HomeMy WebLinkAbout1812_Duke_Marshall_LeachateHandling_DIN28070_20170629 ISSUED FOR BID DOCUMENTS – ELECTRICAL-MECHANICAL MARSHALL STEAM STATION INDUSTRIAL LANDFILL NO. 1 CELL 3 AND 4 CONSTRUCTION June 15, 2017 TECHNICAL SPECIFICATIONS TABLE OF CONTENTS Division 1 Section 01100 Scope of Work Division 2 Section 02060 Aggregate Section 02230 Site Clearing Section 02315 Excavation Section 02320 Backfill Section 02324 Trenching Section 02374 Erosion Control Devices Section 02500 HDPE Pipe Section 02674 Nonwoven Geotextile Section 02751 Valves and Appurtenances Section 02800 Force Main Leakage Test Division 3 Section 03100 Concrete Forms and Accessories Section 03300 Cast in Place Concrete Section 03480 Pre-Cast Concrete Structures Division 11 Section 11313 Pumps Division 13 Section 13030 Pump House Structure Technical Specifications S&ME Project No. 7235-16-004, Phase 7 Marshall Steam Station Industrial Landfill No. 1, Cell 3 and Cell 4 Issued for Bid 2017 Electrical/Mechanical Components 01100 - 1 Scope of Work SECTION 01100 SCOPE OF WORK PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Scope of Work. 1.2 SCOPE OF WORK 1. Location of Work Area: Duke Energy’s Marshall Steam Station 2. Nature of Work: Electrical, Mechanical, and Earthworks 3. Structure Associated with Work: Marshall Steam Station, Industrial Landfill No. 1, Cells 3 and 4 4. Work Objective: Project includes and consists of furnishing all labor, materials, supervision, equipment and services necessary to complete construction of the Electrical/Mechanical Components related to the leachate force main for the landfill as indicated in the Technical Specifications, and Drawings. 5. Work Sequence: The sequence of work to accomplish the work objective for Cell 3 and Cell 4 generally includes the following (sequence may vary): a. Cell 3 and Cell 4 Work: 1) Installation of a temporary and permanent 8-inch diameter HDPE pipeline. 2) Installation of electrical components and connection to retail and generator power supply 3) Installation of 2 Pump Houses, one for Cell 3 and one for Cell 4 4) Installation of valves, flow meters and piping within the pump houses. 5) Power supply to Cell 3 and Cell 4 Pump House. 6) Construction of a concrete generator pad and Installation of a 200KW Generator. 7) Installation of Junction Manholes for the 8-inch force main and associated valves 8) Installation of 2 high flow leachate pumps and 4 low flow leachate pumps. 9) Installation of Cell 3 and 4 component instrumentation 10) Start-up and shut-down testing of Cell 3 and 4 components 11) Installation Hoist foundations for Cell 1 and Cell 2. 12) Repairs to Manifold structure for Cell 1 and Cell 2. 6. Work Schedule: Work shall be completed by the end of August, 2017. END OF SECTION Technical Specifications S&ME Project No. 7235-16-004, Phase 7 Duke Marshall Steam Station Industrial Landfill No. 1, Cell 3 and Cell 4 Issued for Bid 2017 Electrical/Mechanical Components 02060 - Page 3 of 4 Aggregate G. NCDOT Class II Type 1 Bedding and Backfill for culvert bedding and backfill, and where shown on the Drawings H. NCDOT Class III Type 1 Bedding and Backfill for culvert bedding and backfill, and where shown on the Drawings. 2.2 SOURCE QUALITY CONTROL A. Aggregate Material - Testing and Analysis: Perform in accordance with ASTM C33, ASTM C136, ASTM D421, ASTM D422, ASTM D4253, ASTM D4254, AASHTO T11, and/or AASHTO T27. B. When tests indicate materials do not meet specified requirements, change material or material source and retest. C. Furnish materials of each type from same source throughout the Work. PART 3 EXECUTION 3.1. STOCKPILING A. Stockpile materials on site at locations agreed upon by Engineer and Owner. B. Stockpile in sufficient quantities to meet Project schedule and requirements. C. Separate differing materials with dividers or stockpile apart to prevent mixing. D. Direct surface water away from stockpile site so as to prevent erosion or deterioration of materials. 3.2. STOCKPILE CLEANUP A. Remove stockpile, leave area in clean and neat condition. Grade site surface to prevent free standing surface water and restore to original site conditions. 3.3. EXAMINATION A. Verify substrate has been inspected, gradients and elevations are correct, and is dry. 3.4. PREPARATION A. Correct irregularities in substrate gradient and elevation by scarifying, reshaping, and re- compacting. B. Do not place fill on soft, muddy, or frozen surfaces. 3.5. AGGREGATE PLACEMENT A. Spread aggregate over prepared substrate to a total compacted thickness as specified on Drawings. B. Place aggregate in a maximum layer and compact to specified density. C. Level and contour surfaces to elevations and gradients indicated. Technical Specifications S&ME Project No. 7235-16-004, Phase 7 Duke Marshall Steam Station Industrial Landfill No. 1, Cell 3 and Cell 4 Issued for Bid 2017 Electrical/Mechanical Components 02060 - Page 1 of 4 Aggregate SECTION 02060 AGGREGATE PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Aggregate Type A1 – ABC stone for structures and roadways. 2. Aggregate Type A2 – No. 57 stone for drainage aggregate and erosion and sediment control structures. 3. Aggregate Type A3 – Class A riprap for erosion and sediment control structures. 4. Aggregate Type A4 – Class B riprap for erosion and sediment control structures. 5. Aggregate Type A5 – Class 1 riprap for erosion and sediment control structures. 6. Aggregate Type A6 – Class 2 riprap for erosion and sediment control structures. 7. NCDOT Class II Type 1 Bedding and Backfill 8. NCDOT Class III Type 1 Bedding and Backfill B. Related Sections: 1. Section 02320 – Backfill – Structural. 2. Section 02374 – Erosion Control Devices 3. Section 02500 – High Density Polyethylene (HDPE) Pipe. 4. Section 02610 – Pipe Culverts. 5. Section 02674 – Nonwoven Geotextile. 1.2 REFERENCES A. American Association of State Highway and Transportation Officials: 1. AASHTO T11 – Standard Method of Test for Materials Finer than 75 m (No. 200) Sieve in Mineral Aggregates by Washing. 2. AASHTO T27 – Standard Method of Test for Sieve Analysis of Fine and Coarse Aggregates. 3. AASHTO T180 – Standard Method of Test for Moisture-Density Relations of Soils Using a 4.54-kg (10-lb) Rammer and a 457-mm (18-in.) Drop (as modified by NCDOT). B. ASTM International: 1. ASTM C33 – Standard Specification for Construction Aggregates 2. ASTM C136 – Standard Test Method for Sieve Analysis of Fine and Coarse Aggregate. 3. ASTM D421 – Standard Practice for Dry Preparation of Soil Samples for Particle-Size Analysis and Determination of Soil Constants. 4. ASTM D422 – Standard Test Method for Particle Size Analysis of Soils. 5. ASTM D698 - Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Standard Effort (12 400 ft-lbf/ft3 (600 kN-m/m3)). 6. ASTM D1556 – Standard Test Method for Density and Unit Weight of Soil in Place by the Sand-Cone Method. 7. ASTM D1557 - Test Methods for Moisture-Density Relations of Soils and Soil- Aggregate Mixtures, Using 10 lb Rammer and 18 inch Drop. 8. ASTM D2167 - Standard Test Method for Density and Unit Weight of Soil in Place by the Rubber Balloon Method. 9. ASTM D2922 - Standard Test Methods for Density of Soil and Soil-Aggregate in Place by Nuclear Methods (Shallow Depth). 10. ASTM D3017 - Standard Test Method for Water Content of Soil and Rock in Place by Nuclear Methods (Shallow Depth). Technical Specifications S&ME Project No. 7235-16-004, Phase 7 Duke Marshall Steam Station Industrial Landfill No. 1, Cell 3 and Cell 4 Issued for Bid 2017 Electrical/Mechanical Components 02060 - Page 2 of 4 Aggregate 11. ASTM D4253 – Standard Test Methods for Maximum Index Density and Unit Weight of Soils Using a Vibratory Table. 12. ASTM D4254 – Standard Test Method for Minimum Index Density and Unit Weight of Soils and Calculation of Relative Density. C. North Carolina Department of Transportation (NCDOT) Standard specifications for Roads and Structures. 1.3 SUBMITTALS A. Materials Source: Submit name of imported materials suppliers and description of material. B. Manufacturer’s/Supplier’s Certificate: Certify materials meet or exceed specified requirements. C. For aggregate type A1, submit supplier’s Modified Proctor (AASTHTO T180 as modified by NCDOT) curve information. 1.4 QUALITY ASSURANCE A. Furnish each aggregate material type from single source throughout the Work. B. Perform Work in accordance with North Carolina Department of Transportation Standard Specifications for Roads and Structures or as otherwise specified. PART 2 PRODUCTS 2.1. FINE AND COARSE AGGREGATE MATERIALS A. Coarse Aggregate Type A1 - Roadways: Conforming to ABC Stone NCDOT standards. Coarse Aggregate Type A1 shall be used for roadways and where shown on the Drawings. B. Coarse Aggregate Type A2 – Drainage Aggregate: Subangular, subrounded, rounded, or well rounded particle shaped conforming to No. 57 Stone NCDOT Standards. Coarse Aggregate Type A2 shall be used in the LCS and LDS corridors, sumps, infiltration zones, chimney drains, and other drainage applications, for construction of erosion and sediment control structures, and where shown on the Drawings. C. Coarse Aggregate Type A3: Conforming to Class A Riprap NCDOT standards. Coarse Aggregate Type A3 shall be used for drainage feature inlet and outlet protection, for construction of erosion and sediment control structures, and where shown on the Drawings. D. Coarse Aggregate Type A4: Conforming to Class B Riprap NCDOT standards. Coarse aggregate Type A4 shall be used for drainage feature outlet protection, for erosion and sediment control structures, and where shown on the Drawings. E. Coarse Aggregate Type A5: Conforming to Class 1 Riprap NCDOT standards. Coarse Aggregate Type A5 shall be used for drainage feature inlet and outlet protection, for construction of erosion and sediment control structures, and where shown on the Drawings. F. Coarse Aggregate Type A6: Conforming to Class 2 Riprap NCDOT standards. Coarse aggregate Type A6 shall be used for drainage feature outlet protection, for erosion and sediment control structures, and where shown on the Drawings. Technical Specifications S&ME Project No. 7235-16-004, Phase 7 Duke Marshall Steam Station Industrial Landfill No. 1, Cell 3 and Cell 4 Issued for Bid 2017 Electrical/Mechanical Components 02060 - Page 4 of 4 Aggregate D. Add water to assist compaction. If excess water is apparent, remove aggregate and aerate to reduce moisture content. E. Use mechanical tamping equipment in areas inaccessible to compaction equipment. F. Coarse aggregate Type A1, ABC stone for structures and roadways 1. Spread aggregate over prepared substrate to a total compacted thickness as specified on Drawings. 2. Add small quantities of fine aggregate to coarse aggregate as appropriate to assist compaction. 3.6. TOLERANCES A. Scheduled Compacted Thickness: Within ¼ inch. B. Variation from Design Elevation: Within ½ inch. 3.7. FIELD QUALITY CONTROL A. Coarse aggregate Type A1, where used for structures and road surfacing applications, shall be compacted to a density of 98 percent of its NCDOT modified Proctor (AASHTO T180 as modified by NCDOT) maximum dry density and in accordance with these Specifications. Field density testing shall be performed at a minimum frequency of one test per 2,500 square feet per compacted lift or at least 1 test per lift. B. Compaction testing will be performed in accordance with ASTM D1556, ASTM D1557, ASTM D698, AASHTO T180 (as modified by NCDOT), ASTM D2167, ASTM D2922, and/or ASTM D3017. C. If tests indicate Work does not meet specified requirements, remove Work, replace and retest. END OF SECTION Technical Specifications S&ME Project No. 7235-16-004, Phase 7 Duke Marshall Steam Station Industrial Landfill No. 1, Cell 3 and Cell 4 Issued for Bid 2017 Electrical/Mechanical Components 02230 - Page 1 of 3 Site Clearing SECTION 02230 SITE CLEARING PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Site Clearing and Grubbing. 2. Stripping/Topsoil Excavation. 3. Fence Removal B. Related Sections: 1. Section 02315 – Excavation. 2. Section 02374 – Erosion Control Devices. 1.2 SUBMITTALS A. Submit results of soil nutrient and organic content testing for materials approved by the Engineer for re-use as topsoil. 1.3 QUALITY ASSURANCE A. Perform Work in accordance with State and local standards and ordinances. B. Conform to applicable codes for environmental requirements, disposal of debris, and burning debris on site (if allowed by OWNER). PART 2 PRODUCTS 2.1 MATERIALS A. N/A PART 3 EXECUTION 3.1 EXAMINATION A. Verify existing plant life designated to remain is tagged or identified. B. Identify topsoil stockpile area and waste area for materials not approved for re-use as topsoil. May dispose on site if permitted by Owner in Owner designated area. C. Identify Fence to be removed for installation of generator pad. 3.2 PREPARATION A. Coordinate to locate utilities prior to construction. 1. Utilities to be located and marked within and surrounding construction areas. Technical Specifications S&ME Project No. 7235-16-004, Phase 7 Duke Marshall Steam Station Industrial Landfill No. 1, Cell 3 and Cell 4 Issued for Bid 2017 Electrical/Mechanical Components 02230 - Page 2 of 3 Site Clearing 3.3 PROTECTION A. Locate, identify, and protect from damage utilities indicated to remain. B. Protect trees, plant growth, and features designated to remain as final landscaping as specified on Drawings. C. Protect bench marks, survey control points, groundwater monitoring wells, and existing structures from damage or displacement. 3.4 SITE CLEARING AND GRUBBING A. Notify Engineer prior to commencing with clearing activities. B. Install erosion control devices as shown on the Drawings and as specified in Section 02374 – Erosion Control Devices. C. Clear areas required for access to site and execution of Work. D. Remove trees and shrubs within construction area. Remove all trash or debris. Remove all materials to a depth necessary to eliminate soils containing more than 5 percent by weight fibrous organic matter, rubbish, vegetable matter, small stones, stumps, roots, root system, or other objectionable deleterious material within the clearing limits. E. Clear undergrowth and deadwood. F. Allow inspection of cleared areas by Engineer or his representative prior to beginning other construction activities. 3.5 REMOVAL A. Remove debris, rock, and extracted vegetation from site. If permitted by Owner, may dispose of on- site in Owner specified location. B. Remove portion of existing fence in front of proposed generator pad (concrete slab) to be replaced with a Security Gate. Security gate dimension (width) to be provided by Owner. Save fencing material for future use. C. Remove construction debris and other materials that can not be used in earthwork construction or final vegetation. Materials shall be disposed off-site unless permitted by Owner to dispose of on-site in Owner designated location. D. Do not burn or bury materials on-site unless permitted by State and local ordinances and laws and given permission by Owner to do so. Leave site in clean condition. 3.6 STRIPPING/TOPSOIL EXCAVATION A. Excavate topsoil from areas to be further excavated, or re-graded without mixing with foreign materials for use in finish grading. The minimum topsoil stripping depth shall be twelve inches or as determined by the Engineer. B. Stockpile material at the designated on-site stockpile location and protect from erosion. Technical Specifications S&ME Project No. 7235-16-004, Phase 7 Duke Marshall Steam Station Industrial Landfill No. 1, Cell 3 and Cell 4 Issued for Bid 2017 Electrical/Mechanical Components 02230 - Page 3 of 3 Site Clearing C. Remove excess topsoil not intended for reuse, from site unless permitted by Owner to dispose of on- site in Owner designated location. END OF SECTION Technical Specifications S&ME Project No. 7235-16-004, Phase 7 Duke Marshall Steam Station Industrial Landfill No. 1, Cell 3 and Cell 4 Issued for Bid 2017 Electrical/Mechanical Components 02315 - Page 1 of 3 Excavation SECTION 02315 EXCAVATION PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Excavating Soil Materials. 2. Excavating Unsuitable Material (Undercut). 3. Stockpiling Excavated Material. B. Related Sections: 1. Section 02230 – Site Clearing. 2. Section 02320 – Backfill – Structural. 3. Section 02324 – Trenching. 4. Section 02374 – Erosion Control Devices. 1.2 SUBMITTALS A. N/A. PART 2 PRODUCTS 2.1 N/A. PART 3 EXECUTION 3.1 PREPARATION A. Coordinate to locate utilities prior to construction. 1. Have the underground utilities located and marked within and surrounding construction areas. B. The Contractor shall protect all existing facilities, including, but not limited to existing electrical lines and poles, fencing, and monitoring wells during excavations and stockpiling. Damaged facilities shall be promptly replaced at the Contractor's expense. C. Notify utility company to remove and relocate any utilities. D. Perform site clearing, grubbing, rotary mowing, necessary surveys, and topsoil excavation per Section 02230 – Site Clearing. Any depths of removal of twelve inches or less shall be considered Site Clearing and Grubbing. E. Identify required lines, levels, contours, and datum locations. F. Protect bench marks, survey control points, and existing structures from excavating equipment and vehicular traffic. 3.2 EXCAVATION Technical Specifications S&ME Project No. 7235-16-004, Phase 7 Duke Marshall Steam Station Industrial Landfill No. 1, Cell 3 and Cell 4 Issued for Bid 2017 Electrical/Mechanical Components 02315 - Page 2 of 3 Excavation A. Install erosion control measures as specified on the Drawings. B. Excavate subsoil to accommodate site structures including junction manholes, pump houses and generator pad. C. Landfill subgrade shall be excavated to the lines and grades shown on the Drawings. D. Slope banks with machine to angle of repose or less unless shored as per OSHA standards. E. Remove lumped subsoil, boulders, and rock. F. Notify Engineer of unexpected subsurface conditions and discontinue affected Work in area until notified to resume Work. G. Materials determined unsuitable by the Engineer shall be excavated from a depth of 12 inches below the existing ground surface within the area, the area 10 feet beyond the area and any other area designated by the Engineer. (Depths of removal of 12 inches or less in areas designated above shall be considered stripping.) The lateral extent and required depth of undercutting will be determined by the Engineer. H. Excavated unsuitable areas shall be replaced with structural fill, lean concrete, or aggregate as recommended by the Engineer. I. If necessary, the area of excavation/undercutting shall be dewatered to a depth of at least two feet below the bottom of the excavation and shall be maintained in the dewatered condition until compacted earth fill is placed to at least three feet above the original water level or to original ground level, whichever is higher. J. Perform temporary dewatering as necessary during excavation to minimize softening of exposed subgrade soils. A temporary sump may be constructed for accumulation of impounded waters resulting from rain or seepage. A pump with adequate capacity shall be provided and operated to maintain a low water level in the sump. K. Correct over-excavated areas with select backfill and compact replacement as specified for authorized excavation per Section 02320 – Backfill - Structural. No payment will be made for over-excavation or corrections made to over-excavated areas. L. All reconditioning of structural fill to obtain the required compaction will be the responsibility of the Contractor. M. Furnish all labor, materials, supervision, and equipment required for constructing and maintaining temporary diversion measures as required for construction of the landfill and all structures. Furnish, install, maintain, and operate all pumping equipment for diversion or removal of water and maintaining the work area free from water throughout construction including temporary ditches and sump construction. N. Protect and or divert stormwater flows from the work area utilizing Stormwater and Erosion Control Structures referenced in Section 02374. O. Provide survey information before and after excavation. 3.3 FIELD QUALITY CONTROL A. Request visual inspection of bearing surfaces by Engineer before installing subsequent work. Technical Specifications S&ME Project No. 7235-16-004, Phase 7 Duke Marshall Steam Station Industrial Landfill No. 1, Cell 3 and Cell 4 Issued for Bid 2017 Electrical/Mechanical Components 02315 - Page 3 of 3 Excavation B. Excavation is complete when the Engineer approves the Final Subgrade Survey. 3.4 PROTECTION A. Prevent displacement or loose soil from falling into excavation; maintain soil stability. B. Protect bottom of excavations and soil adjacent to and beneath structures from freezing. C. Protect structures, utilities and other facilities from damage caused by settlement, lateral movement, undermining, stormwater, groundwater and other hazards created by earth operations. D. Grade top perimeter of excavation to prevent surface water from draining into excavation. E. Protect outlet of excavations from potential sediment deposit by placing sediment control measures such as silt fence and/or temporary sediment traps. END OF SECTION Technical Specifications S&ME Project No. 7235-16-004, Phase 7 Duke Marshall Steam Station Industrial Landfill No. 1, Cell 3 and Cell 4 Issued for Bid 2017 Electrical/Mechanical Components 02320 - Page 1 of 4 Backfill-Structural SECTION 02320 BACKFILL - STRUCTURAL PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Fill Type S1, structural fill, defined as compacted fill placed for achieving proposed subgrade elevations, perimeter berms, surface water control systems, roadways, area fill, or other systems not intended to function as a migration barrier. Any fill material containing ash will not be considered as Fill Type S1. 2. Fill Type S5, topsoil/vegetative soil, defined as soil material capable of sustaining vegetation as specified in these Specifications. B. Related Sections: 1. Section 02060 – Aggregate. 2. Section 02315 - Excavation. 3. Section 02324 - Trenching. 4. Section 02374 – Erosion Control Devices. 5. Section 02500 – High Density Polyethylene (HDPE) Pipe. 1.2 REFERENCES A. American Society for Testing and Materials (ASTM) standards: 1. ASTM D422 - Standard test Method for Particle-Size Analysis of Soils (Grain Size with Hydrometer). 2. ASTM D698 - Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Standard Effort (12,400 ft-lbf/ft3). 3. ASTM D1556 – Standard Test Method for Density of Soil In Place by the Sand-Cone Method. 4. ASTM D2216 - Standard Test Method for Laboratory Determination of Water (Moisture) Content of Soil and Rock by Mass. 5. ASTM D2922 - Standard Test Method for Density of Soil and Soil-Aggregate in Place by Nuclear Methods (Shallow Depth). 6. ASTM D2487 – Standard Practices for Classification of Soil for Engineering Purposes (Unified Soil Classification System). 7. ASTM D2937 - Standard Test Method for Density of Soil in place by the Drive-Cylinder Method. 8. ASTM D4318 - Standard Test Methods for Liquid Limit, Plastic Limit, and Plasticity Index of Soils. 