must be established within 30 (thirty) working days upon completion of any phase of LCID landfill
development or as addressed in the approved Sedimentation and Erosion Control permit.” UNRESOLVED:
Vegetative ground cover sufficient to control erosion has not been established on the outside slopes or in
completed development phases of the landfill.
-LAND CLEARING AND INERT DEBRIS (LCID) LANDFILL NO. 1 PERMIT NO. 74-C
ATTACHMENT 3 CONDITIONS OF PERMIT TO OPERATE PART I: FACILITY SPECIFIC
CONDITIONS Drainage Control and Water Protection Requirements (19) states “All required
sedimentation and erosion control measures must be installed and maintained to mitigate excessive on-site
erosion and to prevent silt from leaving the site of the landfill unit during the service life of the facility.”
UNRESOLVED: The sedimentation and erosion control measures required to mitigate excessive on-site
erosion have not been installed and maintained.
3) 15A NCAC 13B .0566 (2) states “The facility shall only accept those solid wastes which it is permitted to
receive.” RESOLVED: All unpermitted waste materials have been removed and properly disposed. Currently
only LCID waste is being disposed at this Facility.
4) 15A NCAC 13B .0566 (4) states “Adequate soil cover shall be applied monthly, or when the active area reaches
one acre in size, whichever occurs first.” RESOLVED: Solid waste disposed in this landfill is currently being
covered with one foot of suitable soil cover at least once per month or when the active working area reaches 1
acre in size.
5) 15A NCAC 13B .0566 (5) states “120 calendar days after completion of any phase of disposal operations, or
upon revocation of a permit, the disposal area shall be covered with a minimum of one foot of suitable soil cover
sloped to allow surface water runoff in a controlled manner. The Division may require further action in order to
correct any condition which is or may become injurious to the public health, or a nuisance to the community.”
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
74D_INSP_20170727
Page 3 of 4
UNRESOLVED: The completed phases of disposal operations have not been covered and sloped properly to
allow surface water runoff in a controlled manner.
6) 15A NCAC 13B .0566 (6) states “Adequate erosion control measures, structures, or devices shall be utilized
to prevent silt from leaving the site and to prevent excessive on site erosion.” UNRESOLVED: Adequate
erosion control measures have not been utilized to prevent excessive on site erosion.”
7) 15A NCAC 13B .0566 (7) states “Provisions for a ground cover sufficient to restrain erosion must be
accomplished within 30 working days or 120 calendar days upon completion of any phase of landfill
development.” UNRESOLVED: Vegetative ground cover sufficient to control erosion has not been
established on the outside slopes or in completed development phases of the landfill.
Please see the ADDITIONAL COMMENTS section below for details concerning the violations listed above.
ADDITIONAL COMMENTS:
1) This Facility is a Land Clearing and Inert Debris (LCID) Landfill.
2) This Facility is recorded with the Pitt County Register of Deeds at Book #460; Page #05.
3) This Facility is permitted to receive land clearing waste, yard trash, untreated and unpainted wood,
uncontaminated soil, and inert debris such as unpainted rock, brick, concrete, and concrete block; and asphalt
in accordance with NCGS 130-294(m).
4) This Facility is permitted to receive wastes generated within Pitt County.
5) The operating hours for this Facility are Monday through Friday from 8:00 AM to 5:00 PM.
6) The Facility is secured by means of a locked gate at the Facility entrance. The access gate was open upon my
arrival and an attendant was on-site during this Facility Compliance Inspection.
7) Proper signage has been posted at the Facility entrance.
8) The Facility access road is of all-weather construction and is being maintained in overall good condition at
this time.
9) Inert materials consisting of scrap concrete and asphalt are being stockpiled on-site in an area adjacent to the
landfill for later crushing and reuse in accordance with NC GS 130A-309.05. *Please note that the State rules
regarding recovered materials state that for a material to qualify as a recovered material, the majority of the
material (75% or more) must be sold, used, or re-used within twelve months.
10) This Facility maintains a separate cell adjacent to the LCID for the disposal of yard trash.
11) Permanent, highly-visible markers delineating the permitted waste disposal boundary have been installed as
required.
12) The Facility is currently maintaining one active working area which is being maintained in a compact and
manageable size.
13) The southern outside slope has been covered and graded at a slope not greater than 3:1.
The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance
with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an
administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit,
or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to
enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any
such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules.
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
74D_INSP_20170727
Page 4 of 4
14) At this time, all landfill sideslopes are being maintained at a slope not greater than 3:1. *As per our
conversation, please continue working to ensure all landfill slopes are maintained at a slope not greater than
3:1.
15) Surface water collection/diversion devices have been installed on the top lift of the landfill. These devices
collect and convey surface water from the top of the landfill to the toe of the slope to prevent excessive
erosion of the northern outside slope.
16) Continued erosion was observed in various areas on the outside slopes throughout the landfill. *As per our
conversation, repair these areas by filling and grading at a slope not greater than 3:1. After repairing the
erosion, please seed and mulch the areas to establish a groundcover suitable to prevent erosion of your landfill
cap system.
17) *As per our conversation, please continue working to establish a groundcover suitable to prevent erosion of
your landfill cap system. Seeding and mulching is necessary in order to establish a cover crop in the recently
repaired areas.
18) The active working area is being covered monthly or when it reaches one acre in size, whichever occurs first.
19) The waste type at the landfill working face was reviewed during this Facility Compliance Inspection; the
waste type being disposed is LCID only and no unpermitted materials were observed during this Facility
Compliance Inspection.
20) *Continued corrective actions are required as a result of this Facility Compliance Inspection.
Please contact me if you have any questions or concerns regarding this Facility Compliance Inspection Report.
Ray Williams; Environmental Senior Specialist Phone: 252.948.3955 E-mail: ray.williams@ncdenr.gov Regional Representative
Delivered on: 4 August 2017 by X Electronic delivery US Mail Certified No.
cc: Andrew Hammonds; Eastern District Supervisor/SWS: andrew.hammonds@ncdenr.gov
Jessica Montie; Chief Compliance Officer/SWS: jessica.montie@ncdenr.gov
John Demary; Director/Pitt County Solid Waste & Recycling: jwdemary@pittcountync.gov
C: \2017\Pitt\Facilities\74D\Inspections\74D_INSP_20170727
NCDEQ DWM Laserfiche Online Document Management System: http://edocs.deq.nc.gov/WasteManagement/Welcome.aspx
Go Green! Thank you for helping NCDEQ be environmentally responsible.