Loading...
HomeMy WebLinkAbout7602_Eveready_ERM Proposed Permit Modification_DIN-27842_20111007 ERM NC, Inc. 8000 Corporate Center Dr. Suite 200 Charlotte, NC 28226 (704) 541-8345 (704) 541-8416 (fax) October 7, 2011 NCDENR – Division of Waste Management 610 East Center Avenue Suite 301 Mooresville, NC 28115 Attention: Mr. John Murray Reference: Energizer Battery Manufacturing Proposed Permit Modification – Permit No. 76-02 Permit to Construct Phase 3A – Issued April 22, 2009 Energizer Scrap Battery Landfill - Asheboro, North Carolina Mr. Murray: On behalf of Energizer Battery Manufacturing, Inc. (Energizer), ERM NC, Inc. (ERM) is submitting this letter and attached submittal for NCDENR – Division of Waste Management approval. This submittal is for a modification to the permit for changes to property boundary and addition of alternate liner section including a geosynthetic clay liner (GCL). On April 22, 2009, the Division of Solid Waste Management issued a Permit to Construct for the Expansion and Upgrade of the Energizer Scrap Battery Landfill - Phase 3A. During initial construction of the permitted Phase 3A expansion, buried municipal solid waste was discovered in the area of the proposed sediment trap east of the 3A expansion. The waste appears to have resulted from County Landfill operations in the 1980’s. Randolph County has agreed to take possession of the impacted lands, and also transfer a separate small portion of land to Energizer located north of the currently permitted boundary. The property transfers resulted in a decrease in size of both the Energizer property, and the landfill boundary. However, the change to the property boundary will not affect the currently permitted limits or design of Phases 3A through 3C. This request for permit modification is being submitted to reflect changes to the facility property boundaries, buffers and landfill limits for future phases. In addition to the changes involving property boundaries and landfill limits, this request for modification includes an alternate liner section utilizing a geosynthetic clay liner (GCL) in place of the currently permitted 18-inch low-permeability compacted soil liner. This change is requested in the event that compacted soil liner materials are not readily available at the time of construction. Mr. John Murray October 7, 2011 Page 2 Included within this submittal is the following:  A copy of the recorded deed following transfer of properties with Randolph County.  A copy of the recorded survey plat following transfer of properties with Randolph County.  A subset of the original Phase 3A Permit to Construct Application Drawings, which includes all Phase 3A drawings, and any other revised drawings  A subset of the original Phase 3A Permit to Construct Application Technical Specifications, which includes revised Sections for inclusion of GCL.  A subset of the original Construction Quality Assurance Plan (CQA Plan), including revisions for inclusion of GCL. If you should have any questions or require additional information, please contact me at (704) 541-8345 or dave.wasiela@erm.com. Sincerely, ERM NC, Inc. NC License # C-2206 David W. Wasiela, P.E. NC Registration No. 20770 Senior Project Engineer cc: Mr. Ed Mussler – NCDENR – Division of Waste Management Mr. Scott Boyle – Energizer Battery Company Energizer Battery Company Request for Permit Modification Energizer Scrap Battery Landfill Permit No. 76-02 Asheboro, North Carolina October 2011 Request for Permit Modification Energizer Scrap Battery Landfill Permit No. 76-02 Property Deed and Survey Plat The recorded deed and survey plats that follow reflect revisions to the property boundary due to the transfer of properties with Randolph County. Request for Permit Modification Energizer Scrap Battery Landfill Permit No. 76-02 Drawings Revised drawings are included with this submittal under separate cover. The drawings illustrate revisions due to change in property boundary and inclusion of geosynthetic clay liner (GCL) as an alternative liner section. Only the drawings requiring revision are included in this submittal. The remainder of the previously permitted plan sheets remain unchanged. ENERGIZER SCRAP BATTERY LANDFILL REVISION DATENO.APPR.REVISION DESIGN ENGINEER DRAWN BY DWW CJM ENERGIZER BATTERY COMPANY COVER SHEET DATE AutoCAD 2002PROJECT MANAGER PROJECT ENGINEER DWW DWW RANDOLPH COUNTY, NORTH CAROLINA 0124816 PROJECT NO. SCALE 1 OCTOBER 2011 Cover Sheet.DWG SHEET 1 DRAWING NO. 26OF REV. NO. TITLEDRAWING NO. CONTRACTOR SHALL CONTROL AND MONITOR ALL CONSTRUCTION ACTIVITIES ON THE SITE TO ASSURE THAT NO ENVIRONMENTAL RELEASES TO OFFSITE AIR AND WATER RESOURCES OCCURS; ANY RELEASES SHALL IMMEDIATELY BE REPORTED TO THE OWNER, ENGINEER AND APPROPRIATE REGULATORY AGENCIES. CONTRACTOR SHALL INSTALL TEMPORARY, AS REQUIRED, AND THREE PERMANENT BENCHMARKS PRIOR TO CONSTRUCTION. THE LOCATION OF ALL BENCHMARKS SHALL BE FIELD DETERMINED BY THE ENGINEER. ALL BENCHMARKS SHALL BE PROTECTED AND/OR RELOCATED IF A BENCHMARK MUST BE DISTURBED DURING CONSTRUCTION. BENCHMARKS SHALL BE REFERENCED TO THE NATIONAL GEODETIC VERTICAL DATUM (NGVD). CONTRACTOR SHALL MANAGE STORMWATER THROUGHOUT CONSTRUCTION ACTIVITIES AND PREVENT THE MIGRATION OF SEDIMENTS FROM THE SITE. CONTRACTOR SHALL NOTIFY NORTH CAROLINA "DIG SAFE" (1-800-632-4949) AT LEAST 3 DAYS PRIOR TO SUBSURFACE DISTURBANCE. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION OF ALL SITE UTILITIES PRIOR TO THE INITIATION OF ANY EXPLORATORY OR CONSTRUCTION ACTIVITIES. EXISTING CONTOURS REPRESENT THE TOPOGRAPHY OF THE SITE IN AUGUST 2005; TOPOGRAPHY PROVIDED BY JERRY KING SURVEYING, INC. OF ASHEBORO, NORTH CAROLINA. CONTOUR LINES ARE INDICATED AT 2-FOOT INTERVALS WITH ELEVATIONS MEASURED ABOVE MEAN SEAL LEVEL (MSL) DATUM, UNLESS OTHERWISE INDICATED. SCALES AS ARE INDICATED ON EACH DRAWING. THESE DRAWINGS ARE INTENDED FOR APPLICATION PURPOSES ONLY, AND ARE NOT RELEASED FOR CONSTRUCTION. THE GENERAL NOTES AND LEGEND PROVIDED ON THIS SHEET APPLY TO ALL DRAWINGS, UNLESS OTHERWISE INDICATED. LIST OF DRAWINGS GENERAL NOTES ENERGIZER SCRAP BATTERY LANDFILL APPLICATION FOR PERMIT TO CONSTRUCT PHASE 3A - PERMIT No. 76-02 REQUEST FOR MODIFICATION 9. 8. 7. 6. 5. 3. 4. 2. 1. ASHEBORO APPLICATION FOR LANDFILL UPGRADE AND EXPANSION AS SHOWNERM NC, Inc. 1. COVER SHEET 2. EXISTING SITE CONDITIONS 3. EROSION & SEDIMENTATION CONTROL 4. EROSION & SEDIMENTATION CONTROL DETAILS 5. CELLS NO.1 & 2 CLOSURE PLAN 6. MANHOLE 1 / MANHOLE 2 CONNECTION (STS PLAN APPROVED 1996) 7. PHASE 3A GRADING PLAN 8. PHASE 3A GRADING PLAN 9. PHASE 3A TOP OF LINER GRADING PLAN 10. PHASE 3A LEACHATE COLLECTION PLAN 11. PHASE 3A TOP OF COVER GRADING PLAN 12. PHASE 3A INTERMEDIATE FILL PLAN 13. PHASE 3B GRADING PLAN 14. PHASE 3B TOP OF LINER GRADING PLAN 15. PHASE 3B LEACHATE COLLECTION PLAN 16. PHASE 3B TOP OF COVER GRADING PLAN 17. PHASE 3B INTERMEDIATE FILL PLAN 18. PHASE 3C GRADING PLAN 19. PHASE 3C TOP OF LINER GRADING PLAN 20. PHASE 3C LEACHATE COLLECTION PLAN 21. PHASE 3C TOP OF COVER GRADING PLAN 22. PHASE 3C INTERMEDIATE FILL PLAN 23. FINAL CLOSURE PLAN 24. LANDFILL DETAILS 25. LANDFILL DETAILS 26. SUMP & MANHOLE DETAILS LEGEND * * * * * * * * * * * * * * *SHEET INCLUDED IN THIS REQUEST FOR MODIFICATION, OCTOBER 2011 30' PROGRESS ENERGY R.O.W. ACTIVE CELL NO. 2 LANDFILLING (2009) EXISTING LANDFILL ENTRANCE WOODED AREA WOODED AREA WOODED AREA WOODED AREA WOODED AREA WOODED AREA WOODED AREAWOODED AREA X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 12" DUCTILE IRON PIPE TELEPHONE PEDESTAL POWER POLE AND ANCHOR POINTS POWER POLE POWER POLE AND TELEPHONE PEDESTAL ANCHOR LINE POLE AND ANCHOR POINT ANCHOR LINE POLE AND ANCHOR POINT POWER POLE AND ANCHOR POINTS POWER POLE AND ANCHOR POINTS EXISTING LANDFILL ENTRANCE 30' PROGRESS ENERGY R.O.W. TOP OF CASING EL. = 700.3 TOP OF CASING EL. = 713.4 TOP OF CASING EL. = 746.6 50-FT PROPERTY BUFFER APPROXIMATE WASTE LIMITS CELL NO. 2 EXISTING MANHOLE NO. 2 PROPERTY BOUNDARY APPROXIMATE WASTE LIMITS CELL NO. 1 EXISTING MANHOLE NO. 1 SW-2 EXISTING STORM DITCH EXISTING RIP RAP OUTLET ENERGIZER SCRAP BATTERY LANDFILL REVISION DATENO.APPR.REVISION DESIGN ENGINEER DRAWN BY DWW ENERGIZER BATTERY COMPANY EXISTING SITE CONDITIONS DATE AutoCAD 2007PROJECT MANAGER PROJECT ENGINEER DWW DWW ASHEBORO, NORTH CAROLINA 0124816 1"=30' PROJECT NO. SCALE 2 OCTOBER 2011 Existing Conditions.dwg SHEET 2 DRAWING NO. N 26OF REV. NO. CJM ERM NC, Inc. WOODED AREA WOODED AREA 30' PROGRESS ENERGY R.O.W. WOODED AREA WOODED AREA WOODED AREA WOODED AREA WOODED AREAWOODED AREA X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 12" DUCTILE IRON PIPE TELEPHONE PEDESTAL POWER POLE AND ANCHOR POINTS POWER POLE POWER POLE AND TELEPHONE PEDESTAL ANCHOR LINE POLE AND ANCHOR POINT ANCHOR LINE POLE AND ANCHOR POINT POWER POLE AND ANCHOR POINTS POWER POLE AND ANCHOR POINTS 30' PROGRESS ENERGY R.O.W. TOP OF CASING EL. = 700.3 TOP OF CASING EL. = 713.4 TOP OF CASING EL. = 746.6 SW-2 7 3 0 7 2 0 74 0 50-FT PROPERTY BUFFER EROSION CONTROL BLANKET EROSION CONTROL BLANKET EROSION CONTROL BLANKET DOUBLE ROW OF SILT FENCE SPACED 3' APART DOUBLE ROW OF SILT FENCE SPACED 3-FT APART EXISTING STORM DITCH EXISTING RIP RAP OUTLET BAFFLE (TYP.) INSTALLED AT 20-FT INCREMENTS FROM WEIR LIMITS OF PHASE 3A LANDFILL WEIR SECTION TO EXISTING OUTLET DRAINAGE AREA FOR ST-1 2.58 ACRES LIMITS OF DISTURBANCE CO-LOCATED WITH SILT FENCE TOTAL AREA IS 3.64 ACRES WEIR SECTION TO EXISTING OUTLET PROPERTY BOUNDARY AND 50' BUFFER ENERGIZER SCRAP BATTERY LANDFILL REVISION DATENO.APPR.REVISION DESIGN ENGINEER DRAWN BY DWW ENERGIZER BATTERY COMPANY EROSION & SEDIMENTATION CONTROL DATE AutoCAD 2007PROJECT MANAGER PROJECT ENGINEER DWW DWW ASHEBORO, NORTH CAROLINA CONST- RUCTION 0124816 1"=30' PROJECT NO. SCALE NOT FOR 3 OCTOBER 2011 ESC - Erosion and Sedimentation Control.dwg SHEET 3 DRAWING NO. N 26OF REV. NO. CJM ERM NC, Inc.      