1.3 SUBMITTALS A. N/A. PART 2 PRODUCTS 2.1 FILL MATERIALS A. Fill Type S1, Structural Fill: 1. Structural fill is defined as compacted fill for perimeter berms, surface water control systems, roadways, general fill, or other systems not intended to function as a migration barrier. Technical Specifications S&ME Project No. 7235-16-004, Phase 7 Duke Marshall Steam Station Industrial Landfill No. 1, Cell 3 and Cell 4 Issued for Bid 2017 Electrical/Mechanical Components 02320 - Page 2 of 4 Backfill-Structural 2. Natural soil material from designated on-site borrow areas and/or stockpiles. Any fill material containing ash shall not be considered as Type S1 Fill. 3. Structural fill shall be classified as SP, SM, SW, SC, SW-SM, SW-SC, SP-SM, ML, MH, or CL soils according to the Unified Soil Classification System (ASTM D2487). 4. Free of topsoil, organic material, roots, stumps, brush, rocks larger than 4 inches, subsoil, debris, vegetation, and other foreign matter. 5. All material clods will be broken down with tillers and/or discs to provide a homogeneous soil that is free of clods greater than 4 inches in diameter with no more than 15% retained on the No. 4 sieve. B. Fill Type S5, Topsoil/Vegetative Soil: 1. Topsoil/vegetative soil is defined as fill placed to support vegetation establishment in areas not within the landfill cells. 2. Excavated and reused materials from designated on-site or off-site borrow areas and/or stockpiles. 3. Shall be classified as SM, SC, SW-SM, SW-SC, SP-SM, ML, MH, or CL soils according to the Unified Soil Classification System (ASTM D2487). 4. Free of roots, stumps, brush, rocks larger than 2 inches, debris, and other foreign matter. 5. Topsoil material shall have nutrient content and pH capable of supporting vegetation. 6. Shall have a minimum organic content of 2% by weight. 7. All material clods will be broken down with tillers and/or discs to provide a homogeneous soil that is free of clods greater than 2 inches in diameter with no more than 15% retained on the No. 4 sieve. PART 3 EXECUTION 3.1 EXAMINATION A. The Engineer will assist the Earthwork Contractor in the determination of Structural Fill and non-select material during excavation operations (see Section 02315). The Earthwork Contractor will be responsible for excavating, transporting, stockpiling, placing and compacting all materials as needed. 3.2 PREPARATION A. Proof roll subgrade to identify soft spots; fill and compact to density equal to or greater than requirements for subsequent fill material. B. Cut out soft areas of subgrade not capable of compaction in place. Backfill with Type S1 fill (as specified by the Engineer) and compact to density equal to or greater than requirements for subsequent fill material. C. Scarify subgrade surface to depth of 6 inches. D. Begin backfilling after Engineer’s acceptance of the appropriate survey for underlying surface. 3.3 BACKFILLING A. Backfill areas to contours and elevations as shown on Drawings with unfrozen materials. B. Systematically backfill to allow maximum time for natural settlement. Do not backfill over porous, wet, frozen, or spongy subgrade surfaces. Technical Specifications S&ME Project No. 7235-16-004, Phase 7 Duke Marshall Steam Station Industrial Landfill No. 1, Cell 3 and Cell 4 Issued for Bid 2017 Electrical/Mechanical Components 02320 - Page 3 of 4 Backfill-Structural C. Fill Type S1: Place and compact material in loose lifts not exceeding 8 inches in thickness and not exceeding 6 inches compacted thickness. The first lift over geosynthetics shall be not less than 12 inches in loose thickness. Refer to Specification Section 02324 – Trenching for backfill requirements for drop inlets and culverts. D. Fill Type S5: Scarify subgrade, place material in one lift and track in with backhoe or other equipment approved by Engineer. E. Employ placement method that does not disturb or damage other work. F. Backfill against supported structures. Do not backfill against unsupported structures. Backfill simultaneously on each side of unsupported structures until supports are in place. G. Protect backfill from desiccation, crusting, or cracking. H. Make gradual grade changes. Blend slope into level areas. I. Remove surplus backfill materials from site unless authorized by Owner to dispose of on-site in an Owner designated location. J. Leave fill material stockpile areas free of excess fill materials. K. Provide survey information before and after placement of structural fill. 3.4 TOLERANCES A. Top Surface Type S1 fill shall be plus or minus 1 inch from required elevations or -1 to plus 0 inches for subgrade of liner. 3.5 FIELD QUALITY CONTROL A. Laboratory Testing: 1. Perform laboratory material tests in accordance with ASTM D422, ASTM D698, ASTM D2216, and ASTM D4318. 2. Fill Type S1– Soil Materials test at a frequency of: a. 10,000 cubic yards of material placed; b. When materials used for structural fill change; and/or c. When directed by the Engineer. d. Sample size shall be 50-lb. B. In Place Compaction and Natural Moisture Content Tests 1. Perform in place compaction tests in accordance with ASTM D1556, ASTM D6938, or ASTM D2937. 2. Perform in place natural moisture content test in accordance with ASTM D4959. 3. Frequency of compaction/natural moisture content tests: a. General fill, landfill subgrade, surface water control systems, or other systems not intended to function as a migration barrier, in-place density and moisture: Each lift at a minimum frequency of 1 per acre per lift, or as otherwise indicated in these Specifications. b. Perimeter berms and roadways: Each lift at a minimum frequency of 1 per 10,000 sq. ft. c. Leachate force main and culverts: see Section 02324. 4. Compaction criteria: a. Type S1 fill shall be compacted to minimum 95 percent of its Standard Proctor (ASTM D 698) maximum dry density. Technical Specifications S&ME Project No. 7235-16-004, Phase 7 Duke Marshall Steam Station Industrial Landfill No. 1, Cell 3 and Cell 4 Issued for Bid 2017 Electrical/Mechanical Components 02320 - Page 4 of 4 Backfill-Structural b. Type S1 and fill placed for roadways shall be compacted to a minimum 100 percent of its Standard Proctor (ASTM D 698) maximum dry density. c. Fill Type S5 should be placed in one continuous loose lift and tracked in by backhoe or other equipment approved by Engineer. d. Compacted moisture content shall be within 3 percent of optimum moisture content for all fill placed, or as otherwise approved by Engineer. e. Force main and culverts: see Section 02324. C. When tests indicate Work does not meet specified requirements, remove Work, replace and retest. 3.6 PROTECTION OF WORK A. Reshape and re-compact fills subjected to vehicular traffic. END OF SECTION Technical Specifications S&ME Project No. 7235-16-004, Phase 7 Duke Marshall Steam Station Industrial Landfill No. 1, Cell 3 and Cell 4 Issued for Bid 2017 Electrical/Mechanical Components 02324 - Page 1 of 5 Trenching SECTION 02324 TRENCHING PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Trenching for buried pipe. B. Related Sections: 1. Section 02315 - Excavation. 2. Section 02320 – Backfill - Structural. 3. Section 02500 - High Density Polyethylene (HDPE) Pipe. 1.2 REFERENCES A. American Association of State Highway and Transportation Officials: 1. AASHTO T180 - Standard Specification for Moisture-Density Relations of Soils Using a 4.54-kg (10-lb) Rammer and a 457-mm (18-in.) Drop. B. American Society for Testing and Materials (ASTM) standards: 1. ASTM D698 - Standard Test Method for Laboratory Compaction Characteristics of Soil Using Standard Effort (12,400 ft-lbf/ft3) (Standard Proctor Test). 2. ASTM D1556 – Standard Test Method for Density and Unit Weight of Soil in place by the Sand- Cone Method. 3. ASTM D1557 - Standard Test Method for Laboratory Compaction Characteristics of Soil Using Modified Effort (6,000 ft-lbf/ft3) (Modified Proctor Test). 4. ASTM D2216 - Standard Test Method for Moisture Content. 5. ASTM D2922 – Standard Test Method for Density of Soil and Soil Aggregate in Place by Nuclear Methods (Shallow Depth). 6. ASTM D2937 – Standard Test Method for Density of Soil in place by the Drive-Cylinder Method Test. 7. ASTM D3017 – Standard Test Method for Water Content of Soil and Rock in Place by Nuclear Methods (Shallow Depth). 8. ASTM D4959 – Standard Test Method for Determination of Water Content of Soil be Direct Heating. 1.3 DEFINITIONS A. Utility: Any buried pipe, duct, conduit, or cable. 1.4 SUBMITTALS A. As site conditions may dictate, the Contractor shall prepare an excavation protection plan under direct supervision of Professional Engineer experienced in design of this Work and licensed in State of project. 1.5 QUALITY ASSURANCE A. Perform Work in accordance with North Carolina Department of Transportation (NCDOT) standards. Technical Specifications S&ME Project No. 7235-16-004, Phase 7 Duke Marshall Steam Station Industrial Landfill No. 1, Cell 3 and Cell 4 Issued for Bid 2017 Electrical/Mechanical Components 02324 - Page 2 of 5 Trenching B. Perform Work in accordance with applicable Federal, State, and local excavation safety standards. 1.6 FIELD MEASUREMENTS A. Verify field measurements prior to placement of materials within trench. 1.7 COORDINATION A. Verify Work associated with lower elevation utilities is complete before placing higher elevation utilities. PART 2 PRODUCTS 2.1 FILL MATERIALS A. Structural Fill for pipe backfill: Type S1 as specified in Section 02320. PART 3 EXECUTION 3.1 LINES AND GRADES A. Grades: 1. Lay pipes to lines and grades indicated on Drawings. 2. Maintain grade alignment of pipe using string line parallel with grade line and vertically above centerline of pipe. a. Establish string line on level batter boards at intervals of not more than 25 feet. b. Install batter boards spanning trench, rigidly anchored to posts driven into ground on both sides of trench. c. Set three adjacent batter boards before laying pipe to verify grades and line. d. Determine elevation and position of string line from elevation and position of offset points or stakes located along pipe route. e. Do not locate pipe using side lines for line or grade. 3. As an alternative method, use laser-beam instrument with qualified operator to establish lines and grades. B. Location of Pipe Lines: 1. Location and approximate depths of proposed pipe lines are shown on Drawings. 2. Engineer or Owner reserves right to make changes in lines, grades, and depths of pipe lines and structures when changes are required for Project conditions. 3.2 PREPARATION A. Coordinate to locate utilities prior to construction. 1. Underground utilities must be located and marked within and surrounding construction areas. B. Identify required lines, levels, contours, and datum locations. C. Protect bench marks and existing structures from excavating equipment and vehicular traffic. D. Maintain and protect above and below grade utilities indicated to remain. Technical Specifications S&ME Project No. 7235-16-004, Phase 7 Duke Marshall Steam Station Industrial Landfill No. 1, Cell 3 and Cell 4 Issued for Bid 2017 Electrical/Mechanical Components 02324 - Page 3 of 5 Trenching 3.3 TRENCHING A. Implement temporary dewatering measures to reduce softening of exposed subgrade soils as excavation advances, until foundation construction is complete, and until fill placement is a minimum of 3-feet above the groundwater level. B. Do not advance open trench more than 100 feet ahead of installed pipe. C. Cut trenches sufficiently wide to enable installation and allow inspection. Remove water or materials that interfere with Work. D. Excavate trenches to depth and width indicated on Drawings. Provide uniform and continuous bearing and support for pipe. E. Do not disturb subgrade soils within a 45 degree zone of influence with depth of foundations, if applicable. F. When Project conditions permit, slope side walls of excavation starting 2 feet above top of pipe. When side walls can not be sloped, provide sheeting and shoring to protect excavation as specified in this Section. G. When required, perform excavations and provide temporary bracing, shoring, and/or benching in accordance with applicable Federal, State, and local excavation safety standards. H. When subsurface materials at bottom of trench are loose or soft, excavate to greater depth as directed by Engineer until suitable material is encountered. Backfill according to Part 3.5 of this Section. I. Cut out soft areas of subgrade not capable of compaction in place. Backfill with Fill Type S1 and compact to density equal to or greater than requirements for subsequent backfill material. J. Hand trim excavation. Remove loose matter. K. Correct over excavated areas with compacted backfill as specified for authorized excavation or replace with lean concrete as directed by Engineer. Corrections for over excavation shall be conducted at no cost to the Owner. L. Stockpile excavated material in area designated on site and remove excess material not being used from site unless authorized by Owner to dispose of on-site in an Owner designated location. 3.4 SHEETING AND SHORING A. Comply with all OSHA, Federal, State, and local trench safety and excavation requirements. B. Trenches 4 feet or more in depth should be provided with a fixed means of egress. Spacing between ladders or other means of egress must be such that a worker will not have to travel more than 25 feet laterally to the nearest means of egress. Ladders must be secured and extend a minimum of 36 inches above the landing. C. Provide sheeting, shoring, bracing, or other protection to maintain stability of excavation for trenches more than 5 feet deep, and as necessary to prevent danger to persons, structures and adjacent properties and to prevent caving, erosion, and loss of surrounding subsoil. Technical Specifications S&ME Project No. 7235-16-004, Phase 7 Duke Marshall Steam Station Industrial Landfill No. 1, Cell 3 and Cell 4 Issued for Bid 2017 Electrical/Mechanical Components 02324 - Page 4 of 5 Trenching D. Design sheeting and shoring to be removed at completion of excavation work. E. Repair damage caused by failure of the sheeting, shoring, or bracing and for settlement of filled excavations or adjacent soil at no cost to the Owner. F. Repair damage to pipe bedding work from settlement, water or earth pressure or other causes resulting from inadequate sheeting, shoring, or bracing. 3.5 BACKFILLING A. Trenches with Piping: 1. Cover pipe with Fill Type S1 in loose 8 inch or thinner lifts with unfrozen fill materials, compacted uniformly to a minimum of 95 percent of its Standard Proctor maximum dry density (AASHTO T180, ASTM D698, ASTM D1557). 2. Employ placement method that does not disturb or damage utilities in trench. B. Systematically backfill to allow maximum time for natural settlement. Do not backfill over porous, wet, frozen, or spongy subgrade surfaces. C. Maintain optimum moisture content of fill materials to attain required compaction density. D. Do not leave more than 50 feet of trench open at end of working day. Remove surplus fill materials from site unless authorized by Owner to dispose of on-site in an Owner designated location. E. Protect open trench to prevent danger to the contractor’s workers, Owner’s personnel and public. 3.6 TOLERANCES A. Top Surface of General Backfilling: Plus or minus 1/2 inch from required elevations. 3.7 FIELD QUALITY CONTROL A. Perform laboratory material tests as described in Sections 02320 and 02321. B. Perform in place compaction tests in accordance with the following: 1. Density Tests: ASTM D1556, ASTM D2922, ASTM D2937. 2. The time schedule for excavation and backfilling of the anchor trench is to be approved by the Engineer. 3. Moisture Tests: ASTM D2216, ASTM D3017, ASTM D4959. C. When tests indicate Work does not meet specified requirements, remove Work, replace, compact, and retest. D. Frequency of Tests: One test per compacted lift per 200 linear feet of trench for piping and for anchor trench backfill. 3.8 PROTECTION OF INSTALLED CONSTRUCTION A. Reshape and re-compact fills subjected to vehicular traffic during construction. B. General construction traffic shall be limited to areas designated by the Engineer that have been protected by at least 36 inches of compacted fill material. Technical Specifications S&ME Project No. 7235-16-004, Phase 7 Duke Marshall Steam Station Industrial Landfill No. 1, Cell 3 and Cell 4 Issued for Bid 2017 Electrical/Mechanical Components 02324 - Page 5 of 5 Trenching END OF SECTION Technical Specifications S&ME Project No. 7235-16-004, Phase 7 Duke Marshall Steam Station Industrial Landfill No. 1, Cell 3 and Cell 4 Force Main Issued for Bid 2017 02374 - Page 1 of 3 Erosion Control Devices SECTION 02374 EROSION CONTROL DEVICES PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Riprap Channel/Energy Dissipater 2. Silt Fence Outlets. 3. Check Dam. 4. Straw Wattle. 5. Slope Matting. 6. Grassing. 7. Erosion Maintenance. 8. Temporary Diversion Berms. B. Related Sections: 1. Section 02060 - Aggregate. 2. Section 02230 - Site Clearing. 3. Section 02315 – Excavation. 4. Section 02320 – Backfill – Structural. 5. Section 02610 – Pipe Culverts. 6. Section 02674 – Nonwoven Geotextile. 7. Section 02924 - Seeding and Soil Supplements. 1.2 REFERENCES A. ASTM International: 1. ASTM D698 - Standard Test Method for Laboratory Compaction Characteristics of Soil Using Standard Effort (12,400 ft-lbf/ft3 (600 kN-m/m3)). 1.3 SUBMITTALS A. Manufacturer's Certificate: Certify Products meet or exceed specified requirements. 1.4 QUALITY ASSURANCE A. Perform Work in accordance with requirements of these Project Specifications. B. Perform Work in accordance with NCDOT standards. 1.5 PRE-INSTALLATION MEETINGS A. Convene minimum one week prior to commencing work of this Section. PART 2 PRODUCTS 2.1 RIPRAP AND GEOTEXTILE MATERIALS A. Riprap: As shown on Drawings and as specified in Section 02060. Furnish in accordance with NCDOT standards. Technical Specifications S&ME Project No. 7235-16-004, Phase 7 Duke Marshall Steam Station Industrial Landfill No. 1, Cell 3 and Cell 4 Force Main Issued for Bid 2017 02374 - Page 2 of 3 Erosion Control Devices B. Geotextile Fabric: Non-biodegradable, non-woven geotextile, 8 oz/sy, UV stabilized filter fabric as specified in Section 02674. 2.2 AGGREGATE AND SOIL MATERIALS A. Fine and Coarse Aggregate: As shown on Drawings and as specified in Section 02060. B. Soil Backfill: Soil Type S1 as specified in Section 02320. Subsoil with no rocks over 4 inches in diameter, frozen earth or foreign matter. 2.3 SILT FENCING, SILT FENCING OUTLETS, WATTLES,AND INLET PROTECTION A. As specified on Drawings. 2.4 PLANTING MATERIALS A. Seeding and Soil Supplements: As specified in Section 02924. B. Mulch: As specified in Section 02924. 2.5 CULVERTS A. As specified on Drawings. PART 3 EXECUTION 3.1 RIPRAP CHANNEL/ENERGY DISSIPATOR A. Excavate to indicated depth of rock lining or nominal placement thickness as indicated on Drawings. Remove loose, unsuitable material below bottom of rock lining, then replace with suitable material. Thoroughly compact and finish entire foundation area to firm, even surface. B. Lay and overlay geotextile fabric over substrate. Lay fabric parallel to flow from upstream to downstream. Overlap edges upstream over downstream and upslope over downslope. Provide a minimum overlap of 2 feet. Offset adjacent roll ends a minimum of 5 feet when lapped. Cover fabric as soon as possible and in no case leave fabric exposed more than 4 weeks. C. Carefully place rock on geotextile fabric to produce an even distribution of pieces, with minimum of voids and without tearing geotextile. Place as indicated on Drawings. D. Unless indicated otherwise, place full course thickness in one operation to prevent segregation and to avoid displacement of underlying material. Arrange individual rocks for uniform distribution. Place evenly and carefully to minimize voids. 1. Saturate rock with water and let all standing water drain. Fill voids between pieces with grout, were shown on Drawings, for at least top 6 inches. Sweep surface with stiff broom to remove excess grout. 3.2 SILT FENCING A. Maintain existing silt fence installed as part of landfill cell construction. Technical Specifications S&ME Project No. 7235-16-004, Phase 7 Duke Marshall Steam Station Industrial Landfill No. 1, Cell 3 and Cell 4 Force Main Issued for Bid 2017 02374 - Page 3 of 3 Erosion Control Devices B. Install new silt fence as specified on Drawings. 3.3 SILT FENCE OUTLETS A. Maintain existing silt fence outlets installed for landfill cell construction. B. Install new silt fence outlets at locations as indicated on the Drawings. Silt fence outlets may be field-adjusted with Engineer’s approval. 3.4 SITE STABILIZATION A. Incorporate erosion control devices indicated on Drawings into the Project at the earliest practicable time. B. Construct, stabilize and activate erosion controls before site disturbance within tributary areas of those controls. C. Stabilize any disturbed area of affected erosion control devices on which activity has temporarily or permanently ceased and which will remain exposed for more than 7 calendar days in accordance with the stabilization schedule in the plans and specifications. 1. During non-germinating periods, apply mulch at recommended rates. 2. Stabilize disturbed areas which are not at finished grade and which will be disturbed within one year in accordance with Section 02924 and as specified on Drawings for temporary seeding. 3. Stabilize disturbed areas which are either at finished grade or will not be disturbed within one year in accordance with Section 02924 permanent seeding specifications. D. Stabilize diversion channels and stockpiles immediately. 3.5 FIELD QUALITY CONTROL A. Inspect erosion control devices on a weekly basis and after each runoff event in accordance with applicable North Carolina regulations. Perform additional inspections as required by the Self- Inspection Program. Make necessary repairs to ensure erosion and sediment controls are in good working order. B. Compaction Testing: As specified in Section 02320. C. When tests indicate work does not meet specified requirements, remove work, replace and retest. 3.6 CLEANING A. Remove and dispose of sediment when sediment accumulation in sedimentation structures has reached a point one-half depth of sediment structure or device, or as indicated on the Drawings. B. Do not damage structure or devices during cleaning operations. Any damage caused by cleaning operations shall be repaired at no cost to the Owner. C. Do not permit sediment to erode into construction or site areas or natural waterways. 3.7 SCHEDULES A. As indicated on Drawings. END OF SECTION Technical Specifications S&ME Project No. 7235-16-004, Phase 7 Duke Marshall Steam Station Industrial Landfill No. 1, Cell 3 and Cell 4 Issued for Bid 2017 Electrical/Mechanical Components 02500 - Page 1 of 8 High Density Polyethylene (HDPE) Pipe SECTION 02500 HIGH DENSITY POLYETHYLENE (HDPE) PIPE PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Materials, placement, and installation of solid HDPE pipe and fittings for force main system. B. Related Sections: 1. Section 02060 - Aggregate. 2. Section 02320 - Backfill - Structural. 3. Section 02324 - Trenching. 4. Section 02674 – Nonwoven Geotextile. 5. Section 03560 - Force Main Leakage Test 1.2 REFERENCES A. American Society for Testing and Materials: 1. ASTM D638 - Standard Test Method for Tensile Properties of Plastics. 2. ASTM D695 - Standard Test Method for Compressive Properties of Rigid Plastics. 3. ASTM D696 - Standard Test Method for Coefficient of Thermal Expansion of Plastics Between (-30o)C and 30oC With a Vitreous Silica Dilatometer. 