HomeMy WebLinkAbout8202_SampsonCoMSWLF_20170505_PTCPhase3Cell10_DIN27697
Facility Permit No: 8202-MSWLF-2000
Permit Approval To Construct
May 05, 2017
DIN 27697
Page 1 of 21
North Carolina Department of Environmental Quality
Division of Waste Management
Roy Cooper Michael S. Regan
Governor Secretary
1646 Mail Service Center, Raleigh, North Carolina 27699-1646
Phone/Fax 919-707-8200 Internet: http://www.ncdenr.gov
An Equal Opportunity \ Affirmative Action Employer
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF WASTE MANAGEMENT
SOLID WASTE SECTION
SOLID WASTE MANAGEMENT FACILITY
Permit No. 8202-MSWLF-2000
SAMPSON COUNTY DISPOSAL, LLC
a wholly owned subsidiary of
WASTE INDUSTRIES USA, INC.
is hereby issued a
PERMIT APPROVAL TO CONSTRUCT
MSW LANDFILL UNIT - PHASE 3, CELL 10
C&D LANDFILL UNIT - CELL 2B
PERMIT APPROVAL TO OPERATE
NOT APPLICABLE
PERMIT FOR CLOSURE
NOT APPLICABLE
located on North Carolina State Road 24 approximately 3.8 miles east of the Town of Roseboro,
Sampson County, North Carolina, in accordance with Article 9, Chapter 130A, of the General Statutes of
North Carolina and all rules promulgated thereunder and subject to the conditions set forth in this
permit. The legal description of the site is identified on the deeds recorded for this property listed in
Attachment No. 1 of this permit.
Edward F. Mussler, III, P.E.
Permitting Branch Supervisor
Solid Waste Section
Facility Permit No: 8202-MSWLF-2000
Permit Approval To Construct
May 05, 2017
DIN 27697
Page 2 of 14
ATTACHMENT 1
GENERAL PERMIT CONDITIONS/INFORMATION
Permit Approval to Operate Data Table
Permit Status Issuance Date Expiration DIN
8202-MSWLF-2000 Active May 05, 2017 June 01, 2026 27697
DIN = Document Identification Number.
PART I: GENERAL FACILITY
1. This permit is issued by the North Carolina Department of Environmental Quality,
Division of Waste Management (Division), Solid Waste Section (Section). In accordance
with North Carolina Solid Waste Management Rule (Rule) 15A NCAC 13B .0201(d), a
solid waste management facility permit shall have two parts: a Permit Approval to
Construct and a Permit Approval to Operate. The Permit Approval to Construct (PTC)
must be implemented in accordance with Attachment 2 of this permit. The Permit
Approval to Operate (PTO) must be implemented in accordance with Attachment 3 of
this permit.
a. The PTC and PTO shall expire June 01, 2026.
b. Pursuant to Rules 15A NCAC 13B .1604(b)(2)(H) or .0534(b)(2)(H), the
permittee must commence construction authorized by this PTC within 18 months
from the issuance date of this permit. Construction includes, but is not limited to,
issuance of construction contracts, mobilization of equipment on site, and related
construction activities including installation of sedimentation and erosion control
structures. If construction does not begin within 18 months from the issuance date
of this permit, then the PTC for the MSWLF and C&DLF units defined in this
permit shall expire September 02, 2016. However, the permittee may re-apply for
the PTC prior to this expiration date. and the re-application will be subject to the
statutes and rules in effect on that date and may be subject to additional fees.
c. Pursuant to the N.C.G.S. 130A-294(a2), the permittee may request the Section an
approval of a Life-of-Site Permit for constructing and/or operating the sanitary
landfill units inside the approved landfill facility on or before June 01, 2026. The
permit application for a Life-of-Site Permit must pertinent plans to the landfill
facility including facility plan, engineering plan, operations plan, closure & post-
closure plan, financial assurance cost estimates, environmental media monitoring
plans, and any other applicable modification to the plans, which shall be made in
accordance with rules in effect at the time of review.
Facility Permit No: 8202-MSWLF-2000
Permit Approval To Construct
May 05, 2017
DIN 27697
Page 3 of 14
2. The persons to whom this permit is issued (“permittee”) are the owners and operators of
the solid waste management facility.
3. The Permit to Construct and Operate for the MSWLF unit and C&DLF unit dated June
15, 2014 has been registered in the Sampson County Register of Deeds on June 21, 2004;
Deed Book 1545, Pages 384-399 (DIN 9938).
