Loading...
HomeMy WebLinkAbout7305_DukeMayo_Email_RequestAlteredAssessmentScheduleANDApproval_DIN27771_201705181 Werner, Elizabeth From:Werner, Elizabeth Sent:Thursday, May 18, 2017 9:25 AM To:'Witt, Kimberlee' Subject:RE: Mayo Steam Electric Plant Landfill (Permit No. 7305) Dear Kim,     The Division of Waste Management, Solid Waste Section concurs with the alterations made to the assessment  schedule.  Please don’t hesitate to contact me with any future questions or concerns.    Sincerely,   Elizabeth      Elizabeth S Werner Permitting Hydrogeologist North Carolina Department of Environmental Quality (DEQ) Division of Waste Management Solid Waste Section Phone & Fax: 919.707.8253 Physical Address: 217 West Jones Street Mailing Address: 1646 Mail Service Center Raleigh, NC 27699-1646 elizabeth.werner@ncdenr.gov http://deq.nc.gov/ Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties.       From: Witt, Kimberlee [mailto:Kimberlee.Witt@duke‐energy.com]   Sent: Wednesday, May 17, 2017 4:29 PM  To: Werner, Elizabeth <elizabeth.werner@ncdenr.gov>  Subject: Mayo Steam Electric Plant Landfill (Permit No. 7305)    Elizabeth‐    With this email Duke would like to inform the Division of a schedule alteration to the assessment activities at the Mayo  Steam Electric Plant Landfill (Permit No. 7305).  The groundwater assessment workplan was submitted to your office on  1/31/17 and subsequently approved on 3/22/17.    As the project has progressed and detailed access field verified, Duke learned that there will need to be significant road  installation work to an existing embankment for three of the well clusters.  The access road activities were determined  by Duke geotechnical engineers to require stability analysis and detailed construction plan development.  The addition  of a geotechnical investigation and detailed construction plan development has required additional time including a  revision to the previously submitted E&SC plans.     2 The current proposed schedule for the assessment activities is outlined below.  Please let me know if the Division  concurs with the alterations from the initial workplan schedule.  Feel free to call with any questions or comments.    Thanks‐  Kim    Mayo Steam Electric Plant Landfill (Permit No. 7305) groundwater assessment schedule  Task Estimated Timeline  E&SC Plan preparation and submittal submitted  4/5/17  E&SC approval received 4/24/17  E&SC revision request for geotechnical  investigation  submitted 5/11/17  verbal approval 5/17/17  Geotechnical investigation and construction  package development  completed approximately 4 ‐ 6 weeks after  geotechnical field work  Monitoring well access and E&SC permit  implementation   completed approximately 4 ‐ 6 weeks after  completion of construction package completion  Monitoring well installation 5 weeks  Sample collection and analysis 2 weeks after completion of  monitoring well  installation  Data validation 2 weeks after receipt of laboratory analytical  reports  Submittal of assessment report 8 weeks after completion of data validation          Kimberlee Witt, PE DUKE ENERGY Sr. Engineer - Environmental Services 3191 Pine Hall Rd. Walnut Cove, NC 27009 336-215-4576