Loading...
HomeMy WebLinkAbout2017-07-06 Duke Mayo Landfill 7305 Environmental Event ReportingMayo Landfill Facility - Solid Waste Reporting Page 1 of 4 Solid Waste Environmental Event Reporting Event Title: Mayo Landfill Leachate Release Report Date: July 6, 2017 Submitted to: NCDEQ Division of Waste Management (DWM) Regulatory agency contact: Shawn McKee 919-707-8284 Duke Energy contact: Kimberlee Witt 336-215-4576 Duke Energy Facility: Mayo Steam Electric Plant Landfill 10660 Boston Road Roxboro, NC 27574 Person County Permit No.:7305-INDUS 1. Event Description a. Date: discovered Thursday June 29, 2017 at approximately 8:36am b. Material released (Yes/No). Description if yes: landfill leachate c. Summary: • At approximately 8:30am, a blind flange on a riser structure at Station 26+00 along the landfill leachate forcemain from the lift station to the FGD Pond was observed slowly leaking leachate due to a gasket failure; • some of the leachate seeped through a joint in the concrete culvert and into Bowes Branch; • at approximately 3:30pm, the flange was replaced and flows from the leachate force main flange ceased . d. Field actions: • All system pumps were shut off at approximately 8:47am; • HDPE was placed at the bottom of the cleanout manhole to reduce infiltration into stone layer; • a vacuum truck was brought onsite to assist with removal of ponded leachate recovering approximately 500 gallons; • a gate valve allowing water to pass from the leachate lift station to the FGD pond was closed at approximately 11:45 am for safety precautions to ensure no additional water passed through the line as the flange was repaired; • the blind flange was replaced with a site fabricated flange including a valve at approximately 3:30pm. 2. Regulatory Contact a. Date and time of regulatory contact: Thursday June 29, 2017 approximately 3:00pm Regulatory agency: NCDEQ Division of Waste Management (DWM) Contact name/number: Primary - Shawn McKee 919-707-8284 Mayo Landfill Facility - Solid Waste Reporting Page 2 of 4 Summary: Phone conversation describing discovery of the leachate release, field cleanup activities, and that some leachate was believed to have been released into Bowes Branch. A site inspection was set up for Monday July 3, 2017. b. Date and time of additional regulatory agency contact: Thursday June 29, 2017 approximately 4:30pm Regulatory agency: NCDEQ Division of Water Resources NPDES Section Contact name: Danny Smith contacted by Lori Tollie (Duke) Summary: Phone conversation to report that leachate from the force main was released to Bowes Branch. 3. Regulatory Site Visit Was a regulatory visit conducted (Yes/No) a. Date and time of site visit: July 3, 2017 arrival time: 11:00am, departure time: 12:00pm b. Regulatory agency: NCDEQ DWM c. Attendees: Shawn McKee, Elizabeth Werner d. Duke Energy escort: Kimberlee Witt, Rob Miller e. Areas inspected: • Leachate double cleanout located at Station 26+00 • Concrete box culvert located in Bowes Branch • Wheel wash improvements f. Records reviewed: None g. Issues indicated: None 4. Regulatory Recommendations: • Sample existing piezometersPZ-32S and PZ-32D for boron and chlorides as potential indicator for groundwater concerns 5. Duke Energy Follow-Up Actions: • A permanent blind flange with valve will be fabricated and installed on the cleanout at Station 26+00; • the leachate forcemain system will be evaluated. If the forcemain evaluation recommends system alterations, Duke will communicate with DWM and request approval for modifications; • sample piezometers PZ-32S and PZ-32D for boron and chlorides will be conducted the week of July 10, 2017; results will be discussed with Elizabeth Werner, DWM hydrogeologist. Mayo Landfill Facility - Solid Waste Reporting Page 3 of 4 6. Photos: (include description with each photo) Photo 1 - cleanout blind flange at Station 26+00 during leak Photo 2 - cleanout at Station 26+00 with temporary replacement flange and valve Photo 3 - ponding area on June 29, 2017 Photo 4 - previous ponding area on July 3, 2017 Photo 5 - concrete culvert in Bowes Branch Photo 6 - seepage from joint in concrete culvert on June 29, 2017 Mayo Landfill Facility - Solid Waste Reporting Page 4 of 4 cc: Ed Mussler - NDEQ DWM Shannon Aufman - NCDEQ DWM Elizabeth Werner - NCDEQ DWM Ed Sullivan - Duke Energy Bert Lea - Duke Energy Jake Muessen - Duke Energy