HomeMy WebLinkAbout7906_Duke_DanRiver_Cell1LinerEquimentContact_20170720Dan River Landfill - Solid Waste Reporting Page 1 of 2
Solid Waste Environmental Event Reporting
Event Title: Dan River Landfill Cell 1 Liner Equipment Contact
Report Date: July 21, 2017
Submitted to: NCDEQ Division of Waste Management (DWM)
Regulatory agency contact: Shawn McKee; 919-707-8284
Duke Energy contact: Melonie Martin; 336-669-2994
Duke Energy Facility: Dan River Steam Station
900 South Edgewood Road
Eden, NC 27288
Rockingham County
Permit No.: 7906-INDUS
1. Event Description
a. Date discovered: July 20, 2017
b. Material released?
(Yes/No). Description if yes:
c. Summary:
• Landfill operations contractor was installing a supplemental chimney drain in Cell 1
• Excavation equipment came in contact and damaged the geocomposite drainage
layer (uppermost geosynthetic layer).
• Investigation of the area revealed that the primary geomembrane was undamaged.
d. Field actions:
• The damaged geocomposite was repaired in accordance with the landfill
construction specifications.
• The geocomposite defect was patched using the same type of geocomposite used
during original installation.
• The patch extended beyond the limits of the defect and was secured.
2. Regulatory Contact
a. Date and time of regulatory contact:
July 21, 2017 at approximately 10:30am
Regulatory agency: NCDEQ Division of Waste Management (DWM)
Contact name/number: Primary - Shawn McKee 919-707-8284
Summary:
Phone conversation describing the activities that led to the geocomposite
damage and the repairs to the geocomposite.
b. Date and time of additional regulatory agency contact:
None
Regulatory agency: NA
Contact name: __________ contacted by _________ (Duke)
Summary:
Phone conversation to report that _______________
Dan River Landfill - Solid Waste Reporting Page 2 of 2
3. Regulatory Site Visit
Was a regulatory visit conducted (Yes/No)
a. Date and time of site visit:
arrival time: ______, departure time: ______
b. Regulatory agency:
c. Attendees:
d. Duke Energy escort(s): _________
e. Areas inspected:
f. Records reviewed:
g. Issues indicated:
4. Regulatory Recommendations:
5. Duke Energy Follow-Up Actions:
• Send Amec Foster Wheeler Repair summary via email to Shawn McKee and Larry Frost
6. Photos:
Photos are included in the Amec Foster Wheeler Repair summary report.
cc: Ed Mussler - NDEQ DWM
Larry Frost - NCDEQ DWM
Ed Sullivan - Duke Energy
Jason Jomp - Duke Energy
Eric Kinstler- Duke Energy
Amec Foster Wheeler Environment & Infrastructure Inc.
14424 Albemarle Point Place, Ste. 115
Chantilly, Virginia 20151
703-488-3700
amecfw.com
Registered in North Carolina
Engineering and Land Surveying License No. F-1253
Geology License No. C-247
July 21, 2017
Ms. Melonie Martin
Duke Energy Carolinas, LLC
Dan River Steam Station
3195 Pine Hall Road
Belews Creek, North Carolina 27009
Melonie.Martin@duke-energy.com
Subject: Dan River Landfill Cell 1 Geosynthetics Repair
Duke Energy – Dan River Steam Station
Eden, North Carolina
Amec Foster Wheeler Project No. 7810170870
Dear Ms. Martin:
On July 20, 2017 an approximate 2-ft x 2-ft section of the Dan River Landfill Cell 1 leachate
collection geocomposite drainage layer (uppermost geosynthetic layer) in the vicinity of the Cell
1 intercell berm was damaged by excavation equipment during installation of the Cell 1
supplemental chimney drains. Amec Foster Wheeler construction quality assurance (CQA) and
Duke Energy personnel observed the damaged geocomposite and underlying primary
geomembrane. The underlying primary geomembrane was observed to be undamaged.
The damaged geocomposite was repaired by Texas Environmental Plastics (TEP) on July 20,
2017 in general accordance with the landfill construction specifications. The geocomposite
defect was patched using the same type of geocomposite that was installed during Landfill Cell
1 construction. The patch extended beyond the limits of the defect and was secured to the
undamaged geocomposite using zip ties. A geotextile patch was heat sealed over the extents of
the geocomposite patch. A field report by Amec Foster Wheeler is provided as an attachment
documenting field activities for the repair of the geocomposite.
Sincerely,
Amec Foster Wheeler
Cedric H. Ruhl, P.E. Chris Jordan, E.I.