ENERGIZER SCRAP BATTERY LANDFILL REVISION DATENO.APPR.REVISION DESIGN ENGINEER DRAWN BY DWW ENERGIZER BATTERY COMPANY EROSION & SEDIMENTATION CONTROL DATE AutoCAD 2007PROJECT MANAGER PROJECT ENGINEER DWW DWW ASHEBORO, NORTH CAROLINA CONST- RUCTION 0124618 NTS PROJECT NO. SCALE NOT FOR 4 OCTOBER 2011 ESC - Detail Sheet.dwg SHEET 4 DRAWING NO. 26OF REV. NO. DWW DETAILS ERM NC, Inc. WOODED AREA WOODED AREA 30' PROGRESS ENERGY R.O.W. EXISTING LANDFILL ENTRANCE WOODED AREA WOODED AREA WOODED AREA WOODED AREA WOODED AREAWOODED AREA X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 12" DUCTILE IRON PIPE TELEPHONE PEDESTAL POWER POLE POWER POLE AND TELEPHONE PEDESTAL POWER POLE EXISTING LANDFILL ENTRANCE 30' PROGRESS ENERGY R.O.W. TOP OF CASING EL. = 700.3 TOP OF CASING EL. = 713.4 TOP OF CASING EL. = 746.6 EXISTING MANHOLE NO. 2 EXISTING MANHOLE NO. 1 ABANDONED FOR CONSTRUCTION MW-3 ABANDONED FOR CONSTRUCTION MW-2 EXISTING MW-1 SW-1 SW-2 7 3 0 7 2 0 74 0 710 71 0 712 72 0 73 0 74 075 0 70 8 70 0 75 0 75 0 74 8 74 8 74 0 73 0 72 0 74 6 LIMITS OF PROPOSED PHASE 3A LINER LIMITS OF PROPOSED PHASE 3A LINER ACCESS RAMPACCESS RAMP 744 746 75 2 EXISTING STORM DITCH EXISTING RIP RAP OUTLET WEIR SECTION TO EXISTING OUTLET PROPERTY BOUNDARY 50' PROPERTY BUFFER PROPERTY BOUNDARY 50' PROPERTY BUFFER 3A 74 2 ENERGIZER SCRAP BATTERY LANDFILL REVISION DATENO.APPR.REVISION DESIGN ENGINEER DRAWN BY DWW ENERGIZER BATTERY COMPANY PHASE 3A GRADING PLAN DATE AutoCAD 2007PROJECT MANAGER PROJECT ENGINEER DWW DWW ASHEBORO, NORTH CAROLINA 0124816 1"=30' PROJECT NO. SCALE 7 OCTOBER 2011 Proposed Phase 3A Grading Plans - ALL.dwg SHEET 7 DRAWING NO. N 26OF REV. NO. CJM ERM NC, Inc. 30' PROGRESS ENERGY R.O.W. EXISTING LANDFILL ENTRANCE WOODED AREAWOODED AREA 12" DUCTILE IRON PIPE TELEPHONE PEDESTAL POWER POLE POWER POLE AND TELEPHONE PEDESTAL POWER POLE EXISTING LANDFILL ENTRANCE 30' PROGRESS ENERGY R.O.W. 7 3 0 7 2 0 74 0 710 71 0 712 72 0 73 0 74 075 0 70 8 70 0 75 0 75 0 74 8 74 8 74 0 73 0 72 0 74 6 LIMITS OF PROPOSED PHASE 3A LINER LIMITS OF PROPOSED PHASE 3A LINER ACCESS RAMPACCESS RAMP 744 746 75 2 EXISTING STORM DITCH EXISTING RIP RAP OUTLET WEIR SECTION TO EXISTING OUTLET PROPERTY BOUNDARY 50' PROPERTY BUFFER PROPERTY BOUNDARY 50' PROPERTY BUFFER 3A 74 2 ENERGIZER SCRAP BATTERY LANDFILL REVISION DATENO.APPR.REVISION DESIGN ENGINEER DRAWN BY DWW ENERGIZER BATTERY COMPANY PHASE 3A GRADING PLAN DATE AutoCAD 2007PROJECT MANAGER PROJECT ENGINEER DWW DWW ASHEBORO, NORTH CAROLINA 0124816 1"=30' PROJECT NO. SCALE 8 OCTOBER 2011 SHEET 8 DRAWING NO. N 26OF REV. NO. CJM ERM NC, Inc. Proposed Phase 3A Grading Plans - ALL.dwg 30' PROGRESS ENERGY R.O.W. EXISTING LANDFILL ENTRANCE WOODED AREAWOODED AREA 12" DUCTILE IRON PIPE TELEPHONE PEDESTAL POWER POLE POWER POLE AND TELEPHONE PEDESTAL POWER POLE EXISTING LANDFILL ENTRANCE 30' PROGRESS ENERGY R.O.W. 712 70 8 74 6 74 9 . 5 75 3 . 5 75 3 . 5 7 3 0 7 2 0 74 0 710 71 0 72 0 73 0 74 075 0 70 0 75 0 75 0 74 0 73 0 72 0 74 6 74 3 74 8 752 750 LIMITS OF PROPOSED PHASE 3A LINER LIMITS OF PROPOSED PHASE 3A LINER ACCESS RAMPACCESS RAMP 744 746 75 2 74 8 EXISTING STORM DITCH EXISTING RIP RAP OUTLET WEIR SECTION TO EXISTING OUTLET PROPERTY BOUNDARY 50' PROPERTY BUFFER PROPERTY BOUNDARY 50' PROPERTY BUFFER 3A ENERGIZER SCRAP BATTERY LANDFILL ENERGIZER BATTERY COMPANY PHASE 3A TOP OF LINER GRADING PLAN ASHEBORO, NORTH CAROLINA 9 9 N 26 ERM NC, Inc. 30' PROGRESS ENERGY R.O.W. EXISTING LANDFILL ENTRANCE WOODED AREAWOODED AREA 12" DUCTILE IRON PIPE TELEPHONE PEDESTAL POWER POLE POWER POLE AND TELEPHONE PEDESTAL POWER POLE EXISTING LANDFILL ENTRANCE 30' PROGRESS ENERGY R.O.W. 712 70 8 74 6 74 9 . 5 75 3 . 5 75 3 . 5 7 3 0 7 2 0 74 0 710 71 0 72 0 73 0 74 075 0 70 0 75 0 75 0 74 0 73 0 72 0 74 6 74 3 74 8 752 750 744 746 75 2 74 8 EXISTING STORM DITCH EXISTING RIP RAP OUTLET WEIR SECTION TO EXISTING OUTLET 3A ENERGIZER SCRAP BATTERY LANDFILL REVISION DATENO.APPR.REVISION DESIGN ENGINEER DRAWN BY DWW ENERGIZER BATTERY COMPANY PHASE 3A LEACHATE COLLECTION PLAN DATE AutoCAD 2007PROJECT MANAGER PROJECT ENGINEER DWW DWW ASHEBORO, NORTH CAROLINA 0124816 1"=30' PROJECT NO. SCALE 10 OCTOBER 2011 SHEET 10 DRAWING NO. N 26OF REV. NO. CJM ERM NC, Inc. Proposed Phase 3A Grading Plans - ALL.dwg 30' PROGRESS ENERGY R.O.W. EXISTING LANDFILL ENTRANCE WOODED AREAWOODED AREA 12" DUCTILE IRON PIPE TELEPHONE PEDESTAL POWER POLE POWER POLE AND TELEPHONE PEDESTAL POWER POLE EXISTING LANDFILL ENTRANCE 30' PROGRESS ENERGY R.O.W. 712 70 8 74 6 7 3 0 7 2 0 74 0 710 71 0 72 0 73 0 74 075 0 70 0 75 0 75 0 74 0 73 0 72 0 751.5 75 0 752 75 5 . 5 75 4 75 0 PROPOSED GRADES REPRESENT SUBGRADE ELEVATIONS PROPOSED GRADES REPRESENT OPERATIONAL COVER OVER EXTENDED LINER TEMPORARY SUBDIVIDER BERM PROPOSED GRADES REPRESENT TOP OF OPERATIONAL COVER 744 746 75 2 EXISTING STORM DITCH EXISTING RIP RAP OUTLET WEIR SECTION TO EXISTING OUTLET 3A 74 6 . 5 748 747.5 ENERGIZER SCRAP BATTERY LANDFILL REVISION DATENO.APPR.REVISION DESIGN ENGINEER DRAWN BY DWW ENERGIZER BATTERY COMPANY PHASE 3A TOP OF COVER GRADING PLAN DATE AutoCAD 2007PROJECT MANAGER PROJECT ENGINEER DWW DWW ASHEBORO, NORTH CAROLINA 0124816 1"=30' PROJECT NO. SCALE 11 OCTOBER 2011 SHEET 11 DRAWING NO. N 26OF REV. NO. CJM ERM NC, Inc. Proposed Phase 3A Grading Plans - ALL.dwg 30' PROGRESS ENERGY R.O.W. EXISTING LANDFILL ENTRANCE WOODED AREAWOODED AREA 12" DUCTILE IRON PIPE TELEPHONE PEDESTAL POWER POLE POWER POLE AND TELEPHONE PEDESTAL POWER POLE EXISTING LANDFILL ENTRANCE 30' PROGRESS ENERGY R.O.W. 75 1 . 5 760 758 756 754 712 70 8 74 6 75 1 . 5 7 3 0 7 2 0 74 0 710 71 0 72 0 73 0 74 075 0 70 0 75 0 75 0 74 0 73 0 72 0 751.5 75 0 752 75 5 . 5 760 758 756 754 LIMITS OF PROPOSED PHASE 3A LINER LIMITS OF PROPOSED PHASE 3A LINER ACCESS RAMPACCESS RAMP 744 746 75 2 EXISTING STORM DITCH EXISTING RIP RAP OUTLET WEIR SECTION TO EXISTING OUTLET PROPERTY BOUNDARY 50' PROPERTY BUFFER PROPERTY BOUNDARY 50' PROPERTY BUFFER 3A ENERGIZER SCRAP BATTERY LANDFILL REVISION DATENO.APPR.REVISION DESIGN ENGINEER DRAWN BY DWW ENERGIZER BATTERY COMPANY PHASE 3A INTERMEDIATE FILL PLAN DATE AutoCAD 2007PROJECT MANAGER PROJECT ENGINEER DWW DWW ASHEBORO, NORTH CAROLINA 0124816 1"=30' PROJECT NO. SCALE 12 OCTOBER 2011 SHEET 12 DRAWING NO. N 26OF REV. NO. CJM ERM NC, Inc. Proposed Phase 3A Grading Plans - ALL.dwg 30' PROGRESS ENERGY R.O.W. EXISTING LANDFILL ENTRANCE WOODED AREAWOODED AREA 12" DUCTILE IRON PIPE TELEPHONE PEDESTAL POWER POLE POWER POLE AND TELEPHONE PEDESTAL POWER POLE EXISTING LANDFILL ENTRANCE 30' PROGRESS ENERGY R.O.W. ACCESS RAMPACCESS RAMP PHASE 3B CERTIFICATION LIMITS PHASE 3C LINER LIMITSPHASE 3C LINER LIMITS 7 2 0 74 0 710 71 0 71 2 70 8 70 0 7 3 0 740 730 750 720 73 0 74 0 75 0 760 770 746 750 748 75 0 3B 3A 3C 4A-4C 5A-5C 6A-6C 7A-7C 8A-8C 77 0 76 0 75 0 74 0 73 0 72 0 EXISTING MANHOLE NO. 1 ENERGIZER SCRAP BATTERY LANDFILL REVISION DATENO.APPR.REVISION DESIGN ENGINEER DRAWN BY DWW ENERGIZER BATTERY COMPANY FINAL CLOSURE PLAN DATE AutoCAD 2007PROJECT MANAGER PROJECT ENGINEER DWW DWW ASHEBORO, NORTH CAROLINA 0124816 1"=30' PROJECT NO. SCALE 23 OCTOBER 2011 Final Closure Plan.dwg SHEET 23 DRAWING NO. N 26OF REV. NO. CJM ERM NC, Inc. FUTURE MANHOLE 4 FUTURE MANHOLE 5 FUTURE MANHOLE 6 FUTURE MANHOLE 7 FUTURE COLLECTION/ PUMP OUT TANK(S) TYPICAL LINER OVERLAP CONNECTION 60-MIL TEXTURED HDPE GEOCOMPOSITE ENERGIZER SCRAP BATTERY LANDFILL REVISION DATENO.APPR.REVISION DESIGN ENGINEER DRAWN BY DWW ENERGIZER BATTERY COMPANY LANDFILL DETAILS DATE AutoCAD 2007PROJECT MANAGER PROJECT ENGINEER DWW DWW ASHEBORO, NORTH CAROLINA 0124816 NTS PROJECT NO. SCALE 24 OCTOBER 2011 Details Sheet 1.dwg SHEET 24 DRAWING NO. 26OF REV. NO. DWW ANCHOR HDPE 12-IN DEEP, 12-IN WIDE BURY LEADING EDGE 12-IN 18-IN DRAINAGE LAYER ERM NC, Inc. 10 9 5 5 18-IN. DRAINAGE LAYER 14 ENERGIZER SCRAP BATTERY LANDFILL REVISION DATENO.APPR.REVISION DESIGN ENGINEER DRAWN BY DWW ENERGIZER BATTERY COMPANY LANDFILL DETAILS DATE AutoCAD 2007PROJECT MANAGER PROJECT ENGINEER DWW DWW ASHEBORO, NORTH CAROLINA 0124816 NTS PROJECT NO. SCALE 25 OCTOBER 2011 Details Sheet 2.dwg SHEET 25 DRAWING NO. 26OF REV. NO. DWW ERM NC, Inc. TOP OF 18-IN DRAINAGE LAYER 6-IN-DIA. PREFABRICATED STUB SDR 32.5 HDPE PIPE EXTENDS 12-IN FROM MANHOLE EDGE. BUTT FUSION OR THERMAL COUPLE