4. When this property is sold, leased, conveyed, or transferred in any manner, the deed or
other instrument of transfer shall contain in the description section in no smaller type than
that used in the body of the deed or instrument, a statement that the property has been
used as a sanitary landfill and a reference by book and page to the recordation of the
permit.
5. By beginning construction or receiving waste at the facility the permittee shall be
considered to have accepted the terms and conditions of this permit.
6. Construction or operation of this solid waste management facility must be in accordance
with the Solid Waste Management Rules (Rule), 15A NCAC 13B, Article 9 of the
Chapter 130A of the North Carolina General Statutes (N.C.G.S. 130A-290, et seq.), the
conditions contained in this permit; and the approved plan. Should the approved plan and
the rules conflict, the rules shall take precedence unless specifically addressed by permit
condition. Failure to comply may result in compliance action or permit revocation.
7. This permit is issued based on the documents submitted in support of the application for
permitting the facility including those identified in the “List of Documents for the
Approved Plan” which constitute the approved plan for the facility. Where discrepancies
exist, the most recent submittals and the Conditions of Permit shall govern.
8. This permit may be transferred only with the approval of the Section, through the
issuance of a new or substantially amended permit in accordance with applicable statutes
and rules. In accordance with N.C.G.S. 130A-295.2(g) the permittee shall notify the
Section thirty (30) days prior to any significant change in the identity or business structure
of either the owner or the operator, including but not limited to a proposed transfer of
ownership of the facility or a change in the parent company of the owner or operator of
the facility.
9. The permittee is responsible for obtaining all permits and approvals necessary for the
development of this project including approval from appropriate agencies for a General or
Individual NPDES Stormwater Discharge Permit. Issuance of this permit does not
Facility Permit No: 8202-MSWLF-2000
Permit Approval To Construct
May 05, 2017
DIN 27697
Page 4 of 14
remove the permittee’s responsibilities for compliance with any other local, state or
federal rule, regulation or statute.
Properties Approved for the Solid Waste Facility
Sampson County NC Register of Deeds
Deed
Book
Page
No.
Grantor Grantee Tract Description Acreage
1359 630 BFI Waste Systems
of North America,
Inc. Tract
Sampson County
Disposal, Inc.
Canal Industries Tract 59.23
Canal Industries Tract 2 168.00
B. Williams Tract 5.85
Carlisle Tract 2.00
DuBose-Jones Tract 117.03
Butler Tract No. 1 14.45
Williams/Godwin Tract 7.00
Fisher Tract 110.54
Canal Industries Tract 26.77
Butler Tract No. 2 12.33
Thompkins Tract No. 2 5.00
Spell Tract 5.00
J. Williams Tract 10.00
Canal Industries Tract 1 64.16
Godwin/Williams Tract 3.25
1367 749 Canal Industries,
Inc.
Sampson County
Disposal, Inc.
Portion of Williams
Tract
315.00
1426 0021 Benjamin R.
Warrick
Sampson County
Disposal, LLC
N/A 9.10
Total 934.71
PART II: MUNICIPAL SOLID WASTE LANDFILL (MSWLF) UNIT(S)
Permitting History
The permit history only lists the permit activities under Permit Number 8202-MSWLF-2000 for
Sampson County Disposal, Inc. or Sampson County Disposal, LLC owned by Waste Industries,
Inc. since May 30, 2000.
Permit Type Date Issued DIN
Initial Issuance. Permit to Construct (PTC): MSWLF -
Phase 1; CDLF – Phases 2 & 3.
April 19, 1999 9926
Initial Issuance for Change of Ownership. Permit to
Operate (PTO): MSWLF - Phase 1, Cells 1 & 2; CDLF
– Phase 1.
September 6, 2000 9927
Facility Permit No: 8202-MSWLF-2000
Permit Approval To Construct
May 05, 2017
DIN 27697
Page 5 of 14
Permit Modification. PTO: MSWLF – Phase 1, Cells 3
& 4; C&DLF – Phase IIA.
October 5, 2001 9931
Permit Modification. PTO: MSWLF - Phase 1, Cells
3A and 5.
November 18, 2003 9937
Permit Substantial Amendment - Change in Franchise.
PTO: MSWLF – Phase 1.
