Loading...
HomeMy WebLinkAbout7906_Duke_DanRiver_Cell1LinerEquimentContact_20170720Dan River Landfill - Solid Waste Reporting Page 1 of 2 Solid Waste Environmental Event Reporting Event Title: Dan River Landfill Cell 1 Liner Equipment Contact Report Date: July 21, 2017 Submitted to: NCDEQ Division of Waste Management (DWM) Regulatory agency contact: Shawn McKee; 919-707-8284 Duke Energy contact: Melonie Martin; 336-669-2994 Duke Energy Facility: Dan River Steam Station 900 South Edgewood Road Eden, NC 27288 Rockingham County Permit No.: 7906-INDUS 1. Event Description a. Date discovered: July 20, 2017 b. Material released? (Yes/No). Description if yes: c. Summary: • Landfill operations contractor was installing a supplemental chimney drain in Cell 1 • Excavation equipment came in contact and damaged the geocomposite drainage layer (uppermost geosynthetic layer). • Investigation of the area revealed that the primary geomembrane was undamaged. d. Field actions: • The damaged geocomposite was repaired in accordance with the landfill construction specifications. • The geocomposite defect was patched using the same type of geocomposite used during original installation. • The patch extended beyond the limits of the defect and was secured. 2. Regulatory Contact a. Date and time of regulatory contact: July 21, 2017 at approximately 10:30am Regulatory agency: NCDEQ Division of Waste Management (DWM) Contact name/number: Primary - Shawn McKee 919-707-8284 Summary: Phone conversation describing the activities that led to the geocomposite damage and the repairs to the geocomposite. b. Date and time of additional regulatory agency contact: None Regulatory agency: NA Contact name: __________ contacted by _________ (Duke) Summary: Phone conversation to report that _______________ Dan River Landfill - Solid Waste Reporting Page 2 of 2 3. Regulatory Site Visit Was a regulatory visit conducted (Yes/No) a. Date and time of site visit: arrival time: ______, departure time: ______ b. Regulatory agency: c. Attendees: d. Duke Energy escort(s): _________ e. Areas inspected: f. Records reviewed: g. Issues indicated: 4. Regulatory Recommendations: 5. Duke Energy Follow-Up Actions: • Send Amec Foster Wheeler Repair summary via email to Shawn McKee and Larry Frost 6. Photos: Photos are included in the Amec Foster Wheeler Repair summary report. cc: Ed Mussler - NDEQ DWM Larry Frost - NCDEQ DWM Ed Sullivan - Duke Energy Jason Jomp - Duke Energy Eric Kinstler- Duke Energy Amec Foster Wheeler Environment & Infrastructure Inc. 14424 Albemarle Point Place, Ste. 115 Chantilly, Virginia 20151 703-488-3700 amecfw.com Registered in North Carolina Engineering and Land Surveying License No. F-1253 Geology License No. C-247 July 21, 2017 Ms. Melonie Martin Duke Energy Carolinas, LLC Dan River Steam Station 3195 Pine Hall Road Belews Creek, North Carolina 27009 Melonie.Martin@duke-energy.com Subject: Dan River Landfill Cell 1 Geosynthetics Repair Duke Energy – Dan River Steam Station Eden, North Carolina Amec Foster Wheeler Project No. 7810170870 Dear Ms. Martin: On July 20, 2017 an approximate 2-ft x 2-ft section of the Dan River Landfill Cell 1 leachate collection geocomposite drainage layer (uppermost geosynthetic layer) in the vicinity of the Cell 1 intercell berm was damaged by excavation equipment during installation of the Cell 1 supplemental chimney drains. Amec Foster Wheeler construction quality assurance (CQA) and Duke Energy personnel observed the damaged geocomposite and underlying primary geomembrane. The underlying primary geomembrane was observed to be undamaged. The damaged geocomposite was repaired by Texas Environmental Plastics (TEP) on July 20, 2017 in general accordance with the landfill construction specifications. The geocomposite defect was patched using the same type of geocomposite that was installed during Landfill Cell 1 construction. The patch extended beyond the limits of the defect and was secured to the undamaged geocomposite using zip ties. A geotextile patch was heat sealed over the extents of the geocomposite patch. A field report by Amec Foster Wheeler is provided as an attachment documenting field activities for the repair of the geocomposite. Sincerely, Amec Foster Wheeler Cedric H. Ruhl, P.E. Chris Jordan, E.I. Senior Engineer Technical Professional Attachments: Amec Foster Wheeler Daily Field Report – dated 7/20/2017 AM ECF W _ R e v. 2 _ 2 0 1 61 01 3 A m ec Fos t er W h e e l er W EAT