Loading...
HomeMy WebLinkAbout7906_Duke DanRiver_RevisedOpsPlanApproval_DIN27829_20170525 ROY COOPER Governor MICHAEL S. REGAN Secretary MICHAEL SCOTT Director State of North Carolina | Environmental Quality | Waste Management 1646 Mail Service Center | 217 West Jones Street | Raleigh, North Carolina 27699-1646 919 707 8200 May 25, 2017 Delivered by Email – melonie.martin@duke-energy.com Ms. Melonie Martin, Lead Environmental Specialist Duke Energy Corporation 3195 Pine Hall Road Belews Creek, North Carolina 27009 Subject: Revised Operations Plan, Approval Permit No. 7906-INDUS-2016, Duke Energy Dan River Steam Station Rockingham County, DIN 27829 Dear Mrs. Martin: On May 24, 2017, the Division of Waste Management, Solid Waste Section (Section) received Duke Energy’s revised Operations Plan (Plan) for Permit No. 7906-INDUS-2016, Duke Energy Dan River Steam Station (Facility), entitled; Operations Plan, Dan River Landfill, Duke Energy – Dan River Steam Station, Eden, North Carolina, Amec Foster Wheeler Project No. 7810140065. Prepared for Duke Energy. Prepared by Amec Foster Wheeler. May 2017. DIN 27828. The Section has reviewed the revised Plan and hereby approves. Prior to issuing an approval to commence operations in Cell 1 the following conditions remain to be met; 1. A revised Water Quality Monitoring Plan must be submitted to and approved by the Section. 2. Attachment 2. Condition 20. of the Permit Approval to Construct requires a pre-operation meeting prior to commencement of operations, the Section expects all landfill equipment and appurtenances to be in place and operational at the time of the meeting. The required meeting is scheduled for May 30, 2017. 3. The Duke Energy must provide to the Section a list of all trained landfill operators for this Facility, operator training is scheduled for May 30, 2017. The document referenced above (DIN 27828) is now considered an approved document of the Facility’s permit and will be treated as such. The next time the Facility’s permit is either amended or modified this document will be added to the list of approved documents within the permit. All documents referred to in this letter are available at; http://edocs.deq.nc.gov/WasteManagement/0/fol/870/Row1.aspx Duke Energy, Dan River Steam Station May 25, 2017 Page 2 of 2 Should you have any questions regarding this matter you may contact me at (828) 296-4704 larry.frost@ncdenr.gov or Elizabeth Werner at (919) 707-8253 elizabeth.werner@ncdenr.gov . Sincerely, Larry Frost, Engineering Project Manager Permitting Branch, Solid Waste Section Division of Waste Management, NCDEQ ec: Cedric Ruhl -Amec Foster Wheeler Ellen Lorscheider – SWS/RCO Ed Mussler – SWS/RCO Elizabeth Werner – SWS/RCO Shawn McKee – SWS/RCO