June 15, 2004 9938
Permit Amendment. PTC: MSWLF Phase 2, Cells 6. August 25, 2005 9940
Permit Modification. PTO: MSWLF - Phase 2, Cell 6. June 1, 2006 9944
Permit Amendment. PTC: MSWLF - Phase 2, Cell 8;
PTO: MSWLF – Phase 1 Cells 1 - 5 & Phase 2, Cells 6
& 7.
April 8, 2010 10311
Permit Modification. PTC: MSWLF – Phase 2, Cell 8;
PTO: MSWLF – Phase 1, Cells 1 - 5 & Phase 2, Cells 6
& 7 and C&DLF Cells 1 & 2A.
April 20, 2012 16469
Permit Modification. PTO: MSWLF – Phases 1 & 2
(Cells 1 – 8) and C&DLF Cells 1 & 2A.
July 3, 2012 16859
Permit Amendment (10 Year Permit). PTC: MSWLF –
Phase 3, Cell 9, C&DLF Cell 2B; PTO: MSWLF –
Phases 1 & 2 (Cells 1 through 8) and C&DLF Cells 1
& 2A.
March 23, 2015 23820
Permit Modification (10 Year Permit). PTC: C&DLF
Cell 2B; PTO: MSWLF – Phases 1, 2 & 3 (Cells 1
through 9) and C&DLF Cells 1 & 2A.
June 29, 2016 26349
Permit Modification (10 Year Permit). PTC: MSWLF –
Phase 3, Cell 10, C&DLF Cell 2B.
May 05, 2017 27697
List of Documents for the Approved Plan
The descriptions of historical documents are found in the Permit to Operate issued July 3, 2012,
DIN 16859.
DOCUMENT
ID NO. (DIN)
DOCUMENT DESCRIPTION
9938 Leachate Recirculation Demonstration Report, Sampson County Landfill (Permit
No. 82-02). Prepared by: G.N. Richardson, & Associates, Inc. (GRA), April 22,
2004.
9944 Notification of Sludge Solidification Operations, Sampson County Landfill
(Permit No. 82-02). Prepared by: GRA, February 17, 2005.
9944 Notice of Intend to Closure, Closure Event No. 1, Sampson County Disposal,
LLC, (Permit No. 82-02). Prepared by: GRA, January 25, 2006. Proposed to close
18.3 acres and final closure area is 12 acres.
Facility Permit No: 8202-MSWLF-2000
Permit Approval To Construct
May 05, 2017
DIN 27697
Page 6 of 14
22564 Construction Certification Report, Sampson County Disposal, LLC (Solid Waste
Permit No. 82-02), Roseboro, North Carolina. Prepared by: Richardson Smith
Gardner & Associates, Inc. (RSG), August 10, 2007. Approximately 12-acre final
cover was installed over MSWLF Cells 1 through 4.
16404 Permit Renewal Application, Sampson County Disposal, LLC, Landfill Facility,
NC Solid Waste Permit No. 82-02. Prepared by: RSG, April 2011. The 30-yr
franchise agreement (expire November 21, 2032) and zoning approval letter are
included.
17091 Landfill Gas Well Installation/Up-fit, Sampson County C&D and MSW Landfills,
Roseboro, North Carolina. Prepared by Smith Gardner, Inc. August 7, 2012.
Seven (7) gas wells (GP-1 through GP-7) around C&DLF were installed.
22565 Construction Quality Assurance Report, Ring Cap Construction, Final Cover
Event No.2 – “Ring Cap,” NC Solid Waste Permit No. 82-02. Prepared by Smith
Gardner, Inc. (S+G). July 2013. Approximately 2.6-acre final cover of the
MSWLF was installed.
18979 Evaporation as a Leachate Management Tool Demonstration Request, Sampson
County Disposal, LLC, (NC Solid Waste Permit No. 82-02) Roseboro, North
Carolina. Prepared by S+G. May 10 2013.
23401 Gravity Groundwater Intercept Cell 9 – Final Report. Sampson County Disposal,
LLC. Prepared by S+G. February 3, 2015. Approved on February 19, 2015 (DIN
23682). The MSWLF Phases 3 encompasses three Cells – 9 through 11.
23774
Water Quality Monitoring Plan, Sampson County Disposal, LLC, MSW Landfill
Phase 3 and C&D Landfill Cells 2B & 3, Roseboro, North Carolina. Prepared by
S+G. November 2013
23775 Landfill Gas Monitoring Plan, Sampson County Disposal, LLC, MSW Landfill
Phase 3 and C&D Landfill Cells 2B & 3, Roseboro, North Carolina. Prepared by
S+G. November 2013
23822 Permit To Construction Application, Sampson County Disposal, LLC, MSW
Landfill Phase 3 and C&D Landfill Cells 2B & 3, Roseboro, North Carolina.
