Loading...
HomeMy WebLinkAbout1107_BuncombeCo_CDLF_Ph5BSoilBaseInstall_27690_20170515 May 15, 2017 Sent Via Email – jon.creighton@buncombecounty.org Mr. Jon Creighton Planning & Development Director 46 Valley Street Asheville, North Carolina 28801 Subject: Phase 5B Soil Base Installation Approval Buncombe County C&D Unit Buncombe County, Permit # 1107‐CDLF‐1998, Document ID 27690 Mr. Creighton, The Division of Waste Management, Solid Waste Section (Section) has completed a review of the submittals titled Permit Modification, Phase 5B (DIN 27689) and Construction Quality Assurance Plan, Phase 5B (DIN 27727). The documents were submitted to the Section on your behalf by McGill Associates and received in the Asheville Regional Office on May 3, 2017 and May 11, 2017, respectively. Based on this review, the Section approves the soil base installation in the approximately 0.2‐acre Phase 5B area of the C&D unit. The soil base must be installed, tested and documented in accordance with the following plans: 1. Permit Modification, Phase 5B (DIN 27689), 2. Construction Quality Assurance Plan (DIN 24948, pp. 529-541) 3. Construction Quality Assurance Plan, Phase 5B (DIN 27727) Waste filling activities in the Phase 5B area may only commence with written authorization from the Section after receipt and review of the Construction Quality Assurance Certification Report. If you should have any questions regarding this matter please contact me at (828) 296‐ 4703, or by email at allen.gaither@ncdenr.gov . Sincerely, Allen Gaither Environmental Engineer Mr. Jon Creighton Phase 5B Soil Base Installation Approval May 15, 2017 Page 2 of 2 CC: Mr. Joe Wiseman – Environmental Infrastructure Consulting Mr. Stephen Hunter – Buncombe County Ms. Kristy Smith – Buncombe County Mr. Jeff Bishop – McGill Associates Mr. Mark Cathey – McGill Associates Mr. Andy Alexander – Bunnell-Lammons Engineering Mr. Jeff Helvey – Bunnell-Lammons Engineering Mr. Kris Riddle – SWS/ARO