Senior Engineer Technical Professional
Attachments:
Amec Foster Wheeler Daily Field Report – dated 7/20/2017
AM ECF W
_ R
e v. 2
_
2 0 1 61 01 3
A m
ec Fos
t
er W
h
e e
l
er
W EAT HE R
:TE
M P
E R
A
TURE 9
0's
FURT HE R A CT IO NREQUI RED
:
SU MMA RYOFQUANT IT IESTODAY
:TOT
A L
U
ND .C
U T
/
U
NS
U IT
. (CY )
TOT
A L
RO
CK
E X
C. (CY )
C
O
NC
RE TE
CYL
I
ND
E R
S BA GSAM PL
E
S G
ROUT
/M
ORT
A
R
SP
E
C
I
M
E
N
RE SP ECT FULLYSUBMITT E DBY
:
A m
ec Fos
t
er W
h
e e
l
er
RE V IEW EDBY
:
CL
E
A
R :
CL
OU
DY
:
L
I
GH
T R
A
I
N
:
SH
O
W
E R
S
:
H
E
A V Y
R
A
I
N
:
N
O :
Y
E
S
:
DAT E
:20 170720PA GE1OF7
JOB NA ME
:
D
an R
i
v er
L
an
d fil l&S t
orm
W . D i
v er
s i
on
JOB LOCAT IO N
:9
00 S
ou
th
E
d
ge wo o
d
Roa
d ,
E
d
en
NC.
JOB NU MBE R
:
7 810 170870 .0 1 .10 1
PH ASE/TAS KNO
:
P
ar
s
on
s C
e
ll #1 As hFil l
SCO NO
:
NA M E
:Al l
en W . M
oho n
PE R S ON NELCLASSIFIC AT IO N
T ECHNICIANSTA FFENG INE E R
SR . T EC HNICIANPROJ ECTENG INE E R
CONST .SE RV ICESSUP R.SENIOR ENG INE E R
OT HER
:
PR INCIPAL ENG INE ER
HOUR S WORKED :
S
TART T IMEENDT IMERE TE
S
T
BRE AKDOWN
:RE
G
U
LA
R T I
M
E O
V
E RT I
M
E
S
T
A NDBY
T I
M
E TO T
AL
UNIT P RICE
:TR I
P CHA
R
G
E
M
I
L
E
A G
E E QU I
PM
E
N
T
SU MMA RYOFOBSE RVAT ION S
,
T EST ING
,
AND REC OM MENDAT IONS
:
I
n
t r
o
P
ar
s
on
s c
on
ti
nue
d ch i
m ney
d
ra
i
n p
l
a
c
emen
t f
or
c
e
ll #1 c
on
ti
nu e
d
work
i
ng on
s
ou
th s
e
ct
o r
d
ra
i
n
f
r omwe
st s l
op e ea
st t
o
c hi
mn e y
d
r a
i
n
st
a
c
k
. Pl
a
c
e
d s
e
c
o n
d,thi
r
d
an
d st
a
c
k
s
e
cti
on o
f HDP
E p
i
pe
.
P
ar
s
o n
s st
ar
t
e
d
ex
c
ava
ti
n g
f
o r
ch i
m ney
d
ra
i
n nor
th
o
f i
nn er bermwe
st s id
e u
si
ng a 3
4
9
F c
a
t t
ra
c
k e x
c
ava
t
o rw
ith t
ee
th
o nbu
c
ke
t
e
d
ge
.P
a r
s
o n
s
op era
t
or m a
d
e
c
o n
t
a
ct
w
ith
pr
i
mar y
G
eo
c
om po
s it
e
D
ra
i
na ge
L
ay era2
'
x 2
'
ar ea o
f c
om po
s it
e wa
s d
am age
d
s
ee a
tt
a
c h
e
d
p
ic t
ure
s .
P
r
i
ma ry
HD P
E
li
ner wa
s i
n
s
pe
ct
e
d
by
Al l
en
M
o
h
o no
f A
me
c F
o
st
er
W h
e e
l
er an
d Ch
a
d G
rooverw
ith D
uke Ener gyan
d
no
d
e
f
e
cts
or
c
u
ts
we re
f
oun
d i
n pr
i
m ary
li
ner
.
A
rea wa
s
repa
i
re
d
by Te x a
s
Env
i
ro nm en
t
a
l P l
a
stic s
repa
i
r
l
o
c
a
ti
o ne
l
ev a
ti
on 59
1.
9
4
E
17 8
9
4 1.
9
7
5
,N 100 0084 .
3
7
5 a reawa
s
repa
i
re
d
per p
l
a n
s
an
d s
pe
c i fic
a
ti
on
s .
