Loading...
HomeMy WebLinkAbout7904_Rockingham_MSWLF_TempTankInstall_DIN28232_201706291 Frost, Larry From:Jenny Johnson <jjohnson@joyceengineering.com> Sent:Thursday, June 29, 2017 6:37 PM To:Frost, Larry; Lane, Ervin Cc:Kathryn Jolly (kjolly@co.rockingham.nc.us); Ronnie Tate (rtate@co.rockingham.nc.us); mnugent@co.rockingham.nc.us; Heim, Susan A; Mousa A. Maimoun Subject:7904-Rockingham County 06-29-17 Update Attachments:Temporary Tank at SMP-5.pdf Larry and Ervin, On behalf of Rockingham County, Joyce Engineering is notifying you that we have achieved the June 30, 2017, deadlines presented in our letter dated May 9, 2017, and addressed to Mr. Larry Frost RE: Request Plan Updates, Landfill Facility and Alternate Source Demonstration Addendum: Volatile Organic Compounds. A temporary tank was installed to collect discharge from Surface Water Monitoring Point (SMP)-5 on June 8, 2017 (see attached photo). The tank is inspected daily, and the contents are pumped to the leachate pond, as necessary. The date and approximate quantity of the contents pumped are being recorded. The County has secured a contractor, Reynolda Electric Company, to inspect the LCS pumps, controls and level switches. The inspection is to be completed by August 31, 2017. Jenny Jenny Johnson | Director of Operations | JOYCE ENGINEERING  Richmond, VA - Greensboro, NC - Charlotte, NC - Charleston, SC | 1604 Ownby Lane, Richmond, VA 23220 | tel: (804) 355-4520 | direct: (804) 980-7462 | cell: (804) 357-0697 | fax: (804) 355-4282 | JoyceEngineering.com    Temporary Tank at SMP_5 Joyce Engineering Rockingham County Page 1 June 2017 A temporary tank was installed to collect discharge from Surface Water Monitoring Point (SMP)-5 on June 8, 2017. The tank is inspected daily, and the contents are pumped to the leachate pond, as necessary.