WELD TOGETHER ENERGIZER SCRAP BATTERY LANDFILL REVISION DATENO.APPR.REVISION DESIGN ENGINEER DRAWN BY DWW ENERGIZER BATTERY COMPANY SUMP & MANHOLE DETAILS DATE AutoCAD 2007PROJECT MANAGER PROJECT ENGINEER DWW DWW ASHEBORO, NORTH CAROLINA 0124816 NTS PROJECT NO. SCALE 26 OCTOBER 2011 Details Sheet 3.dwg SHEET 26 DRAWING NO. 26OF REV. NO. DWW ERM NC, Inc. Request for Permit Modification Energizer Scrap Battery Landfill Permit No. 76-02 Revised Technical Specifications The Technical Specifications that follow reflect revisions to currently permitted technical specifications with the addition of geosynthetic clay liner (GCL) as an alternate liner section. Only the sections of technical specifications requiring revision are included in this submittal. The remainder of the previously permitted technical specifications remains unchanged. TECHNICAL SPECIFICATIONS ENERGIZER SCRAP BATTERY LANDFILL RANDOLPH COUNTY, NORTH CAROLINA TABLE OF CONTENTS DIVISION 0 - BIDDING AND CONTRACT DOCUMENTS SECTION SUBJECT 00001 Title Page 00003 Table of Contents DIVISION 1 - GENERAL REQUIREMENTS SECTION SUBJECT 01010 Scope of Work 01051 Survey Requirements 01410 Testing Laboratory Services DIVISION 2 - SITE WORK SECTION SUBJECT 02100 Site Preparation 02200 Excavation, Grading, Backfill, and Compaction 02272 Non-woven Geotextiles 02273 Geosynthetic Drainage Composite 02275 Compacted Soil Liner 02276 Erosion and Sedimentation Control 02623 High Density Polyethylene (HDPE) Pipe 02700 Drainage/Protective Cover Material 02776 Textured Geomembrane Liner REV OCT. 2011 02777 Geosynthetic Clay Liner 02985 Seeding and Mulching 02777-1 SECTION 02777 GEOSYNTHETIC CLAY LINER PART 1: GENERAL 1.01 SCOPE OF WORK A. Work covered in this section shall consist of the manufacture, fabrication (if needed), supply, and installation of geosynthetic clay liner (GCL). The Geosynthetics Installer shall provide all labor, materials, transportation, supervision, tools, equipment, and services necessary to complete and test the GCL installation as described in and on the Technical Specifications and Construction Drawings. B. All procedures, operations, and testing methods shall be in strict accordance with these Technical Specifications and the CQA Plan. The installed system shall conform exactly to the Technical Specifications and Contract Drawings except where otherwise authorized in writing by the Engineer or Owner. 1.02 RELATED SECTIONS A. Section 02200: Excavation, Backfill and Compaction. B. Section 02273: Geosynthetic Drainage Composite C. Section 02275: Compacted Soil Liner D. Section 02776: Textured Geomembrane Liner 1.03 SUBMITTALS A. The Geosynthetics Installer shall, prior to delivery of materials, submit to the Owner and CQA Consultant certification from the GCL manufacturer that the delivered GCL will meet the minimum specifications listed in this Technical Specification and the CQA Plan. Within 15 calendar days following the Effective Date of the Agreement, submit the following information: 1. Submittals relating to Manufacturer and GCL liner a. Corporate Background b. Manufacturing capabilities: (1) Information on factory size, equipment, personnel, number of shifts per day and production capacity per shift. (2) List of material properties and samples of liner with attached certified test results. 02777-2 (3) Manufacturer's quality control program and manual including description of laboratory facilities. (4) A list of ten completed facilities totaling a minimum of 2,000,000 square feet, for which the manufacturer has manufactured a GCL liner. The following information shall be provided for each facility.  Name and purpose of facility, its location and date of installation.  Name of Owner, project manager, design engineer and installer.  GCL Liner thickness and surface area.  Information on performance of the facility. c. Copy of quality control certificates in conformance with Paragraphs 2.01 and 2.02. 2. Submittals relating to Geosynthetics Installer a. Background Information b. Installation capabilities: (1) Information on equipment (including Granular Bentonite spreader) and personnel. (2) Anticipated average daily production (complete including QC measures). c. A list of five completed facilities totaling 2,000,000 square feet for which the installer has installed GCL. The following information shall be provided for each facility: (1) Name and purpose of facility, its location and date of installation. (2) Name of Owner, design engineer, manufacturer and name and telephone number of contact at the facility who can discuss the project. (3) Thickness of GCL liner and surface area of the installed liner. (4) A copy of the manufacturer's certification or approval letter. (5) Resume of the qualifications of the Installation Supervisor and Quality Control personnel to be assigned to this project. 02777-3 d. Installation schedule. e. A quality control manual that specifically defines the quality assurance program during installation. The manual shall include daily procedures, field testing procedures, lab testing procedures, specific steps that are to be taken in the event of a failure or defect, personnel requirements, levels of authority and all other information necessary to ensure a high quality liner installation. 1.04 REFERENCE STANDARDS A. American Society for Testing and Materials (ASTM) 1. ASTM D2216 – Standard Test Method for Laboratory Determination of Water (moisture) Content of Soil, Rock and Soil-Aggregate Mixtures. 2. ASTM D4354 – Standard Practice for Sampling of Geosynthetics for Testing. 3. ASTM D4632 – Standard Test Method for Grab Breaking Load and Elongation of Geotextiles. 4. ASTM D4833 – Standard Test Method for Index Puncture Resistance of Geotextiles, Geomembranes and Related Products. 5. ASTM D5084 – Standard Test Method for Measurement of Hydraulic Conductivity of Saturated Porous Materials Using a Flexible Wall Permeameter. 6. ASTM D5261 – Standard Test Method for Measuring Mass Per Unit Area of Geotextiles. 7. ASTM D5887 - Standard Test Method for Measurement of Index Flux Through Saturated Geosynthetic Clay Liner Specimens Using a Flexible Wall Permeameter. 8. ASTM D5888 - Standard Guide for Storage and Handling of Geosynthetic Clay Liners. 9. ASTM D5889 - Standard Practice for Quality Control of Geosynthetic Clay Liners. 10. ASTM D5890 - Standard Test Method for Swell Index of Clay Mineral Components of Geosynthetic Clay Liners. 11. ASTM D5891 - Standard Test Method for Fluid Loss of Clay Component of Geosynthetic Clay Liners. 02777-4 12. ASTM D5993 - Standard Test Method for Measuring Mass Per Unit of Geosynthetic Clay Liners. 13. ASTM D6072 - Standard Guide for Obtaining Samples of Geosynthetic Clay Liners. 14. ASTM D6102 - Standard Guide for Installation of Geosynthetic Clay Liners. 15. ASTM D6141 - Standard Guide for Screening the Clay Portion of a Geosynthetic Clay Liner (GCL) for Chemical Compatibility to Liquids. 16. ASTM D6243 - Standard Test Method for Determining the Internal and Interface Shear Resistance of Geosynthetic Clay Liner by the Direct Shear Method. 17. ASTM D6495 - Standard Guide for Acceptance Testing Requirements for Geosynthetic Clay Liners. 18. ASTM D6496 - Standard Test Method for Determining Average Bonding Peel Strength Between the Top and Bottom Layers of Needle-Punched Geosynthetic Clay Liners. B. Where reference is made to one of the above standards, the revision in effect at the time of bid opening shall apply. 1.05 QUALITY ASSURANCE A. In addition to manufacturer and installer requirements for qualifications and certification specified in Paragraph 1.03 the Quality Assurance consists of conformance testing of the material delivered to the site and field quality control during installation. B. Conformance testing requirements are specified in Paragraph 2.03. The purpose of conformance testing is to assure that the supplied material conforms to the specifications and to the manufacturer's quality control certificates. C. Field quality control requirements are specified in Paragraph 3.03. The purpose of field quality control procedures is to assure that the liner has been installed in accordance with the specifications and manufacturer's recommendations. D. Geomembrane Quality Control Documentation 1. Pre-installation Conference a. Prior to commencing work, a pre-installation conference shall be held and the following project personnel shall be identified by name and recorded in the project files: 02777-5  Contractor  Contractor's Representative  Engineer's Field Representative  Geosynthetics Installer  Installation Supervisor: Quality Control Personnel  Quality Assurance Laboratory b. Two duplicate project files shall be maintained. One shall be maintained by the Engineer Field Representative and the other shall be maintained by the Installation Supervisor. At the end of each work week the files shall be updated and checked to assure that copies of all pertinent project information are included in each file. 1.06 QUALIFICATIONS A. Manufacturer 1. The Manufacturer of the lining material described below shall have previously demonstrated the ability to produce this liner by having at least five years continuous experience in the manufacture of GCL liner and successfully manufactured a minimum of 10,000,000 square feet of similar liner material for hydraulic lining installations. B. Geosynthetics Installer 1. The Geosynthetics Installer shall be the manufacturer or an approved installer trained and certified to install the manufacturer's liner. Installation shall be performed under the constant direction of a single installation supervisor who shall remain on site and be in charge throughout the liner installation, for liner layout, seaming, patching, repairs and all other activities required by the installer. The Installation Supervisor shall have installed or supervised the installation of a minimum of 2,000,000 square feet of GCL liner. 