Loading...
HomeMy WebLinkAbout1804_Duke_Marshall_HaulRoadReport_DIN27933_20170613526 South Church Street: Mail Code EC13K Charlotte, North Carolina 28202 980-373-5697 June 13, 2017 North Carolina Department of Environmental Quality Division of Waste Management Solid Waste Section 2090 U.S. Highway 70 Swannanoa, North Carolina 28778 Attn: Mr. Larry Frost Re: Bottom Ash Haul Road Improvement Report Permit No.: 1804-INDUS Marshall Steam Station Catawba County Terrell, North Carolina 28682 Dear Mr. Frost, On October 11, 2016, Duke Energy received concurrence from NCDEQ Solid Waste Section to remove eroded bottom ash from the toe of the Dry Ash Landfill Phase II (Permit No. 1804) and to improve the bottom ash haul road. The work to remove the bottom ash and prevent similar erosion issues from occurring in the future was completed the week of March 27, 2017. A work completion notice was submitted via email on April 3, 2017, which included pictures and a statement referencing a more detailed report which would be submitted at a later date. Included with this submittal are as-built cross sections for the improved road and a report on construction materials testing for the project. If there are any questions regarding this submittal or if you need anything additional, please contact me at (980) 373-5697. Respectfully Submitted, Tyler Hardin Environmental Services Attachments: Construction Materials Testing Services Report Cross Section Figures (10) Cc (via e-mail): Ed Mussler, NCDEQ Kyle Baucom, Duke Energy Dan Zakary, Duke Energy Jeff Jones, Duke Energy F i g u r e s B o t t o m A s h H a u l R o a d I m p r o v e m e n t C r o s s S e c t i o n s ( 1 0 ) F i g u r e 1 o f 1 0 c o n t a i n e d i n a s e p a r a t e e m a i l d u e t o f i l e s i z e l i m i t a t i o n s