Prepared by S+G. Dated November 2013 and revised through February 10, 2015.
26281 Leachate Storage Tank Modification, Sampson County Disposal, LLC (Solid
Waste Permit No. 82-02), Roseboro, North Carolina. Prepared by S+G. Dated
June 17, 2016.
26348 Construction Quality Assurance Report, Sampson County Disposal, LLC, Permit
Area 82-02MSW Landfill, Cell 9 Construction, Roseboro, North Carolina.
Prepared by S+G. Dated May 16, 2016 and revised through June 27, 2016.
27693 Gravity Groundwater Intercept Installation – Cell 10, Sampson County Disposal,
LLC, Roseboro, North Carolina. Prepared by S+G. Dated April 27, 2017 and
revised through May 02, 2017. The revised subgrade of the landfill base of Phase
Facility Permit No: 8202-MSWLF-2000
Permit Approval To Construct
May 05, 2017
DIN 27697
Page 7 of 14
3, Cell 10 & as-built GGI are included (DIN 27691).
PART III: CONSTRUCTION AND DEMOLITION DEBRIS LANDFILL (C&DLF)
UNIT(S)
Permitting History
Permit Type Date Issued DIN
Permit issued under the Permit Number 8202-CDLF-1996 SAMPSON COUNTY C&DLF
Original issuance. Permit to Construct (PTC): C&DLF-
Phase 1.
March 8, 1996, 9921
Original issuance. Permit to Operate (PTO): C&DLF –
Phase 1.
September 10, 1996 9921
Permit Amendment. PTC: C&DLF – Phase 1. September 25, 1996 9921
On April 19, 1999 the permit for C&DLF unit has been incorporated into the permit for
MSWLF unit; the permitting history of the C&DLF unit is same as that of the MSWLF unit
which is described in Part II of Attachment 1.
List of Documents for the Approved Plan
DIN DOCUMENT DESCRIPTION
22338 Construction Plan Application for a Construction and Demolition
Debris Landfill, Sampson County Disposal, Inc., Northern Expansion
Area. Prepared by S&ME, Inc. December 1995 and revised through
January 1996.
- Request for Modification to Permit No. 82-02. Prepared by S&ME,
Inc. September 25, 1996.
- Field Density Test Report. Prepared by: S&ME Inc. August 30, 1996.
- As-Built Survey. Prepared by: Derward W. Baker and Associates. August
30, 1996.
- Sampson County C&D Landfill, Phase IIA. Construction Quality
Assurance (CQA) & Application for a Permit to Operate a C&D Landfill.
Prepared by: ESP Associates, P.A. September 2000.
- Permit Area 82-02 C&D Landfill- Cell IIA Repair Certification,
Sampson County, NC. Prepared by: GNA, January 17, 2001.
5050 Transition Application. Prepared by: RSG, June 30, 2008. The document
is submitted in compliance with Rule 15A NCAC 13B .0547.
Since 2009 the approved documents associated with the CDLF unit can be found in the “List of
Documents of Approved Plan” for MSWLF unit.
PART IV: INDUSTRIAL LANDFILL UNIT(S)
Not Applicable.
Facility Permit No: 8202-MSWLF-2000
Permit Approval To Construct
May 05, 2017
DIN 27697
Page 8 of 14
PART V: LAND CLEARING AND INERT DEBRIS LANDFILL UNIT(S)
Not Applicable.
PART VI: TRANSFER STATION/TREATMENT & PROCESSING UNIT(S)
Not Applicable.
PART VII: MISCELLANEOUS SOLID WASTE MANAGEMENT UNIT (S)
Not Applicable.
- End of Section –
ATTACHMENT 2
CONDITIONS OF PERMIT APPROVAL TO CONSTRUCT
PART I: MUNICIPAL SOLID WASTE LANDFILL UNIT CONSTRUCTION
CONDITIONS
1. This permit approves the Facility Plan (DIN 23822) that defines the comprehensive
development of the MSWLF unit encompassing 206.2-acre waste footprint and consisting
of four (4)-phased developments – Phases 1 through 4 with total gross capacity of
55,097,069 cubic yards (CY), which is measured from the top of the protective cover to
the top of final cover as shown on the Drawing No. S3 (DIN 23822). This MSWLF unit
has approved total gross capacity of 56,600,000 CY (DIN10311).