1.07 DELIVERY, STORAGE AND HANDLING A. The GCL liner shall be packaged and shipped by appropriate means to prevent damage of the liner rolls. Unloading and storage of the liner is the responsibility of the Geosynthetics Installer. The GCL liner shall be unloaded in the presence of the CQA Consultant or his representative. The Geosynthetics Installer shall be responsible for replacing any damaged or unacceptable material at no cost to the Owner. B. Damage during unloading shall be documented by the CQA Consultant or his representative. All damaged rolls must be separated from the undamaged rolls until the proper disposition of that material has been determined by the Engineer. C. The GCL liner rolls shall be stored so as to be protected from puncture, dirt, grease, water, moisture, mud, mechanical abrasions and excessive heat that may damage the liner material. The rolls shall be stored on a prepared surface (not wooden pallets) and shall not be stacked more than two rolls high. All rolls shall be covered by additional plastic tarps. 02777-6 1.08 DEFINITIONS AND RESPONSIBILITIES A. Geosynthetics Installer 1. The Geosynthetics Installer is the firm or corporation with whom the Owner has entered into agreement to construct the project. The Geosynthetics Installer shall be the Manufacturer or approved installer trained and certified to install the manufacturer’s geomembrane. The Geosynthetics Installer is responsible for all submittals by the Manufacturer as required by the Specifications. The Geosynthetics Installer is responsible for scheduling and coordination of the required work with the Manufacturer. The Geosynthetics Installer shall be responsible for field handling, storing, placing, sewing, and all other aspects of installation. The Geosynthetics Installer is responsible for furnishing record drawings and a copy of the complete documentation of the liner system. The Geosynthetics Installer is also responsible for daily updating of the design drawings onsite and for any and all deviations from these drawings. All deviations must be initialed and approved by the Engineer's Field Representative onsite. B. Manufacturer 1. The Manufacturer is the firm or corporation responsible for production of the GCL liner material to be used in the project. The Manufacturer shall produce a consistent product meeting the project specifications, and shall provide quality control documentation for the product specified herein. The Manufacturer is responsible for the condition of the GCL liner until the material is accepted by the Engineer's Field Representative upon delivery and installation. The Manufacturer shall produce a consistent product meeting the project specifications. PART 2: PRODUCTS 2.01 MATERIALS A. GCL materials shall be stored, handled, and installed in strict accordance with the manufacturer’s recommendation. At a minimum, the Owner shall provide a dry storage area on firm level ground. All rolls shall be packaged in moisture resistant plastic sleeves with cardboard cores sufficiently strong to resist collapse during transit and handling. All rolls shall be covered by additional plastic tarps. B. The GCL shall be a reinforced GCL with a sodium bentonite layer encapsulated between woven and non-woven geotextiles as manufactured by CETCO (Bentomat ST) or Engineer approved alternate, and shall meet the minimum average roll value conformance testing specifications presented in Table 3.3 of the CQA Plan. The non- woven geotextile side of the GCL shall be installed against the textured HDPE liner. C. Any accessory bentonite used for sealing seams, penetrations, or repairs, shall be the same granular bentonite as used in the production of the GCL itself. 02777-7 D. The minimum acceptable dimensions for the GCL panels shall be 15 feet wide and 125 feet long. Short rolls (rolls less than 125 feet long) may be supplied, but at a rate not to exceed 5 percent of the total square footage produced for this project. E. A minimum overlap guideline and a construction match-line delineating the overlap zone shall be imprinted with non-toxic ink on both edges of the GCL panel to ensure the accuracy of the seam. These lines shall be used during CQA to ensure the minimum overlap is achieved. The minimum overlap guideline shall indicate where the edge of the panel must be placed in order to achieve a full 6 inches of bentonite overlap for each panel. 2.02 QUALITY CONTROL DOCUMENTATION A. Prior to installation of any liner material, the Geosynthetics Installer shall provide the following information certified by the Manufacturer for the delivered liner. 1. Origin, identification and production of the GCL liner (supplier's name, brand name and production plant). 2. Bentonite Manufacturer Certification – Bentonite Manufacturer quality control documentation for the particular lot of clay used in the production of rolls delivered. 3. Geotextile Manufacturer Certification – Geotextile Manufacturer quality control documentation for the particular lots of geotextiles used in the production of the rolls delivered. 4. Each roll delivered to the project site shall have the following identification information:  Manufacturer's name  Product identification  Thickness or total roll weight  Lot or Batch Number  Roll number  Length and width (or width and area)  Geotextile Type and Roll numbers (upper & lower) 5. Quality control certificates, signed by the Manufacturer's quality assurance manager. Each certificate shall have roll identification number, sampling procedures, frequency and test results. At a minimum the following test results shall be in accordance with test requirements specified in Table 1:  Bentonite Content  GCL Peel Strength  Swell Index  Fluid Loss  Permeability Refer to Table 3.3 of the CQA Plan for the required testing frequencies. 02777-8 2.03 CONFORMANCE TESTING A. Conformance testing shall be performed by an independent Quality Assurance Laboratory approved by the Owner at the frequencies specified in Table 3.3 of the CQA Plan. Samples will be taken across the entire width of the roll and will not include the first 3 linear feet. Unless otherwise specified, samples will be 3 feet long and the width of the roll. The CQA Consultant shall obtain the samples from the roll, and mark the machine direction and identification number. B. The following conformance tests shall be performed in accordance with Table 3.3 of the CQA Plan:  GCL Peel Strength  Permeability • If all the test values for a sample meet all of the values given in the above conformance testing specifications, and also the Manufacturer's guaranteed minimum values, the sample passes. • If any of the test values for the sample do not meet one or more of the required conformance testing values, additional evaluation procedures will be implemented by the CQA Consultant: - For the failing test parameter(s), the CQA Geosynthetic Laboratory shall perform two additional tests on the sample. The tests may be performed by another CQA Geosynthetics Laboratory at the discretion of the CQA Consultant and the Owner; - If all of the test values for each of the two additional tests meet the required values, the roll and adjacent rolls pass and are acceptable. - If one or more of the additional test values do not meet requirements, the CQA Consultant shall reject the roll and collect samples from the closest numerical roll on both sides of the failed roll and test for the failed parameter(s). If one or both of these tests do not meet requirements, those roll(s) will be rejected and the CQA Consultant and Owner shall determine further testing protocol and criteria for identifying the limits of rejected rolls. C. The CQA Consultant will ensure that conformance samples are removed at the specified frequency and forwarded to the CQA Consultant's Laboratory. The CQA Consultant will review laboratory test results as soon as they become available, and make appropriate recommendations to the Owner. All conformance test results shall be reviewed by Engineer and accepted or rejected, prior to the placement of the GCL liner. All test results shall meet, or exceed, the property values listed in Table 1. In the case of failing test results, the Manufacturer may request that another sample be retested by an independent laboratory with the Manufacturer's technical representative present during the testing procedures. The Manufacturer shall pay for this retesting. The Manufacturer may also have the sample retested at two different laboratories approved by the Owner. If both laboratories report passing results, the material shall be accepted. If both laboratories do not report passing results, all liner material from the lot representing the failing sample will be considered out of specification and rejected. 