T
h
e re
s
u
lts
o
f thi sd
ay
'st
e
sti
ng an
d
ob
s
erva
ti
on
s
w ere
c
om mun
ic
a
t
e
d t
o
th
e
c
o n
t
ra
ct
o r
's
on
s it
e repr e
s
en
t
a
ti
ve pr
i
o r
t
o
d
epa r
ti
n g
th
e
s it
e
.
AM ECF W
_ R
e v. 2
_
2 0 1 61 01 3
A m
ec Fos
t
er W
h
e e
l
er
DAT E
:20 170720PA GE 2OF7NA ME
:Al l
en W . M
oho n
JOB NA ME
:
D
an R
i
v er
L
an
d fil l&S t
orm
W . D i
v er
s i
on
JOB NO
:
78 10 170870 .0 1.10 1SCONO
:
JOB LOCAT IO N
:9
00 S
ou
th
E
d
ge wo o
d
Roa
d ,
E
d
en
NC.P H/TK NO
:
P
a r
s
on
s C
e
l l#1 A s hFil l
P h
o
t
o
1
P h
o
t
o 2
AM ECF W
_ R
e v. 2
_
2 0 1 61 01 3
A m
ec Fos
t
er W
h
e e
l
er
DAT E
:20 170720PA GE3OF7NA ME
:Al l
en W . M
oho n
JOB NA ME
:
D
an R
i
v er
L
an
d fil l&S t
orm
W . D i
v er
s i
on
JOB NO
:
78 10 170870 .0 1.10 1SCONO
:
JOB LOCAT IO N
:9
00 S
ou
th
E
d
ge wo o
d
Roa
d ,
E
d
en
NC.P H/TK NO
:
P
a r
s
on
s C
e
l l#1 A s hFil l
P h
o
t
o 3
P h
o
t
o
4
AM ECF W
_ R
e v. 2
_
2 0 1 61 01 3
A m
ec Fos
t
er W
h
e e
l
er
DAT E
:20 170720PA GE 4OF7NA ME
:Al l
en W . M
oho n
JOB NA ME
:
D
an R
i
v er
L
an
d fil l&S t
orm
W . D i
v er
s i
on
JOB NO
:
78 10 170870 .0 1.10 1SCONO
:
JOB LOCAT IO N
:9
00 S
ou
th
E
d
ge wo o
d
Roa
d ,
E
d
en
NC.P H/TK NO
:
P
a r
s
on
s C
e
l l#1 A s hFil l
P h
o
t
o 5
P h
o
t
o 6
AM ECF W
_ R
e v. 2
_
2 0 1 61 01 3
A m
ec Fos
t
er W
h
e e
l
er
DAT E
:20 170720PA GE5OF7NA ME
:Al l
en W . M
oho n
JOB NA ME
:
D
an R
i
v er
L
an
d fil l&S t
orm
W . D i
v er
s i
on
JOB NO
:
78 10 170870 .0 1.10 1SCONO
:
JOB LOCAT IO N
:9
00 S
ou
th
E
d
ge wo o
d
Roa
d ,
E
d
en
NC.P H/TK NO
:
P
a r
s
on
s C
e
l l#1 A s hFil l
P h
o
t
o
7
P h
o
t
o
8
AM ECF W
_ R
e v. 2
_
2 0 1 61 01 3
A m
ec Fos
t
er W
h
e e
l
er
DAT E
:20 170720PA GE6OF7NA ME
:Al l
en W . M
oho n
JOB NA ME
:
D
an R
i
v er
L
an
d fil l&S t
orm
W . D i
v er
s i
on
JOB NO
:
78 10 170870 .0 1.10 1SCONO
:
JOB LOCAT IO N
:9
00 S
ou
th
E
d
ge wo o
d
Roa
d ,
E
d
en
NC.P H/TK NO
:
P
a r
s
on
s C
e
l l#1 A s hFil l
P h
o
t
o 9
AM ECF W
_ R
e v. 2
_
2 0 1 61 01 3
A m
ec Fos
t
er W
h
e e
l
er
DAT E
:20 170720PA GE7OF7NA ME
:Al l
en W . M
oho n
JOB NA ME
:
D
an R
i
v er
L
an
d fil l&S t
orm
W . D i
v er
s i
on
JOB NO
:
78 10 170870 .0 1.10 1SCONO
:
JOB LOCAT IO N
:9
00 S
ou
th
E
d
ge wo o
d
Roa
d ,
E
d
en
NC.P H/TK NO
:
P
a r
s
on
s C
e
l l#1 A s hFil l