2. Pursuant to the Rule 15A NCAC 13B .0201 (d)(1), this permit approves a subsequent
lateral expansion of the MSWLF unit, Phase 3 – Cell 10 as shown on Drawing Nos. X1,
X2 & P1 in the approved Facility and Engineering Plans (DIN23822). Construction of
Cell 10 shall only be in accordance with the approved plans and drawings (DINs 23822 &
27691, & 27693) and the requirements stipulated in Rule 15A NCAC 13B .1624. The
following table summarizes the dimensions and details for the MSWLF unit – Phase 3 –
Cell 10:
MSWLF - Phase 3 Waste Footprint (acreage) Gross Capacity (CY)
Cell 10 23.1 6,064,714
3. Pursuant to Rule 15A NCAC 13B .1617(c), the permittee must prepare and provide
updated plans in the PTC Application for the MSWLF unit – Phase 3, Cell 11 including
the demonstration that the vertical separation requirement set forth in Rule 15A NCAC
13B .1623(b) is achieved at each new landfill cell. The following table summarizes the
dimensions and details for the MSWLF unit – Phase 3, Cell 11:
MSWLF - Phase 3 Waste Footprint (acreage) Gross Capacity (CY)
Cell 11 22.6 6,120,223
Facility Permit No: 8202-MSWLF-2000
Permit Approval To Construct
May 05, 2017
DIN 27697
Page 9 of 14
PART II: CONSTRUCTION AND DEMOLITION SOLID WASTE LANDFILL UNIT
CONSTRUCTION CONDITIONS
1. This permit approves the Facility Plan (DIN 23822) that defines the comprehensive
development of the C&DLF unit encompassing a 35.1-acre waste footprint and consisting
of three (3)-phases of development – Cells 1 through 3 with a total gross capacity of
2,180,681 CY, which is measured from the elevation of initial of waste placement
through the top of final cover as shown on the Drawing No. S3 (DIN 23822).
2. Pursuant to the Rule 15A NCAC 13B .0201 (d)(1), this permit approves a subsequent
lateral expansion of Cell 2B of the C&DLF unit as shown on Drawing Nos. X3 & P2 in
the approved Facility and Engineering Plans (DIN23822). Construction of Cell 2B shall
only be in accordance with the approved plans and drawings listed in Parts II and III of
Attachment 1 of this permit and the requirements stipulated in Rules 15A NCAC 13B
.0531 through .0574. The following table summarizes the dimensions and details for the
C&DLF unit – Cells 2B:
C&DLF – Phase Waste Footprint (acreage) Gross Capacity (CY)
Cell 2B 4.5 314,286
3. The Cells 3A & 3B of the C&DLF unit as shown on Drawing Nos. X3 & P2 are approved
suitable for development. Pursuant to N.C.G.S. 130A-295.8 (b)(3), the permittee must
submit the Section a permit modification to the approved PTC Application (DIN 23822)
for review and approval before construction activities commence. The following table
summarizes the dimensions and details for the C&DLF unit – Cells 3A and 3B:
C&DLF – Phase Waste Footprint (acreage) Gross Capacity (CY)
Cell 3A 5.1 317,265
Cell 3B 6.1 494,948
PART III: GENERAL FACILITY CONSTRUCTION CONDITIONS
1. The permittee must conduct a preconstruction meeting at the landfill facility prior to
initiating construction of any phase/cell/sub-cell of the landfill units and must notify the
Section at least 10 days prior to the meeting.
2. Pursuant to the Rules 15A NCAC 13B .0542(i)(2) or .1626(5), open burning solid waste
without prior approval is prohibited at this landfill facility.
3. This facility shall conform to the specific conditions set forth in this permit and the
provisions of Rules 15A NCAC 13B .0534(b)(2) or .1604(b)(2).
EROSION AND SEDIMENTATION CONTROL REQUIREMENTS
Facility Permit No: 8202-MSWLF-2000
Permit Approval To Construct
May 05, 2017
DIN 27697
Page 10 of 14
4. All required sedimentation and erosion control measures must be installed and operable
to mitigate excessive on-site erosion and to prevent silt from leaving the area of the
landfill units during the service life of the facility.
