Loading...
HomeMy WebLinkAbout8003_RowanCountyMSWLF_LFG_DIN28050_20160114i2 i3 i1 650 670 690 690 660 650 640 OLD LANDFILL ENTRANCE SCALE HOUSE PROPERTY LINE FRENCH DRAIN SAMPLE POINT TO BE DECOMMISSIONED TO BE DECOMMISSIONED MMW-6A CONSULTANT DESIGN PREPARED REVIEW APPROVED YYYY-MM-DD TITLE PROJECT No.Rev. PROJECTCLIENT Pa t h : \ \ g r e e n s b o r o \ C A D \ P r o j e c t s \ 0 6 3 6 5 7 2 - R o w a n C o \ P R O D U C T I O N \ _ D - M e t h a n e 2 0 1 5 \ | F i l e N a m e : M e t h a n e M a p ( 0 4 - 1 0 - 1 5 ) . d w g IF T H I S M E A S U R E M E N T D O E S N O T M A T C H W H A T I S S H O W N , T H E S H E E T S I Z E H A S B E E N M O D I F I E D F R O M : A N S I D 0 1 i n 0636572014 PHASE 100 DRAWING 10 2015-04-10 BSD BSD DYR RPK ROWAN COUNTY ACTIVE LANDFILLS PERMIT NO.80-03 ROWAN COUNTY, NORTH CAROLINA ROWAN COUNTY METHANE MONITORING MAP (GW CONTOURS FROM JANUARY 20-21, 2015) 0 FEET 250 500 SCALE EXISTING TOPOGRAPHIC CONTOUR FACILITY BOUNDARY APPROXIMATE LIMITS OF WASTE GROUNDWATER SURFACE CONTOURS APPROXIMATE GROUNDWATER FLOW SEGMENT USED TO CALCULATE GRADIENT EXISTING GROUNDWATER MONITORING WELL WITH GROUNDWATER ELEVATION PROPOSED GROUNDWATER MONITORING WELL SURFACE WATER MONITORING POINT METHANE PROBE LOCATION NOT AVAILABLE FRENCH DRAIN MONITORING POINT LEGEND NOTES REFERENCES 1. TOPOGRAPHIC CONTOUR INTERVAL = 2 FEET. 2. GROUNDWATER SURFACE CONTOUR INTERVAL = 10 FEET. 3. GROUNDWATER ELEVATIONS MEASURED ON JANUARY 20-21, 2015. 4. GROUNDWATER CONTOURS ARE BASED ON LINEAR INTERPOLATION BETWEEN AND EXTRAPOLATION FROM KNOWN DATA, TOPOGRAPHIC CONTOURS, AND KNOWN FIELD CONDITIONS. THEREFORE, GROUNDWATER CONTOURS MAY NOT REFLECT ACTUAL GROUNDWATER CONDITIONS. 5. GROUNDWATER CONTOUR LINES SHOW THE WATER TABLE SHAPE AND ELEVATION. THESE CONTOURS ARE INFERRED LINES FOLLOWING THE GROUNDWATER SURFACE AT A CONSTANT ELEVATION ABOVE SEA LEVEL. THE GROUNDWATER FLOW DIRECTION IS GENERALLY PERPENDICULAR TO THE GROUNDWATER SURFACE CONTOURS, SIMILAR TO THE RELATIONSHIP BETWEEN SURFACE WATER FLOW AND TOPOGRAPHIC CONTOURS. 6. SURFACE WATER MONITORING POINT SW-1 IS APPROXIMATELY 550 FEET OFF THE MAPPING LIMITS SHOWN AND IS COLLECTED FROM SECOND CREEK. 7. MONITORING WELLS MW-6 AND MW-27A ARE UTILIZED FOR WATER LEVEL MONITORING ONLY. 8. THE LOCATION OF THE FRENCH DRAIN MONITORING POINT IS APPROXIMATE. 9. WELLS MW-21 AND MW-22 WILL BE DECOMMISSIONED PRIOR TO PHASE IV CELL CONSTRUCTION. 10. SURFACE WATER MONITORING POINT SW-6 WILL NOT BE MONITORED FOR PHASE IV. 1. OVERALL SITE BASE TOPOGRAPHY PROVIDED BY S&ME ENGINEERING, INC. SW-4 SITE LOCATION MAP 1" = 10,000' SITE LOCATION PE C-2862 PG C-399 GOLDER ASSOCIATES NC, INC.