Loading...
HomeMy WebLinkAbout7002_INSP_20170324FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section UNIT TYPE: Lined MSWLF LCID YW Transfer Compost SLAS COUNTY: Pasquotank Closed MSWLF X HHW White goods Incin T&P FIRM PERMIT NO.: 7002-MSWLF-1983 CDLF Tire T&P / Collection Tire Monofill Industrial Landfill DEMO SDTF FILE TYPE: COMPLIANCE Date of Site Inspection: March 24, 2017 Date of Last Inspection: May 20, 2014 FACILITY NAME AND ADDRESS: Pasquotank County Closed MSWLF 985 Simpson Ditch Rd. Elizabeth City, North Carolina 27907 GPS COORDINATES: N: 36.24007 -E: 76.26546 FACILITY CONTACT NAME AND PHONE NUMBER: Name: Rodney Bunch Telephone: Office - 252-335-0865 Email: bunchr@co.pasquotank.nc.us Fax: 252-331-5623 Contractors Name: Eddie Stevenson Telephone: 252-341-4701 cell: 252-338-3004 Email: eddiestevenson33@yahoo.com Contractors Name: Carl Swain Telephone: 252-333-7018 cell: 252-333-7018 Email:speedracer37@embarqmail.com FACILITY CONTACT ADDRESS: Pasquotank County Manager Rodney Bunch P.O. Box 39 Elizabeth City, North Carolina 27907 Stevenson Sand 1924 Peartree Rd. Elizabeth City, Pasquotank Co. NC 27907 R&D Excavating 1816 Fearing Ave. Elizabeth City, NC 27909 PARTICIPANTS: Rick O. Holley – TS Operator Eddie Stevenson – C&DLF Contractor John College, DWM, Solid Waste Section STATUS OF PERMIT: Closed MSWLF. PURPOSE OF SITE VISIT: Partial Facility Compliance Inspection. STATUS OF PAST NOTED VIOLATIONS: None OBSERVED VIOLATIONS None FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 2 of 2 ADDITIONAL COMMENTS; 1 – This closed MSWLF consist of 2 cells separated by the entrance road. 2 – The entrance road is made of all-weather material and maintained well. 3 – Due to the vegetation height, this is a partial facility compliance inspection. John will be called when both cells have been mowed to further evaluate the structures. At a minimum, to inspect these MSWLF’s they need to be mowed 2 times per year if not more. Need to have grass established not weeds and woody vegetation. 4 – Both structures need all the woody vegetation removed to the toe of the side slopes so Inspections can be done to ensure no leachate breakouts are happening. Staff will need to monitor this routinely for breakouts. 5 – Cell #1 needs the Edge of Waste marker put back up (found on ground) on the Northwest corner. Cell #2 needs the Northeast Edge of Waste marker replaced. Found the concrete where marker was but no marker found. 6 – Cell #1 has several areas with slight erosion. Please repair and establish grass. 7 – Found some deeps tire ruts on top of East corner of Cell #2. Need to repair. 8 – Cell #2 has a berm around the top structure to prevent erosion with plastic drain pipes. The inside areas of the berm are holding water due to a grading issue and several of the drain pipes have been broken due to the mowing. Need to keep this water from ponding on top such as it was during this inspection. Re-grade and repair/replace pipes or remove berm, establish grass so water can drain off top of this cell. If left as is this could cause issues. Ponded water can cause leachate breakouts. Please contact me if you have any questions or concerns regarding this inspection report. ___________________________ Phone: 919-268-1524 Email: john.college@ncdenr.gov Environmental Senior Specialist Regional Representative Sent on: March 28, 2017 X Email Hand delivery US Mail Certified No. [ _] Copies: * Andrew Hammonds, Eastern Area Supervisor * Jessica Montie, Compliance Officer The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit, or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules. FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 3 of 3  Cell # 1 NW marker. Cell # 2 NE marker concrete.  Cell # 2 hole under broken drainage pipe on North side. Erosion on Cell # 1 Southside. FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 4 of 4  One of several broken drain pipes. Area on top side of MSWLF in front of berm.  Repaired entrance path to the top of cell #2. Good job.