4. ASTM D746 - Standard Test Method for Brittleness Temperature of Plastics and Elastomers by Impact. 5. ASTM D790 - Standard Test Method for Flexural Properties of Unreinforced and Reinforced Plastics and Electrical Insulating Materials. 6. ASTM D1238 - Standard Test Method for Flow Rates of Thermoplastics by Extrusion Plastometer. 7. ASTM D1248 - Standard Specification for Polyethylene Plastics Extrusion Materials for Wire and Cable. 8. ASTM D1505 - Standard Test Method for Density of Plastics by the Density Gradient Technique. 9. ASTM D1603 - Standard Test Method for Carbon Black in Olefin Plastics. 10. ASTM D1693 - Standard Test Method for Environmental Stress Cracking of Ethylene Plastics. 11. ASTM D2240 - Standard Test Method for Rubber Property - Durometer Hardness. 12. ASTM D2513 - Standard Specification for Thermoplastic Gas Pressure Pipe, Tubing, and Fittings. 13. ASTM D2657 - Standard Practice for Heat Fusion Joining of Polyolefin Pipe and Fittings. 14. ASTM D 2837 - Standard Test Method for Obtaining Hydrostatic Design Basis for Thermoplastic Pipe materials. 15. ASTM D3261 - Standard Specification for Butt Fusion Polyethylene (PE) Plastic Fittings for Polyethylene (PE) Plastic Pipe and Tubing. 16. ASTM D3350 - Standard Specification for Polyethylene Plastics Pipe and Fittings Materials. 17. ASTM F405 Standard Specification for Corrugated Polyethylene (PE) Pipe and Fittings. 18. ASTM F667 Standard Specification for Large Diameter Corrugated Polyethylene Pipe and Fittings. 19. ASTM F714 - Standard Specification for Polyethylene (PE) Plastic Pipe (SDR-PR) Based on Outside Diameter. Technical Specifications S&ME Project No. 7235-16-004, Phase 7 Duke Marshall Steam Station Industrial Landfill No. 1, Cell 3 and Cell 4 Issued for Bid 2017 Electrical/Mechanical Components 02500 - Page 2 of 8 High Density Polyethylene (HDPE) Pipe 20. ASTM F1473 - Standard Test Method for Notch Tensile Test to Measure the Resistance to Slow Crack Growth of Polyethylene Pipes and Resins. 21. ASTM F2619 – Standard Specification for High-Density Polyethylene Line Pipe B. Plastics Pipe Institute (PPI): 1. PPI TR4 - Recommended Hydrostatic Strengths and Design Stresses for Thermoplastic Pipe and Fittings Compound. 1.3 SUBMITTALS A. HDPE Pipe 1. Shop Drawings: Submit shop drawings for HDPE Pipe, fittings, valves, vaults, and other accessories. Indicate piece numbers and locations. Shop drawings for fabricated fittings shall be submitted to the Engineer for approval at least two weeks prior to fabrication. 2. Product Data: The Contractor or Supplier shall submit a complete description of and data indicating pipe material used, and pipe accessories and fittings proposed for use to the Engineer for approval at least two weeks prior to installation. Pipe data shall conform to the standards set in Table 02500-A found in Part 2.1 of this Section. 3. Manufacturer's Certificates: a. Certification of the analysis for the HDPE resin. b. Certify products meet or exceed specified requirements specified in Table 02500-A found in Part 2.1 of this Section 02500. c. Certifications must be submitted to Engineer for approval at least two weeks prior to installation. B. Manufacturer's Installation Instructions: Indicate special procedures required to store and install products specified. 1.4 CLOSEOUT SUBMITTALS A. Project Record Documents: Record location of pipe runs, connections, and invert elevations via survey information. B. Camera inspection reports of all installed piping larger than 6 inches in diameter. 1.5 QUALITY ASSURANCE A. The pipe and fitting manufacturer’s production facilities shall be open for inspection by the Owner or his designated agents with a reasonable advanced notice. B. During inspection, the manufacturer shall demonstrate that it has facilities capable of manufacturing and testing the pipe and fittings to standards required by this Specification. C. Pipe which has been tested by the manufacturer and falls outside of the appropriate limits set forth in Table 02500-A contained in this specification will be cause for rejection. D. The owner or the specifying engineer may request certified lab data to verify the physical properties of materials not meeting the requirements of this specification. 1.6 FIELD MEASUREMENTS A. Verify field measurements and elevations are as indicated on the Drawings. Technical Specifications S&ME Project No. 7235-16-004, Phase 7 Duke Marshall Steam Station Industrial Landfill No. 1, Cell 3 and Cell 4 Issued for Bid 2017 Electrical/Mechanical Components 02500 - Page 3 of 8 High Density Polyethylene (HDPE) Pipe 1.7 DELIVERY, STORAGE, AND HANDLING A. Packaging, handling, and shipment shall be in accordance with the manufacturer’s standards, instructions, and recommendations. B. Transportation to Site: 1. The manufacturer shall package the pipe, fittings, structures, and/or other miscellaneous HDPE items in a manner designed to deliver it or them to the project neatly, intact, and without physical damage. 2. The transportation carrier shall use appropriate methods and intermittent checks to insure the materials are properly supported, stacked, and restrained during transport such that it is not nicked, gouged, or physically damaged. C. Storage: 1. Pipe, structures, and other miscellaneous HDPE items shall be stored on clean, level ground to prevent undue scratching or gouging and as needed to protect them from being covered with excessive dirt, water, moisture, and mechanical abrasion. 2. The handling of pipe, structures, and other miscellaneous HDPE items shall be done in such a manner that there is no damage. Nylon slings are often used. 3. If the pipe must be stacked for storage, such stacking shall be done in accordance with the pipe manufacturer’s recommendations. 4. Store gaskets for mechanical and push-on joints in cool, dry location out of direct sunlight and not in contact with petroleum products. D. Care shall be taken to minimize the amount of soil collected inside the pipe, structures, and other miscellaneous HDPE items while handling and installing. E. The pipe, structures, and other miscellaneous HDPE items shall be handled in such a manner that it is not pulled over sharp objects or cut by chokers or lifting equipment, and care shall be exercised during installation not to damage the pipes and fittings. F. Any pipe section, fitting, joint or other miscellaneous HDPE items that becomes broken, cracked, crushed, cut, scratched, gouged or otherwise rendered unsuitable, as determined by the Engineer, shall be removed and replaced by the Contractor. Scratches greater than 6 inches in length and gouges exhibiting a depth in excess of 8 percent of the wall thickness of the pipe shall be cause for rejection of pipe or fittings to the extent designated by the Engineer. G. Fused Pipe Segment Handling: 1. Fused segments of pipe shall be handled so as to avoid damage to the pipe. 2. Chains or cable type chokers must be avoided when lifting fused sections of pipe. Nylon slings are preferred. 3. Spreader bars are recommended when lifting long fused sections. 4. Pipe shall be fused in lengths not to exceed that which can be moved and placed easily and safely, causing no damage to the fused pipe or welds. 1.8 COORDINATION A. Coordinate the Work with connection to piping, leachate collection and detection systems, stormwater collection systems, and trenching. Technical Specifications S&ME Project No. 7235-16-004, Phase 7 Duke Marshall Steam Station Industrial Landfill No. 1, Cell 3 and Cell 4 Issued for Bid 2017 Electrical/Mechanical Components 02500 - Page 4 of 8 High Density Polyethylene (HDPE) Pipe PART 2 PRODUCTS 2.1 HIGH DENSITY POLYETHYLENE (HDPE) PIPING A. Base Resin (HDPE Material) 1. HDPE material used for the manufacture of HDPE pipe and fittings under this specification shall be produced from approved pipe material base resin that is high density, high molecular weight polyethylene (HDPE) pipe grade resin with the nominal physical properties: a. Equivalent to Type III, Category 5, Class C, Grade PE 3408 / PE4710 in accordance with ASTM D1248. b. Equivalent to cell classification PE445574C in accordance with ASTM D3350. c. As outlined in Table 02500-A below. 2. The material shall be listed by PPI (Plastics Pipe Institute, a division of the Society of the Plastics Industry) in PPI TR-4 with a 73ºF hydrostatic design basis of 1,600 psi and a 140ºF hydrostatic design basis of 800 psi. The PPI listing shall be in the name of the pipe manufacturer and shall be based on ASTM D 2837 testing. 3. The resin shall contain not less than 97% of the base polymer and not less than 2% carbon black as defined in ASTM D1248, Class C to impart maximum weather resistance. 4. The pipe material shall contain no more than 3% carbon black, anti-oxidants, and heat stabilizers combined, and no other additives, fillers or extenders. 5. The pipe shall contain no recycled compound except that generated in the manufacturer’s own plant from resin of the same raw material, including both the base resin and the co- extruded resin. B. Physical Appearance 1. All pipes shall have good appearance qualities. 2. The pipe shall be homogeneous throughout and the surfaces shall be smooth and uniform with no visible defects. 3. The pipes shall be free of visible cracks, holes, voids, nicks, cuts, gouges, scratches, blisters, gels, undispersed ingredients, any signs of contamination by foreign inclusions, or other defects that may affect the wall integrity or the pipe’s serviceability. 4. Holes for perforated HDPE pipes shall be cleanly cut, identical in geometry, and evenly spaced. C. Physical Properties 1. Pipe and fitting dimensions, workmanship, standard dimension ratio (SDR) and corresponding pressure rating shall be in accordance with the requirements of ASTM F714. 2. HDPE piping shall have a Standard Dimension Ratio (SDR) as specified on the Drawings. 3. The chemical and corrosion resistance of the PE pipe and all fittings shall be in keeping with typical properties of high quality polyethylene products currently available through commercial sources. 4. All mechanical fasteners or fittings shall be stainless steel. 5. At a minimum, the pipe material shall meet the properties presented in Table 02500-A below: Technical Specifications S&ME Project No. 7235-16-004, Phase 7 Duke Marshall Steam Station Industrial Landfill No. 1, Cell 3 and Cell 4 Issued for Bid 2017 Electrical/Mechanical Components 02500 - Page 5 of 8 High Density Polyethylene (HDPE) Pipe TABLE 02500-A REQUIRED PIPE AND BASE RESIN PHYSICAL PROPERTIES Property Test Method Unit Nominal Value Material Designation PPI-TR4 PE 3408 / PE 4710 Cell Classification ASTM D3350 445574C Material Classification ASTM D1248 Type III, Category 5, Class C Density ASTM D1505 ≥0.945 g/cm3 Melt Index ASTM D1238 (Condition E) g/10min <0.1 Carbon Black Content/Color; UV Stabilzer ASTM D1603 % range 2 to 3 Flexural Modulus ASTM D790 2% Secant psi >125,000 Tensile Strength @ Ultimate ASTM D638 psi 3,200 Tensile Strength @Yield ASTM D638 (Type IV, 2 ipm) 1 psi >3,000 Elongation @ Yield ASTM D638 (Type IV, 2 ipm) 1 % >8 Ultimate Elongation @ Break ASTM D638 % >750 Modulus of Elasticity ASTM D638 (Type IV, 2 ipm) 1 psi >100,000 Environmental Stress Crack Resistance (ESCR) ASTM D1693 Fo, Condition C hrs >5,000 Hardness ASTM D2240 Shore “D” >60 Compressive Strength at Yield ASTM D695 psi >1,600 Slow Crack Resistance (SCG) (PENT test) ASTM F1473 hours >100 Hydrostatic Design Basis @ 73.4°F (23°C) 140°F (60°C) ASTM D2837 psi >1,600 >800 Low Temperature Brittleness ASTM D746 °F(°C) < - 180 (-117) Linear Thermal Expansion Coefficient ASTM D696 in/in/°F 9 x 10-5 Notes: 1. Dumb-bell tested at a rate of strain of 2 inches/minute (ipm) D. Pipe Fittings 1. All fittings specified on the Drawings, or otherwise, needed to make pipe connections (ex: 90º elbow) shall be in accordance with ASTM D2513 and ASTM D3261 and shall be manufactured by injection molding, a combination of extrusion and machining, or fabrication from HDPE pipe conforming to this specification. 2. The fittings shall be fully pressure rated and provide a working pressure equal to that of the pipe with an included 2:1 safety factor. 3. The fittings shall be manufactured from the same base resin type and cell classification as the pipe itself as specified in Parts 2.1A, 2.1B, and 2.1C of this Section 02500. The fittings shall be homogeneous throughout and free from cracks, holes, foreign inclusions, voids, or other injurious defects. Technical Specifications S&ME Project No. 7235-16-004, Phase 7 Duke Marshall Steam Station Industrial Landfill No. 1, Cell 3 and Cell 4 Issued for Bid 2017 Electrical/Mechanical Components 02500 - Page 6 of 8 High Density Polyethylene (HDPE) Pipe 4. Molded socket fittings shall not be used. 5. Pre-fabricated fittings: a. Shall not be permitted unless molded fittings are not available from the pipe Manufacturer, and only after obtaining specific approval from the Engineer. b. Shall be made using pipe segments meeting all base resin, physical, and property requirements presented in Parts 2.1A, 2.1B, and 2.1C of this Section 02500. c. All pipe segments in a pre-fabricated fitting shall be pressure rated to exceed by 20% the highest pipe pressure rating to which they are intended to be connected. E. HDPE Joints 1. The method of joining for high density polyethylene pipe shall be the heat butt fusion method of high density polyethylene pipe per ASTM D2657 and shall be performed in strict accordance with the pipe manufacturer’s recommendations, subject to the Engineer’s approval. The heat fusion equipment used in the joining procedures should be capable of meeting all conditions recommended by the pipe manufacturer. 2. All joints shall be made by trained technicians qualified by the Manufacturer and using equipment and controlled procedures approved by the Manufacturer. 3. All pipe joints shall be stronger than the pipe itself under both tension and hydrostatic loading conditions. 4. The joints shall be leak-tight, homogeneous and uniform throughout. 5. Pipe joints shall exhibit a uniform melt bead and the protrusion of the melt bead on the pipe interior shall be removed prior to installation. 6. Properly executed electrofusion fittings may be used. Extrusion welding or hot gas welding of HDPE shall not be used for pressure pipe applications or fabrications where shear or structural strength is important, as determined by the Engineer. Mechanical joint adapters, flanges, unions, grooved-couplers, transition fittings, and some mechanical couplings may be used to mechanically connect HDPE pipe with approval by the Engineer. Refer to the manufacturer’s recommendations. F. Accessories 1. Valves, vaults, and other accessories as shown on Drawings. G. Identification 1. The following shall be continuously indent printed on the pipe, or spaced at intervals not exceeding 5 feet: a. Name and/or trademark of the pipe manufacturer. b. Pipe series designation. c. Nominal pipe size. d. Standard dimension ratio (SDR). e. The letters PE followed by the polyethylene grade per ASTM D1248, followed by the Hydrostatic Design basis in 100's of psi (e.g., PE 3408, PE 4710). f. Manufacturing Standard Reference (e.g., ASTM F714-1). g. A production code from which the date and place of manufacture can be determined. PART 3 EXECUTION 3.1 EXAMINATION A. Verify trench cut or excavation is ready to receive work and excavations, dimensions, and elevations are as indicated on the Drawings. 3.2 PREPARATION A. Correct over excavation with fill material at no additional cost to the Owner. Technical Specifications S&ME Project No. 7235-16-004, Phase 7 Duke Marshall Steam Station Industrial Landfill No. 1, Cell 3 and Cell 4 Issued for Bid 2017 Electrical/Mechanical Components 02500 - Page 7 of 8 High Density Polyethylene (HDPE) Pipe B. Remove large stones or other hard matter capable of damaging pipe or impeding consistent backfilling or compaction. C. Pipe trenching should be conducted in accordance with Section 02324. D. Cavities shall be excavated according to Section 02315. 3.3 INSTALLATION A. Miscellaneous HDPE Items 1. Install in accordance with the Drawings and the Manufacturer’s recommendations. 3.4 FIELD QUALITY CONTROL A. The Engineer will undertake observations and inspections to determine compliance of the materials and work with this Specification. B. Quality control by the Engineer will include testing, monitoring, and/or inspecting: 1. The HDPE pipe and fittings for correct size, SDR rating; workmanship, and fabrication. 2. Damage during installation. 3. The installation, alignment and welding of all pipe, and fittings. 4. Backfilling of pipe. C. Contractor shall request inspection prior to and immediately after placing pipe. D. Pipe and fittings to be used in a pressurized application shall be hydrostatically tested in accordance with Section 03860, Force Main Leakage Test. E. Perform camera inspection reports on all pipe larger than 6 inches in diameter. F. Backfill and Compaction Testing: In accordance with Section 02324. G. When tests indicate Work does not meet specified requirements, remove work, replace and retest. H. HDPE pipes and other miscellaneous items shall be subject to rejection on account of failure to conform to these Specifications. In addition, individual sections of these items may be rejected because of any of following reasons: 1. Any pipe section, fitting, or joint that becomes broken, cracked, crushed, cut, scratched, gouged or otherwise rendered unsuitable, as determined by the Engineer, shall be removed and replaced by the Contractor. 2. Scratches greater than 6 inches in length and gouges exhibiting a depth in excess of 8 percent of the wall thickness of the pipe, fitting, or outlet structure shall be cause for rejection of a pipe section, fitting, or outlet structure to the extent designated by the Engineer. 3.5 PROTECTION OF FINISHED WORK A. Protect pipe and associated appurtenances from damage or displacement until backfilling operation is in progress. B. Care shall be exercised during construction not to damage the pipelines, fittings, and joints. 1. Construction equipment shall not be allowed to pass over any pipeline until a minimum of 36 inches of compacted cover is placed above the crown of the pipe. Technical Specifications S&ME Project No. 7235-16-004, Phase 7 Duke Marshall Steam Station Industrial Landfill No. 1, Cell 3 and Cell 4 Issued for Bid 2017 Electrical/Mechanical Components 02500 - Page 8 of 8 High Density Polyethylene (HDPE) Pipe END OF SECTION Technical Specifications S&ME Project No. 7235-16-004, Phase 7 Duke Marshall Steam Station Industrial Landfill No. 1 Cell 3 and Cell 4 Issued for Bid 2017 Electrical/Mechanical Components 02674 - Page 1 of 5 Nonwoven Geotextiles SECTION 02674 NONWOVEN GEOTEXTILES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Nonwoven geotextile for: a. Miscellaneous erosion control devices. B. Related Sections: 1. Section 02060 – Aggregate. 2. Section 02374 – Erosion Control Devices. 3. Section 02500 – High Density Polyethylene (HDPE) Pipe. 1.2 REFERENCES: A. Construction Quality Assurance (CQA) Plan B. American Society for Testing and Materials (ASTM) standards 1. ASTM D3786 Standard Test Method for Hydraulic Burst Strength of Knitted Goods and Non-woven Fabrics (Diaphragm Bursting Strength Tester Method). 2. ASTM D4354 Practice for Sampling of Geosynthetics for Testing. 3. ASTM D4355 Test Method for Deterioration of Geotextiles from Exposure to Ultraviolet Light and Water (Xenon-Arc Type Apparatus). 4. ASTM D4491 Standard Test Method for Water Permeability of Geotextiles by Permittivity. 5. ASTM D4751 Standard Test Method for Determining Apparent Opening Size of a Geotextile. 6. ASTM D4533 Test Method for Trapezoidal Tearing Strength of Geotextiles. 7. ASTM D4632 Test Method for Grab Breaking Load and Elongation of Geotextiles. 8. ASTM D4759 Practice for Determining the Specification Conformance of Geosynthetics. 9. ASTM D4873 Guide for Identification, Storage and Handling of Geotextiles. 10. ASTM D5261 Test Method for Measuring Mass per Unit Area of Geotextiles. 11. ASTM D5321 Standard Test Method for Determining the Coefficient of Soil and Geosynthetic or Geosynthetic and Geosynthetic Friction by the Direct Shear Method. 12. ASTM D6241 Standard Test Method for the Static Puncture Strength of Geotextiles and Geotextile-Related Products Using a 50-mm Probe. 1.3 SUBMITTALS A. Manufacturer’s Product Information 1. As part of their bid, the Contractor shall submit for the geotextile to be used: a. Name of manufacturer. b. Product name. c. Style number. d. Chemical composition of the filaments and yarns. e. Product data sheets. f. Manufacturer’s installation instructions. 2. Submit the results of factory testing to the Engineer prior to initiating field work. Technical Specifications S&ME Project No. 7235-16-004, Phase 7 Duke Marshall Steam Station Industrial Landfill No. 1 Cell 3 and Cell 4 Issued for Bid 2017 Electrical/Mechanical Components 02674 - Page 2 of 5 Nonwoven Geotextiles 3. At a minimum, the Manufacturer will perform factory testing at the frequencies given in Table 02674-A found in this Section 02674 on the geotextile prior to shipping the material to the site. 4. A written certificate from the Geotextile Manufacturer stating that the materials supplied are in compliance with this Specification: 5. Either mislabeling or misrepresentation of materials shall be reason to reject those geotextile products. 1.4 QUALITY ASSURANCE A. Perform Work in accordance with these Specifications. B. If a geotextile sample fails to meet the quality control requirements of this Section 02674, the Contractor shall require that the Geotextile Manufacturer sample and test each roll manufactured in the same lot or batch, or at the same time, as the failing roll. Sampling and testing of rolls shall continue until a pattern of acceptable test results is established. C. General manufacturing procedures shall be performed in accordance with the manufacturer’s internal quality control guide and/or documents. D. The Manufacturer shall be a well-established firm with more than two years experience in the manufacture of geotextiles. E. The Installer shall be trained and qualified to install geotextiles. F. The engineer shall monitor the geotextile rolls upon delivery to the site and report any deviations from project specifications to the contractor. 1.5 DELIVERY, STORAGE AND HANDLING A. Geotextile labeling, shipment, and storage shall follow ASTM D 4873. B. Product labels shall clearly show: 1. Manufacturer or supplier name. 2. Product identification. 3. Lot or batch number. 4. Roll number. 