HomeMy WebLinkAbout3216_NewSoil_Compost permit_DIN27488_20170316
Facility Permit No: 3216-COMPOST-2017
NewSoil Vermiculture LLC. Facility
Permit to Operate
DIN 27488
March 16, 2017
North Carolina Department of Environmental Quality
Roy Cooper Michael S. Regan
Governor Secretary
1646 Mail Service Center, Raleigh, North Carolina 27699-1646
Phone: 919-707-8200 \ Internet http://portal.ncdenr.org/web/wm
An Equal Opportunity \ Affirmative Action Employer – 50% Recycled \ 10% Post Consumer Paper
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF WASTE MANAGEMENT
SOLID WASTE SECTION
SMALL TYPE 3 SOLID WASTE COMPOST FACILITY
Permit No. 3216-COMPOST-2017
NewSoil Vermiculture LLC. (Business Owner/Operator)
and
David W. Eddinger and Marjorie E. Eddinger (Property Owners)
is hereby issued a
PERMIT TO OPERATE
NEWSOIL VERMICULTURE COMPOST FACILITY
Located at 314 Latta Road, in Durham, Durham County, North Carolina, in accordance with Article 9,
Chapter 130A, of the General Statutes of North Carolina and all rules promulgated thereunder and
subject to the conditions set forth in this permit. The legal description of the site is identified on the
deeds recorded for this property listed in Attachment 1 of this permit.
________________________________________
Ellen B. Lorscheider, Section Chief
Solid Waste Section
Facility Permit No: 3216-COMPOST-2017
NewSoil Vermiculture LLC. Facility
Permit to Operate
DIN 27488
March 16, 2017
Page 2 of 7
ATTACHMENT 1
PART I: PERMITTING HISTORY
Permit Issuance Date
Original Issue Permit to Operate (PTO) March 16, 2017
1. The facility was initially operated as a compost demonstration SWCD-32-01 from 2013
through 2017.
PART II: LIST OF DOCUMENTS FOR APPROVED PLAN
1. Application of NewSoil Vermiculture LLC for Compost Facility Permit. Dated December 25,
2015, revised through August 2016. Doc ID 27487.
PART III: PROPERTIES APPROVED FOR THE SOLID WASTE FACILITY
Gaston County, N.C. Register of Deeds
Book Page Grantee (sold to) Acres
6470 23-26 David W. Eddinger and Marjorie E. Eddinger 3.4
Note - Durham County Parcel No. 182969 and 201866.
Compost facility encompasses less than 1 acre
PART IV: GENERAL PERMIT CONDITIONS
1. This permit is issued by the North Carolina Department of Environmental Quality, Division
of Waste Management, Solid Waste Section (Section). In accordance with North Carolina
Solid Waste Management Rule 15A NCAC 13B .0201(d), a solid waste management facility
permit shall have two parts: a Permit to Construct and a Permit to Operate. The Permit to
Operate shall expire March 16, 2022. The Permit to Operate must be implemented in
accordance with Attachment 3 of this permit.
2. The persons to whom this permit is issued (“permittee”) are the owners and operators of the
solid waste management facility.
3. By receiving waste at this facility, the permittee shall be considered to have accepted the
terms and conditions of this permit.
Facility Permit No: 3216-COMPOST-2017
NewSoil Vermiculture LLC. Facility
Permit to Operate
DIN 27488
March 16, 2017
Page 3 of 7
4. Operation of this solid waste management facility must be in accordance with the Solid
Waste Management Rules, 15A NCAC 13B, Article 9 of Chapter 130A of the North
Carolina General Statutes (NCGS 130A-290, et seq.), the conditions contained in this permit,
and the approved plan. Should the approved plan and the rules conflict, the Solid Waste
Management Rules shall take precedence unless specifically addressed by permit condition.
Failure to comply may result in compliance action or permit revocation.
5. This permit is issued based on the documents submitted in support of the application for
permitting the facility identified in “List of Documents for Approved Plan,” which
constitutes the approved plan for the facility. Where discrepancies exist, the most recent
submittals and the Attachment 3, “Conditions of Operating Permit” shall govern.
6. This permit may be transferred only with the approval of the Section, through the issuance of
a new or substantially amended permit in accordance with applicable statutes and rules. In
accordance with NCGS 130A-295.2(g), the permittee must notify the Section thirty (30)
days prior to any significant change in the identity or business structure of either the owner
or the operator, including but not limited to, a proposed transfer of ownership of the facility
or a change in the parent company of the owner or operator of the facility.
7. The permittee is responsible for obtaining all permits and approvals necessary for the
development of this project including approval from appropriate agencies for sedimentation
and erosion control, and a General or Individual National Pollutant Discharge Elimination
System (NPDES) Stormwater Discharge Permit, if applicable. Issuance of this permit does
not remove the permittee’s responsibilities for compliance with any other local, state or
federal rule, or statute.
