HomeMy WebLinkAbout8003_RowanCountyMSWLF_LFG_DIN28052_20160801Ms. Jaclynne Drummond, Compliance Hydrogeologist August 8, 2016
NCDENR DWM Solid Waste Section 2 Project No. 063-6572016.300
2016-08-06 final august 2016 methane report.docx
Greg Greene, Planning and Development Specialist, Rowan County Department of
Environmental Management, 2727-D Old Concord Road, Salisbury, North Carolina 28146;
(704) 216-8591
Jeff Boyd, Landfill Supervisor, Rowan County Department of Environmental Management, 789
Campbell Road, Woodleaf, North Carolina 27054; (704) 278-2211
Mike Plummer, P.E., HDR, 440 S. Church Street, 10th Floor, Charlotte, NC 28202-2075,
mplummer@hdrinc.com; (704) 338-6719 (electronic only)
G:\Projects\Rowan\0636572016\200 DRAFT Reports\201 DRAFT 2016 3rd Quarterly Methane Report\2016-08-06 Working\2016-08-06 Final August 2016 Methane Report.docx
i2
i3
i1
650
690
690
660
650
640
OLD
LANDFILL
ENTRANCE
SCALE
HOUSE
PROPERTY
LINE
FRENCH DRAIN
SAMPLE POINT
MMW-6A
MMW-6
MMW-8
CONSULTANT
DESIGN
PREPARED
REVIEW
APPROVED
YYYY-MM-DD TITLE
PROJECT No.Rev.
PROJECTCLIENT
Pa
t
h
:
--
-
-
|
F
i
l
e
N
a
m
e
:
06
3
6
5
7
2
0
1
5
E
0
0
1
.
d
w
g
IF
T
H
I
S
M
E
A
S
U
R
E
M
E
N
T
D
O
E
S
N
O
T
M
A
T
C
H
W
H
A
T
I
S
S
H
O
W
N
,
T
H
E
S
H
E
E
T
S
I
Z
E
H
A
S
B
E
E
N
M
O
D
I
F
I
E
D
F
R
O
M
:
A
N
S
I
D
0
1
i
n
0636572015
PHASE
100
DRAWING
10
2016-02-02
BSD
TM
DYR
BSD
ROWAN COUNTY ACTIVE LANDFILLS
PERMIT NO.80-03
ROWAN COUNTY, NORTH CAROLINA
ROWAN COUNTY
GROUNDWATER CONTOUR MAP
JANUARY 12-14, 2016
0
FEET
250 500
SCALE
EXISTING TOPOGRAPHIC CONTOUR
FACILITY BOUNDARY
APPROXIMATE LIMITS OF WASTE
GROUNDWATER SURFACE CONTOURS
APPROXIMATE GROUNDWATER FLOW SEGMENT USED TO CALCULATE GRADIENT
EXISTING GROUNDWATER MONITORING WELL WITH GROUNDWATER ELEVATION
PROPOSED GROUNDWATER MONITORING WELL
SURFACE WATER MONITORING POINT
COMPLIANCE METHANE MONITORING POINT
ASSESSMENT METHANE MONITORING POINT
NOT AVAILABLE
FRENCH DRAIN MONITORING POINT
LEGEND
NOTES
REFERENCES
1.TOPOGRAPHIC CONTOUR INTERVAL = 2 FEET.
2.GROUNDWATER SURFACE CONTOUR INTERVAL = 10 FEET.
3.GROUNDWATER ELEVATIONS MEASURED ON JANUARY 12-14, 2016.
4.GROUNDWATER CONTOURS ARE BASED ON LINEAR INTERPOLATION BETWEEN AND
EXTRAPOLATION FROM KNOWN DATA, TOPOGRAPHIC CONTOURS, AND KNOWN FIELD CONDITIONS.
THEREFORE, GROUNDWATER CONTOURS MAY NOT REFLECT ACTUAL GROUNDWATER
CONDITIONS.
5.GROUNDWATER CONTOUR LINES SHOW THE WATER TABLE SHAPE AND ELEVATION. THESE
CONTOURS ARE INFERRED LINES FOLLOWING THE GROUNDWATER SURFACE AT A CONSTANT
ELEVATION ABOVE SEA LEVEL. THE GROUNDWATER FLOW DIRECTION IS GENERALLY
PERPENDICULAR TO THE GROUNDWATER SURFACE CONTOURS, SIMILAR TO THE RELATIONSHIP
BETWEEN SURFACE WATER FLOW AND TOPOGRAPHIC CONTOURS.
6.SURFACE WATER MONITORING POINT SW-1 IS APPROXIMATELY 550 FEET OFF THE MAPPING LIMITS
SHOWN AND IS COLLECTED FROM SECOND CREEK.
7.MONITORING WELLS MW-6 AND MW-27A ARE UTILIZED FOR WATER LEVEL MONITORING ONLY.
8.THE LOCATION OF THE FRENCH DRAIN MONITORING POINT IS APPROXIMATE.
1. OVERALL SITE BASE TOPOGRAPHY PROVIDED BY S&ME ENGINEERING, INC.
SW-4
SITE LOCATION MAP
1" = 10,000'
SITE LOCATION
PE C-2862
PG C-399
GOLDER ASSOCIATES NC, INC.