5. Roll dimensions (length and width). C. Transport and handle geotextile with equipment designed to protect it from damage. Equipment used to unload, stack or transport geotextile shall not damage protective wrap or geotextile. D. Upon delivery at the job site, the contractor shall ensure that the geotextile rolls are handled and stored in accordance with the manufacturer’s instructions as to prevent damage. E. The geotextile rolls shall not be stacked more than three rolls high or as otherwise recommended by the Manufacturer. F. Do not use materials damaged during storage or handling. If the geotextile is not packaged and a roll is damaged during shipment, it shall be rejected. Technical Specifications S&ME Project No. 7235-16-004, Phase 7 Duke Marshall Steam Station Industrial Landfill No. 1 Cell 3 and Cell 4 Issued for Bid 2017 Electrical/Mechanical Components 02674 - Page 3 of 5 Nonwoven Geotextiles G. If only the outermost surface of the roll is affected, it may be peeled back, cut, and wasted if approved by the Engineer (i.e., it shall be treated as if it were the protective packaging for the remainder of the roll). H. The geotextile shall be relatively free of holes or any sign of contamination by foreign matter. The Engineer may reject all or portions of units (or rolls) of the geotextile if in his opinion significant quantities of production flaws are observed. I. The Installer shall take any necessary precautions to prevent damage to other portions of the Work during placement of the geotextile. PART 2 PRODUCTS 2.1 GEOTEXTILE A. Nonwoven geotextile shall be that which is specified on the Drawings. Unless otherwise noted on the Drawings, geotextile suppliers shall furnish materials whose Minimum Average Roll Values meet or exceed the criteria specified in Table 02674-B. The Manufacturer shall provide test results for these procedures, as well as a certification that the material properties meet or exceed the specified values. 1. Minimum Average Roll Value (MARV) shall be based on Manufacturer's data and shall be calculated as the mean value of the property of interest plus or minus two standard deviations, as appropriate. 2. Where material properties vary among the machine and cross-machine directions, the MARV shall apply to the direction providing the lowest value (when a minimum is specified) or the highest value (when a maximum value is specified). B. The geotextiles provided by the supplier shall be stock products. C. The geotextile shall be: 1. Nonwoven, needlepunched, continuous filament polyester material; or 2. Nonwoven, needlepunched, continuous filament polypropylene material; or 3. Nonwoven, needlepunched, polypropylene staple or continuous fiber material. D. The geotextile shall be manufactured from first quality virgin polymer. E. In addition to the property values listed in Table 02674-B, the geotextiles shall: 1. Retain its structure during handling, placement, and long-term service. 2. Be capable of withstanding outdoor exposure for a minimum of 30 days with no measurable deterioration. Technical Specifications S&ME Project No. 7235-16-004, Phase 7 Duke Marshall Steam Station Industrial Landfill No. 1 Cell 3 and Cell 4 Issued for Bid 2017 Electrical/Mechanical Components 02674 - Page 4 of 5 Nonwoven Geotextiles TABLE 02674-A GEOTEXTILE REQUIRED PHYSICAL PRE-SHIPPING TESTING PROPERTY TEST METHOD MINIMUM FREQUENCY Mass Per Unit Area ASTM D5261 Every 100,000 ft2 Grab Tensile Strength ASTM D4632 Every 100,000 ft2 Grab Tensile Elongation ASTM D4632 Every 100,000 ft2 Trapezoid Tear Strength ASTM D4533 Every 100,000 ft2 CBR Puncture Strength ASTM D6241 Every 100,000 ft2 Apparent Opening Size (AOS) ASTM D4751 1 per production lot (filter geotextiles only) Permittivity ASTM D4491 1 per production lot (filter geotextiles only) UV Resistance(3) ASTM D4355 1 per formulation TABLE 02674-B GEOTEXTILE REQUIRED PHYSICAL AND HYDRAULIC PROPERTIES PROPERTIES AND REQUIREMENTS(1,2) UNITS SPECIFIED VALUES 6 oz. SPECIFIED VALUES 8 oz. SPECIFIED VALUES 10 oz. SPECIFIED VALUES 12 oz. TEST METHOD Type --- Nonwoven Nonwoven Nonwoven Nonwoven --- Mass Per Unit Area oz/yd2 6.0 8.0 10.0 12.0 ASTM D5261 Grab Tensile Strength lb 160 200 230 300 ASTM D4632 Grab Tensile Elongation % 50 50 50 50 ASTM D4632 Trapezoid Tear Strength lb 65 80 95 115 ASTM D4533 CBR Puncture Strength lb 410 500 700 800 ASTM D6241 Apparent Opening Size (AOS) US Sieve/ mm 70/0.212 80/0.18 100/0.15 100/0.15 ASTM D4751 Permittivity sec-1 1.5 1.4 0.8 0.8 ASTM D4491 UV Resistance(3) % strength retained 70 70 70 70 ASTM D4355 Notes: (1) All values represent minimum average roll values except for UV resistance, which is a minimum value. (2) Polymer composition of 95 % polypropylene or polyester by weight (3) Evaluation to be on 2.0 inch strip tensile specimen after 500 hours of exposure. PART 3 EXECUTION 3.1 EXAMINATION A. Prior to implementing any geotextile work, the Contractor shall carefully inspect the subgrade and verify that all work is complete to the point where the installation of the geotextile may properly commence without adverse impact. B. Any geotextile that does not comply with Table 02674-B of this Section 02674 shall be rejected and replaced with new material in accordance with the Specifications, at no additional cost to Owner. Technical Specifications S&ME Project No. 7235-16-004, Phase 7 Duke Marshall Steam Station Industrial Landfill No. 1 Cell 3 and Cell 4 Issued for Bid 2017 Electrical/Mechanical Components 02674 - Page 5 of 5 Nonwoven Geotextiles 3.2 INSTALLATION A. The Contractor shall handle all geotextile in such a manner as to ensure they are not damaged in any way. B. After unwrapping the geotextile from its opaque cover, the geotextile shall not be left exposed for a period in excess of 20 days unless a longer exposure period is approved by the Engineer. C. Nonwoven geotextile shall be continuously sewn at their seams. Geotextiles shall be overlapped a minimum of 6 inches, or as otherwise specified in the Specifications. 3.3 FIELD QUALITY CONTROL A. The finished geotextile shall have good appearance qualities. It shall be free from such defects that would affect the specific properties of the geotextile, or its proper functioning. B. Defects and Repairs: 1. Any holes or tears in the geotextile shall be repaired with a patch made from the same geotextile. The patch shall be sewn in place with a minimum of 12 inches overlap in all directions. 2. Care shall be taken to remove any soil or other material, which may have penetrated the torn geotextile. 3.4 PROTECTION OF FINISHED WORK A. Protect installed geotextile according to manufacturer’s instructions. Repair or replace areas of damaged by scuffing, punctures, traffic, rough subgrade, or other unacceptable conditions. B. The contractor shall not use heavy equipment to traffic above the geotextile without approved protection. END OF SECTION Technical Specifications S&ME Project No. 7235-16-004, Phase 7 Cell 3 and 4 Force Main – Marshall Industrial Landfill No. 1 Cells 3 and 4 Issued for Bid 2017 02751 – Page 1of 3 Valves and Appurtenances SECTION 02751 VALVES AND APPURTENANCES PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Valves and appurtenances used in Pump Houses. 2 Valves and appurtenances used in Junction Manholes. B. Related Sections: 1. Section 02315 – Excavation 2. Section 02320 – Backfill – Structural 3. Section 02324 – Trenching 4. Section 02500 – High Density Polyethylene (HDPE) Pipe 5. Section 03300 - Cast-In-Place Concrete 6. Section 03480 – Pre-Cast Concrete Structures 7. Section 11313 - Pumps C. ASTM A48 – Gray Iron Castings. D. ASTM C478 – Standard Specification for Underground Precast Concrete Utility Structures E. ASTM C923 – Standard Specification for Resilient Connectors between Reinforced Concrete Manhole Structures, Pipes and Laterals. F. ASTM D2729 – Standard Specification for Poly Vinyl Chloride (PVC) Sewer Pipe and Fittings. G. ASTM F2619 – Standard Specification for High-Density Polyethylene Line Pipe H. AASHTO M198 – Butyl Rubber Sealants I. AWWA C500 – Gate Valves for Water and Sewerage Systems J. AWWA C508 - Swing-Check Valves for Waterworks K. AWWA C517 - Resilient-Seated Cast Iron Eccentric Plug Valves L. AWWA C509- Standard for Resilient-Seated Gate Valves for Water Supply Service 1.2 SUBMITTALS A. Shop Drawings: Indicate locations, elevations, piping, sizes and elevations of penetrations. B. Product Data: Submit features, configuration, and dimensions. 1.3 DELIVERY, STORAGE AND HANDLING A. Comply with manufacturer’s instructions for unloading, storing and moving materials. B. Store materials to prevent damage to Owner’s property or other public or private property. Repair property damaged from materials storage. Technical Specifications S&ME Project No. 7235-16-004, Phase 7 Cell 3 and 4 Force Main – Marshall Industrial Landfill No. 1 Cells 3 and 4 Issued for Bid 2017 02751 – Page 2of 3 Valves and Appurtenances 1.6 CLOSEOUT SUBMITTALS A. Project Record Documents: Record location of pipe runs, connections, cleanouts and principal invert elevations. PART 2 PRODUCTS 2.1 COMPONENTS A. Valves and Appurtenances used in Pump House: 1. Ball Valves: Stainless steel ball valves having diameters indicated on Drawings. 2. Check Valves: Stainless steel check valves having diameters indicated on Drawings. 3. Magnetic Flow Meter: Flanged connection magnetic flow meter with; internal linings consisting of stainless steel or materials compatible with leachate; capable of measuring flows of up to 600 gpm; hardwire capabilities; LED display providing instantaneous and cumulative flows. 4. Flanges: All flange connections shall have stainless steel bolts, nuts and backup rings. 5. Piping and fittings: HDPE in accordance with Section 02500, HDPE Pipe. 6. Adjustable Pipe supports: Pipe support stand or flange support stand manufactured Gulf State Hangers or approved equal. 7. Pipe penetrations through concrete: Seal with LinkSeal or approved equivalent. 8. Floor Grating: 1-1/4” x 3/16” serrated bearing bars, spaced 1-3/16” on center, hot dip galvanized. Manufactured by McNichols Co. or approved equal. B. Valves and Appurtenances used in Junction Manholes: 1. Plug Valve: Eccentric plug valve with 316 stainless steel body and 316 stainless steel/EPDM plug having diameters indicated on Drawings. Rated for 175 psi working pressure. Flanged end valves shall meet the face to face pattern of the HDPE flanges. Unless otherwise specified or shown on the plans, above ground or exposed manually actuated valves 6” and smaller shall be lever operated and larger valves shall be supplied with a gear operator and handwheel. Valves larger than 6 inches shall be equipped with worm gear actuator. Buried valves shall be supplied with a sealed and grease packed gear operator with a 2” square operating nut. Manual actuators shall mount on a pre-drilled ISO 5211/MSS SP-101 mounting pad to minimize the need for brackets and adaptors. Manufactured by Clow, Crispin, or approved equal. 2. Check Valves: Cast Iron swing type valves having diameters indicated on Drawings. Rated for working pressure of 200 psi. Valve shall be internally and externally factory coated with minimum 8 mil DFT of NSF-61 certified 2-part epoxy for corrosion protection. Flanged end valves shall meet the face to face pattern of the HDPE flanges Manufactured by Clow or approved equal. 3. Flanges: All flange connections shall have stainless steel bolts, nuts and backup rings. 4. Pipe and fittings: HDPE in accordance with Section 02500, HDPE Pipe. 5. Adjustable Pipe supports: Pipe support stand or flange support stand manufactured by Gulf State Hangers or approved equal. 6. Access Doors: Aluminum double leaf access doors with dimensions indicated on drawings, 300 psf rated. Series W2R or W2S access door as manufactured by Halliday Products or equivalent. 7. Steps: Co-Polymer Polypropylene steel reinforced steps meeting ASTM 478. 8. Pipe penetrations through concrete: Seal with LinkSeal or approved equivalent. Technical Specifications S&ME Project No. 7235-16-004, Phase 7 Cell 3 and 4 Force Main – Marshall Industrial Landfill No. 1 Cells 3 and 4 Issued for Bid 2017 02751 – Page 3of 3 Valves and Appurtenances C. Verify items provided by other sections of Work are properly sized and located. D. Verify built-in items are in proper location, and ready for roughing into Work. PART 3 EXECUTION 3.1 EXAMINATION A. Verify items provided by other sections of Work are properly sized and located. B. Verify built-in items are in proper location, and ready for roughing into Work. C. Verify excavation for structures is correct. 3.2 PREPARATION A. Coordinate placement of pipes and structures required by other sections. B. Do not install structures where site conditions induce loads exceeding structural capacity of structures. C. Inspect structures immediately prior to placement in excavation to verify structures are internally clean and free from damage. Remove and replace damaged units. 3.3 INSTALLATION A. Excavation and Backfill: 1. Assembly and construction in accordance with Manufactures Instructions and guidelines. 2. Excavate for structures and pipe in accordance with Section 02315 and Section 02324 in location and to depth shown. Provide clearance for construction operations. 3. When groundwater is encountered, prevent accumulation of water in excavations or structures. Place structures in dry trench and appurtenances within dry structures. Maintain groundwater levels at a minimum of 3 feet below foundation excavation until concrete placement is complete. 4. Backfill for structures and pipe in accordance with Section 02320 and Section 02324. B. Install materials in accordance with manufacturer’s recommendations. C. Coordinate with other sections of Work to provide correct size, shape, and location. 3.4 FIELD QUALITY CONTROL A. Section 01400 - Quality Requirements: Testing and observation services. END OF SECTION Technical Specifications S&ME Project No. 7235-16-004, Phase 7 Duke Marshall Steam Station Industrial Landfill No. 1, Cell 3 and Cell 4 Issued for Bid 2017 Electrical/Mechanical Components 02860 - Page 1 of 3 Force Main Leakage Test SECTION 02800 FORCE MAIN LEAKAGE TEST PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Pressure testing of HDPE Force Main. B. Related Sections: 1. Section 02315 - Excavation. 2. Section 02320 – Backfill - Structural. 3. Section 02500 - High Density Polyethylene (HDPE) Pipe. 1.2 SUBMITTALS A. Detailed Pressure Testing Plan outlining methods and procedures. Submit to Engineer for approval. B. Credentials of the Independent Testing firm that will conduct the leakage test for approval by the Engineer. C. Submit certified calibration test reports on all gauges and meters to be used for leakage testing. 1.3 REFERENCES A. American Water Works Association: 1. AWWA C600 – Installation of Ductile Iron Water Mains and their Appurtenances. B. American Society for Testing and Materials (ASTM) standards: 1. ASTM F2164 – Standard Practice for Field Leak Testing of Polyethylene Pressure Pipe Systems. C. Plastics Pipe Institute: 2. Guidance for Field Hydrostatic Testing of High Density Polyethylene Pressure Pipelines, Document TN 46/2013a. 1.4 QUALITY ASSURANCE A. Perform Work in accordance with ASTM F2164 and Plastics Pipe Institute Guidance Document TN 46/2013a. B. Perform Work in accordance with applicable Federal, State, and local safety standards. 1.5 COORDINATION A. Verify all installation work associated with the force main is complete prior to testing. PART 2 PRODUCTS 2.1 Provide all materials necessary to conduct leakage test. Technical Specifications S&ME Project No. 7235-16-004, Phase 7 Duke Marshall Steam Station Industrial Landfill No. 1, Cell 3 and Cell 4 Issued for Bid 2017 Electrical/Mechanical Components 02860 - Page 2 of 3 Force Main Leakage Test A. Submit a list of all equipment and materials proposed for use in flushing and testing to Engineer for review and approval to any field flushing or testing. B. Hydrostatic tests and flushing materials: 1. Piping connections 2. Test pumping equipment 3. Water meter 4. Pressure gauge 5. Bulkheads and supports. 6. Other equipment or items as necessary. C. Section 02500 - High Density Polyethylene (HDPE) Pipe D. As a minimum, all force mains shall be tested in accordance with the Hydrostatic Testing Requirements of ASTM F2164: E. All force mains shall be given a hydrostatic test of at least the design pressure rating for the pipe. For DR 11 HDPE pipe, the design pressure rating is 200 psig. The specified test pressure (STP) shall be 200 psig. . PART 3 EXECUTION 3.1 FORCE MAIN LEAKAGE TEST A. As a minimum, all force mains shall be tested in accordance with the Hydrostatic Testing Requirements of ASTM F2164: B. All flushing and testing shall be performed in the presence of the Engineer. C. Protect all structures and equipment from damage and leakage during and after flushing and testing. D. All force mains shall be given a hydrostatic test of at least the design pressure rating for the pipe. For DR 11 HDPE pipe, the design pressure rating is 200 psig. The specified test pressure (STP) shall be 200 psig. E. The Contractor shall employ an independent testing firm to conduct the leakage test. The testing firm shall be experienced in pressure/leakage tests. F. Where practicable, pipelines shall be tested between line valves or plugs in lengths of not more than 1500 feet. G. Flush clean water through lines to be tested such that the velocity of the water is not less than 2.5 feet per second. Flushing shall continue until all sediment or discolored water is flushed from the lines. H. The pipe shall be slowly filled with water and the specified test pressure (STP) shall be applied by means of a pump connected to the pipe in a manner satisfactory to the Engineer. The pump, pipe connection, and all necessary apparatus except the gauges shall be furnished by the Contractor. The Independent Testing Firm will furnish the gauges for the test, but the Contractor shall furnish all necessary assistance for conducting the test. Before applying the specified test pressure, all air shall be expelled from the pipe. Technical Specifications S&ME Project No. 7235-16-004, Phase 7 Duke Marshall Steam Station Industrial Landfill No. 1, Cell 3 and Cell 4 Issued for Bid 2017 Electrical/Mechanical Components 02860 - Page 3 of 3 Force Main Leakage Test I. Duration of Test shall not be less than that specified under ASTM F2164. J. The test pressure shall not exceed the rated pressure of the valves in the system unless the valves are protected or plugged off and tested separately. K. Where leaks are visible at exposed joints and/or evident on the surface where joints are covered, the shall repair the joints, retighten the bolts, relay the pipe, or replace the pipe until the leak is eliminated- -regardless of total leakage as shown by the leakage test. L. All pipe, fittings and other materials found to be defective under test shall be removed and replaced at the Contractor’s expense. M. Lines that fail to meet test requirements shall be repaired and retested as necessary until test requirements are complied with. N. The Owner will provide water for testing the force mains; however, the Contractor will be responsible for piping or hauling the water if necessary. O. No pipe installation will be accepted if the leakage is greater than that determined by the criteria. P. No pipe installation will be accepted if the leakage is greater than that determined by the criteria under ASTM F2164: 1. Hold STP for 30 minutes, injecting water as necessary to hold STP. 2. At 90 minutes if P90 <70% STP, test fails. If T90>70%, test passes and test continues. 3. Perform air volume assessment per ASTM F2164. 4. Perform final test for 30 minutes minimum. Variation in test pressure shall remain constant for the test duration and shall not deviate by more than 5%. 3.2 FORCE MAIN LEAKAGE TEST REPORT A. Prepare a written Leakage Test Report in accordance with Plastics Pipe Institute Document TN 46/2013a for Engineer approval. END OF SECTION Technical Specifications S&ME Project No. 7235-16-004, Phase 7 Duke Marshall Steam Station Industrial Landfill No. 1, Cell 3 and Cell 4 Issued for Bid 2017 Electrical/Mechanical Components 03100 - Page 1 of 5 Concrete Forms and Accessories SECTION 03100 CONCRETE FORMS AND ACCESSORIES PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Formwork for cast-in place concrete. 2. Shoring, bracing, and anchorage. 3. Form accessories. 4. Form stripping. B. Related Sections: 1. Section 03300 - Cast-in-Place Concrete. 1.2 REFERENCES A. American Concrete Institute: 1. ACI 301 - Specifications for Structural Concrete. 2. ACI 318 - Building Code Requirements for Structural Concrete. 3. ACI 347 - Guide to Formwork for Concrete. 1.3 DESIGN REQUIREMENTS A. Design, engineer, and construct formwork, shoring and bracing to conform to design and code requirements to achieve concrete shape, line and dimension as indicated on Drawings. 1.4 SUBMITTALS A. N/A 1.5 QUALITY ASSURANCE A. Perform Work in accordance with ACI 301, ACI 318, and ACI 347. B. For wood products furnished for work of this Section, comply with the American Forest and Paper Association (AF & PA). C. Perform Work in accordance with NCDOT standards. 1.6 QUALIFICATIONS A. Design formwork under direct supervision of Professional Engineer experienced in design of this Work and licensed in State of project. 1.7 COORDINATION A. Coordinate this Section with other sections of work, requiring attachment of components to formwork. Technical Specifications S&ME Project No. 7235-16-004, Phase 7 Duke Marshall Steam Station Industrial Landfill No. 1, Cell 3 and Cell 4 Issued for Bid 2017 Electrical/Mechanical Components 03100 - Page 2 of 5 Concrete Forms and Accessories PART 2 PRODUCTS 2.1 WOOD FORM MATERIALS A. Form Materials: At discretion of Contractor unless otherwise directed by Engineer due to special conditions or situations. 2.2 PREFABRICATED FORMS A. Furnish materials in accordance with NCDOT standards. 2.3 FORMWORK ACCESSORIES A. Form Ties: At discretion of Contractor unless otherwise directed by Engineer due to special conditions or situations. B. Spreaders: Standard, non-corrosive metal form clamp assembly, of type acting as spreaders and leaving no metal within 1 inch of concrete face. Wire ties, wood spreaders or through bolts are not permitted. C. Form Anchors and Hangers: 1. Do not use anchors and hangers leaving exposed metal at concrete surface. 2. Symmetrically arrange hangers supporting forms from structural steel members to minimize twisting or rotation of member. 3. Penetration of structural steel members is not permitted. D. Form Release Agent: Colorless mineral oil that will not stain concrete, or absorb moisture or impair natural bonding or color characteristics of coating intended for use on concrete. E. Nails, Spikes, Lag Bolts, Through Bolts, Anchorages: Size, strength and character to maintain formwork in place while placing concrete. PART 3 EXECUTION 3.1 EXAMINATION A. Verify lines, levels, and centers before proceeding with formwork. Verify dimensions agree with Drawings. B. When formwork is placed after reinforcement resulting in insufficient concrete cover over reinforcement before proceeding, request instructions from Engineer. 3.2 INSTALLATION A. Earth Forms: 1. Earth forms are not permitted. B. Formwork - General: 1. Provide top form for sloped surfaces steeper than 1.5 horizontal to 1 vertical to hold shape of concrete during placement, unless it can be demonstrated that top forms can be omitted. 2. Construct forms to correct shape and dimensions, mortar-tight, braced, and of sufficient strength to maintain shape and position under imposed loads from construction operations. Technical Specifications S&ME Project No. 7235-16-004, Phase 7 Duke Marshall Steam Station Industrial Landfill No. 1, Cell 3 and Cell 4 Issued for Bid 2017 Electrical/Mechanical Components 03100 - Page 3 of 5 Concrete Forms and Accessories 3. Camber forms where necessary to produce level finished soffits unless otherwise shown on Drawings. 4. Carefully verify horizontal and vertical positions of forms. Correct misaligned or misplaced forms before placing concrete. 5. Complete wedging and bracing before placing concrete. C. Forms for Smooth Finish Concrete: 1. Use steel, plywood or lined board forms. 2. Use clean and smooth plywood and form liners, uniform in size, and free from surface and edge damage capable of affecting resulting concrete finish. 