- End of Section -
Facility Permit No: 3216-COMPOST-2017
NewSoil Vermiculture LLC. Facility
Permit to Operate
DIN 27488
March 16, 2017
Page 4 of 7
ATTACHMENT 2
CONDITIONS OF PERMIT TO CONSTRUCT
[NOT APPLICABLE]
- End of Section -
Facility Permit No: 3216-COMPOST-2017
NewSoil Vermiculture LLC. Facility
Permit to Operate
DIN 27488
March 16, 2017
Page 5 of 7
ATTACHMENT 3
CONDITIONS OF OPERATING PERMIT
1. The Permit to Operate shall expire March 16, 2022. Pursuant to 15A NCAC 13B
.0201(g), no later than November 16, 2021, the permittee must submit a request to the
Section for permit review and must update pertinent facility plans.
2. The facility must be adequately secured by means of gates, chains, berms, fences, or
other measures approved by the Section to prevent unauthorized entry.
3. A sign must be maintained at the site entrance providing site information including the
permit number, prohibited materials, and emergency contact information.
4. A responsible individual trained in facility operations must be onsite during all operating
hours of the facility, in accordance with NCGS 130A-309.25.
5. Interior roadways must be of all-weather construction and maintained in good condition.
All sides of storage and compost areas for flammable materials must be clear and
drivable, to provide vehicular access in the event of a fire.
6. Feedstocks for composting are limited to:
coffee and tea grounds,
restaurant pre-and post-consumer food waste,
organic material (mulched leaves, yard waste and mushroom substrate) and
manure with bedding.
A request must be submitted to receive additional feedstocks, and may require a permit
modification.
7. An appropriate Division of Energy, Mineral and Land Resources (DEMLR) permit for
managing any stormwater or wastewater at the facility must be maintained as required.
Any leachate generated at the facility and any runoff from the facility must be managed
to prevent contamination of groundwater and surface water. The facility must be
maintained to prevent the accumulation of stormwater and leachate on processing areas,
composting areas, storage areas, and roads.
8. Feedstocks must not be received that are in an anaerobic state.
Facility Permit No: 3216-COMPOST-2017
NewSoil Vermiculture LLC. Facility
Permit to Operate
DIN 27488
March 16, 2017
Page 6 of 7
9. Vermiculture composting in ten modified 55 gallon barrels.
10. Storage of pre-processed debris and mulch must be limited to piles of maximum 30 feet
in height, 50 feet in width, with unlimited length within the approved boundaries, unless
otherwise approved by the Section.
11. The odor management procedures must be followed to minimize odors at the facility
boundary. Upon receipt of an odor complaint, the facility operator must investigate and
take action as necessary to minimize the cause of the complaint. A copy of all written
complaints regarding this facility must be maintained for the duration of the permit
including the operator’s actions taken to resolve the complaints.
12. Compost process data must be maintained in writing as required to document
temperatures, moisture levels, and turning/aeration intervals.
13. All compost produced at the facility must meet the requirements of Rule .1407 of the
Solid Waste Compost Facilities Rules and the approved operations plans.
14. Testing and reporting must be conducted in accordance with the requirements of Rule
.1408 and the approved operations plans.
a. The sample collected for metals analysis is to be a composite sample from
subsamples accumulated from each batch produced during the six-month period,
or 20,000 tons of compost produced, whichever comes first.
b. The sample collected for pathogens testing should not be collected and held over
a six-month period. The sample should be collected as a composite sample from
finished compost onsite on the same day it is to be taken to the lab for analysis.
The sample should be processed within the hold time required by the lab testing
procedure.
15. In the event of a mechanical failure, the facility must immediately use its best effort to
utilize substitute equipment for completion of the composting operation.
16. Effective vector control measures must be applied to reduce the potential for vector
attraction, as needed.
17. The facility must be operated and maintained with sufficient dust control measures to
minimize airborne emissions and to prevent dust from becoming a nuisance or safety
hazard. Fugitive dust emissions from the facility that contribute to substantive
complaints may subject the facility to the Division of Air Quality requirements as listed
in 15A NCAC 2D .0540.
18. Unacceptable wastes received at the site must be stored in containers and promptly
removed from the site for proper disposal.
Facility Permit No: 3216-COMPOST-2017
NewSoil Vermiculture LLC. Facility
Permit to Operate
DIN 27488
March 16, 2017
Page 7 of 7
19. An annual report of facility activities for the fiscal year July 1 to June 30 must be
submitted to the Section by August 1 of each year on forms provided by the Section.
This report must include the amount of materials composted in tons, temperature records,
and metal, pathogen, and foreign matter testing analytical data.
20. Copies of this permit, the approved plans, and all records required to be maintained by
the permittee must be maintained at the facility and made available to the Section upon
request during normal business hours.
21. Open burning of waste is prohibited. Fires must be reported to the regional
environmental senior specialist with 24 hours of the occurrence, followed by a written
report of the details of the fire within 15 days of the occurrence.
22. Facility construction, operations or practices must not cause or result in a discharge of
pollution, dredged material, and/or fill material into waters of the state in violation of the
requirements under Sections 401 and 404 of the Clean Water Act, as amended.
23. Groundwater quality at this facility is subject to the classification, monitoring, and
remedial action provisions of 15A NCAC 2L. Groundwater monitoring may be required
if there is an indication for the potential for groundwater contamination.
- End of Permit Conditions -