02777-9 PART 3: EXECUTION 3.01 PREPARED SUBBASE PREPARATION A. The surface of the prepared subbase shall be smooth, uniform, free from sudden changes in grade (such as vehicular ruts), rocks, stones, debris and deleterious materials. The moisture content of the prepared subbase must be maintained within the project specifications until the synthetic liner has been installed. If excessive drying occurs, the Contractor shall rehydrate and compact the affected area to the Engineer's satisfaction. During actual placing of the GCL liner, the prepared subbase surface shall be kept free of all standing water. If the prepared subbase surface below the GCL liner becomes wet and unstable, it shall be dried and recompacted to the CQA Consultant’s satisfaction. If drying and recompacting the material is insufficient, the unstable material must be removed and replace with approved material. B. Before the liner installation begins, the Contractor and installer shall verify in writing and submit to the CQA Consultant: 1. Lines and grades are in relative conformance with the Drawings and Specifications. 2. The surface area to be lined has been rolled and compacted, free of irregularities and abrupt changes in grade. C. Any synthetic liner system materials damaged during the repair work shall be replaced with new material. All costs associated with such actions will be paid for entirely by the Contractor including, but not limited to, labor, additional liner system material, testing, labor and material costs incurred by the Engineer to perform additional inspection services. 3.02 ANCHOR TRENCH A. The anchor trench shall be constructed as shown on the Contract Drawings and as specified herein. B. Slightly rounded corners shall be provided in the trench to avoid sharp bends in the liner. C. The anchor trench shall be adequately drained to prevent water ponding and softening of adjacent soils. The anchor trench shall be backfilled with local fill material and compacted to 95 percent standard proctor density, ASTM D698 as specified in Section 02200. D. If the anchor trench is located in a clay susceptible to desiccation, the amount of trench open at any time shall be limited to one day of liner installation capacity. 3.03 GCL LINER PLACEMENT 02777-10 A. Weather Conditions 1. GCL liner placement shall not proceed at an ambient temperature below 40 degrees Fahrenheit (F) or above 100 degrees F unless otherwise authorized, in writing, by the Engineer or his/her field representative. GCL liner placement shall not be performed during precipitation, excessive moisture, in an area of ponded water, or excessive winds. The Geosynthetics Installer shall limit the deployment of GCL to areas that may subsequently be covered by the primary HDPE geomembrane, including seaming of all HDPE panels during the same day. B. Handling and Storage 1. The party responsible for unloading the GCL shall contact the manufacturer prior to shipment to determine the correct unloading methods and equipment if different from the pre-approved and specified methods. 2. The GCL roll must be supported during handling to ensure worker safety and prevent damage to the liner. Under approved circumstances only, shall the rolls be dragged, lifted from one end, lifted with only the forks of a lift truck or pushed to the ground from the delivery vehicle. 3. The CQA inspector shall verify that proper handling equipment exists which does not pose any danger to installation personnel or risk of damage or deformation to the liner material itself. Suitable handling equipment is described below. a. Spreader Bar Assembly – A spreader bar assembly shall include both a core pipe or bar and a spreader bar beam. The core pipe shall be used to uniformly support the roll when inserted through the GCL core while the spreader bar beam will prevent chains or straps from chafing the roll edges. b. Stinger – A stinger is a rigid pipe or rod with one end directly connected to a forklift or other handling equipment. If a stinger is used, it should be fully inserted to its full length into the roll to prevent excessive bending of the roll when lifted. c. Roller Cradles – Roller cradles consist of two large diameter rollers spaced approximately 3 inches apart, which both support the GCL roll and allow it to freely unroll. The use of roller cradles shall be permitted if the rollers support the entire width of the GCL roll. d. Straps – Straps may be used to support the ends of spreader bars but are not recommended as the primary support mechanism. As straps may damage the GCL where wrapped around the roll and generally do not provide sufficient uniform support to prevent roll bending or deformation, great care must be exercised when this option is used. 02777-11 4. Each roll shall be visually inspected when unloaded to determine if any packaging or material has been damaged during transit. Repairs to damaged GCL shall be performed in accordance with Section 3.05 of this specification. a. Rolls exhibiting damage shall be marked and set aside for closer examination during deployment. b. Minor rips or tears in the plastic packaging shall be repaired with moisture resistant tape prior to being placed in storage to prevent moisture damage. c. GCL rolls delivered to the project site shall be only those indicated on GCL manufacturing quality control certificates. 5. Storage of the GCL rolls shall be the responsibility of the Geosynthetics Installer or other designated party. All GCL rolls shall be stockpiled and maintained dry in a flat location area away from high-traffic areas sufficiently close to the active work area to minimize handling. 6. The presence of free-flowing water within the packaging shall require that roll to be set aside for further examination to ascertain the extent of damage, if any. Free-flowing water within the packaging of unreinforced GCLs shall be cause for rejection of that roll. a. GCL should be stored no higher than three to four rolls high or limited to the height at which the handling apparatus may be safely handled by installation personnel. Stacks or tiers of rolls should be situated in a manner that prevents sliding or rolling by “choking” the bottom layer of rolls. b. Rolls shall not be stacked on uneven or discontinuous surfaces in order to prevent bending, deformation, and damage to the GCL or cause difficulty inserting the core pipe. c. An additional tarpaulin or plastic sheet shall be used over the stacked rolls to provide extra protection for GCL material stored outdoors. d. Bagged bentonite material shall be stored and tarped next to GCL rolls unless other more protective measures are available. Bags shall be stored on pallets or other suitably dry surface, which will prevent undue prehydration. C. Method of Placement 1. GCL shall be installed such that all seams of the material are laid perpendicular to contours of constant elevation. Exceptions to this can be approved by the Owner or CQA Consultant only. The layout shall be designed to keep field overlapping of the GCL liner to a minimum and consistent with proper methods of GCL liner installation. The non-woven side of the GCL shall be placed against the soil liner. 2. For GCL liner placed on 4 to 1 or steeper slopes, the overlap seams shall be oriented in the direction of the slope. Horizontal seams on 4 to 1 slopes or steeper shall not be allowed except for cases in which it is unavoidable. 02777-12 Horizontal overlapping seaming methods on 4 to 1 slopes or steeper shall be approved by the Engineer prior to or during the Geosynthetics pre-construction meeting. 3. The equipment used to deploy the liner shall not cause rutting of the prepared subbase surface. If rutting occurs, the Geosynthetics Installer shall suspend all liner placement activities and repair the ruts and immediately employ an alternative method for liner deployment. GCL liner rolls shall be placed using spreader and rolling bars with cloth slings. If a sheet must be relocated a distance greater than its width, a slip-sheet shall be used. 4. The CQA Consultant shall inspect each panel, after placement and for damage and/or defects. Defective or damaged panels shall be replaced or repaired, as approved by the CQA Consultant. 