3. Install form lining with close-fitting square joints between separate sheets without springing into place. 4. Use full size sheets of form lines and plywood wherever possible. 5. Tape joints to prevent protrusions in concrete. 6. Use care in forming and stripping wood forms to protect corners and edges. 7. Level and continue horizontal joints. 8. Keep wood forms wet until stripped. D. Forms for Surfaces to Receive Membrane Waterproofing: Use plywood or steel forms. After erection of forms, tape form joints to prevent protrusions in concrete. E. Erect formwork, shoring, and bracing to achieve design requirements, in accordance with requirements of ACI 301. F. Arrange and assemble formwork to permit dismantling and stripping. Do not damage concrete during stripping. Permit removal of remaining principal shores. G. Obtain Engineer’s approval before framing openings in structural members not indicated on Drawings. H. Install void forms in accordance with manufacturer's recommendations. I. Do not reuse wood formwork more than 3 times for concrete surfaces to be exposed to view. Do not patch formwork. 3.3 APPLICATION - FORM RELEASE AGENT A. Apply form release agent on formwork in accordance with manufacturer's recommendations. B. Apply prior to placement of reinforcing steel, anchoring devices, and embedded items. C. Do not apply form release agent where concrete surfaces are indicated to receive special finishes or applied coverings that are affected by agent. Soak inside surfaces of untreated forms with clean water. Keep surfaces coated prior to placement of concrete. D. Reuse and Coating of Forms: Thoroughly clean forms and reapply form coating before each reuse. For exposed work, do not reuse forms with damaged faces or edges. Apply form coating to forms in accordance with manufacturer’s specifications. Do not coat forms for concrete indicated to receive “scored finish”. Apply form coatings before placing reinforcing steel. 3.4 INSTALLATION - INSERTS, EMBEDDED PARTS, AND OPENINGS A. Install formed openings for items to be embedded in or passing through concrete work. Technical Specifications S&ME Project No. 7235-16-004, Phase 7 Duke Marshall Steam Station Industrial Landfill No. 1, Cell 3 and Cell 4 Issued for Bid 2017 Electrical/Mechanical Components 03100 - Page 4 of 5 Concrete Forms and Accessories B. Locate and set in place items required to be cast directly into concrete. C. Coordinate with Work of other sections in forming and placing openings, slots, reglets, recesses, sleeves, bolts, anchors, other inserts, and components of other Work. D. Install accessories straight, level, and plumb. Ensure items are not disturbed during concrete placement. E. Install water stops continuous without displacing reinforcement. F. Provide temporary ports or openings in formwork where required to facilitate cleaning and inspection. Locate openings at bottom of forms to allow flushing water to drain. G. Close temporary openings with tight fitting panels, flush with inside face of forms, and neatly fitted so joints will not be apparent in exposed concrete surfaces. H. Form Ties: 1. Use sufficient strength and sufficient quantity to prevent spreading of forms. 2. Place ties at least 1 inch away from finished surface of concrete. 3. Leave inner rods in concrete when forms are stripped. 4. Space form ties equidistant, symmetrical and aligned vertically and horizontally unless otherwise shown on Drawings. I. Arrangement: Arrange formwork to allow proper erection sequence and to permit form removal without damage to concrete. 3.5 FORM CLEANING A. Clean forms as erection proceeds, to remove foreign matter within forms. B. Clean formed cavities of debris prior to placing concrete. C. Flush with water or use compressed air to remove remaining foreign matter. Ensure that water and debris drain to exterior through clean-out ports. D. During cold weather, remove ice and snow from within forms. Do not use de-icing salts. Do not use water to clean out forms, unless formwork and concrete construction proceed within heated enclosure. Use compressed air or other means to remove foreign matter. 3.6 FORM REMOVAL A. Do not remove forms or bracing until concrete has gained sufficient strength to carry its own weight and imposed loads and removal has been approved by formwork design Engineer. B. Loosen forms carefully. Do not wedge pry bars, hammers, or tools against finish concrete surfaces scheduled for exposure to view. C. Store removed forms in manner that surfaces to be in contact with fresh concrete will not be damaged. Discard damaged forms. D. Leave forms in place for minimum number of days as specified in ACI 347. 3.7 ERECTION TOLERANCES Technical Specifications S&ME Project No. 7235-16-004, Phase 7 Duke Marshall Steam Station Industrial Landfill No. 1, Cell 3 and Cell 4 Issued for Bid 2017 Electrical/Mechanical Components 03100 - Page 5 of 5 Concrete Forms and Accessories A. Construct formwork to maintain tolerances required by ACI 301. 3.8 FIELD QUALITY CONTROL A. Inspect erected formwork, shoring, and bracing to ensure that work is in accordance with formwork design, and that supports, fastenings, wedges, ties, and items are secure. B. Notify Engineer after placement of reinforcing steel in forms, but prior to placing concrete. C. Schedule concrete placement to permit formwork inspection before placing concrete. END OF SECTION Technical Specifications S&ME Project No. 7235-16-004, Phase 7 Duke Marshall Steam Station Industrial Landfill No. 1, Cell 3 and Cell 4 Issued for Bid 2017 Electrical/Mechanical Components 03300 - Page 1 of 5 Cast-In-Place Concrete SECTION 03300 CAST-IN-PLACE CONCRETE PART 1 GENERAL 1.1 SUMMARY A. Section includes cast-in-place concrete for the following: 1. Junction Manholes 2. Pump House 3. Miscellaneous cast-in-place concrete as needed. B. Related Sections: 1. Section 02320 – Backfill - Structural. 2. Section 02374 – Erosion Control Devices. 3. Section 03100 - Concrete Forms and Accessories. 1.2 REFERENCES A. American Concrete Institute: 1. ACI 301 - Specifications for Structural Concrete. 2. ACI 305R - Hot Weather Concreting. 3. ACI 306.1 - Standard Specification for Cold Weather Concreting. 4. ACI 308 (American Concrete Institute) - Standard Practice for Curing Concrete. 5. ACI 318 - Building Code Requirements for Structural Concrete. B. ASTM International: 1. ASTM C33 - Standard Specification for Concrete Aggregates. 2. ASTM C94 - Standard Specification for Ready-Mixed Concrete. 3. ASTM C150 - Standard Specification for Portland Cement. 4. ASTM C260 - Standard Specification for Air-Entraining Admixtures for Concrete. 5. ASTM C494 - Standard Specification for Chemical Admixtures for Concrete. 6. ASTM C618 - Standard Specification for Coal Fly Ash and Raw or Calcined Natural Pozzolan for Use as a Mineral Admixture in Portland Cement Concrete. 7. ASTM C1017 - Standard Specification for Chemical Admixtures for Use in Producing Flowing Concrete. 8. ASTM C1107 - Standard Specification for Packaged Dry, Hydraulic-Cement Grout (Nonshrink). 9. ASTM C1116 - Standard Specification for Fiber-Reinforced Concrete. 1.3 SUBMITTALS A. Product Data: Submit data on: 1. Concrete mix design at least 14 days prior to using the mixture. B. Design Data: 1. Submit concrete mix design for each concrete strength. Submit separate mix designs when admixtures are required for the following: a. Hot and cold weather concrete work. b. Air entrained concrete work. 2. Identify mix ingredients and proportions, including admixtures. Technical Specifications S&ME Project No. 7235-16-004, Phase 7 Duke Marshall Steam Station Industrial Landfill No. 1, Cell 3 and Cell 4 Issued for Bid 2017 Electrical/Mechanical Components 03300 - Page 2 of 5 Cast-In-Place Concrete 1.4 CLOSEOUT SUBMITTALS A. Project Record Documents: Accurately record actual locations of embedded utilities and components concealed from view in finished construction. 1.5 QUALITY ASSURANCE A. Perform Work in accordance with ACI 301. B. Perform any waterproofing in accordance with Manufacturer’s recommendations.. C. Acquire cement and aggregate from one source for Work. D. Conform to ACI 305R when concreting during hot weather. E. Conform to ACI 306.1 when concreting during cold weather. 1.6 QUALIFICATIONS A. Waterproofing Material Manufacturer (if applicable): Company specializing in waterproofing membrane with minimum three years documented experience. B. Waterproofing Applicator (if applicable): Company specializing in performing the work of this section with minimum three years documented experience. PART 2 PRODUCTS 2.1 CONCRETE MATERIALS A. Cement: ASTM C150, Type I or Type II. B. Fine and Coarse Aggregates: ASTM C33. C. Water: Clean and not detrimental to concrete. 2.2 ADMIXTURES (Engineer’s approval required prior to using any admixtures). A. Furnish materials in accordance with NCDOT standards. B. Air Entrainment: ASTM C260. C. Chemical: ASTM C494. D. Fly Ash, Calcined Pozzolan: ASTM C618; Class Type C or F, limit fly ash to maximum 25 percent of cement content by weight. E. Plasticizing: ASTM C1017. 2.3 ACCESSORIES A. Non-Shrink Grout: ASTM C1107; premixed compound consisting of non-metallic aggregate, cement, water reducing and plasticizing agents; capable of developing minimum compressive strength of 4,000 psi in 72 hours. Technical Specifications S&ME Project No. 7235-16-004, Phase 7 Duke Marshall Steam Station Industrial Landfill No. 1, Cell 3 and Cell 4 Issued for Bid 2017 Electrical/Mechanical Components 03300 - Page 3 of 5 Cast-In-Place Concrete B. Concrete Reinforcing Fibers: ASTM C1116 Type III, synthetic fiber reinforced concrete. Fibers shall be synthetic fiber consisting of 100 percent virgin polypropylene fibrillated fibers containing no reprocessed olefin materials. Fibers shall have a specific gravity of 0.9, a minimum tensile strength of 70 ksi, graded per manufacturer, and specifically manufactured to an optimum gradation for use as concrete secondary reinforcement. A minimum of 1.5 pounds of fiber per cubic yard of concrete shall be used. Fibers shall be added at the batch plant. Toughness indices shall meet requirements for performance Level I. 2.4 CONCRETE MIX A. Mix concrete in accordance with ACI 301. Deliver concrete in accordance with ASTM C94. B. Select proportions for normal weight concrete (if applicable) in accordance with ACI 301. C. Select aggregate proportions for light weight concrete (if applicable) in accordance with ACI 301. D. Provide concrete to the following criteria: Unit Measurement Compressive Strength (7 day) 3,000 psi Compressive Strength (28 day) 4,000 psi Water/Cement Ratio (maximum) 0.45 by weight (mass) Air Entrained 4 - 6 percent Slump 4 inches E. Admixtures: Include admixture types and quantities indicated in concrete mix designs approved by Engineer through submittal process. 1. Use accelerating admixtures in cold weather. Use of admixtures will not relax cold weather placement requirements. 2. Use set retarding admixtures during hot weather. 3. Add air entraining agent to normal weight concrete mix for work exposed to exterior. 4. Air Entrainment: ASTM C260. 5. Chemical: ASTM C494 Type A - Water Reducing, Type B – Retarding, Type C – Accelerating, Type D - Water Reducing and Retarding, Type E - Water Reducing and Accelerating, Type F - Water Reducing, High Range, Type G - Water Reducing, High Range and Retarding. 6. Fly Ash, Calcined Pozzolan: ASTM C618. 7. Plasticizing: ASTM C1017. PART 3 EXECUTION 3.1 EXAMINATION A. Verify requirements for concrete cover over reinforcement. B. Verify anchors, seats, plates, reinforcement and other items to be cast into concrete are accurately placed, positioned securely, and will not interfere with placing concrete. C. Verify substrate surfaces are smooth, free of honeycomb or pitting, and not detrimental to full contact bond of waterproofing materials. D. Verify items penetrating surfaces to receive waterproofing are securely installed. E. Verify substrate surface slopes to drain for horizontal waterproofing applications. Technical Specifications S&ME Project No. 7235-16-004, Phase 7 Duke Marshall Steam Station Industrial Landfill No. 1, Cell 3 and Cell 4 Issued for Bid 2017 Electrical/Mechanical Components 03300 - Page 4 of 5 Cast-In-Place Concrete 3.2 PREPARATION A. Prepare previously placed concrete by cleaning with steel brush and applying bonding agent. B. In locations where new concrete is doweled to existing work, drill holes in existing concrete, insert steel dowels and pack solid with non-shrink grout. C. Seal cracks and joints with sealant materials using depth to width ratio as recommended by sealant manufacturer. 3.3 PLACING CONCRETE A. Place concrete in accordance with ACI 318. B. Notify Engineer minimum 24 hours prior to commencement of operations. C. Ensure reinforcement, inserts, and embedded parts are not disturbed during concrete placement. D. Maintain records of concrete placement. Record date, location, quantity, air temperature, and test samples taken. E. Do not interrupt successive placement; do not permit cold joints to occur. F. If inside lined area, protect liner and all geosynthetic components from damage during installation and placement of concrete. Any damage caused to the liner as a result of the Contractor’s action shall be repaired at his expense 3.4 CONCRETE FINISHING A. Provide formed concrete surfaces to be left exposed with smooth rubbed finish. 3.5 CURING AND PROTECTION A. Immediately after placement, protect concrete from premature drying, excessively hot or cold temperatures, and mechanical injury. B. Maintain concrete with minimal moisture loss at relatively constant temperature for period necessary for hydration of cement and hardening of concrete. C. Cure all concrete in accordance with ACI 308 unless otherwise directed by Engineer. 3.6 BACKFILLING A. Notify engineer prior to backfilling against concrete structures. B. Concrete should have a minimum of 75 percent of design 28-day compressive strength prior to backfilling concrete structures unless approved by the Engineer 3.7 FIELD QUALITY CONTROL A. Provide free access to Work and cooperate with appointed firm. B. Submit proposed mix design of each class of concrete to inspection and testing firm and Engineer for review 14 days prior to commencement of Work. Technical Specifications S&ME Project No. 7235-16-004, Phase 7 Duke Marshall Steam Station Industrial Landfill No. 1, Cell 3 and Cell 4 Issued for Bid 2017 Electrical/Mechanical Components 03300 - Page 5 of 5 Cast-In-Place Concrete C. Tests of cement and aggregates may be performed to ensure conformance with specified requirements. D. Four concrete test cylinders will be taken for every 100 cu yds or fraction thereof or a minimum of one set of cylinders per each structure or type/class of concrete placed. E. One additional test cylinder will be taken during cold weather concreting, cured on job site under same conditions as concrete it represents. F. One slump test will be taken for each set of test cylinders taken. G. One air content test will be made for each set of test cylinders taken. H. Maintain records of concrete placement. Record date, location, quantity, air temperature and test samples taken. 3.8 PATCHING A. Allow Engineer to inspect concrete surfaces immediately upon removal of forms. B. Excessive honeycomb or embedded debris in concrete is not acceptable. Notify Engineer upon discovery. C. Patch imperfections in accordance with ACI 301. 3.9 DEFECTIVE CONCRETE A. Defective Concrete: Concrete not conforming to required lines, details, dimensions, tolerances or specified requirements. B. Repair or replacement of defective concrete will be determined by Engineer. C. Do not patch, fill, touch-up, repair, or replace exposed concrete except upon express direction of Engineer for each individual area. END OF SECTION Technical Specifications S&ME Project No. 7235-16-004, Phase 7 Duke Marshall Steam Station Industrial Landfill No. 1, Cell 3 and Cell 4 Issued for Bid 2017 Electrical/Mechanical Components 03480 - Page 1 of 4 Pre-Cast Concrete Structures SECTION 03480 PRE-CAST CONCRETE STRUCTURES PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Junction Manholes. 2. Leachate Manifold Repair. B. Related Sections: 1. Section 02315 – Excavation. 2. Section 02320 – Backfill - Structural. 1.2 REFERENCES A. American Concrete Institute 1. ACI 318 - Building Code Requirements for Reinforced Concrete. 2. ACI 350 - Environmental Engineering Concrete Structures. B. ASTM International 1. ASTM A185 - Standard Specification for Steel Welded Wire Fabric, Plain, for Concrete Reinforcement. 2. ASTM A615 - Standard Specification for Deformed and Plain Billet-Steel Bars for Concrete Reinforcement. 3. ASTM B221 - Standard Specification for Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes. 4. ASTM C33 - Standard Specification for Concrete Aggregates. 5. ASTM C150 - Standard Specification for Portland Cement. 6. ASTM C260 - Standard Specification for Air-Entraining Admixtures for Concrete. 7. ASTM C443 - Joints. 8. ASTM C789 – Pre-cast Reinforced Concrete Box Sections for Culverts, Storm Drains, and Sewers. 9. ASTM C 850 – Pre-cast Reinforced Concrete Box Sections for Culverts, Storm Drains, and Sewers with less than 2 feet of cover subjected to highway loadings. 10. ASTM C890 - Standard Practice for Minimum Structural Design Loading for Monolithic or Sectional Pre-cast Concrete Water and Wastewater Structures. 11. ASTM C913 - Standard Specification for Pre-cast Concrete Water and Wastewater Structures. 12. ASTM C923 - Resilient Connectors Between Reinforced Concrete Manhole Structures and Pipes. 13. ASTM C990 - Standard Specification for Joints for Concrete Pipe, Manholes, and Pre- cast Box Sections Using Preformed Flexible Joints Sealants. 14. ASTM C1433 - Standard Specification for Pre-cast Reinforced Concrete Box Sections for Culverts, Storm Drains, and Sewers. 15. ASTM D698 - Standard Test Method for Laboratory Compaction Characteristics of Soil Using Standard Effort (12,400 ft-lbf/ft3). 16. ASTM D2922 - Standard Test Method for Density of Soil and Soil-Aggregate in Place by Nuclear Methods (Shallow Depth). 17. ASTM D3017 - Standard Test Method for Water Content of Soil and Rock in Place by Nuclear Methods (Shallow Depth). C. American Association of State Highway and Transportation Officials 1. AASHTO M198 - Butyl Rubber Sealants. Technical Specifications S&ME Project No. 7235-16-004, Phase 7 Duke Marshall Steam Station Industrial Landfill No. 1, Cell 3 and Cell 4 Issued for Bid 2017 Electrical/Mechanical Components 03480 - Page 2 of 4 Pre-Cast Concrete Structures 2. AASHTO M259 – Pre-cast Reinforced Concrete Box Sections for Culverts, Storm Drains, and Sewers. 3. AASHTO M273 – Pre-cast Reinforced Concrete Box Sections for Culverts, Storm Drains, and Sewers with less than 2 feet of cover subjected to highway loadings. 1.3 DESIGN REQUIREMENTS A. Design Criteria: 1. Honeycombed or retempered concrete is not permitted. 2. Equivalent strength: Based on structural design of reinforced concrete as outlined in ACI 318, Design for H20 Loading. 3. Design of Lifting Devices for Pre-cast Structures: In accordance with ASTM C 913. 4. Design of Joints for Pre-cast Structures: In accordance with ASTM C443. 1.4 SUBMITTALS A. Shop Drawing: Indicate structure locations, elevations, piping, sizes and elevations of penetrations. B. Product Data: Submit covers, component construction, features, configuration, and dimensions. C. Manufacturer’s Certificates: Submit Statement of Compliance, supporting data, from Materials Suppliers attesting that pre-cast concrete structures provided meet or exceed ASTM Standards and Specification requirements. 1.5 CLOSEOUT SUBMITTALS A. Project Record Documents: Accurately record actual locations and inverts of buried pipe, components and connections. 1.6 QUALITY ASSURANCE A. Perform Work in accordance with State and Local Municipality standards. 1.7 DELIVERY, STORAGE AND HANDLING A. Comply with Pre-cast Concrete Manufacturer’s instructions for unloading, storing and moving pre-cast structures. B. Store pre-cast concrete structures to prevent damage to Owner’s property or other public or private property. Repair property damaged from materials storage. C. Mark each pre-cast structure by indentation or waterproof paint showing date of manufacture, Manufacturer, and identifying symbols and numbers shown on Drawings to indicate its intended use. 1.8 ENVIRONMENTAL REQUIREMENTS A. Conduct operations not to interfere with, interrupt, damage, destroy, or endanger integrity of surface or subsurface structures or utilities, and landscape in immediate or adjacent areas. Technical Specifications S&ME Project No. 7235-16-004, Phase 7 Duke Marshall Steam Station Industrial Landfill No. 1, Cell 3 and Cell 4 Issued for Bid 2017 Electrical/Mechanical Components 03480 - Page 3 of 4 Pre-Cast Concrete Structures PART 2 PRODUCTS 2.1 PRECAST CONCRETE STRUCTURES A. Manufacturer’s products and configurations shall be provided and installed as specified on the Drawings. B. Junction Manhole Access Doors: Aluminum double leaf access doors with dimensions indicated on drawings, 300 psf rated. Series W2R or W2S access door as manufactured by Halliday Products or equivalent PART 3 EXECUTION 3.1 EXAMINATION A. Verify connections, sizes, locations and inverts are as indicated on Drawings. B. Verify items provided by other sections of Work are properly sized and located. C. Verify excavations for the structures are correct. 3.2 PREPARATION A. Coordinate placement of connecting pipes required by other Sections of Work as described in these Specifications. B. Do not install structures where site conditions induce loads exceeding structural capacity of structures. C. Inspect pre-cast concrete structures immediately prior to placement in excavation to verify structures are internally clean and free from damage. Remove and replace damaged units. 3.3 INSTALLATION A. Excavation and Backfill: 1. Excavate for pre-cast concrete structures in accordance with Section 02315 of these Specifications in location and to depth shown. Provide clearance around sidewalls of structure for construction operations. 2. When groundwater is encountered, prevent accumulation of water in excavations. Place pre-cast concrete structures in dry trench. 3. Where possibility exists of watertight structure becoming buoyant in flooded excavation, anchor structure to avoid flotation. B. Lift pre-cast structures at lifting points designated by Manufacturer. C. When lowering pre-cast concrete structures into excavations and joining pipe to units, take precautions to ensure interior of pipeline and structure remains clean. D. Set cover frames and covers level without tipping, to correct elevations. E. Paint exposed sides of Junction Manhole structures with safety yellow enamel paint. Technical Specifications S&ME Project No. 7235-16-004, Phase 7 Duke Marshall Steam Station Industrial Landfill No. 1, Cell 3 and Cell 4 Issued for Bid 2017 Electrical/Mechanical Components 03480 - Page 4 of 4 Pre-Cast Concrete Structures F. Install bollards on either side of Junction Manhole, paint exposed bollards with safety yellow enamel paint. G. Coordinate with other Sections of Work as described in these Specifications to provide correct size, shape, and location. 