HomeMy WebLinkAbout6301_MooreCoCDLF_PTO_coverLtr_DIN24741_20150724 North Carolina Department of Environment and Natural Resources
Division of Waste Management
Pat McCrory Donald R. van der Vaart
Governor Secretary
1646 Mail Service Center, Raleigh, North Carolina 27699-1646 Phone: 919-707-8200 \ Internet: http://portal.ncdenr.org/web/wm/sw
An Equal Opportunity \ Affirmative Action Employer
Solid Waste Section
July 24, 2015
Mr. Chad Beane
Solid Waste Division Manager
Moore County Solid Waste
P.O. Box 1927
Carthage, North Carolina 28327
Subject: Approval of Permit Amendment Application and Issuance of Permit to Operate
Moore County Construction and Demolition Debris Landfill (C&DLF)
Moore County, North Carolina
Permit No. 6301-CDLF-1992, Document ID No. (DIN) 24741
Dear Mr. Beane:
The Division of Waste Management (DWM), Solid Waste Section (SWS) has completed the
review of the permit amendment application for a 5-year permit review, which is titled as:
Five-Year Permit Renewal/Amendment, Moore County Landfill, Permit No. 63-01,
Moore County, North Carolina. Prepared by Golder Associates NC, Inc. (Golder
Associates) June 2015 and revised through July 15, 2015 (DIN 24742).
The SWS has no further comment on the permit amendment application at this time and hereby
issues Moore County (the County) the Permit to Operate (DIN 24740), Solid Waste Permit No.
6301-CDLF-1992, to continue operating the existing C&DLF Phases I, II, III, & IV, Cells 1
through 5 and other miscellaneous waste management facility units. The Permit to Operate
(PTO) will expire on July 25, 2020. Pursuant to Rule 15A NCAC 13B .0201(g), no later than
January 25, 2020, the County must submit the SWS a permit application for a permit review.
The permit application must be prepared in accordance with Rule 15A NCAC 13B .0535.
The hard copy of the PTO and the cover page of the approved permit amendment application
(DIN 24742) are enclosed. The electronic format of the approved documents can be directly
downloaded from the DWM’s web site at https://edm.nc.gov/DENR-Portal/. Type in the Doc ID
Number (only numeric number) in the boxed area next to the “Description” in the “Property
Criteria” area. Then click “Search” box. The document in “pdf” format will appear on the
lower section of the screen called “Content” area.
Please review the permit conditions thoroughly and pay special attention to the requirements for
future landfill expansions either vertical (Phase V) or lateral (Cell 6) ones as described in the
Permit to Construct, Attachment 2 of the permit and permit amendment application (DIN
Mr. Chad Beane
July 24, 2015
Page 2 of 2
DIN 24741
24742). If you have any questions about your permit or permitting processes, please contact Mr.
Dennis Shackelford, who is the DWM Waste Management Specialist for your area and can be
reached at (910) 433-3349, dennis.shackelford@ncdenr.gov, or please contact me at (919) 707-
8251, ming.chao@ncdenr.gov.
Sincerely,
Ming-Tai Chao, P.E.
Environmental Engineer
Division of Waste Management, NCDENR
Enclosures:
Permit to Operate – Phases I, II, III, & IV (one copy)
The cover page of the permit application with approval seal and signature (one copy)
Cc:
Rachel P. Kirkman P.G., Golder Associates Ed Mussler, Permitting Branch Supervisor
Elizabeth Werner, DWM Dennis Shackelford, DWM
Central Files