Loading...
HomeMy WebLinkAbout7302_DukeRoxboro_Phase7-9_PiezometerConstructionRecords_DIN27728_201705123191 Pine Hall Road Walnut Cove, North Carolina 27009 336-215-4576 Page 1 of 1 May 12, 2017 North Carolina Department of Environmental Quality Division of Waste Management Solid Waste Section 1646 Mail Service Center Raleigh, North Carolina 27699 Attn: Ms. Elizabeth Werner (submitted electronically) Re: Roxboro Piezometer Installations Permit No. 7302-INDUS-1988 Roxboro Steam Electric Plant 1700 Dunnaway Road Semora, North Carolina 27343 Dear Ms Werner, On November 15, 2013 Duke Energy (Duke) requested approval to install monitoring wells for water level only at various locations in the potential expansion area of the Roxboro Steam Electric Plant landfill. Approval from your office was received on November 26, 2013. Installation of the wells began in December of 2013 and commenced June 2014. There were breaks in installation activities due to unforeseen access issues and weather. Duke is submitting the attached GW-1 installation forms and survey as record of installation. Duke is periodically obtaining water level measurements from these wells, however the intended hydrogeological study associated with these instruments is currently on hold. If you need additional information in regards to this submittal please do not hesitate to call me at 336-215-4576 or email kimberlee.witt@duke-energy.com. Regards, Kimberlee Witt, PE Environmental Services Attachments: Roxboro Phase 7-9 GW-1 Well Records Roxboro Monitoring Well and Piezometer Survey cc: Ed Sullivan – Duke Energy