3.4 FIELD QUALITY CONTROL A. Request observation by Engineer prior to placing cover over piping. B. Compaction Testing: In accordance with Section 02320. C. When tests indicate Work does not meet specified requirements, remove Work, replace and retest. END OF SECTION Technical Specifications S&ME Project No. 7235-16-004, Phase 7 Marshall Steam Station Industrial Landfill No. 1, Cell 3 and Cell 4 Issued for Bid 2017 Electrical/Mechanical Components 11313 – Page 1 of 5 Pumps SECTION 11313 PUMPS PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Leachate Low Flow and High Flow Pumps. 2. Sump pumps. B. Related Sections: 1. Section 02500 – HDPE Pipe. 2. Section 02751 – Valves and Appurtenances 1.2 LUMP SUM - MEASUREMENT AND PAYMENT 1.3 SUBMITTALS A. Shop Drawings: 1. Submit installation details for pumps, piping, controls and accessories including wiring schematics. B. Product Data: Submit data for specified Products, including pump performance data, assembly drawings, electrical schematics, key components cut sheets, fittings installation details, warranty statement, and list any revisions or exceptions to all specifications. C. Manufacturer’s Certificates: Certify products meet or exceed specified requirements. 1.4 CLOSEOUT SUBMITTALS A. Operations and Maintenance Manuals: 3 hard copies and one electronic copy shall be provided and shall include troubleshooting guide, system controls operator instructions, pump assembly and service guide, pump operating characteristics, electrical as-built schematic, bill of materials of electrical control panel, warranty statement, contact statement, and additional information as necessary for normal operation and maintenance of the system. 1.5 QUALITY ASSURANCE A. Perform Work in accordance with local municipality, county, or state standards. B. Perform work in accordance with manufactures instructions and recommendations. 1.6 QUALIFICATIONS A. Manufacturer: Company specializing in manufacturing Products specified in this section with minimum three years documented experience. B. Installer: Company specializing in performing work of this section with minimum five years documented experience or approved by manufacturer. Technical Specifications S&ME Project No. 7235-16-004, Phase 7 Marshall Steam Station Industrial Landfill No. 1, Cell 3 and Cell 4 Issued for Bid 2017 Electrical/Mechanical Components 11313 – Page 2 of 5 Pumps 1.7 DELIVERY, STORAGE AND HANDLING A. Prepare pumps, control panels, and accessories for shipment to prevent entry of foreign matter into product body. B. Store products in areas protected from weather, moisture, or possible damage; do not store products directly on ground; handle products to prevent damage to interior or exterior surfaces. 1.8 ENVIRONMENTAL REQUIREMENTS A. Conduct operations not to interfere with, interrupt, damage, destroy, or endanger integrity of surface or subsurface structures or utilities, and landscape in immediate or adjacent areas. PART 2 PRODUCTS 2.1 RISER PUMPS AND CONTROL PANELS A. Manufacturers: 1. GunnCo Pump & Control, Incorporated, Cumming, Georgia, 770-889-7114. 2. Other, with Engineer’s approval. B. High Flow Pumps: 1. Pumps shall be constructed of stainless steel including housing, impellers, bowls, check valve disc, shaft, coupling, and strainer. Bearings and seal rings shall be constructed of compatible material. 2. The High Flow pumps shall be a GunnCo Model P2K.385.3. Motor shall be designed for 25 HP 3 phase 460 volt service. Alternatively, pumps by other manufacturers may be used, subject to review of manufacturer pump curve and approval by the Engineer. 3. Pumps shall be mounted on an 8-inch wheeled carrier. 4. Power cable shall be heavy duty submersible type, polyethylene jacketed, continuous length, and sized per U.S. NEC standards. A strain relief/riser exit fitting shall be provided. The cable shall be equal to the riser pump length plus the length needed to provide a connection to the control panel or junction box as required. C. Low Flow Pumps: 1. Pumps shall be constructed of stainless steel including housing, impellers, bowls, check valve disc, shaft, coupling, and strainer. Bearings and seal rings shall be constructed of compatible material. 2. The Low Flow pumps shall be a GunnCo Model P2K-40.3. Motor shall be designed for 1.0 HP 3 phase 460 volt service. Alternatively, pumps by other manufacturers may be used, subject to review of manufacturer pump curve and approval by the Engineer. 3. Pumps shall be mounted on a 5-inch wheeled carrier. 4. Power cable shall be heavy duty submersible type, polyethylene jacketed, continuous length, and sized per U.S. NEC standards. A strain relief/riser exit fitting shall be provided. The cable shall be equal to the riser pump length plus the length needed to provide a connection to the control panel or junction box as required. D. Carrier: 1. Pump and motor shall be mounted in a wheeled carrier constructed of stainless steel with non-corrosive and self lubricating wheels. An inlet strainer and level sensor clamp shall be provided. The level sensor may be installed without disassembly or removal of the pump. Technical Specifications S&ME Project No. 7235-16-004, Phase 7 Marshall Steam Station Industrial Landfill No. 1, Cell 3 and Cell 4 Issued for Bid 2017 Electrical/Mechanical Components 11313 – Page 3 of 5 Pumps 2. The High Flow pump assembly shall be designed for use in an 24” SDR 17 HDPE riser pipe. The Low Flow pump assembly shall be designed for use in an 24” SDR 17 HDPE riser pipe. The carrier shall allow the pump to travel to and from the riser sump area over welding beads and allow for stable operation of the pump. Wheels shall have a minimum diameter of 5” for the Low Flow Pump and 8” for the high flow pump, and shall be constructed of a self lubricating non-metallic material. 3. Carrier supplied must be in compliance with US patents laws. 4. The carrier shall be equipped with a welded stainless steel ring with a suitable 3/16” (low flow and high flow pumps) 316 SS stainless retrieval cable equal to the total riser pump length. The cable shall be provided with stainless steel U-bolt type clamps, snap hook, and anchor. The cable shall be removable from the pump carrier without removal of cable u-bolt clips. E. Discharge Pipe Assembly: 1. A 3.0 inch discharge hose (or pipe as recommended by manufacturer) assembly shall be provided for the High Flow pump and a 2.0 inch discharge hose assembly shall be provided for the Low Flow pump. The hose shall be of suitable material for the application and a minimum working pressure rating at least 10% over the maximum pump pressure at shut off condition and rated no less than 150 PSI working pressure. Hose shall be supplied in continuous length with stainless fittings. Hose fittings shall be long shank type for the 3” hose assembly. Cam lock fittings shall be provided at the pump discharge with a positive locking feature. 2. An upper hose fitting elbow and quick connect fittings of stainless steel construction shall be provided to allow removal of the discharge hose assembly without tools. A gas tight riser side exit nipple fitting shall be provided. Instructions for the installation of the fittings shall be provided. All fittings shall be 300 series stainless. 3. Fittings for the power and sensor cables shall be nylon construction non-corrosive and sized for the power and sensor cables provided. Fittings shall be provided for both the riser and associated conduit or junction boxes. A sufficient quantity shall be provided for each application. Instructions for the installation of the fittings shall be provided. F. Controls: 1. Two control panels shall control the pumps in the leachate collection and leak detection sump and be capable of providing automatic pump operation and protection and level indication for two pumps operating in a common sump area. Panels shall be GunnCo SidesloperTM 202 Series Control Panel. Panel shall be rated NEMA 4X Stainless Steel Enclosure size shall be a minimum size of 30” X 36” and shall include an outer door viewing window which allows view of all indicators and pump operator switch (17” X 11” window size minimum). Door shall open and close using a three point latch system with exterior handle and no clips or latches shall be required or installed. The handle shall be equipped with a lock hasp for use with customers pad lock. The High Flow pump motor shall be 25 horse power and the Low Flow pump motor shall be 1.0 horse power operating on three phase, 460 volt service. 2. The panels shall be equipped with a properly sized main thermal magnetic permanent trip (Square D type FAL or equal) circuit breaker inner door interlocked operator handle, Motor Breakers, Control Circuit Breaker, and Receptacle/Accessories Circuit Breaker where applicable. All breakers shall be selected for the required trip characteristics of the components protected and shall be back-plate mounted. Fuses for voltage/phase monitor shall be provided. 3. The motor starters shall be a heavy duty NEMA rated Square D 8536 or equal with properly selected thermal overloads with alarm auxiliary contacts. 4. An indicating controller with digital level read out in inches to 1/10th of an inch shall be provided. Range shall be 0-138.6” and display shall be with ½” high LCD digits. Controller shall be adjustable for pump lead and lag set and reset points using only the selector knob and from mounted potentiometers using a screwdriver. No punch and Technical Specifications S&ME Project No. 7235-16-004, Phase 7 Marshall Steam Station Industrial Landfill No. 1, Cell 3 and Cell 4 Issued for Bid 2017 Electrical/Mechanical Components 11313 – Page 4 of 5 Pumps scroll techniques shall be required to check or adjust settings shall be required. Control unit shall have plug in type terminals for all input and output connections to allow simple replacement if required. An auxiliary start relay shall be incorporated into the control design to minimize wear to motor starter contactor. 5. The duplex control panel shall be equipped with an auxiliary loop power module shall provide a high level alarm indication. Module shall be preset per specified level or factory set one foot above lag pump on setting. The simplex panel shall have both the pump and alarm setting on the indicating controller face. 6. Interior door operator controls and indicators shall include RUN lights, OVERLOAD lights, PHASE FAULT light, H-O-A switches, elapsed run time meters, transducer 1-2 switch (duplex models), and main disconnect operator handle. Indicators shall be 30mm and push to test with LED bulbs. 7. The unit shall include a primary power TVSS lightning arrestor, control circuit surge suppressor with operational indicating light, and an instrument signal surge suppressor. The level system shall be intrinsically safe using a dual barrier fused ISB. A plug in type indicating voltage/phase monitor shall be provided to protect against phase or voltage fault conditions. Phase monitor shall have an adjustable start delay after fault of 6-60 seconds. 8. Terminal strip shall be provided for connection of level sensor and flow meter which shall be mounted for easy access. Terminals for form C relay dry contacts shall be provided for pumps RUN, motor OVERLOAD, Phase FAULT, and HIGH LEVEL. Additionally a terminal for 4-20mA level signal shall be provided. All terminals and components shall be labeled and all wires shall be numbered. Schematic drawing shall include wire and terminal numbers for each component. 9. A transformer shall be provided where required or specified with a minimum rating of 100VA. Transformer shall be fused and shall be operated from main breaker circuit. All control circuits shall be equipped with a properly sized fuse in addition to the control circuit breaker. 10. A common top mounted RED high level/Overload alarm light shall be provided with test function. Alarm light shall be Lexan lens with LED bulb with flasher. Light shall be rated NEMA 4X for outdoor service. An audio alarm horn shall also be provided with test and silence button provided. Horn shall be rated 110dBa at 10 feet and shall be 4X rated. 11. Overload resets shall be provided where required or specified. Reset shall be a through the door pushbutton with spring return. G. Instrumentation: 1. A submersible pressure transducer of stainless steel construction compatible with control panel and with a static accurate of no more than 1% of range shall be provided for each pump. Range shall be 0-5 PSI and the unit shall provide a 4-20mA signal and be equipped with an integral surge suppressor. 2. Transducers shall be equipped with shielded cable suitable for the application and of continuous length with a heavy outer jacket. A strain relief/riser exit fitting shall be provided. Cable shall be equal to pump power cable length. 3. Transducers shall be equipped with a desiccant type disposable drier tube for shipment and a permanent bellow breather located in the control panel for operation. 4. Junction Boxes - properly sized separate junction boxes shall be provided for motor and level cables. Enclosures shall be rated NEMA4X stainless steel with hinged lockable cover and contain terminal strips and ground lugs as required, properly marked, for each set of wires. Non-metallic compression type cable fittings shall be provided for the riser exit and junction box entry points. 2.2 SUMP PUMPS A. Sump pumps located in Pump Houses shall be 110-115 volts capable of pumping 20 gallons per minute and activated with high level sensor. Technical Specifications S&ME Project No. 7235-16-004, Phase 7 Marshall Steam Station Industrial Landfill No. 1, Cell 3 and Cell 4 Issued for Bid 2017 Electrical/Mechanical Components 11313 – Page 5 of 5 Pumps PART 3 EXECUTION 3.1 EXAMINATION A. Verify connections, size, and location are as indicated on Drawings. 3.2 INSTALLATION A. Pumps - Pumps shall be properly installed by the contractor based upon the contract documents and manufacturers instructions. 1. An accurate “RECORD DRAWING” sketch shall be recorded of the riser pipe fabrication and dimensions at the time of installation of the pumps. 2. A record of the total lengths of materials “AS INSTALLATED” used in each riser pipe shall be recorded and provided to at the manufacturer at the time of start-up along with a copy of the original “AS BUILT” sketch. B. Control panels shall be installed to meet local codes and all electrical routing between the control panel and equipment shall allow for recovery and installation necessary for service and prevent moisture or fumes from entering control panel from the riser pipes. C. All piping outside the riser pipe, pipe supports, required pipe fittings, check valves, and isolation valves shall be supplied and installed by the contractor. D. All collection piping and the riser pipe should be free of shavings, debris, sand, silt, or mud at the time of pump installation. E. Contractor shall ensure there is sufficient liquid in the risers at the time of start-up and testing. F. Install pumps in accordance with Drawings and manufacturer’s instructions. G. Provide necessary piping, fittings, and valves as indicated on Drawings. 3.3 FIELD QUALITY CONTROL A. Upon completion of installation, examine, adjust and test each pump for proper operation. B. Test each pump with clean water through minimum of four complete cycles. 3.4 START-UP A. After installation the manufacturer shall provide system start-up services including the following services: 1. Inspect installation and adjust or set all necessary adjustments for proper service. 2. Test and record pump and control operating characteristics including flow rates, amperage, and level readings and cycles at start and completion of testing. 3. Confirm that the installation is correct and advise contractor of any revisions necessary for proper maintenance or operation. 4. A final start-up report shall be furnished which shall include the AS BUILT dimensions of the pump and discharge hose assembly. END OF SECTION Technical Specifications S&ME Project No. 7235-16-004, Phase 7 Duke Marshall Steam Station Industrial Landfill No. 1, Cell 3 and Cell 4 Issued for Bid 2017 Electrical/Mechanical Components 13030 - Page 1 of 5 Pump House Structure SECTION 13030 PUMP HOUSE STRUCTURE PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Wood Products and Dimension Lumber. 2. Fasteners and Anchors. 3. Wall Sheathing. 4. Plastic Siding. 5. Asphalt Shingles. 6. Overhead Coiling Doors. 7. Hollow Metal Doors and Frames. 8. Door Hardware. 9. Crane 10. Floor Grating B. Related Sections: 1. Section 02315 – Excavation 2. Section 02320 – Backfill 3. Section 2500 – HDPE Pipe 4. Section 03300 - Cast-in-Place Concrete 5. Section 02751 – Valves and Appurtenances 1.2 REFERENCES A. American Concrete Institute: 1. ACI 301 - Specifications for Structural Concrete. 2. ACI 318 - Building Code Requirements for Structural Concrete. 3. ACI 347 - Guide to Formwork for Concrete. B. ASTM International: 1. ASTM A307 – Standard Specification for Carbon Steel Bolts 2. ASTM A153 - Standard Specification for Zinc Coating (hot dip) on Iron and Steel Hardware. 3. ASTM A653 - Standard Specification for Sheet Steel, Zinc Coated (galvanized) by the Hot-Dip Process. 4. ASTM D3679 - Standard Specification for Rigid Poly (Vinyl Chloride) (PVC) Siding. 5. ASTM D3462 - Standard Specification for Asphalt Shingles Made From Glass Felt and Surfaced with Mineral Granules; 2010a. 6. ASTM D4586/D4586M - Standard Specification for Asphalt Roof Cement, Asbestos-Free; 2007 (Reapproved 2012). 7. ASTM D4869/D4869M - Standard Specification for Asphalt-Saturated Organic Felt Underlayment Used in Steep Slope Roofing. 8. ASTM E108 - Standard Test Methods for Fire Tests of Roof Coverings; 2011 C. North Carolina State Building Code D. Door and Hardware Institute E. APA – The Engineered Wood Association Technical Specifications S&ME Project No. 7235-16-004, Phase 7 Duke Marshall Steam Station Industrial Landfill No. 1, Cell 3 and Cell 4 Issued for Bid 2017 Electrical/Mechanical Components 13030 - Page 2 of 5 Pump House Structure F. American Forest and Paper Association 1.3 DESIGN REVIEW REQUIREMENTS A. Prior to Construction, the Contractor shall verify that the work conforms to North Carolina State Building Code. Any non-conforming items identified shall be reported to the Engineer for remedy. 1.4 SUBMITTALS A. Submit schedule of proposed materials for approval at least 2 weeks prior to Construction. 1. Product Data: Provide data indicating material characteristics, performance criteria and limitations. 2. Certify that products meet or exceed specified requirements B. Manufacturer’s Installation Instructions: Indicate installation criteria and procedures 1.5 QUALITY ASSURANCE A. Perform Work in accordance with all applicable Federal, State and Local Standards. B. Perform work in accordance with industry standards. 1.6 QUALIFICATIONS A. General Contractor licensed in the State of North Carolina. B. Construction experience with similar types of structures. C. Structures Similar Design formwork under direct supervision of Professional Engineer experienced in design of this Work and licensed in State of project. 1.7 COORDINATION A. Coordinate this Section with other sections of work. PART 2 PRODUCTS 2.1 REINFORCED CONCRETE A. In accordance with Section 03300 - Cast In Place Concrete 2.2 WOOD PRODUCTS AND DIMENSION LUMBER B. Lumber fabricated from old growth timber is not permitted. All lumber shall be continuous without splices except as indicated on drawings. . C. All lumber or timber bearing on or in contact with concrete masonry, or earth shall be pressure treated with retention of 0.25 pounds per cubic foot of CCA in accordance with AWPA C2. D. Grading Agency: Southern Pine Inspection Bureau, Inc; SPIB (GR). E. Sizes: Nominal sizes as indicated on drawings, S4S Gag Technical Specifications S&ME Project No. 7235-16-004, Phase 7 Duke Marshall Steam Station Industrial Landfill No. 1, Cell 3 and Cell 4 Issued for Bid 2017 Electrical/Mechanical Components 13030 - Page 3 of 5 Pump House Structure F. Moisture Content: S-dry or MC19 2.2 ENGINEERED WOOD PRODUCTS A. Wall Sheathing: Oriented Strand Board (OSB) with nominal thickness of ½ inch. 2.3 FASTENERS AND ANCHORS A. Bolts and anchor bolts shall comply with ASTM a-307 and be hot-dipped galvanized. B. Metal plates, straps, connectors, and miscellaneous metal hardware shall be hot-dipped galvanized. C. Nails and screws exposed directly to weather or subject to corrosion shall be stainless steel or hot- dipped galvanized. 2.4 PLASTIC SIDING A. Comply with ASTM D3679. B. Provide horizontal siding in accordance with the following: 1. Clapboard profile, double 5-inch wide; 10-inch exposure 2. Thickness: 0.048 inches 3. Length: 12-feet nominal 4. Nailing Hem: Single layer with 1-1/8 inch nails 5. Finish: Smooth, white in color 2.5 ASPHALT SHINGLES A. Asphalt Shingles: Asphalt-coated glass felt, mineral granule surfaced, complying with ASTM D3462; Class A fire resistance. 1. Wind Resistance: Class F, when tested in accordance with ASTM D3161. 2. Warranted wind Speed: 110 mph 3. Algae resistant 4. Self-sealing type 5. Style: Square 6. Color: As selected by Owner. B. Underlayment: Self adhering rubber-modified asphalt sheet complying with ASTM D1970, 22 mil total thickness; with strippable release film and woven polypropylene sheet top surface. C. Eave Protection Membrane: Self-adhering polymer-modified asphalt sheet complying with ASTM D1970; 40 mil total thickness; with strippable treated release paper and polyethylene sheet top surface D. Accessories 1. Nails: Standard round wire shingle type, galvanized, 3/8” head diameter, 0.1019 inch shank diameter, of sufficient length to penetrate through roof sheathing or ¾” into sheathing or decking. 2. Staples: Standard wire shingle type, of hot dipped zinc coated steel, 16 wire gage, 0.0508 inch diameter, 15/16 inch crown width, of sufficient length to penetrate through roof sheathing or 3/4 inch into roof sheathing or decking. 3. Plastic Cement: ASTM D4586/D4568M, asphalt roof cement. 4. Flashing: Galvanized sheet metal, 0.018” minimum thickness. Technical Specifications S&ME Project No. 7235-16-004, Phase 7 Duke Marshall Steam Station Industrial Landfill No. 1, Cell 3 and Cell 4 Issued for Bid 2017 Electrical/Mechanical Components 13030 - Page 4 of 5 Pump House Structure E. Manufacturers: Timberline Cool Series, Owens Corning Group, Approved Equal. 2.6 OVERHEAD COILING DOORS A. Exterior Coiling Doors: Steel slat curtain. 1. Capable of withstanding positive and negative wind loads of 20 psf, without undue deflection or damage to components. 2. Sandwich slat construction, uninsulated. 3. Nominal Slat Size: 2 inches wide x required length. 4. Finish: Factory painted, color as selected by Owner from standard selection. 5. Guides: Formed track; stainless steel. 6. Hood Enclosure: Manufacturer's standard; primed steel. 7. Manual hand chain lift operation. 8. Mounting: As recommended by manufacturer. 9. Locking Devices: Slide bolt on inside. 10. Slat Ends: Each slat fitted with end locks to act as wearing surface in guides and to prevent lateral movement. B. Manufacturers: Overhead Door Co. or approved equal. 2.7 HOLLOW METAL DOORS AND FRAMES A. Exterior Doors: 1. Grade: ANSI/SDI A250.8 (SDI-100); Level 3 – Extra Heavy Duty, Full Flush. 2. Core: Polystyrene core 3. Galvanizing: Components hot-dipped zinc-iron alloy-coated (galvannealed) in accordance with ASTM A653/A653M, with manufacturer's standard coating thickness. 4. Hardware: Equip with panic exit hardware. 5. Frame: 12 gauge steel. 