HE R :TE M P E R A TURE 9 0's FURT HE R A CT IO NREQUI RED : SU MMA RYOFQUANT IT IESTODAY :TOT A L U ND .C U T / U NS U IT . (CY ) TOT A L RO CK E X C. (CY ) C O NC RE TE CYL I ND E R S BA GSAM PL E S G ROUT /M ORT A R SP E C I M E N RE SP ECT FULLYSUBMITT E DBY : A m ec Fos t er W h e e l er RE V IEW EDBY : CL E A R : CL OU DY : L I GH T R A I N : SH O W E R S : H E A V Y R A I N : N O : Y E S : DAT E :20 170720PA GE1OF7 JOB NA ME : D an R i v er L an d fil l&S t orm W . D i v er s i on JOB LOCAT IO N :9 00 S ou th E d ge wo o d Roa d , E d en NC. JOB NU MBE R : 7 810 170870 .0 1 .10 1 PH ASE/TAS KNO : P ar s on s C e ll #1 As hFil l SCO NO : NA M E :Al l en W . M oho n PE R S ON NELCLASSIFIC AT IO N T ECHNICIANSTA FFENG INE E R SR . T EC HNICIANPROJ ECTENG INE E R CONST .SE RV ICESSUP R.SENIOR ENG INE E R OT HER : PR INCIPAL ENG INE ER HOUR S WORKED : S TART T IMEENDT IMERE TE S T BRE AKDOWN :RE G U LA R T I M E O V E RT I M E S T A NDBY T I M E TO T AL UNIT P RICE :TR I P CHA R G E M I L E A G E E QU I PM E N T SU MMA RYOFOBSE RVAT ION S , T EST ING , AND REC OM MENDAT IONS : I n t r o P ar s on s c on ti nue d ch i m ney d ra i n p l a c emen t f or c e ll #1 c on ti nu e d work i ng on s ou th s e ct o r d ra i n f r omwe st s l op e ea st t o c hi mn e y d r a i n st a c k . Pl a c e d s e c o n d,thi r d an d st a c k s e cti on o f HDP E p i pe . P ar s o n s st ar t e d ex c ava ti n g f o r ch i m ney d ra i n nor th o f i nn er bermwe st s id e u si ng a 3 4 9 F c a t t ra c k e x c ava t o rw ith t ee th o nbu c ke t e d ge .P a r s o n s op era t or m a d e c o n t a ct w ith pr i mar y G eo c om po s it e D ra i na ge L ay era2 ' x 2 ' ar ea o f c om po s it e wa s d am age d s ee a tt a c h e d p ic t ure s . P r i ma ry HD P E li ner wa s i n s pe ct e d by Al l en M o h o no f A me c F o st er W h e e l er an d Ch a d G rooverw ith D uke Ener gyan d no d e f e cts or c u ts we re f oun d i n pr i m ary li ner . A rea wa s repa i re d by Te x a s Env i ro nm en t a l P l a stic s repa i r l o c a ti o ne l ev a ti on 59 1. 9 4 E 17 8 9 4 1. 9 7 5 ,N 100 0084 . 3 7 5 a reawa s repa i re d per p l a n s an d s pe c i fic a ti on s . T h e re s u lts o f thi sd ay 'st e sti ng an d ob s erva ti on s w ere c om mun ic a t e d t o th e c o n t ra ct o r 's on s it e repr e s en t a ti ve pr i o r t o d epa r ti n g th e s it e . AM ECF W _ R e v. 2 _ 2 0 1 61 01 3 A m ec Fos t er W h e e l er DAT E :20 170720PA GE 2OF7NA ME :Al l en W . M oho n JOB NA ME : D an R i v er L an d fil l&S t orm W . D i v er s i on JOB NO : 78 10 170870 .0 1.10 1SCONO : JOB LOCAT IO N :9 00 S ou th E d ge wo o d Roa d , E d en NC.P H/TK NO : P a r s on s C e l l#1 A s hFil l P h o t o 1 P h o t o 2 AM ECF W _ R e v. 2 _ 2 0 1 61 01 3 A m ec Fos t er W h e e l er DAT E :20 170720PA GE3OF7NA ME :Al l en W . M oho n JOB NA ME : D an R i v er L an d fil l&S t orm W . D i v er s i on JOB NO : 78 10 170870 .0 1.10 1SCONO : JOB LOCAT IO N :9 00 S ou th E d ge wo o d Roa d , E d en NC.P H/TK NO : P a r s on s C e l l#1 A s hFil l P h o t o 3 P h o t o 4 AM ECF W _ R e v. 2 _ 2 0 1 61 01 3 A m ec Fos t er W h e e l er DAT E :20 170720PA GE 4OF7NA ME :Al l en W . M oho n JOB NA ME : D an R i v er L an d fil l&S t orm W . D i v er s i on JOB NO : 78 10 170870 .0 1.10 1SCONO : JOB LOCAT IO N :9 00 S ou th E d ge wo o d Roa d , E d en NC.P H/TK NO : P a r s on s C e l l#1 A s hFil l P h o t o 5 P h o t o 6 AM ECF W _ R e v. 2 _ 2 0 1 61 01 3 A m ec Fos t er W h e e l er DAT E :20 170720PA GE5OF7NA ME :Al l en W . M oho n JOB NA ME : D an R i v er L an d fil l&S t orm W . D i v er s i on JOB NO : 78 10 170870 .0 1.10 1SCONO : JOB LOCAT IO N :9 00 S ou th E d ge wo o d Roa d , E d en NC.P H/TK NO : P a r s on s C e l l#1 A s hFil l P h o t o 7 P h o t o 8 AM ECF W _ R e v. 2 _ 2 0 1 61 01 3 A m ec Fos t er W h e e l er DAT E :20 170720PA GE6OF7NA ME :Al l en W . M oho n JOB NA ME : D an R i v er L an d fil l&S t orm W . D i v er s i on JOB NO : 78 10 170870 .0 1.10 1SCONO : JOB LOCAT IO N :9 00 S ou th E d ge wo o d Roa d , E d en NC.P H/TK NO : P a r s on s C e l l#1 A s hFil l P h o t o 9 AM ECF W _ R e v. 2 _ 2 0 1 61 01 3 A m ec Fos t er W h e e l er DAT E :20 170720PA GE7OF7NA ME :Al l en W . M oho n JOB NA ME : D an R i v er L an d fil l&S t orm W . D i v er s i on JOB NO : 78 10 170870 .0 1.10 1SCONO : JOB LOCAT IO N :9 00 S ou th E d ge wo o d Roa d , E d en NC.P H/TK NO : P a r s on s C e l l#1 A s hFil l