5. All earth disturbing activities must be conducted in accordance with the approved Erosion
and Sediment Control Plan, the Sedimentation Pollution Control Act of 1973 (15 NCAC
4), and consistent with any other local, state or federal requirements.
6. Facility construction, operations or practices must not cause or result in a discharge of
pollution, dredged material, and/or fill material into waters of the state in violation of the
requirements under Sections 401 and 404 of the Clean Water Act, as amended.
7. Modifications to the approved sedimentation and erosion control activities require
approval by the North Carolina Land Quality Section. The Section must be notified of any
sedimentation and erosion control plan modifications.
GEOLOGIC, GROUND WATER AND MONITORING REQUIREMENTS
15. Prior to construction of the sub-cells or cell(s) within the phase, all piezometers, borings,
and groundwater monitoring wells within the footprint must be properly abandoned in
accordance with 15A NCAC 2C .0113 (b)(1), entitled “Abandonment of Wells.”
16. In areas where soil is to be undercut, abandoned piezometers, monitoring wells and
borings must not be grouted to pre-grade land surface, but to the proposed base grade
surface to prevent having to cut excess grout and possibly damage the wells.
17. A Licensed Geologist must report any pertinent geological feature(s) exposed during
phase or cell excavation. Prior to placing any landfill liner, the geologist must submit to
the Section Hydrogeologist a written report that includes an accurate description of the
exposed geological feature(s) and effect of the geological feature(s) on the design,
construction, and operation of the cell, phase, or unit.
18. A Licensed Geologist must supervise installation of groundwater monitoring wells and
surface water sampling stations.
19. Any modification to the approved water quality monitoring, sampling, and analysis plan
must be submitted to the Section Hydrogeologist for review.
20. Within 30 days of completed construction of each new groundwater monitoring well or
landfill gas monitoring well, a well construction record (GW-1 form), typical well
Facility Permit No: 8202-MSWLF-2000
Permit Approval To Construct
May 05, 2017
DIN 27697
Page 11 of 14
schematic, boring log, field log and notes, and description of well development activities
must be submitted to the Section.
21. The permittee must provide a plan sheet-sized, scaled topographical map, showing the
location and identification of new, existing, and abandoned wells and piezometers after
installation of groundwater monitoring wells.
22. Within thirty (30) days of the completed permanent abandonment of a ground-water
monitoring well, the well abandonment record (GW-30 form) and any additional
information included in the abandonment record) must be submitted to the Section. The
well abandonment records must be submitted to the Solid Waste Section in accordance
with 15A NCAC 2C .0114(b) and be certified by a Licensed Geologist.
23. All forms, reports, maps, plans, and data submitted to the Section must include an
electronic (pdf) copy.
PRE-OPERATIONAL CONDITIONS
24. The following conditions must be met prior to receiving wastes at the newly constructed
phases, cells, or sub-cells of any landfill unit:
a. The permittee must obtain a Permit Approval to Operate from the Section for
operating the constructed phases, cells or sub-cells of the landfill unit in
accordance with 15A NCAC 13B .0201(d).
b. Site preparation, final landfill base grading, and vertical separation requirements
have been performed in accordance with Rules 15 NCAC 13B .0540 or .1624, and
the approved plans.
i) A written Construction Quality Assurance (CQA) report including: A
certification by a professional engineer registered in the State of North
Carolina.
ii) As-built drawings demonstrate that the landfill base line system was built
in accordance with Rules 15 NCAC 13B .0540 or .1624.
iii) The approved CQA plan (DIN 23822), and the conditions of the permit
must be submitted to the Section for review and approval.
c. The permittee must contact the appropriate regional Senior Environmental
Specialist to determine whether the Section chooses to hold a pre-operative
meeting including a site inspection with key landfill personnel and the Section’s
representatives for the purpose of demonstrating that the facility construction is
consistent with approved plans and specifications.
Facility Permit No: 8202-MSWLF-2000
Permit Approval To Construct
May 05, 2017
DIN 27697
Page 12 of 14
d. New groundwater monitoring wells, and landfill gas monitoring wells shall be
installed, and surface water sampling locations shall be established. A baseline
sampling event for background water quality shall be performed in accordance
with Rules 15A NCAC 13B. 0544 or .1633, and approved water quality
monitoring plan. Well construction records and sampling results shall be
submitted to the Section Hydrogeologist for review and approval prior to issuing
the Permit Approval to Operate.
e. The permittee shall completely implement and install site access, security, signs,
and safety requirements in accordance with Rules 15A NCAC 13B. 0542 or
.1626.
f. The edge of the waste footprint must be identified with permanent physical
markers.
g. Documentation of financial assurance mechanisms must be submitted to the
Section. The financial assurance amount must include closure and post-closure
costs including the new phase, cell, or sub-cell to receive the Permit Approval to
Operate in accordance with N.C.G.S. 130A-295.2, Rules 15A NCAC 13B .0546,
.0547(2), and .1628.
