Loading...
HomeMy WebLinkAbout7906_DukeDanRiverLandfill_StormwaterEvent_06192017Duke Energy Dan River Landfill Permit No. 7906-INDUS-2016 Stormwater Event June 19, 2017 Dan River Landfill Stormwater Event #1 June 19, 2017 •During the morning of June 19, 2017, it was discovered that heavy rains over the weekend had caused CCR material to breach through the Southwest corner of landfill cell #1 into the future cell #3 (remaining ash stack 1). •Rainfall total over the weekend was 2.6”, not including 0.8” of rain had fallen the previous Thursday night. •The berm between cell #1 and cell #3 was covered with approved cover material (sand). •CCR excavation is still occurring in the cell #3 footprint. Area of Concern (1st Event) Cell #1 Future Cell #2 Future Cell #3 Cell #1 Southwest Corner CCR Material washed into Cell #3 Cell #1 Apparent Flow Channel Repair work at Southwest Corner of Cell #1 Nearest Chimney Drain Berm repair & improvements Dan River Landfill Stormwater Event #2 June 19, 2017 •A second heavy rainfall event occurred during the afternoon that produced 0.2” in approximately 15 minutes. •After the event, it was discovered that CCR material had breached the cell #1 berm on the east side of the landfill and resulted in CCR material flowing into cell #2. •Cell #2 is currently under construction with the clay liner being installed. Area of Concern (2nd Event) Future Cell #2 Future Cell #3 Cell #1 Breach of Cell #1 on East side Breach of Cell #1 on East side Cell #2 Inter-cell berm Proposed Dan River Landfill Cell #1 Drainage Modifications The following modifications were discussed on 6/19/17 with the project team. Field observations may reveal additional modifications. 1.Remove sand from around the chimney drain at the Cell 1 inter-cell berm (interior/central portion of Cell 1). 2.Remove the protective cover over the LCS lateral between the chimney drain and the eastern edge of the cell. Direct water from the northern part of the cell towards the LCS lateral and chimney drain. 3.Increase the Cell 1/2 berm at the breach area with soil, grade area to direct potential overflow water to the southern part of cell 1. 4.Remove sand over the LCS corridor along the Cell 1/3 area east of the access ramp. Keep the geotextile intact. Replace the sand with 12 to 18 inches of 78M stone. 5.Install a supplemental chimney drain in the sump area.