Loading...
HomeMy WebLinkAbout6708_INSP_20170518FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section UNIT TYPE: Lined MSWLF X LCID YW Transfer Compost SLAS COUNTY: Onslow Closed MSWLF HHW White goods Incin T&P FIRM PERMIT NO.: 6708-MSWLF-1997 CDLF Tire T&P / Collection Tire Monofill Industrial Landfill DEMO SDTF FILE TYPE: COMPLIANCE Date of Inspection: 18 May 2017 Date of Last Inspection: 25 August 2016 FACILITY NAME AND ADDRESS: MCB Camp Lejeune MSW Landfill Piney Greene Road Camp Lejeune, NC 28452 GPS COORDINATES: N: 34.69065 E: -077.32384 FACILITY CONTACT NAME AND PHONE NUMBER: Joe Powers 910.451.4998 FACILITY CONTACT ADDRESS: U. S. Marine Corps Camp Lejeune MSWLF C/o Commanding General AC/S Facilities (Maintenance/Utilities) CP Lejeune PSC Box 20004 Camp Lejeune, NC 28452 Attn: Joe Powers e-mail: joseph.powers@usmc.mil PARTICIPANTS: Joe Powers; Landfill Director/MCB Camp Lejeune Bradley W Hunter; Environmental Engineer/MCB Camp Lejeune EMD Ray Williams; NCDEQ/Solid Waste STATUS OF PERMIT: Active; Permit to Construct (PTC) Phase IV and Permit to Operate (PTO) Phase III issued 13 May 2014. The Phase III PTO expires 20 May 2024. PURPOSE OF SITE VISIT: Partial Facility Compliance Inspection without records review. STATUS OF PAST NOTED VIOLATIONS: None applicable OBSERVED VIOLATIONS: No violations were observed during this Facility Compliance Inspection; please see the ADDITIONAL COMMENTS section below. ADDITIONAL COMMENTS: 1) This Facility is a Municipal Solid Waste Landfill. 2) This Facility is permitted to receive solid waste generated by and on Marine Corps Base Camp Lejeune, Marine Corps Air Station Cherry Point, and all related ancillary Marine Facilities. FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section 6708_INSP_20170518 Page 2 of 4 3) This Facility is secured by means of a locked gate at the facility entrance. 4) Proper signage is posted at the entrance to the Facility stating the permit number, contact information, and listing banned/excluded wastes. 5) Hours of operation for this Facility are Monday through Friday 7:30 AM to 3:30 PM. Ten Holidays are observed: New Year’s Day, Martin Luther King Jr Day, President’s Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veteran’s Day, Thanksgiving Day, and Christmas Day. 6) The Facility access road is of all-weather construction and is being well maintained at this time. 7) This Facility screens all incoming loads for unpermitted materials. Waste screening activities are recorded in a log which is maintained in the scalehouse. On average, this Facility records the screening of approximately 10% of all incoming loads. 8) Facility monitoring wells were reviewed during this Facility Compliance Inspection. Overall, the wells were readily accessible, properly labeled, and secured with functioning locks. However, one of the groundwater monitoring wells in the expansion area was noted as lacking a functioning lock. *Please ensure that all Facility monitoring wells are properly secured with functioning locks at all times. 9) The Phase I maintenance/repair project is ongoing. Contract personnel were on-site during this Facility Compliance Inspection working on the cover crop and the surface water control features. 10) Repairs of the Southeastern sideslope are ongoing. 11) Overall, the closed areas of the landfill are well maintained with a well-established cover crop of native warm season grasses. The Facility cover crop is mowed throughout the year as needed. FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section 6708_INSP_20170518 Page 3 of 4 12) This Facility manages landfill gas through a passive venting system. 13) Edge of liner markers have been installed throughout the landfill and are being maintained as required. 14) This landfill is currently operating in Phase III. Construction of Phase IV has been completed. 15) This Facility is currently receiving +/-175 tons of waste per day. 16) Soil is stockpiled adjacent to the active working face for use as cover. 17) This Facility is approved for the use of Posi-shell as an alternate daily cover and is currently alternating soil and Posi-Shell for its daily cover. 18) The working face is being maintained in a compact and manageable size. 19) The waste type was reviewed during this Facility Compliance Inspection. Only MSW was observed at the working face. 20) Portable fencing is being used on the downwind side of the working face to control windblown debris. This portable fencing appears to be functioning well. All windblown debris is being collected and returned to the working face as needed. 21) Windblown litter is well managed and no windblown litter was observed outside of the active working area during this Facility Compliance Inspection. 22) The leachate collection system cleanouts are highly visible, readily accessible, protected, and well maintained. 23) Leachate is stored in a lined on-site leachate management pond. The pond is secured by a locked chain link fence. The gate was closed and locked during this Facility Compliance Inspection. The pond is well maintained and no areas of erosion were observed during this Facility Compliance Inspection. 24) This Facility requires five-day advance notice for the receipt of asbestos containing materials. All received asbestos waste is disposed in an area adjacent to the working face, covered upon receipt, and mapped with a GPS unit. 25) The stormwater management basins were reviewed. Overall, the ponds were clear of windblown litter and brush, and no areas of erosion were observed around the pond margins during this Facility Compliance Inspection. However, the pond at the northwest corner of Phase I was observed to have excess sedimentation and is in need of cleaning. *Plans need to be underway for the clearing of excess sedimentation from this stormwater basin. 26) Areas of erosion were observed in various areas on the outside slopes of the Phase IV expansion area. *Please fill and grade these eroded areas. All repaired areas should be seeded and mulched to establish a groundcover suitable to prevent erosion of the landfill cap system. 27) The soil borrow area was reviewed. Areas of erosion were observed near the stormwater control basin. *Plans need to be underway for the repair of these area. All eroded areas should be filled, graded, seeded and FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section 6708_INSP_20170518 Page 4 of 4 mulched to establish a cover crop suitable to prevent erosion. 28) Unpermitted waste consisting of metal, erosion control fencing, wood, and plastic was observed mixed in with a soil stockpile at the eastern end of the borrow area. *Please screen all unpermitted materials from this soil stockpile and properly dispose of the waste. 29) *Corrective measures are required as a result of this Facility Compliance Inspection. Please contact me if you have any questions or concerns regarding this Facility Compliance Inspection Report. Ray Williams; Environmental Senior Specialist Phone: 252.948.3955 E-mail: ray.williams@ncdenr.gov Regional Representative Delivered on: 31 May 2017 by X Electronic delivery US Mail Certified No. [ _] cc: Andrew Hammonds; Eastern District Supervisor/SWS: andrew.hammonds@ncdenr.gov Jessica Montie; Chief Compliance Officer/SWS: jessica.montie@ncdenr.gov Bradley W Hunter; Environmental Engineer/MCB Camp Lejeune EMD: bradley.w.hunter@usmc.mil C: \2017\Onslow\Facilities\67-08\Inspections\6708_INSP_20170518 NCDEQ DWM Laserfiche Online Document Management System: http://edocs.deq.nc.gov/WasteManagement/Welcome.aspx   Go Green! Thank you for helping NCDEQ be environmentally responsible.