5. The GCL shall not be permitted to become hydrated (wet) at any time before, during or after its installation, prior to placement of the primary geomembrane (including seaming of geomembrane). The Geosynthetics Installer shall limit deployment of GCL to areas that may subsequently be covered by the primary geomembrane including seaming of all panels during the same day. Any GCL that is damaged due to rain or any other conditions shall be removed and replaced by the Geosynthetics Installer at no additional cost to the Owner provided the damage was the direct fault of the Geosynthetics Installer. The Owner or CQA Consultant will make determination of the need for removal and replacement. 6. The GCL shall be oriented per the manufacturer's directions. The CQA Consultant shall verify that every GCL panel is installed with this orientation. 7. GCL shall be adjusted to smooth out creases or irregularities, but shall not be pulled enough to induce tension or stress. 8. The Geosynthetics Installer shall not drag the GCL liner panels over the compacted soil liner. 9. All GCL liner shall be anchored as shown on the Contract Drawings and consistent with Manufacturer's recommendations. Sufficient liner shall be installed within the anchor trench to ensure proper installation prior to backfilling the trench. 10. Personnel working on the GCL liner shall not smoke, wear damaging shoes or involve themselves in any activity that may damage the liner. 11. The GCL liner shall be properly weighted with sand bags to avoid uplift due to wind. 12. Vehicular traffic across the GCL liner shall not be allowed. 13. When tying into existing liner, all excavation of previously installed liner shall be performed by hand to prevent damage. 02777-13 3.04 OVERLAPPED FIELD SEAMS A. Individual panels of liner shall be laid out and overlapped by a minimum of 12-inches along longitudinal seams and 12 inches minimum on the panel end seams. GCL shall be adjusted to smooth out creases or irregularities, but shall not be pulled enough to induce tension or stress. B. GCL seams shall consist of a simple overlap and shall not be permitted to be “stapled” or “pinned”. All dirt, soil and debris shall be removed from the overlap. Panels shall be shingled in a down gradient direction. A loose layer of sodium Bentonite shall be spread along each overlap at a rate consistent with manufacturers recommendation. 3.05 REPAIRS A. Prior to cover material placement, damage to the GCL shall be identified and repaired by the installer. Damage is defined as any rips or tears in the geotextiles, delamination of geotextiles or a displaced panel. 1. Rip and Tear Repair (Flat Surfaces) – Rips or tears may be repaired by completely exposing the affected area, removing all foreign objects or soil, and by then placing a patch cut from unused GCL over the damage (damaged material may be left in place), with a minimum overlap of 12 inches on all edges. Accessory bentonite should be placed between the patch edges and the repaired material at a rate of a quarter pound per lineal foot of edge spread in a continuous six-inch fillet. 2. Rip and Tear Repair (Slopes) – Damaged GCL material on slopes shall be repaired by the same procedures above, however, the edges of the patch should also be adhered to the repaired liner with an adhesive to keep the patch in position during backfill or cover operations. 3. Displaced Panels – Displaced panels shall be adjusted to the correct position and orientation. The adjusted panel shall then be inspected for any geotextile damage or bentonite loss. Damage shall be repaired by the above procedure. 4. Premature Hydration – If the GCL is prematurely hydrated, installer shall notify the QA/QC technician and Project Engineer for a site-specific determination as to whether the material is acceptable of if alternative measures must be taken to ensure the quality of the design – dependent upon the degree of damage. B. Care shall be taken to minimize the loss of bentonite into underlying liner materials. Loose bentonite that is present on underlying materials shall be either swept or vacuumed off of the underlying material. 3.06 OVERLYING GEOSYNTHETICS 02777-14 A. Precautions shall be taken to prevent damage to the GCL by restricting the use of heavy equipment over the liner system. B. Installation of the overlying geosynthetic component can be accomplished through the use of lightweight, rubber-tired equipment such as a 4-wheel all-terrain vehicle (ATV). This vehicle can be driven directly on the GCL, provided the ATV makes no sudden stops, starts, or turns. C. A slip-sheet (such as 20-mil smooth HDPE) may be used to facilitate placement of the textured geomembrane. The slip-sheet shall first be placed over the GCL in order to allow the geomembrane to slide into its proper position. Once the overlying geomembrane is properly positioned, the slip-sheet shall be carefully removed paying close attention to avoiding any movement to the geomembrane. END OF SECTION Request for Permit Modification Energizer Scrap Battery Landfill Permit No. 76-02 Construction Quality Assurance(CQA)Plan The Construction Quality Assurance (CQA) Plan that follows reflect revisions to currently permitted Construction Quality Assurance (CQA) Plan with the addition of geosynthetic clay liner (GCL) as an alternate liner section. 3.0 CONSTRUCTION QUALITY ASSURANCE PLAN TABLE OF CONTENTS 3.1 GENERAL 3.1.1 Introduction 3.1.2 Scope of the CQA Plan 3.1.3 Definitions and Use of Terms 3.1.3.1 Definitions Relating To CQA 3.1.3.2 References To Standard 3.1.3.3 Units 3.1.4 Responsibility and Authority 3.1.4.1 Permitting Agency 3.1.4.2 Owner 3.1.4.2.1 Regional Engineer 3.1.4.2.2 Project Manager 3.1.4.3 Permit Engineer 3.1.4.4 Design Engineer 3.1.4.5 CQA Consultant 3.1.4.6 Soils CQA Laboratory 3.1.4.7 Geosynthetics CQA Laboratory 3.1.4.8 Earthwork Contractor 3.1.4.9 Geosynthetics Manufacturer 3.1.4.10 Geosynthetics Installer 3.1.5 Project Meetings 3.1.5.1 Pre-Construction 3.1.5.2 Weekly Progress Meetings 3.1.5.3 Problem or Work Deficiency Meetings TABLE OF CONTENTS (cont’d) 3.1.6 Qualifications of Key Personnel and Organizations 3.1.6.1 CQA Consultant 3.1.6.2 Soils And Geosynthetics CQA Laboratories 3.1.6.3 Earthwork Contractor 3.1.6.4 Geosynthetics Manufacturer 3.1.6.5 Geosynthetics Installer 3.2 STRUCTURAL FILL, COMPACTED SOIL LINER, AND DRAINAGE MATERIALS 3.2.1 Introduction 3.2.2 Test Methods and Sampling Requirements 3.2.3 Subgrade 3.2.4 Structural Fill 3.2.5 Compacted Soil Liner 3.2.6 Protective Cover 3.2.7 Drainage Sand 3.2.8 Coarse Aggregate 3.2.9 Potential Problems and Deficiencies 3.2.9.1 Notification 3.2.9.2 Repairs and Testing 3.3 GEOSYNTHETIC CLAY LINER 3.3.1 General 3.3.2 Materials 3.3.2.1 Storage and Handling 3.3.2.2 Quality Control Testing 3.3.2.3 Conformance Testing 3.3.3 Installation Methods 3.3.3.1 Storage and Handling 3.3.3.2 Compacted Soil Liner Preparation 3.3.3.3 Anchor Trench 3.3.3.4 Placement of GCL Liner 3.3.3.5 GCL Seaming Requirements 3.3.3.6 Repairs 3.3.3.7 Overlying Geosynthetics TABLE OF CONTENTS (cont’d) 3.4 GEOMEMBRANE 3.4.1 Manufacture, Shipment and Storage 3.4.1.1 Manufacture Of Polyethylene Geomembrane 3.4.1.1.1 Resin Quality 3.4.1.1.2 Certification of Property Values 3.4.1.1.3 Quality Control Certificates 3.4.1.2 Shipment And Handling 3.4.1.3 Conformance Testing Of Geomembrane 3.4.1.3.1 Sample Collection 3.4.1.3.2 Test Results 3.4.1.4 Storage 3.4.2 Geomembrane Installation 3.4.2.1 Earthwork 3.4.2.2 Geomembrane Placement 3.4.2.2.1 Panel Layout 3.4.2.2.2 Field Panel Identification 3.4.2.2.3 Installation Schedule 3.4.2.2.4 Weather Conditions 3.4.2.2.5 Anchorage System 3.4.2.2.6 Method of Placement 3.4.2.2.7 Damage 3.4.2.3 Field Seaming 3.4.2.3.1 Extrusion Seaming 3.4.2.3.2 Fusion Seaming 3.4.2.3.3 Seam Preparation 3.4.2.3.4 Weather Conditions for Seaming 3.4.2.3.5 Trial Seams 3.4.2.3.6 General Seaming Procedure 3.4.2.3.7 Non-Destructive Seam Continuity Testing TABLE OF CONTENTS (cont’d) 3.4.2.4 Defects And Repairs 3.4.2.4.1 Repair Procedures 3.4.2.4.2 Verification of Repairs 3.4.2.4.3 Large Wrinkles 3.4.2.5 Backfilling Of Anchor Trench 3.4.2.6 Liner System Certification/Acceptance 3.4.2.7 Materials In Contact With The Geomembranes 3.4.2.7.1 Geonet 3.4.2.7.2 Appurtenances 3.5 GEOCOMPOSITE 3.5.1 Manufacturer’s Documentation 3.5.1.1 Certification Of Property Values 3.5.1.2 Labeling 3.5.2 Shipment and Storage 3.5.3 Conformance Testing of Geocomposite 3.5.3.1 Sample Collection 3.5.3.2 Test Results 3.5.4 Handling and Placement 3.5.5 Stacking and Joining 3.5.6 Repair 3.5.7 Placement of Materials on Geocomposite 3.6 GEOTEXTILE 3.6.1 Manufacturer’s Documentation 3.6.1.1 Certification Of Property Values 3.6.1.2 Labeling 3.6.2 Shipment and Storage 3.6.3 Conformance Testing of Geotextile 3.6.3.1 Sample Collection 3.6.3.2 Test Results TABLE OF CONTENTS (cont’d) 3.6.4 Handling And Placement 3.6.5 Seams and Overlaps 3.6.6 Repairs 3.6.7 Placement of Materials on Geotextiles 3.7 POLYETHYLENE PIPE AND FITTINGS 3.7.1 Material Requirements 3.7.1.1 Pipe 3.7.1.2 Fittings 3.7.1.3 Joints 3.7.2 Manufacturer’s Documentation 3.7.2.1 Certification Of Property Values 3.7.2.2 Quality Control Certificates 3.7.3 Fusion Process for Joints 3.7.3.1 Preparation 3.7.3.2 Weather Conditions For Butt-Fusion 3.7.3.3 General Butt-Fusion Procedure 3.7.4 Pressure Testing of Joints 3.7.4.1 Segment Testing: Pre-Installation 3.7.4.2 Test Failure 3.7.4.3 Final Test 3.7.4.4 Test Reporting 3.8 SURVEYING 3.8.1 Introduction 3.8.2 Survey Control 3.8.3 Surveying Personnel 3.8.4 Precision and Accuracy 3.8.5 Lines and Grades 3.8.6 Frequency and Spacing 3.8.7 Tolerances 3.8.8 Documentation TABLE OF CONTENTS (cont’d) 3.9 DOCUMENTATION 3.9.1 Introduction 3.9.2 Daily Recordkeeping 3.9.2.1 Daily Summary Report 3.9.2.2 Construction Problem and Solution Report 3.9.2.3 Photographic Reporting Data Sheets 3.9.2.4 Design and/or Specification Changes and Clarifications 3.9.3 Reports 3.9.3.1 Final Record Documentation TABLES SAMPLE DOCUMENTATION FORMS 3 - 17  Equipment break downs during placement;  Excessive pumping or cracking of material occurs;  Adverse weather conditions;  Work conducted in difficult areas; or  High frequency of failing tests. If a defect is discovered in the earthwork product, the CQA Consultant shall immediately determine the extent and nature of the defect. If the defect is indicated by an unsatisfactory test result, the CQA Consultant shall determine the extent of the deficient area by additional tests, observations, a review of records, or other appropriate means. All deficiencies shall be corrected by the Earthwork Contractor to the satisfaction of the CQA Consultant and the Owner. 