Loading...
HomeMy WebLinkAbout1910_Brickhaven_AerosolizationMap_DIN27588_201703295 0 ' B U F F E R 1 0 0 ' B U F F E R 200' B U F F E R P R O P E R T Y L I N E P R O J E C T B O U N D A R Y C O M P L I A N C E B O U N D A R Y 4' HIGH BERMSALONG ALLEYWAYPERIMETER20' HIGH MESHFENCING TO BEINSTALLEDAROUNDALLEYWAYPERIMETER ONTOP OFPERIMETER BERMS G E N E R A L N O T E S : ( 1 ) F I N A L C O V E R G R A D E S S H O W N . S Y S T E M M A Y B E P L A C E D O N T O P O F I N T E R I M S O I L C O V E R . I T I S A S S U M E D T H A T I N T E R I M C O V E R G R A D E S W O U L D R E F L E C T F I N A L S U R F A C E G R A D E S A T A L O W E R E L E V A T I O N ( 2 ) A E R O S O L A L L E Y W A Y T O B E V E G E T A T E D . F I N A L C O V E R O R I N T E R I M S O I L C O V E R M U S T B E A M E N D E D T O P R O M O T E V E G E T A T I V E G R O W T H P R I O R T O S Y S T E M O P E R A T I O N . ( 3 ) C O N T I N G E N T F E N C I N G L A Y O U T M A Y B E R E C O N S I D E R E D B A S E D O N P R E D O M I N A N T W I N D D I R E C T I O N . A L L E Y S L O P E D I R E C T I O N LEACHATEAEROSOLIZATIONALLEYWAY. 100' WIDE X300' LONGLEACHATE IMA S AEROSOLIZATION UNITS . TO BE PROVIDED BY OTHER S L E A C H A T E S U P P L Y L I N E . F R O M L E A C H A T E T A N K S O R I N T E R M E D I A T E C O N N E C T I O N I N L E A C H A T E C O L L E C T I O N S Y S T E M . S H O W N W I T H P O S S I B L E I N T E R I M L E A C H A T E S T O R A G E T A N K - T O B E D E T E R M I N E D B Y V E N D O R I F R E Q U I R E D . CELL 1 BOUND A R Y 0 5 0 1 0 0 2 0 0 F I G 3 : L E A C H A T E A E R O S O L I Z A T I O N S Y S T E M C O N S T R U C T I O N L A Y O U T B R I C K H A V E N L E A C H A T E A E R O S O L I Z A T I O N F I E L D T R I A L P R O P O S A L M O N C U R E , N O R T H C A R O L I N A C O N D E N S A T E R E T U R N L I N E T O L E A C H A T E C L E A N O U T F O R C E L L 1 . F L O W M E T E R T O B E I N S T A L L E D T O M E A S U R E R E T U R N F L O W R A T E A N D V O L U M E I N L I N E F L O W M E T E R T O M E A S U R E A N D R E C O R D L E A C H A T E F L O W R A T E T O I M A S A E R O S O L I Z A T I O N U N I T A ' A B ' B AEROSOL I Z A T I O N BROADC A S T DIRECTIO N GENERAL NOTES:(1) EXISTING SOIL COVER MATERIAL OVER CELL 1 CCP STRUCTURA L F I L L H A S A N A V E R A G E D E P T H O F 2 F O O T (2) FML LINER TO BE KEYED INTO ADDED SOIL TO EXISTING COVER L A Y E R O V E R C E L L 1 O R A S N E E D E D T O SECURE THE LINER PROPERLY.(3) LINER AND DRAINAGE COLLECTION PIPING WILL BE PLACED AT A M I N I M U M O F 1 % S L O P E T O E N S U R E POSITIVE DRAINAGE. F I G 5 : L E A C H A T E A E R O S O L I Z A T I O N S Y S T E M A L L E Y W A Y C R O S S S E C T I O N B R I C K H A V E N L E A C H A T E A E R O S O L I Z A T I O N F I E L D T R I A L P R O P O S A L M O N C U R E , N O R T H C A R O L I N A VEGETATIVE COVERFML BETWEEN EXISTING SOIL CAPAND DRAINAGE LAYER. A D D I T I O N A L S O I L T O B E A D D E D T O E X I S T I N G S O I L C A P T O P R O V I D E M I N I M U M O F 1 % S L O P E T O F M L T O P R O M O T E D R A I N A G E T O C O L L E C T I O N P I P E P E R F O R A T E D H D P E D R A I N P I P E T O C O L L E C T A N Y D R A I N A G E L A Y E R F L O W . PERIMETER SOIL BERM. FML TOBE PLACED BELOW EXCAVATIONDEPTH OF PERIMETER FENCINGSUPPORT POLES 2 F O O T P R O T E C T I V E S O I L C O V E R E X I S T I N G S O I L C A P M A T E R I A L O V E R C E L L 1 C C P S T R U C T U R A L F I L L 2 F O O T D R A I N A G E L A Y E R C R O S S S E C T I O N A - A ' C R O S S S E C T I O N B - B ' CROSS SECTION B - B' - DE T A I L 1 C R O S S S E C T I O N B - B ' - D E T A I L 2 N O T T O S C A L E N O T T O S C A L E N O T T O S C A L E N O T T O S C A L E E X I S T I N G S O I L C A P M A T E R I A L O V E R C E L L 1 C C P S T R U C T U R A L F I L L EXISTING SOIL CAP MATERIAL OVER CELL 1 CCPSTRUCTURAL FILL 2 FOOT DRAINAGE LAYER2 FOO T P R O T E C T I V E S O I L C O V E R 2 F O O T P R O T E C T I V E S O I L C O V E R P E R F O R A T E D H D P E D R A I N A G E C O L L E C T I O N P I P E . D A Y L I G H T T O C O L L E C T I O N S U M P . H D P E L I N E D A E R O S O L C O N D E N S A T E C O L L E C T I O N S U M P . C O N D E N S A T E T O B E R E T U R N E D T O E X I S T I N G L E A C H A T E C O L L E C T I O N S Y S T E M C L E A N O U T B Y S U R F A C E P U M P PE R F O R A T E D H D P E D R A I N P I P E T O CO L L E C T A N Y D R A I N A G E L A Y E R F L O W . MIN I M U M S L O P E 1 % FML BETWEEN EXISTING SOIL CAP ANDDRAINAGE LAYER.VEGETATIVE COVER V E G E T A T I V E C O V E R P E R I M E T E R S O I L B E R M . F M L T O B E P L A C E D B E L O W E X C A V A T I O N D E P T H O F P E R I M E T E R F E N C I N G S U P P O R T P O L E S PERIMETER SOIL BERM. FML TOBE PLACED BELOW EXCAVATIONDEPTH OF PERIMETER FENCINGSUPPORT POLES A D D I T I O N A L S O I L T O B E A D D E D T O E X I S T I N G S O I L C A P T O P R O V I D E M I N I M U M O F 1 % S L O P E T O F M L T O P R O M O T E D R A I N A G E T O C O L L E C T I O N P I P E SEE DETAIL 1 S E E D E T A I L 2 3 0 0 ' L E N G T H 1 0 0 ' W I D T H P R O P O S E D W I N D S C R E E N I N G T O P O F P E R I M E T E R S O I L B E R M TOP OF PERIMETERSOIL BERM P R O P O S E D I M A S U N I T 9 0 ' C O L L E C T I O N A R E A A ' A B ' B