6. Manufacturer: DKS Steel Door & Frame Systems, Inc 7. Width and height as determined by Owner. B. Manufacturers: DKS Steel Door & Frame Systems, Inc Width and height as determined by Owner. 2.8 CRANE A. Supply crane and electric winch for removal of leachate pumps. 1. Provide 110-115 volt winch system. 2. Reel capacity of 215 feet using 3/16” or 1/4” stainless steel wire cable. 3. Provide and install socket mount hardware at locations shown on the Drawings per manufacturers instructions. B. Manufacturer: Thern Model SC2000-15. 2.9 FLOOR GRATING A. 1-1/4” x 3/16” serrated bearing bars, spaced 1-3/16” on center, hot dip galvanized. Manufactured by McNichols Co. or approved equal. 1. Install on steel beams as shown on the drawings using steel clips or as recommended by manufacturer. 2. Grating must be removable for access to Pump House valves. Technical Specifications S&ME Project No. 7235-16-004, Phase 7 Duke Marshall Steam Station Industrial Landfill No. 1, Cell 3 and Cell 4 Issued for Bid 2017 Electrical/Mechanical Components 13030 - Page 5 of 5 Pump House Structure PART 3 EXECUTION 3.1 EXAMINATION A. Verify lines, levels, and grade before proceeding with work. Verify dimensions agree with Drawings. 3.2 PREPARATION A. Where wood framing bears on cementitious foundations, install full width sill flashing continuous over top of foundation, lap ends of flashing minimum of 4 inches and seal. B. Install sill gasket under sill plate of framed walls bearing on foundations; puncture gasket cleanly to fit tightly around protruding anchor bolts. 3.3 INSTALLATION A. Concrete placement in accordance with Section 03300, Cast in Place Concrete. B. Provide framing and blocking members as indicated or as required to support finishes, fixtures, specialty items, and trim. In walls, provide blocking attached to studs as backing and support for wall- mounted items, such as electrical panels, unless item can be securely fastened to two or more studs or other method of support is explicitly indicated. C. Where ceiling-mounting is indicated, provide blocking and supplementary supports above ceiling, unless other method of support is explicitly indicated. D. Roofing Components: 1. Install eave protection membrane in accordance with manufacturer's instructions. 2. Underlayment: For Roof Slopes Up to 4:12: Install two layers of underlayment over area not protected by eave protection, with ends and edges weather lapped minimum 6 inches. Stagger end laps of each consecutive layer. Nail in place. 3. Install flashings in accordance with NRCA requirements. 4. Install shingles in accordance with manufacturer's instructions. 5. Fasten individual shingles using 2 nails per shingle, or as required by code, whichever is greater. 6. Fasten strip shingles using 4 nails per strip, or as required by code, whichever is greater. 7. Place shingles in straight coursing pattern with 5 inch weather exposure to produce double thickness over full roof area. Provide double course of shingles at eaves. 8. Project first course of shingles 3/4 inch beyond fascia boards. E. Install Vinyl siding in accordance with Manufacturer’s directions. F. Install Doors in accordance with Manufacturer’s directions. END OF SECTION 0 2000 4000 6000 (IN FEET)GRAPHIC SCALE CELL 3 & CELL 4 CONSTRUCTION PLAN MARSHALL STEAM STATION INDUSTRIAL LANDFILL NO. 1 ELECTRICAL / MECHANICAL COMPONENTS ISSUED FOR BID (IFB) CCP ISSUE NUMBER: MAR-131 DUKE ENERGY - MARSHALL STEAM STATION TERRELL, NORTH CAROLINA JUNE 15, 2017 USGS QUADRANGLE MAPSITE VICINITY MAP 9 SITE LOCATION N N 0 4 8 12 (IN MILES)GRAPHIC SCALE DUKE ENERGY DRAWING NUMBER SHEET NO.TITLE MAR_M907.004.001 M 01 COVER SHEET MAR_M907.004.002 M 02 TEMPORARY FORCE MAIN MAR_M907.004.003 M 03 PERMANENT FORCE MAIN MAR_M907.004.004 M 04 FORCE MAIN PROFILE MAR_M907.004.005 M 05 PUMP HOUSE TO MANHOLE MAR_M907.004.006 M 06 CELL 3 PUMP HOUSE MAR_M907.004.007 M 07 CELL 4 PUMP HOUSE MAR_M907.004.008 M 08 DETAILS (1 OF 5) MAR_M907.004.009 M 09 DETAILS (2 OF 5) MAR_M907.004.010 M 10 DETAILS (3 OF 5) MAR_M907.004.011 M 11 DETAILS (4 OF 5) MAR_M907.004.012 M 12 DETAILS (5 OF 5) MAR_E907.004.001 E 01 GENERATOR PAD ELECTRICAL RISER DIAGRAM MAR_E907.004.002 E 02 ELECTRICAL GENERATOR LAYOUT MAR_E907.004.003 E 03 CELL 3 & 4 - ELECTRICAL PUMP STATION PANEL LAYOUT MAR_E907.004.004 E 04 CELL 3 & 4 - ELECTRICAL PANEL SCHEDULES MAR_E907.004.005 E 05 CELL 3 & 4 - ELECTRICAL POWER SITE PLAN MAR_E907.004.006 E 06 CELL 3 - ELECTRICAL UNDERGROUND DUCTBANK MAR_E907.004.007 E 07 CELL 4 - ELECTRICAL UNDERGROUND DUCTBANK MAR_E907.004.008 E 08 CELL 3 & 4 - INSTRUMENT WIRING DIAGRAM MAR_E907.004.009 E 09 CELL 3 & 4 - INSTRUMENT WIRING DIAGRAM MAR_E907.004.010 E 10 CELL 3 & 4 - POWER & LIGHTING PLAN MAR_E907.004.011 E 11 ELECTRICAL DETAILS MAR_E907.004.012 E 12 ELECTRICAL DETAILS REF:NCDOT STATE TRAVEL MAP 2015-2016 REF:USGS US TOPO 7.5-MINUTE MAP FOR LAKE NORMAN NORTH, NC 10 20 30TENTHSINCHES123 DWG SIZE REVISION FOR SHEET NO. TITLE FILENAME: DWG TYPE: JOB NO: DATE: SCALE:DES: DFTR: CHKD: ENGR: APPD: A F E D C B 2 3 4 5 7 8 96 4 5 7 8 9 106 A F C B 24.0"x35.5" ARCH D DUKE DRAWING NO. COVER SHEET CELL 3 & CELL 4 CONSTRUCTION PLAN MARSHALL STEAM STATION TERRELL, NORTH CAROLINA ISSUED FOR BID (IFB) 1 COVER SHEET.dwg AS SHOWN DWG 7235-16-004 6-15-17 SJL CLD SJL SJL SJL M 01MAR_M907.004.001 9751 SOUTHERN PINE BLVD CHARLOTTE, NC 28273 (704)-523-4726 ENGINEERING FIRM LICENSE NUMBER: F-0176 COA SEAL SITE LOCATION (CATAWBA COUNTY) 840 850 860 870 86 0 87 0 88 0 85 4 85 6 85 8 862 86 4 86 6 868 872 874 876 878 86 0 87 0 88 0 862 86 4 86 6 868 87 2 87 4 87 6 878 870 880 890 900 8 4 0 8 5 0 8 5 0 8 5 0 8 6 0 8 6 0 8 3 0 8 4 0 8 5 0 86 0 8 7 0 850 860 870 880 890 CELL 3 PUMP HOUSE 12 28. 3 0 + 0 0 0 + 1 0 0 + 2 0 0 + 3 0 0 + 4 00 + 5 00 + 6 00 + 7 00 + 8 00 + 9 00 + 10 00 + 11 00 + 12 00 + JUNCTION MANHOLE [JM-2]5 08 JUNCTION MANHOLE [JM-1]4 08 JUNCTION MANHOLE [JM-3]6 09 PI: 3+44.72 PI: 7+09.55 PI: 7+19.55 PI: 7+29.55 PI: 8+ 8 5 . 3 3 PI: 3+23.65 PI: 3+34.72 PC: 6+46.80 PC: 9+42.54 PC: 10+ 5 7 . 0 3 PC: 3+70.24 PT: 6+63.66 PT: 9+51.63 PT: 10+96.59 PT: 4+20.21 Mid: 6+ 5 5 . 2 3 Mid: 9+47.08 Mid: 10+76.81 Mid: 3+ 9 5 . 2 3 FLARED END SECTION 8 09 4" DIA, HDPE SDR-11 FORCE MAIN FORCE MAIN (BY OTHERS) FUTURE FORCE MAIN (BY OTHERS) TO FUTURE RETENTION BASIN FORCE MAIN 8" DIA. HDPE SDR 11 4" DIA. HDPE SDR 11 FORCE MAIN CELL 4 PUMP HOUSE3 07 FORCE MAIN 8" DIA. HDPE SDR 11 HDPE FLANGE CONNECTION WITH SS BACKUP RING AND BOLTS (STA. 10+57.03) CELL 4 (PROTECTIVE COVER GRADES) CELL 3 (PROTECTIVE COVER GRADES) EXISTING PRINCIPAL SPILLWAY SYSTEM PROPOSED FUTURE TIE-IN LOCATOIN HDPE FLANGE CONNECTION WITH SS BACKUP RING AND BOLTS 2 06 LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LC S LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS ISLA N D P O I N T R O A D INSTALL FORCE MAIN MARKER ON EACH SIDE OF HDPE FLANGE LCS LCS LDS LDS LCS LCS L D S L D S L D S L D S L D S L D S L C S L C S L C S L C S L C S L C S L C S L C S L C S L C S L C S L C S PROPOSED FUTURE TIE-IN LOCATION HDPE FLANGE CONNECTION WITH SS BACKUP RING AND BOLTS N: 687441.07 E: 1412510.47 N: 687472.55 E: 1412572.99 N: 687012.42 E: 1412388.47 N: 686951.90 E: 1412423.65 36" ADS N12 ST 1B CULVERT 36" ADS N12 ST 1B CULVERT ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X GENERATOR PAD 21 12 CHAIN LINK FENCE 19 11 X X X X 8"-DIA. HDPE SDR 11 LEACHATE FORCE MAIN 3' (MIN.) FORCE MAIN BACKFILL (STRUCTURAL FILL) PROPOSED GRADE METALLIC LEACHATE TRACE WIRE 12" DEEP TYP. 24" MIN. 6" LEGEND EXISTING GRADE CONTOUR (2 FT) EXISTING GRADE CONTOUR (10 FT) PROTECTIVE COVER GRADE CONTOUR (2 FT) PROTECTIVE COVER GRADE CONTOUR (10 FT.) PROPOSED FORCE MAIN PROPOSED FORCE MAIN (BY OTHERS) PROPOSED LCS & LDS PIPING PROPOSED FORCE MAIN FLOW DIRECTION PROPOSED CULVERT EXISTING FENCE PROPOSED FENCE SILT FENCE SILT FENCE OUTLET EXISTING POWER POLE LDS N 0 50 100 150 (IN FEET)GRAPHIC SCALE LEACHATE FORCE MAIN TRENCH 10 20 30TENTHSINCHES123 DWG SIZE REVISION FOR SHEET NO. TITLE FILENAME: DWG TYPE: JOB NO: DATE: SCALE:DES: DFTR: CHKD: ENGR: APPD: A F E D C B 2 3 4 5 7 8 96 4 5 7 8 9 106 A F C B 24.0"x35.5" ARCH D DUKE DRAWING NO. TEMPORARY FORCE MAIN CELL 3 & CELL 4 CONSTRUCTION PLAN MARSHALL STEAM STATION TERRELL, NORTH CAROLINA ISSUED FOR BID (IFB) TEMPORARY FORCE MAIN.dwg AS SHOWN DWG 7235-16-004 6-15-17 SJL CLD SJL SJL SJL M 02MAR_M907.004.002 9751 SOUTHERN PINE BLVD CHARLOTTE, NC 28273 (704)-523-4726 ENGINEERING FIRM LICENSE NUMBER: F-0176 COA SEAL EXISTING RIPRAP APRON EXISTING SILT FENCE EXISTING SILT FENCE OUTLET (TYP.) EXISTING CHECK DAM SILT FENCE OUTLET TO BE RELOCATED PROPOSED SILT FENCE PROPOSED SILT FENCE AND SILT FENCE OUTLET ■ ■ X X X X X X X X LCS LCS LDS LDS LCS LCS L D S L D S L D S L D S L D S L D S L C S L C S L C S L C S L C S L C S L C S L C S L C S L C S L C S L C S 5 08 6 09 3 07 2 06 4 08 LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LC S LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LCS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS LDS 840 850 860 870 860 87 0 88 0 854 85 6 85 8 86 2 86 4 86 6 86 8 87 2 87 4 87 6 87 8 86 0 87 0 88 0 86 2 864 866 868 872 874 876 878 870 880 890 900 8 4 0 8 5 0 8 5 0 8 5 0 8 6 0 8 6 0 8 3 0 8 4 0 8 5 0 86 0 8 7 0 850 860 870 880 890 CELL 3 PUMP HOUSE JUNCTION MANHOLE [JM-2] (OPEN VALVE TO WASTEWATER IMPOUNDMENT) JUNCTION MANHOLE [JM-3] (FLIP CHECK VALVE DIRECTION AS OUTLINED ON DETAIL) PI: 3+44.72 PI: 7+09.55 PI: 7+19.55 PI: 7+29.55 PI: 8+ 8 5 . 3 3 PI: 3+23.65 PI: 3+34.72 PC: 6+46.80 PC: 9+42.54 PC: 10+ 5 7 . 0 3 PC: 3+70.24 PT: 6+63.66 PT: 9+51.63 PT: 10+96.59 PT: 4+20.21 Mid: 6+ 5 5 . 2 3 Mid: 9+47.08 Mid: 10+76.81 Mid: 3+ 9 5 . 2 3 4" DIA, HDPE SDR 11 FORCE MAIN FORCE MAIN (BY OTHERS) FORCE MAIN (BY OTHERS) TO FUTURE RETENTION BASIN FORCE MAIN 8" DIA. HDPE SDR 11 4" DIA. HDPE SDR 11 FORCE MAIN CELL 4 PUMP HOUSE FORCE MAIN 8" DIA. HDPE SDR 11 DISCONNECT FLANGE CONNECTION AND PLACE BLIND FLANGE FOR FUTURE CELL CONNECTION FUTURE PHASE FORCE MAINREMOVE PIPING AND STORE FOR FUTURE USE (STA 10+67.68 TO 12+38.94) FORCE MAIN TO REMAIN IDLE UNTIL FUTURE PHASE TIE IN (STA. 7+30.24 TO 10+67.68) EXISTING PRINCIPAL SPILLWAY SYSTEM 12 28. 3 0 + 0 0 0 + 1 0 0 + 2 0 0 + 3 0 0 + 4 00 + 5 00 + 6 00 + 7 00 + 8 00 + 9 00 + 10 00 + 11 00 + 12 00 + JUNCTION MANHOLE [JM-1] FORCE MAIN MARKER INSTALL ON EACH SIDE OF HDPE FLANGE ISLA N D P O I N T R O A D CELL 4 (PROTECTIVE COVER GRADES) CELL 3 (PROTECTIVE COVER GRADES) 36" ADS N12 ST 1B CULVERT N: 687441.07 E: 1412510.47 N: 687472.55 E: 1412572.99 N: 687012.42 E: 1412388.47 N: 686951.90 E: 1412423.65 36" ADS N12 ST 1B CULVERT X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X GENERATOR PAD 21 12 EXISTING FENCE CHAIN LINK FENCE 19 11 PROPOSED FUTURE TIE-IN LOCATOIN HDPE FLANGE CONNECTION WITH SS BACKUP RING AND BOLTS PROPOSED FUTURE TIE-IN LOCATION HDPE FLANGE CONNECTION WITH SS BACKUP RING AND BOLTS X X X X 8"-DIA. HDPE SDR 11 LEACHATE FORCE MAIN 3' (MIN.) FORCE MAIN BACKFILL (STRUCTURAL FILL) PROPOSED GRADE METALLIC LEACHATE TRACE WIRE 12" DEEP TYP. 24" MIN. 6" N 0 50 100 150 (IN FEET)GRAPHIC SCALE LEACHATE FORCE MAIN TRENCH SCALE: N.T.S 1 02 10 20 30TENTHSINCHES123 DWG SIZE REVISION FOR SHEET NO. TITLE FILENAME: DWG TYPE: JOB NO: DATE: SCALE:DES: DFTR: CHKD: ENGR: APPD: A F E D C B 2 3 4 5 7 8 96 4 5 7 8 9 106 A F C B 24.0"x35.5" ARCH D DUKE DRAWING NO. PERMANENT FORCE MAIN CELL 3 & CELL 4 CONSTRUCTION PLAN MARSHALL STEAM STATION TERRELL, NORTH CAROLINA ISSUED FOR BID (IFB) 3 PERM. FORCE MAIN.dwg AS SHOWN DWG 7235-16-004 6-15-17 SJL CLD SJL SJL SJL M 03MAR_M907.004.003 9751 SOUTHERN PINE BLVD CHARLOTTE, NC 28273 (704)-523-4726 ENGINEERING FIRM LICENSE NUMBER: F-0176 COA SEAL LEGEND EXISTING GRADE CONTOUR (2 FT) EXISTING GRADE CONTOUR (10 FT) PROTECTIVE COVER GRADE CONTOUR (2 FT) PROTECTIVE COVER GRADE CONTOUR (10 FT.) PROPOSED FORCE MAIN PROPOSED FORCE MAIN (BY OTHERS) PROPOSED LCS & LDS PIPING PROPOSED FORCE MAIN FLOW DIRECTION PROPOSED CULVERT EXISTING FENCE PROPOSED FENCE SILT FENCE SILT FENCE OUTLET EXISTING POWER POLE LDS ■ ■ X X X X X X X X EL E V A T I O N ( I N F E E T ) EL E V A T I O N ( I N F E E T ) 830.00 840.00 850.00 860.00 870.00 880.00 890.00 900.00 910.00 830.00 840.00 850.00 860.00 870.00 880.00 890.00 900.00 910.00 0+00 1+00 2+00 3+00 4+00 5+00 6+00 6+20 0+00 1+00 2+00 3+00 4+00 5+00 6+00 6+20 APPROXIMATE EXISTING GROUND SURFACE PROPOSED GRADE PROPOSED FORCE MAIN (8" DIA. HDPE SDR 11) JUNCTION MANHOLE [JM-1]4 08 JUNCTION MANHOLE [JM-2]5 083' MIN. COVER FUTURE FORCE MAIN (BY OTHERS) CONNECTION - BLIND FLANGE WITH SS BACKUP RING AND BOLTS 5.10% 1.26% 6.83% 7.31% 9.59% PROPOSED GRADE EL E V A T I O N ( I N F E E T ) EL E V A T I O N ( I N F E E T ) Station 820.00 830.00 840.00 850.00 860.00 870.00 880.00 890.00 820.00 830.00 840.00 850.00 860.00 870.00 880.00 890.00 6+20 7+00 8+00 9+00 10+00 11+00 12+00 12+40 6+20 7+00 8+00 9+00 10+00 11+00 12+00 12+40 PROPOSED GRADE APPROXIMATE EXISTING GROUND SURFACE PROPOSED FORCE MAIN (8" DIA. HDPE SDR 11) 3' MIN COVER JUNCTION MANHOLE [JM-3]6 09 TE M P O R A R Y D I S C H A R G E T O E X I S T I N G A S H B A S I N HDPE FLANGE CONNECTION WITH SS BACK UP RING AND BOLTS (STA.10+57.03) 0.63% 1.99% 1.97% 16.21 % 6.96% END TEMPORARY FORCE MAIN 0 20 40 60 (IN FEET)GRAPHIC SCALE 0 2 4 6 (IN FEET)GRAPHIC SCALE HORIZONTAL SCALE VERTICAL SCALE FORCE MAIN PROFILE (STA. 0+00 TO 12+38.94) 10 20 30TENTHSINCHES123 DWG SIZE REVISION FOR SHEET NO. TITLE FILENAME: DWG TYPE: JOB NO: DATE: SCALE:DES: DFTR: CHKD: ENGR: APPD: A F E D C B 2 3 4 5 7 8 96 4 5 7 8 9 106 A F C B 24.0"x35.5" ARCH D DUKE DRAWING NO. FORCE MAIN PROFILE CELL 3 & CELL 4 CONSTRUCTION PLAN MARSHALL STEAM STATION TERRELL, NORTH CAROLINA ISSUED FOR BID (IFB) FORCE MAIN PROFILE.dwg AS SHOWN DWG 7235-16-004 6-15-17 SJL CLD SJL SJL SJL M 04MAR_M907.004.004 COA SEAL EL E V A T I O N ( I N F E E T ) EL E V A T I O N ( I N F E E T ) 844 846 848 850 852 854 856 858 860 862 864 866 868 870 872 874 876 878 880 844 846 848 850 852 854 856 858 860 862 864 866 868 870 872 874 876 878 880 0+00 0+20 0+40 0+60 0+70 0+00 0+10 0+20 0+30 0+40 0+50 0+60 0+70 4" DIA. HDPE SDR 11 PIPE PROPOSED FINAL GRADE CELL 4 PUMP HOUSE NCDOT CLASS II OR III TYPE I BEDDING & BACKFILL 12" ABC STONE WEARING SURFACE 36" DIA.HDPE CULVERT ADS N-12 ST 1B 24" 10' MINIMUM BEND RADIUS (TYP.) JUNCTION MANHOLE (JM-3)6 09 APPROXIMATE EXISTING GROUND SURFACE CONCRETE WALL PROJECTED GALVANIZED STEEL GRATING 3 07 CELL 4 EL E V A T I O N ( I N F E E T ) EL E V A T I O N ( I N F E E T ) 880 882 884 886 888 890 892 894 896 898 900 902 904 906 908 910 880 882 884 886 888 890 892 894 896 898 900 902 904 906 908 910 0+00 0+20 0+40 0+60 0+70 0+00 0+10 0+20 0+30 0+40 0+50 0+60 0+70 JUNCTION MANHOLE (JM-1) 4" DIA. HDPE SDR 11 PIPE PROPOSED FINAL GRADE CELL 3 PUMP HOUSE NCDOT CLASS II OR III TYPE I BEDDING & BACKFILL 12" ABC STONE WEARING SURFACE 36" DIA. HDPE CULVERT ADS N-12 ST 1B 24" 10' MINIMUM BEND RADIUS (TYP.) 4 08 APPROXIMATE EXISTING GROUND SURFACE PROJECTED GALVANIZED STEEL GRATING CONCRETE WALL 2 06 CELL 3 CELL 4 PUMP HOUSE FORCE MAIN CELL 3 PUMP HOUSE FORCE MAIN 0 4 8 12 (IN FEET)GRAPHIC SCALE 0 4 8 12 (IN FEET)GRAPHIC SCALE HORIZONTAL SCALE VERTICAL SCALE 10 20 30TENTHSINCHES123 DWG SIZE REVISION FOR SHEET NO. TITLE FILENAME: DWG TYPE: JOB NO: DATE: SCALE:DES: DFTR: CHKD: ENGR: APPD: A F E D C B 2 3 4 5 7 8 96 4 5 7 8 9 106 A F C B 24.0"x35.5" ARCH D DUKE DRAWING NO. PUMP HOUSE TO MANHOLE CELL 3 & CELL 4 CONSTRUCTION PLAN MARSHALL STEAM STATION TERRELL, NORTH CAROLINA ISSUED FOR BID (IFB) TYPICAL PUMP HOUSE.dwg AS SHOWN DWG 7235-16-004 6-15-17 SJL WRH CLD SJL SJL M 05MAR_M907.004.005 COA SEAL VINYL SIDING (WHITE) OVER TYVEK WRAP AND 1/2" OSB SHEATHING 108"' 24.0" 42.0" 16.0" TYP. 40.0"18.0" 25.5" 42" 48"± (TYP) 82.0" 115" 144.0"32.0" 24" RISER PIPE (TYP.) 12 5 W 6x12 BEAM SUMP 18" DIA. X 6" CONCRETE WALL & FOOTING (4000 PSI) 2"X4" 2"X4" 2"X6" 2"X6" 2"X4" WOOD FRAME 2"X6" RAFTER 34" PLYWOOD SHEATHING W/ 30- YR ARCHITECTURAL SHINGLES (GREY) AND ROOFING FELT 4"X4"X1/4" ANGLE IRON WITH CONCRETE BOLT ANCHORS EACH SIDE (MAX. SPACING 24") STEEL GRATING 18" x 18" CONCRETE PEDESTAL PROPOSED GRADE PROJECTED DOOR HEADER 12" DIA. GALVANIZED STEEL AIR TURBINE VENTILATOR 12" DIA. ADJUSTABLE BASE WITH ROOF FLASHING 1'-6"THICKENED SLAB BENEATH SUMP, 6" TYP. 39.0"BEAM SUPPORT18 11 3' HIGH, 3" DIA. HDPE VENT PIPE 12" 12" 16' x 10' GALVANIZED STEEL RETRACTABLE DOOR W/CHAINHOIST (COIL-AWAY BY OVERHEAD DOOR OR EQUIVALENT) 32' 3/4" PLYWOOD SHEATHING W/ 30- YR ARCHITECTURAL SHINGLES AND ROOFING FELT 2"X6" RAFTER 2"X4" 2"X6"2"X6" 2"X4" 36" MAN DOOR W/KEYLOCK (INTERIOR PANIC BAR OPENING)48" (3) 2"X12" WOOD HEADER 24" 4'16'7'3'2' VINYL SIDING OVER TYVEK WRAP AND 1/2" OSB SHEATHING HIGH LEVEL AUDIO/VISUAL ALARM FOR LCS, LDS, & PUMP HOUSE SUMP ADJUSTABLE SUPPORT (TYP.) 24" O.D. HDPE SDR 17 LDS RISER PIPE TOP OF WALL 2" DIA. 90 DEGREE ELBOW 3" DIA. 90 DEGREE ELBOW 2" DIA. CHECK VALVE 2" DIA. 90 DEGREE ELBOW 2" DIA. BALL VALVE REDUCER (3" X 2") 18" 48"120" 12" 12" 144" 48" 27"27" 32' 28" 28" 28" 3" DIA. TEE 20" 24" O.D. HDPE SDR 17 LCS RISER PIPE (TYP.) 1.5" DIA. QUICK DISCONNECT 6" 18" DIA. SUMP 12" 42" 24" O.D. HDPE SDR 17 LCS RISER PIPE (TYP.) SERRATED & GALVANIZED STEEL GRATING 1'-1/4" X 3/16" BEARING BARS @ 1-3/16" ON CENTER 2" DIA. 90 DEGREE ELBOW 18" 3" DIA. TEE WITH 2" REDUCED TEE BEAM SUPPORT (TYP.) 2" X 6" STUDS @ 24" O/C (TYP.) 2" X 6" RAFTER @ 24" O/C (TYP.) PLYWOOD SHEATHING W/ 30-YEAR ARCHITECTURAL SHINGLES (GREY) AND ROOFING FELT 2"X6" 2"X4" CONCRETE FLOOR STANDARD COUPLING HDPE SDR 11 4" DIA. PIPE PROJECTED CONCRETE PEDESTAL (TYP.) TO JM 24" LINK SEAL (TYP.) TRASH PUMP WITH 1.5" DIA. HOSING 3/8" X 9" ANCHOR BOLTS - 6' MAX SPACING (TYP.) SLOPE TO DRAIN REBAR #8 @ 12" EF REBAR #5 @ 12" EF REBAR #8 @ 12" EW, T&B THICKENED SLAB BENEATH SUMP, 6" TYP. 4"X4"X1/4" ANGLE WITH 3/8"∅ HIHI (KWIK BOLT III) @2' O.C. (2 38" MIN. EMBEDMENT) W 6x12 BEAM (TYP.) DETAIL Z ALL 4 CORNERS 16 11 #8 @ 12" REBAR #8 @ 12" EW, T&B REBAR #8 TOP ONLYREBAR #8 TOP ONLY 9.0' 12"12" CONCRETE FLOOR (4000 PSI) CONCRETE WALL (4000 PSI) 2" DIA. CHECK VALVE PRESSURE GAUGE 2" DIA. BALL VALVE 2" DIA. FLOW METER 2" DIA. 90 DEGREE ELBOW 3" DIA. PIPE 14" LABCOCK SAMPLE PORT (WITH LOCK) 2" DIA. 90 DEGREE ELBOW 3" DIA. 90 DEGREE ELBOW 2" DIA. 90 DEGREE ELBOW 2" DIA. CHECK VALVE 2" DIA. BALL VALVE REDUCER (3" X 2")2" DIA. PIPE 3" DIA. FLOW METER PRESSURE GAUGE PRESSURE GAUGE 3" DIA. CHECK VALVE 3" DIA. BALL VALVE SUPPORT (TYP.) 14" LABCOCK SAMPLE PORT (WITH LOCK) 70" 18" 1.5" DIA. QUICK DISCONNECT 18" DIA. SUMP, 6" DEEP 24" 2" DIA. FLOW METER 3" DIA. TEE 3" DIA. TEE WITH 2" REDUCED TEE 19.5' REDUCER (4" X 3")18" LDS RISER LCS RISERLCS RISER 4" DIA. PIPE TRASH PUMP WITH 1.5" DIA. HOSING 24" TO JM STANDARD COUPLING HDPE SDR 11 4" DIA. PIPE LINK SEAL (TYP.) CONCRETE WALL (4000 PSI) W6x12 BEAM FLOOR SUPPORT (TYP.) NOTES: 1.PIPE SYSTEM IS SDR 11 HDPE 2.ONE THERN PRODUCTS MODEL SC2000-15 CRANE (1,000 MAX LBS) OR EQUIVALENT SHALL BE SUPPLIED WITH EACH STATION 3.VALVES AND FITTING SHALL BE MINIMUM CLASS 150 4.ADDITIONAL CONCRETE WALL REINFORCEMENT SHOWN ON SHEET 10 5.SUMP PUMP OPERATION (ON/OFF) SET AT 6" WATER DEPTH. HIGH LEVEL SHALL TRIGGER AUDIO/VISUAL ALARM SLOPE TO DRAIN SLOPE TO DRAIN SL O P E T O D R A I N 18"x18" CONCRETE PEDESTAL (TYP.) WITH THERN SS HOIST SOCKET SC2000-15 FLUSH BASE 5BF20 PH-3.2PH-3.1 PH-3.3PH-3.4 BEAM SUPPORT (TYP.) CORNER DETAIL ALL 4 CORNERS 17 11 BEAM POCKET (TYP.)20 11 48" (TYP) 18 11 2 06 10 20 30TENTHSINCHES123 DWG SIZE REVISION FOR SHEET NO. TITLE FILENAME: DWG TYPE: JOB NO: DATE: SCALE:DES: DFTR: CHKD: ENGR: APPD: A F E D C B 2 3 4 5 7 8 96 4 5 7 8 9 106 A F C B 24.0"x35.5" ARCH D DUKE DRAWING NO. CELL 3 PUMP HOUSE CELL 3 & CELL 4 CONSTRUCTION PLAN MARSHALL STEAM STATION TERRELL, NORTH CAROLINA ISSUED FOR BID (IFB) PUMP HOUSE.dwg AS SHOWN DWG 7235-16-004 6-15-17 JRH CLD SJL SJL SJL M 06MAR_M907.004.006 CELL 3 PUMP HOUSE SCALE: AS SHOWN SIDE ELEVATION SCALE: 1"=3' FRONT ELEVATION SCALE: 1"=3' PLAN VIEW SCALE: 1"=2' REAR ELEVATION SCALE: 1"=2' 9751 SOUTHERN PINE BLVD CHARLOTTE, NC 28273 (704)-523-4726 ENGINEERING FIRM LICENSE NUMBER: F-0176 COA SEAL EL. 894.9 ± EL. 890.9 ± VINYL SIDING (WHITE) OVER TYVEK WRAP AND 1/2" OSB SHEATHING 108"' 24.0" 42.0" 16.0" TYP. 40.0"18.0" 25.5" 42" 48"± (TYP) 82.0" 115" 144.0"32.0" 24" RISER PIPE (TYP.) 12 5 W 6x12 BEAM SUMP 18" DIA. X 6" CONCRETE WALL & FOOTING (4000 PSI) 2"X4" 2"X4" 2"X6" 2"X6" 2"X4" WOOD FRAME 2"X6" RAFTER 34" PLYWOOD SHEATHING W/ 30- YR ARCHITECTURAL SHINGLES (GREY) AND ROOFING FELT 4"X4"X1/4" ANGLE IRON WITH CONCRETE BOLT ANCHORS EACH SIDE (MAX. SPACING 24") STEEL GRATING 18" x 18" CONCRETE PEDESTAL PROPOSED GRADE PROJECTED DOOR HEADER 12" DIA. GALVANIZED STEEL AIR TURBINE VENTILATOR 12" DIA. ADJUSTABLE BASE WITH ROOF FLASHING 1'-6" THICKENED SLAB BENEATH SUMP, 6" TYP. 39.0"BEAM SUPPORT18 11 3' HIGH, 3" DIA. HDPE VENT PIPE 12" 12" 16' x 10' GALVANIZED STEEL RETRACTABLE DOOR W/CHAINHOIST (COIL-AWAY BY OVERHEAD DOOR OR EQUIVALENT) 32' 3/4" PLYWOOD SHEATHING W/ 30- YR ARCHITECTURAL SHINGLES AND ROOFING FELT 2"X6" RAFTER 2"X4" 2"X6"2"X6" 2"X4" VINYL D SIDING OVER TYVEK WRAP AND 1/2" OSB SHEATHING 36" MAN DOOR W/KEYLOCK (INTERIOR PANIC BAR OPENING) 48" (3) 2"X12" WOOD HEADER 2'3'7'16'4' 24" HIGH LEVEL AUDIO/VISUAL ALARM FOR LCS, LDS, & PUMP HOUSE SUMP 10" I.D. HDPE SDR 17 LDS HEADER PIPE ADJUSTABLE SUPPORT (TYP.) 24" O.D. HDPE SDR 17 LDS RISER PIPE TOP OF WALL 2" DIA. 90 DEGREE ELBOW 3" DIA. 90 DEGREE ELBOW 2" DIA. CHECK VALVE 2" DIA. 90 DEGREE ELBOW 2" DIA. BALL VALVE REDUCER (3" X 2") 18" 10" I.D. HDPE SDR 17 LCS HEADER PIPE 48"48"48" 48" 12" 12" 120" 48" 26"27"27"33" 32' 28" 28" 28" 3" DIA. TEE 20" 24" O.D. HDPE SDR 17 LCS RISER PIPE (TYP.) 6"18" DIA. SUMP 12" 42" 2" DIA. 90 DEGREE ELBOW 18" 3" DIA. TEE WITH 2" REDUCED TEE W 6x12 BEAM (TYP.) 2" X 6" STUDS @ 24" O/C (TYP.) 2" X 6" RAFTER @ 24" O/C (TYP.) PLYWOOD SHEATHING W/ 30-YEAR ARCHITECTURAL SHINGLES (GREY) AND ROOFING FELT 2"X6" 2"X4" CONCRETE FLOORSTANDARD COUPLING HDPE SDR 11 4" DIA. PIPE TO JM 24" LINK SEAL (TYP.) TRASH PUMP WITH 1.5" DIA. HOSING SERRATED & GALVANIZED STEEL GRATING 1'-1/4" X 3/16" BEARING BARS @ 1-3/16" ON CENTER SLOPE TO DRAIN THICKENED SLAB BENEATH SUMP, 6" TYP. REBAR #8 @ 12" EF REBAR #5 @ 12" EF 1.5" DIA. QUICK DISCONNECT 24" O.D. HDPE SDR 17 LCS RISER PIPE (TYP.) PROJECTED CONCRETE PEDESTAL (TYP.) REBAR #8 @ 12" EW, T&B 4"X4"X1/4" ANGLE WITH 3/8"∅ HIHI (KWIK BOLT III) @2' O.C. (2 38" MIN. EMBEDMENT) BEAM SUPPORT (TYP.) DETAIL Z ALL 4 CORNERS 16 11 #8 @ 12" REBAR #8 @ 12" EW, T&B REBAR #8 TOP ONLY REBAR #8 TOP ONLY 3/8" X 9" ANCHOR BOLTS - 6' MAX SPACING (TYP.) 9.0' 12"12" 12" CONCRETE FLOOR (4000 PSI) 2" DIA. CHECK VALVE PRESSURE GAUGE 2" DIA. BALL VALVE 2" DIA. FLOW METER 2" DIA. 90 DEGREE ELBOW 3" DIA. PIPE 14" LABCOCK SAMPLE PORT (WITH LOCK)2" DIA. 90 DEGREE ELBOW 3" DIA. 90 DEGREE ELBOW 2" DIA. 90 DEGREE ELBOW 2" DIA. CHECK VALVE 2" DIA. BALL VALVE REDUCER (3" X 2")2" DIA. PIPE 3" DIA. FLOW METER PRESSURE GAUGE PRESSURE GAUGE 3" DIA. CHECK VALVE 3" DIA. BALL VALVE SUPPORT (TYP.) 14" LABCOCK SAMPLE PORT (WITH LOCK) 70" 18" 1.5" DIA. QUICK DISCONNECT 18" DIA. SUMP, 6" DEEP 24" 2" DIA. FLOW METER 3" DIA. TEE 3" DIA. TEE WITH 2" REDUCED TEE 19.5' REDUCER (4" X 3") 18" LDS HEADER LDS RISER LCS HEADER LCS RISER LCS RISER 4" DIA. PIPE 18"x18" CONCRETE PEDESTAL (TYP.) WITH THERN SS HOIST SOCKET SC2000-15 FLUSH BASE 5BF20 TRASH PUMP WITH 1.5" DIA. HOSING 24" TO JM STANDARD COUPLING HDPE SDR 11 4" DIA. PIPE LINK SEAL (TYP.) CONCRETE WALL (4000 PSI) W6x12 BEAM FLOOR SUPPORT (TYP.) 11' CONCRETE WALL (4000 PSI) NOTES: 1.PIPE SYSTEM IS SDR 11 HDPE 2.ONE THERN PRODUCTS MODEL SC2000-15 CRANE (1,000 MAX LBS) OR EQUIVALENT SHALL BE SUPPLIED