Loading...
HomeMy WebLinkAbout3606_Gaston_MSWLF_CoverLetterPTO_DIN27708_20170505 ROY COOPER Governor MICHAEL S. REGAN Secretary MICHAEL SCOTT Director State of North Carolina | Environmental Quality | Waste Management Asheville Regional Office | 2090 US Highway 70 | Swannanoa, North Carolina 28778 828 296 4500 T May 5, 2017 Ms. Marcie Smith Gaston County Post Office Box 1578 Gastonia, North Carolina 28053-1578 Subject: Permit Approval to Operate, Unit II Phase 2, Issuance Permit No. 3606-MSWLF-1997, Gaston County Landfill Gaston County, DIN 27708 Dear Ms. Smith: Enclosed you will find a copy of Permit No. 3606-MSWLF-1997, dated May 3, 2017, DIN 27480. This permit action is the permit approval to operate for Unit II, Phase 2 for the Gaston County Landfill. Make note of the following items;  Read your permit carefully and should you have any questions contact me immediately.  All the documents related to this permit may be downloaded at http://edocs.deq.nc.gov/WasteManagement/0/fol/175/Row1.aspx.  Copies of this permit, the approved plans, and all records, are required to be maintained by the permittee at the facility and made available to the Section upon request during normal business hours.  The notes form the pre-operations meeting held on May 4, 2017 are attached as well. Should you have any questions regarding this matter you may contact me at (828) 296-4704 or at larry.frost@ncdenr.gov. Sincerely, Larry Frost, Engineering Project Manager Permitting Branch, Solid Waste Section Division of Waste Management, NCDEQ Attachments ec: Kim Sue – SWS/MRO Perry Sugg – SWS/RCO Solid Waste Section, Permitting Site Report Facility Type: County: CDLF COMPOST INDUS LCID County name Gaston MSWLF X TP TRANSFER Other Other type DATE: May 4, 2017 FACILITY NAME: 3606-MSWLF-1997, Gaston County Landfill FACILITY CONTACT NAME AND PHONE NUMBER: Marcie Smith Gaston County Post Office Box 1578 Gastonia, North Carolina 28053-1578 o- (704) 922-0267 marcie.smith@gastongov.com NOTES:  Pre- Operations Meeting Unit II, Phase 2 o Approval was given for the commencement of operations in Unit II, Phase 2. o The permit to operate for Unit II, Phase 2 was hand delivered to the facility. o Pumps, controls and landfill construction is complete and in place. o Heavy rain has caused minimal damage (erosion rills and silt) to the protective cover in Phase 2, the area without rain/wind cover. The area is in the process of being repaired by staff. o Reviewed;  Truck access to the phase and protecting the anchor trench/line.  Installation of a fluff layer in the new phase.  Approved the use of 2 working faces until the fluff layer is installed in the phase, one in phase 1 and one in phase 2.  Reminded staff that the filter fabric cover over the leachate channel must be split and laid open prior to operation, and must be documented in the operating record.  Reminded staff that the rain/wind cover must be removed prior to operation, and must be documented in the operating record.  Kim Sue, Environmental Senior Specialist must be notified when the first waste is placed in phase 2. PERMIITING FIELD REPORT Division of Waste Management Solid Waste Section Page 2 of 2  Attending; o Larry Frost – SWS o Barry Cloninger – Gaston County o Marci Smith – Gaston County o Ray Maxwell – Gaston County o Mike Lee – Gaston County o Bob Sallach – CHA o Ed Shuffler – HDR