PART IV: INDUSTRIAL LANDFILL UNIT(S)
Not Applicable.
PART V: LAND CLEARING AND INERT DEBRIS LANDFILL UNIT(S)
Not Applicable.
PART VI: TRANSFER STATION/TREATMENT & PROCESSING UNIT(S)
Not Applicable.
PART VII: MISCELLANEOUS SOLID WASTE MANAGEMENT UNIT (S)
Not Applicable.
- End of Section-
ATTACHMENT 3
CONDITIONS OF PERMIT TO OPERATE
PART I: GENERAL FACILITY OPERATION CONDITIONS
1. The permittee shall implement the general facility operation permit conditions according
to the approved plans (DIN 23822), the permit conditions stated in the Permit dated June
29, 2016 (DIN 26349), and the applicable Rules 15A NCAC 13B.
Facility Permit No: 8202-MSWLF-2000
Permit Approval To Construct
May 05, 2017
DIN 27697
Page 13 of 14
PART II: MUNICIPAL SOLID WASTE LANDFILL UNIT(S)
1. The permittee shall continue operating the existing Phase 1 - Cells 1 through 5, Phase 2 -
Cells 6, 7, 8, and Phase 3 - Cell 9 of the MSWLF unit as well as the onsite environmental
management and protection facilities as described in the approved plans (DIN 23822), the
Permit Conditions under this part stated in the permit dated June 29, 2016 (DIN 26349), and
the applicable Rules 15A NCAC 13B.
2. At the time of issuance of this permit, no additional operation of the future phases or cells of
this MSWLF unit is approved.
PART III: CONSTRUCTION AND DEMOLITION DEBRIS LANDFILL UNIT(S)
1. The permittee shall continue operating the existing Cell 1 and Cell 2A of the C&DLF unit as
well as the onsite environmental management and protection facilities as described in the
approved plans (DIN 23822, the Permit Conditions under this part stated in the permit dated
June 29, 2016 (DIN 26349), and the applicable Rules 15A NCAC 13B.
2. At the time of issuance of this permit, no additional operation of the future phases or cells of
this MSWLF unit is approved.
PART IV: INDUSTRIAL LANDFILL UNIT(S)
Not Applicable.
PART V: LAND CLEARING AND INERT DEBRIS LANDFILL UNIT(S)
Not Applicable.
PART VI - TRANSFER STATION/TREATMENT & PROCESSING UNIT(S)
Not Applicable.
PART VII- MISCELLANEOUS SOLID WASTE MANAGEMENT UNIT (S)
1. The permittee shall continue operating the existing miscellaneous soil waste management
units (MSWMU) as well as the onsite environmental management and protection
facilities as described in the approved plans (DIN 23822), the Permit Conditions under
this part stated in the permit dated June 29, 2016 (DIN 26349), and the applicable Rules
15A NCAC 13B.
2. At the time of issuance of this permit, no operation of a new MSWMU is approved inside
the landfill property.
- End of Section-
ATTACHMENT 4
CONDITIONS OF PERMIT FOR CLOSURE
Facility Permit No: 8202-MSWLF-2000
Permit Approval To Construct
May 05, 2017
DIN 27697
Page 14 of 14
PART I: GENERAL FACILITY
Not Applicable.
PART II: MUNICIPAL SOLID WASTE LANDFILL UNIT(S)
Not Applicable.
PART III: CONSTRUCTION AND DEMOLITION DEBRIS LANDFILL UNIT(S)
Not Applicable.
PART IV: INDUSTRIAL LANDFILL UNIT(S)
Not Applicable.
PART V: LAND CLEARING AND INERT DEBRIS LANDFILL UNIT(S)
Not Applicable.
PART VI: TRANSFER STATION/TREATMENT & PROCESSING UNIT(S)
Not Applicable.
PART VII: MISCELLANEOUS SOLID WASTE MANAGEMENT
Not Applicable.
- End of Permit Conditions -