HomeMy WebLinkAbout7302_DukeRoxboro_Phase7-9_PiezometerConstructionRecords_DIN27728_201705123191 Pine Hall Road
Walnut Cove, North Carolina 27009
336-215-4576
Page 1 of 1
May 12, 2017 North Carolina Department of Environmental Quality
Division of Waste Management Solid Waste Section
1646 Mail Service Center
Raleigh, North Carolina 27699
Attn: Ms. Elizabeth Werner (submitted electronically)
Re: Roxboro Piezometer Installations
Permit No. 7302-INDUS-1988 Roxboro Steam Electric Plant 1700 Dunnaway Road
Semora, North Carolina 27343
Dear Ms Werner,
On November 15, 2013 Duke Energy (Duke) requested approval to install monitoring wells for water level only at various locations in the potential expansion area of the Roxboro Steam Electric Plant
landfill. Approval from your office was received on November 26, 2013.
Installation of the wells began in December of 2013 and commenced June 2014. There were breaks in
installation activities due to unforeseen access issues and weather. Duke is submitting the attached GW-1 installation forms and survey as record of installation. Duke is periodically obtaining water level
measurements from these wells, however the intended hydrogeological study associated with these
instruments is currently on hold.
If you need additional information in regards to this submittal please do not hesitate to call me at 336-215-4576 or email kimberlee.witt@duke-energy.com.
Regards,
Kimberlee Witt, PE Environmental Services
Attachments: Roxboro Phase 7-9 GW-1 Well Records
Roxboro Monitoring Well and Piezometer Survey
cc: Ed Sullivan – Duke Energy