3.2.9.1 Notification The CQA Consultant shall notify the Earthwork Contractor immediately upon discovering the defect. After determining the extent and nature of the defect, the CQA Consultant shall notify the Project Manager as necessary. 3.2.9.2 Repairs and Retesting The Earthwork Contractor shall correct the deficiency to the satisfaction of the CQA Consultant and Owner. If a design specification criterion cannot be met, or unusual weather conditions hinder work, then the CQA Consultant shall develop and present to the Owner suggested solutions for approval. The CQA Consultant shall schedule appropriate retests after the work deficiency has been corrected. Retests recommended by the CQA Consultant must verify that the defect has been corrected before any additional work is performed by the Earthwork Contractor in the area of the deficiency. 3.3 GEOSYNTHETIC CLAY LINER 3.3.1 General Geosynthetic clay liner (GCL) shall meet material acceptance and construction quality requirements as stated in this Section of the CQA Plan and in the design specifications. 3.3.2 Materials 3.3.2.1 Storage and Handling GCL materials shall be stored, handled, and installed in strict accordance with the manufacturer's recommendation. At a minimum, the Owner shall provide a dry storage 3 - 18 area on firm level ground. The Geosynthetics Installer shall cover all rolls with additional plastic tarps. 3.3.2.2 Quality Control Testing Quality control testing shall be conducted by the manufacturer and the results submitted to the CQA Consultant to demonstrate that the GCL meets the certification requirements as contained in the CQA Plan. The Manufacturer's quality control manager shall sign quality control certificates. Each certificate shall have Manufacturer’s name, product identification, lot number, length, width roll identification number, sampling procedures, frequency and test results. At a minimum the following test results shall be provided in accordance with test requirements specified in Table 3.3-1.  Bentonite Content  GCL Peel Strength  Swell Index  Fluid Loss  Permeability 3.3.2.3 Conformance Testing The GCL shall be manufactured by Colloid Environmental Technologies Company (Bentomat ST) or Engineer approved equal, and shall meet the minimum average roll value conformance testing specifications contained in Table 3.3-2. If a conformance test is found to be failing the following procedures shall be used to determine the acceptance of the material:  If all the test values for a sample meet all of the values given in the conformance testing requirements in Table 3.3-2, and also the Manufacturer's guaranteed minimum values, the sample passes.  If any of the test values for the sample do not meet one or more of the required conformance testing values, additional evaluation procedures will be implemented by the CQA Consultant:  For the failing test parameter(s), the CQA Geosynthetic Laboratory shall perform two additional tests on the sample. The tests may be performed by another CQA Geosynthetics Laboratory at the discretion of the CQA Consultant and the Owner.  If all of the test values for each of the two additional tests meet the required values, the roll and adjacent rolls pass and are acceptable. 3 - 19  If one or more of the additional test values do not meet requirements, the CQA Consultant shall reject the roll and collect samples from the closest numerical roll on both sides of the failed roll and test for the failed parameter(s). If one or both of these tests do not meet requirements, those roll(s) will be rejected and the CQA Consultant and Owner shall determine further testing protocol and criteria for identifying the limits of rejected rolls. The CQA Consultant will ensure that conformance samples are removed at the specified frequency and forwarded to the CQA Consultant’s Laboratory. The CQA Consultant will review laboratory test results as soon as they become available, and make appropriate recommendations to the Owner. All conformance test results shall meet, or exceed, the property values listed in Table 3.3-2. In the case of failing test results, the Manufacturer may request that an independent laboratory retest another sample with the Manufacturer’s technical representative present during testing procedures. The Manufacturer shall pay for this retesting. The Manufacturer may also have the sample retested at two different laboratories approved by the Owner. If both laboratories report passing results, the material shall be accepted. If both laboratories do not report passing results, all liner material from the lot representing the failing sample will be considered out of specification and rejected. The Geosynthetics Installer shall, prior to delivery of materials, submit to the Owner and CQA Consultant certifications from the GCL manufacturer that the delivered GCL will meet the minimum specifications listed in this Technical Specification and the CQA Plan. 3.3.3 Installation Methods 3.3.3.1 Storage and Handling Materials shall be transported, stored, and handled so as to prevent damage of the liner rolls. The GCL materials shall be stored so as to be protected from puncture, dirt, grease, water, moisture, mud, mechanical abrasions, and excessive heat. GCL Liner rolls shall not be moved from this structure until the day they are to be installed. Storage of GCL in the open environment shall be avoided. The storage of GCL Liner shall be sufficiently close to the work area to minimize handling. Spreader bars, stingers, roller cradles, or straps shall be used to handle and place the GCL Liner. Protective plastic wrapping shall not be removed until just prior to deployment. The GCL shall not be permitted to become hydrated (wet) at any time before, during or after its installation, prior to placement of the primary geomembrane (including seaming of geomembrane). Geosynthetics Installer shall limit deployment of GCL to areas that may subsequently be covered by the primary geomembrane including seaming of all 3 - 20 panels during the same day. Any GCL that is damaged due to rain or any other conditions shall be removed and replaced by the Geosynthetics Installer at no additional cost to the Owner provided the damage was the direct fault of the Geosynthetics Installer. The Owner or CQA Consultant will make determination of the need for removal and replacement. 3.3.3.2 Prepared Subbase Preparation Preparation of the prepared subbase surface shall be as specified in Section 3.2.4, of the CQA manual. The surface of the prepared subbase shall be smooth, uniform, and free from sudden changes in grade (such as vehicular ruts), rocks, stones, debris, ice, standing water, and deleterious materials. The moisture content of the prepared subbase must be maintained within the project specifications until the synthetic liner has been installed. If excessive drying occurs, the contractor shall rehydrate and compact the affected area to the Engineer's satisfaction. During actual placing of the GCL, the prepared subbase surface shall be kept free of all standing water. If the prepared subbase surface below the GCL liner becomes wet and unstable, it shall be dried and recompacted to the Engineer's satisfaction. If drying and recompacting the material is insufficient, the unstable material must be removed and replace with approved material. Before the liner installation begins, the Contractor and installer shall verify in writing and submit to the CQA Consultant that the lines and grades are in relative conformance with the Contract Drawings and Specifications and that the surface area to be lined has been rolled and compacted, free of irregularities, abrupt changes in grade and meets the requirements of Section 3.7 of the CQA manual. Any synthetic liner system materials damaged during the repair work shall be replaced with new material. All costs associated with such actions will be paid for entirely by the Contractor including, but not limited to, labor, additional liner system material, testing, labor and material costs incurred by the Engineer to perform additional inspection services. 