WITH EACH STATION 3.VALVES AND FITTING SHALL BE MINIMUM CLASS 150 4.ADDITIONAL CONCRETE WALL REINFORCEMENT SHOWN ON SHEET 10 5.SUMP PUMP OPERATION (ON/OFF) SET AT 6" WATER DEPTH. HIGH LEVEL SHALL TRIGGER AUDIO/VISUAL ALARM SLOPE TO DRAIN SLOPE TO DRAIN PH-4.1 PH-4.2 PH-4.4 PH-4.3 BEAM SUPPORT (TYP.) CORNER DETAIL ALL 4 CORNERS 17 11 BEAM POCKET (TYP.)20 11 18 11 48" (TYP.) 3 07 CELL 4 PUMP HOUSE SCALE: AS SHOWN SIDE ELEVATION SCALE: 1"=3' FRONT ELEVATION SCALE: 1"=3' PLAN VIEW SCALE: 1"=2' REAR ELEVATION SCALE: 1"=2' 10 20 30TENTHSINCHES123 DWG SIZE REVISION FOR SHEET NO. TITLE FILENAME: DWG TYPE: JOB NO: DATE: SCALE:DES: DFTR: CHKD: ENGR: APPD: A F E D C B 2 3 4 5 7 8 96 4 5 7 8 9 106 A F C B 24.0"x35.5" ARCH D DUKE DRAWING NO. CELL 4 PUMP HOUSE CELL 3 & CELL 4 CONSTRUCTION PLAN MARSHALL STEAM STATION TERRELL, NORTH CAROLINA ISSUED FOR BID (IFB) PUMP HOUSE.dwg AS SHOWN DWG 7235-16-004 6-15-17 JRH CLD SJL SJL SJL M 07MAR_M907.004.007 9751 SOUTHERN PINE BLVD CHARLOTTE, NC 28273 (704)-523-4726 ENGINEERING FIRM LICENSE NUMBER: F-0176 COA SEAL EL. 858.5 ± EL. 854.5 ± FLOW FROM CELLS 1 & 2 8" DIA. HDPE SDR 11 PIPE (BY OTHERS) FLOW FROM CELL 3 4" DIA. HDPE SDR 11 4" DIA. CHECK VALVE 8" DIA. CHECK VALVE 8" DIA. TEE WITH 4" DIA. REDUCER ON BRANCH HDPE SDR 11 FLOW TO: CELL 4 (TEMP.) RETENTION BASIN (PERM.) 8' X 7' PRECAST CONCRETE MANHOLE 8" DIA. HDPE SDR 11 PIPE 8" DIA. HDPE SDR 11 PIPE EDGE OF ROAD 8' 7' 6" 36" 8" 18"ADJUSTABLE SUPPORT (TYP.) 8" 10" 8" 112" 6" ABC STONE 4" DIA. CHECK VALVE 8" DIA. CHECK VALVE 8" DIA. TEE WITH 4" DIA. REDUCER ON BRANCH HDPE SDR 11 3'-6" 4' ACCESS DOOR EL.886.6' 8" DIA. HDPE SDR 11 PIPE INV.EL. 888.4'INV.EL. 888.4' EL.897.45' PLAN VIEW SIDE VIEW 7 09 2 1 8" DIA. PLUG VALVE 18" DIA. 4" DEEP SUMP STEEL REINFORCED PLASTIC STEP (TYP.) 10' 8" DIA. HDPE BLIND FLANGE WITH STAINLESS STEEL BACKUP RING AND BOLTS PAINT (SAFETY YELLOW) ON EXPOSED MH LID SIDES (3) ALONG THE ROAD SLOPE TO DRAIN LINK SEAL OR EQUIVALENT (TYP) BOLLARD (TYP.)9 09 STEEL REINFORCED PLASTIC STEP (TYP.) BOLLARD 9 09 1'-9" 1'-9" PROJECTED 18" DIA. 4" DEEP SUMP 18" TYP. 4' SL O P E T O DR A I N SLOPE TO DRAIN 3'-6"4" DIA. BALL VALVE 8" DIA. PLUG VALVE BUTYL SEAL WITH 6" ADHESIVE BUTYL TAPE ON THE OUTSIDE OF JOINT (TYP.) JM-1.4JM-1.3 JM-1.1JM-1.2 12" (TYP.) FLOW FROM CELLS 1, 2, AND 3 8" DIA. CHECK VALVE 12" DIA. TO 8" DIA. REDUCER HDPE SDR 11 12' X 10' PRECAST CONCRETE MANHOLE 8" DIA. CHECK VALVE 12" DIA. TEE HDPE SDR 11 8" DIA. HDPE SDR 11 PIPE 8" DIA. HDPE SDR 11 PIPE FLOW TO CELL 4 8" DIA. HDPE SDR 11 12" DIA. PLUG VALVE (CLOSED) 12" DIA. HDPE SDR 11 PIPE 12" DIA. HDPE BLIND FLANGE WITH STAINLESS STEEL BACKUP RING AND BOLTS 12' 10' FUTURE FORCE MAIN TO POTW 12" DIA. HDPE BLIND FLANGE WITH STAINLESS STEEL BACKUP RING AND BOLTS 8" ADJUSTABLE SUPPORT (TYP.) 8" 10" 8" 6" ABC STONE 12" DIA. TEE HDPE SDR 11 10' 10' 5' 5" 7' 12" DIA. TO 8" DIA. REDUCER HDPE SDR 11 12" DIA. TEE HDPE SDR 1112" DIA. PLUG VALVE 2" 13' INV.EL. 876.2' INV.EL. 876.3' EL.873.3' INV.EL. 875.6'INV.EL. 875.6' EL.882.15' 8" DIA. HDPE SDR 11 PIPE PLAN VIEW (TEMPORARY CONDITION) SIDE VIEW ACCESS DOOR 12" DIA. HDPE SDR 11 PIPE 7 09 2 1 18" DIA. 6" DEEP SUMP FLOW FROM CELLS 1, 2, AND 8" DIA. CHECK VALVE REVERSE FLOW DIRECTION 8" DIA. HDPE SDR 11 PIPE 8" DIA. HDPE SDR 11 PIPE FLOW FROM CELL 4 8" DIA. HDPE SDR 11 12" DIA. HDPE BLIND FLANGE WITH STAINLESS STEEL BACKUP RING AND BOLTS 12' 10' FUTURE FORCE MAIN TO POTW 8" 10' 5' 5" 7' PLAN VIEW (PERMANENT CONDITION) FUTURE FORCE MAIN TO RETENTION BASIN (DESIGNED BY OTHERS) PROJECTED 18" DIA. 4" DEEP SUMP STEEL REINFORCED PLASTIC STEP (TYP.) STEEL REINFORCED PLASTIC STEP (TYP.) BUTYL SEAL WITH 6" ADHESIVE BUTYL TAPE ON THE OUTSIDE OF JOINT (TYP.)18" LINK SEAL OR EQUIVALENT (TYP) SLO P E T O D R A I N SLO P E T O D R A I N 12" DIA. PLUG VALVE (OPEN) 2' -3" 12" DIA. PLUG VALVE (CLOSED) 2'-3" 8" DIA. CHECK VALVE JM-2.4 JM-2.1 JM-2.3 JM-2.2 JM-2.4 JM-2.1 JM-2.3 JM-2.2 12" (TYP.) ACCESS DOOR 7 09 JUNCTION MANHOLE [JM-1]4 08 SCALE: 1" = 2' JUNCTION MANHOLE [JM-2]5 08 SCALE: 1" = 2' 10 20 30TENTHSINCHES123 DWG SIZE REVISION FOR SHEET NO. TITLE FILENAME: DWG TYPE: JOB NO: DATE: SCALE:DES: DFTR: CHKD: ENGR: APPD: A F E D C B 2 3 4 5 7 8 96 4 5 7 8 9 106 A F C B 24.0"x35.5" ARCH D DUKE DRAWING NO. DETAILS (1 OF 5) CELL 3 & CELL 4 CONSTRUCTION PLAN MARSHALL STEAM STATION TERRELL, NORTH CAROLINA ISSUED FOR BID (IFB) DETAIL (1&2 OF 3).dwg AS SHOWN DWG 7235-16-004 6-15-17 SJL CLD SJL SJL SJL M 08MAR_M907.004.008 9751 SOUTHERN PINE BLVD CHARLOTTE, NC 28273 (704)-523-4726 ENGINEERING FIRM LICENSE NUMBER: F-0176 COA SEAL 10' X 7' PRECAST CONCRETE MANHOLE 8" DIA. TEE WITH 4" DIA. REDUCER ON BRANCH HDPE SDR 11 8" DIA. HDPE SDR 11 PIPE 4" DIA. CHECK VALVE 4" DIA. BALL VALVE 8" DIA. CHECK VALVE FLOW FROM CELL 4 4" DIA. HDPE SDR 11 4" DIA. HDPE SDR 11 PIPE FLOW TO ASH BASIN 8" DIA. PLUG VALVE FLOW FROM JM-2 8" DIA. HDPE SDR 11 EDGE OF ROAD 10' 7' 6"36"8" 10' 8" 6" ABC STONE 2" 3'-6" 5' 5' 10" EL.849.2' INV.EL. 851.5'INV.EL. 851.5' EL.857.45' 2 PLAN VIEW (PERMANENT CONDITION) SIDE VIEW ACCESS DOOR 8" DIA. PLUG VALVE 8" DIA. CHECK VALVE 8" DIA. CHECK VALVE (TO BE REVERSED FOR PERM. CONDITION) 8" DIA. TEE WITH 4" DIA. REDUCER ON BRANCH HDPE SDR 11 7 09 1 ACCESS DOOR 7 09 STEEL REINFORCED PLASTIC STEP (TYP.) 1'-9" 1'-9" SLOPE TO DRAIN 18" DIA., 4" DEEP SUMP 8" DIA. PLUG VALVE 8" DIA. HDPE SDR 11 PIPE FLOW FROM CELL 4 4" DIA. HDPE SDR 11 4" DIA. HDPE SDR 11 PIPE FLOW FROM FUTURE CELLS 8" DIA. CHECK VALVE (REVERSE FLOW DIRECTION) FLOW TO JM-2 8" DIA. HDPE SDR 11 EDGE OF ROAD 10' 7' 6"36"8" 3'-6" ACCESS DOOR 7 09 STEEL REINFORCED PLASTIC STEP (TYP.) PLAN VIEW (TEMPORARY CONDITION) BOLLARD 9 09 BOLLARD 9 09 STEEL REINFORCED PLASTIC STEP (TYP.) PROJECTED 18" DIA. 4" DEEP SUMP BOLLARD 9 09 4' LINK SEAL OR EQUIVALENT (TYP.) SLOPE TO DRAIN SLOPE TO DRAIN ADJUSTABLE SUPPORT (TYP.) PAINT (SAFETY YELLOW) ON EXPOSED MH LID SIDES (3) ALONG THE ROAD BUTYL SEAL WITH 6" ADHESIVE BUTYL TAPE ON THE OUTSIDE OF JOINT (TYP.) 8" DIA. HDPE SDR 11 PIPE 18" JM-3.4JM-3.3 JM-3.1JM-3.2 JM-3.4JM-3.3 JM-3.1JM-3.2 12" TYP. 18" D 8" 4.5"10" A 3"3" 2.5" 3" 34" IMBEDDED STEEL FRAME(TYP) SERIES W2R ACCESS DOOR SEE DETAIL SIDE VIEW A/2 NCDOT CLASS B RIPRAP (8" D50) UNDERLAIN WITH 10 OZ/SY NON-WOVEN GEOTEXTILE FILTER FABRIC 10" FLARED END SECTION BY ADS (PART #1015NP) NCDOT CLASS B RIPRAP (8" D50) UNDERLAIN WITH 10 OZ/SY NON-WOVEN GEOTEXTILE FILTER FABRIC PE THREADED ROD W/WING NUTS & SPACER 8" (NOMINAL) SDR11 HDPE HEADER (8.625" O.D.; 6.963" I.D.) 7.0' 6.0' 3.5' PE THREADED ROD W/WING NUTS & SPACER 8" (NOMINAL) SDR11 HDPE HEADER (8.625" O.D.; 6.963" I.D.) 9" A C 3"X3" FRAME SEAT LIP HOLLIDAY PRODUCT SERIES W2R ACCESS DOOR OR EQUIVALENT 8" PLAN VIEW D B VARIES, SEE JUNCTION MANHOLE DETAILS ROAD 6" DIA. STEEL PIPE FILLED WITH CONCRETE EXISTING GRADE 6" 2' 4' 18" DIA. 4000 PSI CONCRETE BOLLARD HDPE PLASTIC COVER (SAFETY YELLOW WITH (2) REFLECTIVE STRIPS) STANDARD SIZES JUNCTION MANHOLE MODEL NO.A DIM. INCHES C DIM. INCHES B DIM. INCHES D DIM. INCHES 1 W2R7260 84 72 84 96 2 W2R120120 108 108 120 144 3 W2R8460 108 72 84 120 JUNCTION MANHOLE [JM-3]6 09 SCALE: 1" = 2' FLARED END SECTION/ APRON8 09 SCALE: 1" = 2' TYPICAL MANHOLE ACCESS DOOR (ALUMINUM)7 09 SCALE: 1" = 2' BOLLARD (TYPICAL)9 09 SCALE: 1" = 1' 10 20 30TENTHSINCHES123 DWG SIZE REVISION FOR SHEET NO. TITLE FILENAME: DWG TYPE: JOB NO: DATE: SCALE:DES: DFTR: CHKD: ENGR: APPD: A F E D C B 2 3 4 5 7 8 96 4 5 7 8 9 106 A F C B 24.0"x35.5" ARCH D DUKE DRAWING NO. DETAILS (2 OF 5) CELL 3 & CELL 4 CONSTRUCTION PLAN MARSHALL STEAM STATION TERRELL, NORTH CAROLINA ISSUED FOR BID (IFB) DETAIL (1&2 OF 3).dwg AS SHOWN DWG 7235-16-004 6-15-17 SJL CLD SJL SJL SJL M 09MAR_M907.004.009 9751 SOUTHERN PINE BLVD CHARLOTTE, NC 28273 (704)-523-4726 ENGINEERING FIRM LICENSE NUMBER: F-0176 COA SEAL EXTRUSION WELD HDPE EMBEDDED STRIP CONCRETE WALL GEOCOMPOSITE DRAINAGE LAYER (LEACHATE COLLECTION) GEOSYNTHETIC CLAY LINER PRIMARY HDPE LINER SECONDARY HDPE LINER GEOCOMPOSITE DRAINAGE LAYER (LEAK DETECTION) LINER TURN DOWN IN ANCHOR TRENCH LI M I T O F W A S T E 5.0' PROPOSED GRADE BEYOND PUMPHOUSE (EACH END) SOIL LINER LINER SYSTEM PUMP HOUSE WALL PROTECTIVE COVER EXIT FITTING SHOULD BE PLACED APPROXIMATELY 6" BELOW THE TOP OF THE RISER AND 10" MAX TO ALLOW REACH TO FITTING 1/4" HOLE FOR CABLE EYE BOLT 3/4" POWER CABLE EXIT FITTING. DRILL 15/16" HOLE AND USE BLACK IRON PIPE NIPPLE TO TAP. 1/2" LEVEL/FLOW SENSOR CABLE EXIT FITTING. DRILL 3/4" HOLE AND TAP USING 1/2" BLACK IRON PIPE NIPPLE TO TAP. FOR HIGH FLOW PUMPS: 3" DISCHARGE EXIT FITTING DRILL 3.375" HOLE TYPICAL AT 3:00 OR 9:00 O'CLOCK. HOLE SHOULD BE LEVEL AND NOT EXCEED 3.375" USE EXIT FITTING TO TAP HOLE FOR INSTALLATION. OR 6" TO 12" POSITION CABLE EXIT FITTING AS REQUIRED-TYPICAL ABOVE THE DISCHARGE EXIT FITTING 6" TO 12" FOR LOW FLOW PUMPS: 2" DISCHARGE EXIT FITTING DRILL 2.25" HOLE TYPICAL AT 3:00 OR 9:00 O'CLOCK. HOLE SHOULD BE LEVEL AND NOT EXCEED 2.25" USE EXIT FITTING TO TAP HOLE FOR INSTALLATION. LCS O R L D S R I S E R E.F. = EACH FACE I.F. = INSIDE FACE O.F. = OUTSIDE FACE 4 ADDITIONAL #5 BARS (E.F.) (2 TOP, 2 BOTTOM) EXTENDED FULL LENGTH INTO OPPOSITE WALLS #8 BARS (2 EACH SIDE, 2 EF) 8 ADDITIONAL #11 EXTENDED FULL HEIGHT #5 BAR (8 REQ. PER OPENING - 2 E.F.) BARS SHALL EXTEND 2 FEET BEYOND OPENING ON EACH SIDE. 24" DIA. OPENING FOR LDS & LCS RISERS LDS RISER LCS RISER LCS RISER 10.0' SS HOIST SOCKET THERN MODEL 5BF20 14.5"x15.88"x13.88" CONCRETE FOUNDATION 18"x18"x36" D (TYP.) SE C T I O N V I E W WASTE ASH 10.0' APPROXIMATE EXISTING GROUND SURFACE HOIST SOCKET WITH DUST CAP FLUSH WITH GROUND SURFACE CONCRETE FOUNDATION LCS RISER 12" EXISTING METAL COVER REBAR: #4 EF, T&B PROPOSED PRECAST CONCRETE RING 4'x4'x12" DEEP EXISTING 4'x4'x30" DEEP PRECAST CONCRETE STRUCTURE PROPOSED BUTYL RUBBER WEATHERSTRIP NOTES: 1.VERIFY EXISTING MANIFOLD DIMENSION AND WALL THICKNESS 2.REMOVE EXISTING COVER AND CLEAN CONCRETE BEARING SURFACE 3.INSTALL BUTYL RUBBER WEATHERSTRIP 4.PLACE PRECAST CONCRETE RING 5.RE-ATTACH EXISTING COVER OR REPLACE WITH SERIES W1C ACCESS DOOR BY HALLIDAY PRODUCTS RE-USE OR REPLACE ACCESS COVER 3"x3" LIP COA SEAL 10 20 30TENTHSINCHES123 DWG SIZE REVISION FOR SHEET NO. TITLE FILENAME: DWG TYPE: JOB NO: DATE: SCALE:DES: DFTR: CHKD: ENGR: APPD: A F E D C B 2 3 4 5 7 8 96 4 5 7 8 9 106 A F C B 24.0"x35.5" ARCH D DUKE DRAWING NO. DETAILS (3 OF 5) CELL 3 & CELL 4 CONSTRUCTION PLAN MARSHALL STEAM STATION TERRELL, NORTH CAROLINA ISSUED FOR BID (IFB) DETAILS (3 OF 5).dwg AS SHOWN DWG 7235-16-004 6-15-17 SJL WRH CLD SJL SJL M 10MAR_M907.004.010 10 10 LINER TIE-IN AT PUMP HOUSE SCALE: 1" = 2' 11 10 EXIT FITTING INSTALLATION GUIDELINE FOR HIGH AND LOW FLOW LEACHATE PUMPS SCALE: 1" = 2' 14 10 CELL 1 & CELL 2 LEACHATE MANIFOLD REPAIR ( RECOMMENDED) SCALE: 1" = 2' 13 10 CELL 1 & CELL 2 HOIST FOUNDATION (RECOMMENDED) SCALE: NTS 15 10 PENETRATION REINFORCEMENT LAYOUT SCALE: 1" = 1' PLAN VIEW SECTION VIEW #5 @ 12"(HORIZONTAL)1'1'#8 @ 12"(VERTICAL)3'-4"3'-4"#5 @ 12"(HORIZONTAL)1'1'#5 @ 12"(HORIZONTAL)2 #8 ADDITIONAL(WITH DOWELS)#5 @ 12" CORNERBAR (TYP)(MATCH HORZ BARS)#8 @ 12"(VERTICAL)#8 @ 12"(VERTICAL) 2 4 " 3.5" L 6 " X 4 " X 3 / 8 " X 2 ' L O N G ( T Y P . @ E A C H B E A M S U P P O R T ) 1 / 2 " D I A . K W I K B O L T I I I ( 2 R E Q . ) 1 / 4 " S T I F F N E R P L A T E ( T Y P . ) W 6 X 1 2 4 " 5 " 3 " 4 " 5 " 3 " W 6 X 1 2 8 " 1 2 " H E A D E D S T U D ( 3 / 8 " D I A . X 4 1 / 8 " ) A S M A N U F A C T U R E D B Y N E L S O N S T U D O R A P P R O V E D E Q U I V A L E N T - W E L D T O B E A R I N G P L A T E ( 1 R E Q . P E R B E A M ) L E V E L I N G G R O U T 5 " X 8 " X 8 " W I D E ( P O C K E T ) 4 " X 5 " X 3 / 8 " B E A R I N G P L A T E 5 " 2 # 5 B A R S A D D I T I O N A L 2 " 1 2 " 6 " 1 4 T Y P W 6 X 1 2 1 / 4 " S T I F F N E R P L A T E , 2 R E Q . @ E A C H S U P P O R T R L 6 " X 4 " X 3 / 8 " X 2 ' L O N G 2 - 1 2 " D I A . K W I K B O L T I I I ( M I N . E M B E D M E N T = 4 3 4 " ) 6 " 3 . 5 " R ' 9 " 3 ' M I N . 8 ' 1 0 ' L I N E P O S T C A P P I P E C A P ( V A R I E S D U E T O M A N U F A C T U R I N G D I M E N S I O N S ) X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X N O T E S : 1 . A L L F E N C E C O M P O N E N T M A T E R I A L S S H A L L B E H O T D I P P E D G A L V A N I Z E D S T E E L . F E N C E F A B R I C S H A L L B E A L U M I N U M C O A T E D . 8 ' 1 2 " 3 ' M I N . 9 " 3 ' M I N . 8 ' H I N G E H I N G E X X X X X X X X X X X X X X X X X X X X X X X X X X X X X O W N E R P R O V I D E D W I D T H C O A S E A L 102030TENTHSINCHES123 D W G S I Z E R E V I S I O N F O R S H E E T N O . T I T L E F I L E N A M E : D W G T Y P E : J O B N O : D A T E : S C A L E : D E S : D F T R : C H K D : E N G R : A P P D : AFEDCB 234 5 7 8 9 6 4 5 7 8 9 1 0 6 A F C B 2 4 . 0 " x 3 5 . 5 " A R C H D D U K E D R A W I N G N O . D E T A I L S ( 4 O F 5 ) C E L L 3 & C E L L 4 C O N S T R U C T I O N P L A N M A R S H A L L S T E A M S T A T I O N T E R R E L L , N O R T H C A R O L I N A I S S U E D F O R B I D ( I F B ) D E T A I L S ( 4 & 5 O F 5 ) . d w g A S S H O W N D W G 7 2 3 5 - 1 6 - 0 0 4 6 - 1 5 - 1 7 S J L W R H C L D S J L S J L M 1 1 M A R _ M 9 0 7 . 0 0 4 . 0 1 1 DETAIL ZSCALE: 1" = 1'CORNER DETAIL - PLAN VIEWSCALE: 1" = 1' B E A M S U P P O R T S C A L E : 1 " = 1 / 2 ' B E A M P O C K E T S C A L E : 1 " : 1 / 2 ' S E C T I O N R - R ' S C A L E : 1 " = 1 / 2 ' 16111711 1 8 1 1 2 0 1 1 C H A I N L I N K F E N C E S C A L E : 1 " = 2 ' 1 9 1 1 D O U B L E G A T E S C A L E : 1 " = 2 ' 200 K W D I E S E L G E N E R A T O R 25'15' 3.5' 13.5' 8" WALL 2 .5' HIGH (BACK & SIDE WALL) X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 885 884 883 882 881 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X GP-1.3 GP-1.2 GP-1.4 GP-1.1 8"x8" CURB 21A 12 21A 12 GP-1.7 GP-1.6 GP-1.5 GP-1.8 SIDE WALLS BOTH ENDS 8" WALL (2.5' HIGH) 15' 12" 8" SLAB 3 13112" 8" #5 @ 12" (TYP.) SYNKO-FLEX WATER STOP BY HENRY, INC. OR APPROVED EQUIVALENT EPOXY GROUT BY SIKA OR APPROVED EQUIVALENT 6" COMPACTED ABC STONE 3' - 0" 8" #5 @ 12" 3' - 0" 2'-8"#5 @ 12" #7 @ 12" EW (MIDDLE) NOTE: USE 12" DIA. KWIK BOLT III EXPANSION ANCHORS BY HILTI (OR APPROVED EQUAL) TO ANCHOR GENERATOR. MINIMUM 2 1 4"EMBEDMENT REQUIRED. EXISTING GROUND SURFACE (TYP.) FOUNDATION CORNER DETAIL SCALE: N.T.S. VA R I E S #5 HORIZONTAL BARS VARIES #5 HORIZONTAL BARS #5 TO MATCH HORIZONTAL BAR WALL CORNER DETAIL SCALE: N.T.S. 0' - 8 " 3 - #5 HORIZONTAL BARS 0'-8" #5 TO MATCH HORIZONTAL BAR #5 VERTICAL BAR (ADDITIONAL) WITH DOWEL 8" 2" DIA. HDPE PIPE EMBEDDED IN CONCRETE 8" 12" 2" DIA. LOCKABLE HDPE BALL VALVE 4" RECESS IN CONCRETE DRAIN DETAIL SCALE: N.T.S. COA SEAL 10 20 30TENTHSINCHES123 DWG SIZE REVISION FOR SHEET NO. TITLE FILENAME: DWG TYPE: JOB NO: DATE: SCALE:DES: DFTR: CHKD: ENGR: APPD: A F E D C B 2 3 4 5 7 8 96 4 5 7 8 9 106 A F C B 24.0"x35.5" ARCH D DUKE DRAWING NO. DETAILS (5 OF 5) CELL 3 & CELL 4 CONSTRUCTION PLAN MARSHALL STEAM STATION TERRELL, NORTH CAROLINA ISSUED FOR BID (IFB) DETAILS (4 & 5 OF 5).dwg AS SHOWN DWG 7235-16-004 6-15-17 SJL WRH CLD SJL SJL M 12MAR_M907.004.012 GENERATOR PAD SCALE: 1" : 5' 21 12 N PROPOSED FENCE 19 11 NOTES: 1.GENERATOR SHALL BE ATTACHED TO CONCRETE SLAB IN ACCORDANCE WITH MANUFACTURES RECOMMENDATIONS 2.REMOVE FENCE IN FRONT OF GENERATOR PAD FOR CONSTRUCTION. 3.REPLACE FENCE AFTER INSTALLATION OF GENERATOR. 4.ADD DOUBLE GATE AT LOCATION PROVIDED BY OWNER. SEE NOTE 4 SEE NOTE 2 PLAN VIEW SCALE: 1" : 5' CROSS SECTION SCALE: 1" : 2' 21A 12 INSTALL DRAIN EACH CORNER SEE DRAIN DETAIL 884 882 PROPOSED CONTOURS EXISTING GROUND SURFACE CONTOURS EXISTING FENCE x C O A S E A L 9 7 5 1 S O U T H E R N P I N E B L V D C H A R L O T T E , N C 2 8 2 7 3 ( 7 0 4 ) - 5 2 3 - 4 7 2 6 E N G I N E E R I N G F I R M L I C E N S E N U M B E R : F - 0 1 7 6 102030TENTHSINCHES123 D W G S I Z E R E V I S I O N F O R D R A W I N G N O . T I T L E F I L E N A M E : D W G T Y P E : J O B N O : D A T E : S C A L E : D E S : D F T R : C H K D : E N G R : A P P D : AFEDCB 234 5 7 8 9 6 4 5 7 8 9 1 0 6 A F C B 2 4 . 0 " x 3 5 . 5 " A R C H D D U K E D R A W I N G N O . C E L L 3 & C E L L 4 E L E C T R I C A L P A N E L L A Y O U T M A R S H A L L S T E A M S T A T I O N T E R R E L L , N O R T H C A R O L I N A I S S U E D F O R B I D 1 1 0 5 3 4 - E 0 3 E l e c t r i c a l P u m p S t a t i o n P n l L a y o u t . d w g N O N E D W G 7 2 3 5 - 1 6 - 0 0 4 5 - 5 - 1 7 B G B G J E C R E B F F J E 0 3 E 0 3 E 0 3 C C C X X X X X C O A S E A L 9 7 5 1 S O U T H E R N P I N E B L V D C H A R L O T T E , N C 2 8 2 7 3 ( 7 0 4 ) - 5 2 3 - 4 7 2 6 E N G I N E E R I N G F I R M L I C E N S E N U M B E R : F - 0 1 7 6 102030TENTHSINCHES123 D W G S I Z E R E V I S I O N F O R D R A W I N G N O . T I T L E F I L E N A M E : D W G T Y P E : J O B N O : D A T E : S C A L E : D E S : D F T R : C H K D : E N G R : A P P D : AFEDCB 234 5 7 8 9 6 4 5 7 8 9 1 0 6 A F C B 2 4 . 0 " x 3 5 . 5 " A R C H D D U K E D R A W I N G N O . C E L L 3 & C E L L 4 E L E C T R I C A L P A N E L S C H E D U L E S M A R S H A L L S T E A M S T A T I O N T E R R E L L , N O R T H C A R O L I N A I S S U E D F O R B I D 1 1 0 5 3 4 - E 0 4 P a n e l S c h e d u l e s . d w g N O N E D W G 7 2 3 5 - 1 6 - 0 0 4 5 - 5 - 1 7 B G B G J E C R E B F F J E 0 4 E 0 4 E 0 4 C C C X X X X X L O W L O W L O W L O W L O W L O W L O W L O W L O W L O W L O W L O W L O W L O W L O W L O W L O W L O W L O W L O W L O W L O W L O W L O W L O W L O W F O R C E M A I N M A R K E R I N S T A L L O N E A C H S I D E C E L L 4 ( P R O T E C T I V E C O V E R G R A D E S ) C E L L 3 ( P R O T E C T I V E C O V E R G R A D E S ) 102030TENTHSINCHES123 D W G S I Z E R E V I S I O N F O R D R A W I N G N O . T I T L E F I L E N A M E : D W G T Y P E : J O B N O : D A T E : S C A L E : D E S : D F T R : C H K D : E N G R : A P P D : AFEDCB 234 5 7 8 9 6 4 5 7 8 9 1 0 6 A F C B 2 4 . 0 " x 3 5 . 5 " A R C H D D U K E D R A W I N G N O . C E L L 3 & C E L L 4 E L E C T R I C A L P O W E R S I T E P L A N M A R S H A L L S T E A M S T A T I O N T E R R E L L , N O R T H C A R O L I N A I S S U E D F O R B I D 1 1 0 5 3 4 - E 0 5 E l e c t r i c a l P o w e r S i t e P l a n . d w g N O N E D W G 7 2 3 5 - 1 6 - 0 0 4 5 - 5 - 1 7 B G B G J E C R E B F F J E 0 5 E 0 5 E 0 5 C C C X X X X X C O A S E A L 9 7 5 1 S O U T H E R N P I N E B L V D C H A R L O T T E , N C 2 8 2 7 3 ( 7 0 4 ) - 5 2 3 - 4 7 2 6 E N G I N E E R I N G F I R M L I C E N S E N U M B E R : F - 0 1 7 6 102030TENTHSINCHES123 D W G S I Z E R E V I S I O N F O R D R A W I N G N O . T I T L E F I L E N A M E : D W G T Y P E : J O B N O : D A T E : S C A L E : D E S : D F T R : C H K D : E N G R : A P P D : AFEDCB 234 5 7 8 9 6 4 5 7 8 9 1 0 6 A F C B 2 4 . 0 " x 3 5 . 5 " A R C H D D U K E D R A W I N G N O . C E L L 3 E L E C T R I C A L U N D E G R O U N D D U C T B A N K M A R S H A L L S T E A M S T A T I O N T E R R E L L , N O R T H C A R O L I N A I S S U E D F O R B I D 1 1 0 5 3 4 - E 0 6 E l e c t r i c a l U n d e r g r o u n d D u c t b a n k . d w g N O N E D W G 7 2 3 5 - 1 6 - 0 0 4 5 - 5 - 1 7 B G B G J E C R E B F F J E 0 6 E 0 6 E 0 6 C C C X X X X X C O A S E A L 102030TENTHSINCHES123 D W G S I Z E R E V I S I O N F O R D R A W I N G N O . T I T L E F I L E N A M E : D W G T Y P E : J O B N O : D A T E : S C A L E : D E S : D F T R : C H K D : E N G R : A P P D : AFEDCB 234 5 7 8 9 6 4 5 7 8 9 1 0 6 A F C B 2 4 . 0 " x 3 5 . 5 " A R C H D D U K E D R A W I N G N O . C E L L 4 E L E C T R I C A L U N D E R G R O U N D D U C T B A N K M A R S H A L L S T E A M S T A T I O N T E R R E L L , N O R T H C A R O L I N A I S S U E D F O R B I D 1 1 0 5 3 4 - E 0 7 E l e c t r i c a l U n d e r g r o u n d D u c t b a n k . d w g N O N E D W G 7 2 3 5 - 1 6 - 0 0 4 5 - 5 - 1 7 B G B G J E C R E B F F J E 0 7 E 0 7 E 0 7 C C C X X X X X C O A S E A L 102030TENTHSINCHES123 D W G S I Z E R E V I S I O N F O R D R A W I N G N O . T I T L E F I L E N A M E : D W G T Y P E : J O B N O : D A T E : S C A L E : D E S : D F T R : C H K D : E N G R : A P P D : AFEDCB 234 5 7 8 9 6 4 5 7 8 9 1 0 6 A F C B 2 4 . 0 " x 3 5 . 5 " A R C H D D U K E D R A W I N G N O . C E L L 3 & C E L L 4 I N S T R W I R I N G D I A G R A M M A R S H A L L S T E A M S T A T I O N T E R R E L L , N O R T H C A R O L I N A I S S U E D F O R B I D 1 1 0 5 3 4 - E 0 8 I n s t r u m e n t W i r i n g D i a . d w g N O N E D W G 7 2 3 5 - 1 6 - 0 0 4 5 - 5 - 1 7 B G B G J E C R E B F F J E 0 8 E 0 8 E 0 8 C C C X X X X X C O A S E A L 9 7 5 1 S O U T H E R N P I N E B L V D C H A R L O T T E , N C 2 8 2 7 3 ( 7 0 4 ) - 5 2 3 - 4 7 2 6 E N G I N E E R I N G F I R M L I C E N S E N U M B E R : F - 0 1 7 6 102030TENTHSINCHES123 D W G S I Z E R E V I S I O N F O R D R A W I N G N O . T I T L E F I L E N A M E : D W G T Y P E : J O B N O : D A T E : S C A L E : D E S : D F T R : C H K D : E N G R : A P P D : AFEDCB 234 5 7 8 9 6 4 5 7 8 9 1 0 6 A F C B 2 4 . 0 " x 3 5 . 5 " A R C H D D U K E D R A W I N G N O . C E L L 3 & C E L L 4 I N S T R U M E N T W I R I N G D I A G R A M M A R S H A L L S T E A M S T A T I O N T E R R E L L , N O R T H C A R O L I N A I S S U E D F O R B I D 1 1 0 5 3 4 - E 0 9 I n s t r u m e n t W i r i n g D i a . d w g N O N E D W G 7 2 3 5 - 1 6 - 0 0 4 5 - 5 - 1 7 B G B G J E C R E B F F J E 0 9 E 0 9 E 0 9 C C C X X X X X C O A S E A L 102030TENTHSINCHES123 D W G S I Z E R E V I S I O N F O R D R A W I N G N O . T I T L E F I L E N A M E : D W G T Y P E : J O B N O : D A T E : S C A L E : D E S : D F T R : C H K D : E N G R : A P P D : AFEDCB 234 5 7 8 9 6 4 5 7 8 9 1 0 6 A F C B 2 4 . 0 " x 3 5 . 5 " A R C H D D U K E D R A W I N G N O . C E L L 3 & C E L L 4 P O W E R & L I G H T I N G P L A N M A R S H A L L S T E A M S T A T I O N T E R R E L L , N O R T H C A R O L I N A I S S U E D F O R B I D 1 1 0 5 3 4 - E 1 0 P u m p S t a t i o n P l a n . d w g N O N E D W G 7 2 3 5 - 1 6 - 0 0 4 5 - 5 - 1 7 B G B G J E C R E B F F J E 1 0 E 1 0 E 1 0 C C C X X X X X C O A S E A L 102030TENTHSINCHES123 D W G S I Z E R E V I S I O N F O R D R A W I N G N O . T I T L E F I L E N A M E : D W G T Y P E : J O B N O : D A T E : S C A L E : D E S : D F T R : C H K D : E N G R : A P P D : AFEDCB 234 5 7 8 9 6 4 5 7 8 9 1 0 6 A F C B 2 4 . 0 " x 3 5 . 5 " A R C H D D U K E D R A W I N G N O . C E L L 3 & C E L L 4 E L E C T R I C A L D E T A I L S M A R S H A L L S T E A M S T A T I O N T E R R E L L , N O R T H C A R O L I N A I S S U E D F O R B I D 1 1 0 5 3 4 - E 1 1 D e t a i l s . d w g N O N E D W G 7 2 3 5 - 1 6 - 0 0 4 5 - 5 - 1 7 B G B G J E C R E B F F J E 1 1 E 1 1 E 1 1 C C C X X X X X C O A S E A L 9 7 5 1 S O U T H E R N P I N E B L V D C H A R L O T T E , N C 2 8 2 7 3 ( 7 0 4 ) - 5 2 3 - 4 7 2 6 E N G I N E E R I N G F I R M L I C E N S E N U M B E R : F - 0 1 7 6 102030TENTHSINCHES123 D W G S I Z E R E V I S I O N F O R D R A W I N G N O . T I T L E F I L E N A M E : D W G T Y P E : J O B N O : D A T E : S C A L E : D E S : D F T R : C H K D : E N G R : A P P D : AFEDCB 234 5 7 8 9 6 4 5 7 8 9 1 0 6 A F C B 2 4 . 0 " x 3 5 . 5 " A R C H D D R A W I N G N O . C E L L 3 & C E L L 4 E L E C T R I C A L D E T A I L S M A R S H A L L S T E A M S T A T I O N T E R R E L L , N O R T H C A R O L I N A I S S U E D F O R B I D 1 1 0 5 3 4 - E 1 2 D e t a i l s . d w g N O N E D W G 7 2 3 5 - 1 6 - 0 0 4 5 - 5 - 1 7 B G B G J E C R E B F F J E 1 2 E 1 2 E 1 2 C C C X X X X X C O A S E A L 9 7 5 1 S O U T H E R N P I N E B L V D C H A R L O T T E , N C 2 8 2 7 3 ( 7 0 4 ) - 5 2 3 - 4 7 2 6 E N G I N E E R I N G F I R M L I C E N S E N U M B E R : F - 0 1 7 6