Loading...
HomeMy WebLinkAbout9703_INSP_20170511FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 1 of 2 UNIT TYPE: Lined MSWLF LCID YW Transfer Compost SLAS COUNTY: Wilkes Closed MSWLF HHW White goods Incin T&P FIRM PERMIT NO.: 97-03 CDLF Tire T&P / Collection Tire Monofill Industrial Landfill X DEMO SDTF FILE TYPE: COMPLIANCE Date of Site Inspection: May 11, 2017 Date of Last Inspection: June 2, 2016 FACILITY NAME AND ADDRESS: Louisiana Pacific Corporation 1151 ABTCO Road North Wilkesboro, North Carolina 28659 GPS COORDINATES: N: 36.20102 W: 81.04109 FACILITY CONTACT NAME AND PHONE NUMBER: Name: Sharon Wetzel, Environmental Manager Telephone: (336) 696-3464 (o) or (336) 466-2692 (m) Email address: sharon.wetzel@lpcorp.com FACILITY CONTACT ADDRESS: Post Office Box 98 Roaring River, North Carolina 28669 PARTICIPANTS: Sharon Wetzel, Environmental Manager Charles Gerstell, NCDEQ – Solid Waste Section STATUS OF PERMIT: A Permit to Operate Existing Landfill Unit & Horizontal Expansion Unit was issued to Louisiana-Pacific Corporation on February 4, 2016. This permit shall expire on December 28, 2019. PURPOSE OF SITE VISIT: Comprehensive Inspection STATUS OF PAST NOTED VIOLATIONS: N/A OBSERVED VIOLATIONS: None The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit, or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules. FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 2 of 2 ADDITIONAL COMMENTS 1. The Louisiana Pacific Corporation manufactures hardboard (construction) siding and operates a wood ash landfill located adjacent to the manufacturing facility. 2. The landfill is permitted to accept wood ash generated from the wood-fired boilers and zinc borate sludge from the facility’s wastewater treatment plant. 3. The facility is required to maintain a record of the amount of solid waste received at the landfill unit, compiled on a monthly basis. Disposal records for July 2016 through April 2017 were verified. The facility received a total of 10, 566 tons of waste during this time period. 4. In-house training is provided for all personnel involved with ash landfill operations. The last training event was performed on July 26, 2016. 5. Groundwater monitoring was being performed semiannually as required. Facility staff take samples which are sent to Meritech, Inc. Environmental Laboratory for testing. Second semiannual sampling for 2016 was performed on August 22, 2016. First semiannual sampling for 2017 had just recently been performed and the facility had not yet received the results. Operations Inspection of the Landfill Unit: 6. Waste was being placed in Phase 3B at the time of inspection. 7. Inactive portions of the landfill were stable with native vegetation. 8. Multiple fire boxes equipped with hydrants and fire hoses were provided on top of the landfill to aid in fire control. 9. The working face was well controlled at the time of inspection. 10. No unacceptable waste streams were observed. 11. At the time of inspection, a portion of the western half of the landfill had been mowed. 12. Two of the wooden posts located along the crest of the southern slope had been broken since the last inspection leaving holes in the soil on the landfill. Please ensure that these areas are properly repaired to prevent erosion or water infiltration into the landfill. 13. A small rut was observed adjacent to the wooden posts at the crest of the southern slope of the landfill. Please repair this area and stabilize any related soil disturbance with a groundcover sufficient to restrain erosion. 14. The facility is approved to mix zinc borate sludge with ash for disposal within the landfill. The sludge to ash ratio is required to be an average of 2:1. 15. The riser basin appeared to be adequately maintained at the time of inspection. 16. The rock check dam located adjacent to the access road was in place and maintained. 17. Yellow edge of waste markers were in place. 18. The facility is secured by a gate and access must be granted via scale house personnel. 19. All access roads were of all-weather construction and well maintained. Please contact me if you have any questions or concerns regarding this inspection report. _________________________________________ Phone: (704) 235-2144 Charles T. Gerstell Environmental Senior Specialist Regional Representative Sent on: 5/19/17 X Email Hand delivery US Mail Certified No. [ _] Copies: Deb Aja, Western District Supervisor - Solid Waste Section Jessica Montie, Compliance Officer - Solid Waste Section Digitally signed by Charles T. Gerstell DN: cn=Charles T. Gerstell, o=Divsion of Waste Management, ou=Solid Waste Section, email=charles.gerstell@ncdenr.gov, c=US Date: 2017.05.19 10:30:54 -04'00'