3.3.3.3 Anchor Trench The anchor trench shall be constructed as shown on the Contract Drawings and as specified herein. Slightly rounded corners shall be provided in the trench to avoid sharp bends in the liner. The anchor trench shall be adequately drained to prevent water ponding and softening of adjacent soils. Backfilling of anchor trenches shall be performed in accordance with the Technical Specifications and Section 3.4.2.5 of the CQA Manual. 3 - 21 If the anchor trench is located in clay susceptible to desiccation, the amount of trench open at any time shall be limited to one day of liner installation capacity. 3.3.3.4 Placement of GCL Liner GCL shall not be installed when working conditions exceed temperatures of 104° Fahrenheit (F) or are less than 40°F. GCL liner placement shall not be performed during precipitation, excessive moisture, in an area of ponded water, or excessive winds. The Geosynthetics Installer shall limit the deployment of GCL to areas that may subsequently be covered by the primary HDPE geomembrane, including seaming of all HDPE panels during the same day. GCL shall be installed such that all seams of the material are laid perpendicular to contours of constant elevation. Exceptions to this can be approved by the Owner or CQA Consultant only. The GCL shall be oriented per the manufacturer's directions. The CQA Consultant shall verify that every GCL panel is installed with this orientation. For GCL liner placed on 4 to 1 or steeper slopes, the overlap seams shall be oriented in the direction of the slope. Horizontal seams on 4 to 1 slopes or steeper shall not be allowed except for cases in which it is unavoidable. The Engineer prior to or during the Geosynthetics pre-construction meeting shall approve horizontal overlapping seaming methods on 4 to 1 slopes or steeper. The equipment used to deploy the liner shall not cause rutting of the prepared subbase surface. If rutting occurs, the Liner Contractor shall suspend all liner placement activities and repair the ruts and immediately employ an alternative method for liner deployment. GCL liner rolls shall be placed using spreader and rolling bars with cloth slings. If a sheet must be relocated a distance greater than its width, a slip-sheet shall be used. The CQA Consultant shall inspect each panel after placement for damage and/or defects. Defective or damaged panels shall be replaced or repaired, as approved by the CQA Consultant. GCL shall be adjusted to smooth out creases or irregularities, but shall not be pulled enough to induce tension or stress. The Geosynthetics Installer shall not drag the GCL liner panels over the compacted soil liner. All GCL seams shall have an overlap of 6 inches minimum along longitudinal seams and 24 inches minimum on the panel end seams. 3 - 22 Care shall be taken to minimize the loss of bentonite into underlying liner materials. Loose bentonite that is present on underlying materials shall be either swept or vacuumed off of the underlying material. Vehicular traffic across the GCL liner shall not be allowed. When tying into existing liner, all excavation of previously installed liner shall be performed by hand to prevent damage. 3.3.3.5 GCL Seaming Requirements Individual panels of liner shall be laid out and overlapped by a minimum of 12-inches along longitudinal seams and 12 inches minimum on the panel end seams. GCL shall be adjusted to smooth out creases or irregularities, but shall not be pulled enough to induce tension or stress. GCL seams shall consist of a simple overlap and shall not be permitted to be "stapled or pinned." All dirt, soil, and other debris shall be removed from the overlap. Panels should be shingled in a down gradient direction. A loose layer of sodium bentonite shall be spread along each overlap at a rate consistent with manufacturer’s recommendations. Damaged areas shall be repaired by removing the damaged area and placing a new piece of GCL underneath the damaged area. This new piece shall extend a minimum of 12 inches beyond the damaged area in all dimensions. 3.3.3.6 Repairs Prior to cover material placement, damage to the GCL shall be identified and repaired by the installer. Damage is defined as any rips or tears in the geotextiles, delamination of geotextiles or a displaced panel.  Rip and Tear Repair (Flat Surfaces) – Rips or tears may be repaired by completely exposing the affected area, removing all foreign objects or soil, and by then placing a patch cut from unused GCL over the damage (damaged material may be left in place), with a minimum overlap of 12 inches on all edges. Accessory bentonite should be placed between the patch edges and the repaired material at a rate of a quarter pound per lineal foot of edge spread in a continuous six-inch fillet.  Rip and Tear Repair (Slopes) – Damaged GCL material on slopes shall be repaired by the same procedures above, however, the edges of the patch should also be adhered to the repaired liner with an adhesive to keep the patch in position during backfill or cover operations.  Displaced Panels – Displaced panels shall be adjusted to the correct position and orientation. The adjusted panel shall then be inspected for 3 - 23 any geotextile damage or bentonite loss. Damage shall be repaired by the above procedure.  Premature Hydration – If the GCL is prematurely hydrated, the Geosynthetics Installer shall notify the QA/QC technician and Project Engineer for a site-specific determination as to whether the material is acceptable of if alternative measures must be taken to ensure the quality of the design – dependent upon the degree of damage. Care shall be taken to minimize the loss of bentonite into underlying liner materials. Loose bentonite that is present on underlying materials shall be either swept or vacuumed off of the underlying material. 3.3.3.7 Overlying Geosynthetics Precautions shall be taken to prevent damage to the GCL by restricting the use of heavy equipment over the liner system. Installation of the overlying geosynthetic component can be accomplished through the use of lightweight, rubber-tired equipment such as a 4-wheel all-terrain vehicle (ATV). This vehicle can be driven directly on the GCL, provided the ATV makes no sudden stops, starts, or turns. A slip-sheet (such as 20-mil smooth HDPE) may be used to facilitate placement of the textured geomembrane. The slip-sheet shall first be placed over the GCL in order to allow the geomembrane to slide into its proper position. Once the overlying geomembrane is properly positioned, the slip-sheet shall be carefully removed paying close attention to avoiding any movement to the geomembrane. 3.4 GEOMEMBRANE 3.4.1 Manufacture, Shipment and Storage The following addresses the activities associated with the manufacture of the geomembrane; the shipment, handling, and delivery of geomembrane to the site; conformance testing of delivered geomembrane; and the storage of the geomembrane prior to installation. 3.4.1.1 Manufacture Of Polyethylene Geomembrane The Geosynthetics Manufacturer shall provide documentation that the material meets the requirements of the design specifications, as listed in Table 3.4-1 [High Density Polyethylene (HDPE)] and Table 3.4-4 [Liner Low Density Polyethylene (LLDPE)] (Tables), and that adequate quality control measures have been implemented during the manufacturing process. SECTION 3.3 ATTACHMENTS TABLE 3.3-1 REQUIRED GEOSYNTHETIC CLAY LINER PROPERTIES Material Property Value Units Test Method Test Frequency Swell Index 24 ml ASTM D5890 1 per 100,000 lb or 1 per lot Fluid Loss 18 ml ASTM D5891 1 per 100,000 lb or 1 per lot Bentonite Content(1) 0.75 lbs/ft2 ASTM D5993 1 per 40,000 ft2 or 1 per lot GCL Peel Strength 3.5 lbs/in ASTM D6496 1 per 40,000 ft2 or 1 per lot Permeability(2) 5.0 x 10-9 cm/sec ASTM D5084 1 per 100,000 ft2 or 1 per lot Notes: (1) At a 0 percent moisture content or oven dried condition. (2) Engineer shall determine permeability test pressure and gradients. TABLE 3.3-2 REQUIRED MATERIAL CONFORMATION TESTING GEOSYNTHETIC CLAY LINER Material Property Value Units Test Method Test Frequency Bentonite Content(1) 0.75 lbs/ft2 ASTM D5993 1 per 100,000 ft2 or 1 per lot GCL Peel Strength 3.5 lbs/in ASTM D6496 1 per 100,000 ft2 or 1 per lot Permeability(2) 5.0 x 10-9 cm/sec ASTM D5084 1 per 250,000 ft2 or 1 per lot Notes: (1) At a 0 percent moisture content or oven dried condition. (2) Engineer shall determine permeability test pressure and gradients. ERM NC, Inc. 8000 Corporate Center Drive, Suite 200 Charlotte, NC 28226 (704) 541-8345 SHEET NO. OF DATE PROJECT NAME: COMPUTED BY: PROJECT NO.: CHECKED BY: MATERIAL DESCRIPTION: GCL DEPLOYMENT LOG PANEL DATE ROLL NO. LENGTH WIDTH SQUARE FOOTAGE TOTAL SQUARE FOOTAGE