Loading...
HomeMy WebLinkAbout1203_BurkeCDLF_SWS_SiteSuit_CA_Letter_DIN27500_20170327 (2) ROY COOPER Governor MICHAEL S. REGAN Secretary MICHAEL SCOTT Director March 27, 2017 Mr. Chris Hollifield General Services Director Burke County PO Box 1486 Morganton, NC 28680 Re: Permit No. 1203-CDLF-2014 Burke County Johns River Waste Management facility C&D Landfill Expansion Conditional Site Suitability – Facility Request for Re-evaluation DIN 27500 Dear Mr. Hollifield: On August 29, 2016, the Solid Waste Section (Section) received Joyce Engineering’s letter (DIN 27499), submitted on behalf of Burke County, requesting a reevaluation of site suitability for Phases 1B, 2B, and 3 of the active C&D landfill. The Section approved a conditional site suitability for the landfill expansion on February 28, 2014 (DIN 20647) that determined the proposed Phases 1B, 2B, and 3 were not suitable for landfill construction due to existing groundwater contamination from the adjacent CD over MSW landfill. At that time, the Section also requested monitoring and assessment in this expansion area over the next two years before reevaluating site suitability for construction at Burke County’s request. Conditions for constructing Cell 1B (and by extension, Cells 2B & 3) were further listed in the 2015 Permit to Construct/Operate (DIN 25226) and are dependent on “successful mitigation and remediation of groundwater contamination, and upon written approval from the Section,” (Attachment 2, Part III #18 of the current PTC/PTO). In the letter requesting reevaluation, Joyce presented a summary of the landfill gas and groundwater monitoring data collected in the subject area from February 2013 to May 2016. Landfill gas abatement had been approved as a remedy in the amended CAP as one means of addressing groundwater contamination and was implemented in late 2013. LFG data presented by Joyce indicates that while passive gas venting appears to at least be stabilizing gas migration, landfill gas remains a source for groundwater contamination in the subject area. Groundwater monitoring data from seven wells within the vicinity of phases 1B, 2B, and 3 indicate a similar trend with elevated levels of VOCs concentrated in the southwest portion of this area, including the proposed waste boundary footprint. Page 2 Based on the Section’s evaluation of the data presented and given the proximity of landfill gas exceedances and elevated contaminants still present in the groundwater in the subject area (including within the proposed landfill footprint), as well as not meeting the permit conditions for ‘successful mitigation and remediation of groundwater condition’, the request for site suitability approval for Phases 1B, 2B, and 3 is not being issued by the Section. Please note that the Division has not approved permitting of unlined landfills in areas of known groundwater contamination. One of the prime tests of site suitability is the ability to monitor the landfill unit and distinguish between releases from different discrete units. The proposed phases in question do not meet this requirement. Corrective Action – CD over MSW In addition, water quality analytical data and methane gas readings collected since the implementation of the corrective action in 2008 still indicate groundwater exceedances of Appendix I and II constituents beyond the relevant point of compliance and methane gas exceedances beyond the facility boundary for the adjacent closed and unlined C&D Over MSW landfill. Based upon the County’s approved Addendum to Corrective Action Plan dated August 23, 2013 (DINs 19615, 19616, and 19655) and the County’s approved Revised November 2008 Burke County John’s River Waste Management Facility Corrective Action Plan (DINs 6585 and 6681), the selected remedy does not appear to be working as effectively as designed. Burke County must take all measures necessary to ensure the protection of public health and the environment. Therefore, in accordance with 15A NCAC 13B .1637, the Section requests implementation of the County’s corrective action contingency plans. Within 90 days of receipt of this letter, please provide the Section with the proposed alternate remedy and implementation schedule. If you have any questions regarding these decisions, please feel free to contact me at (919) 707.8258 and perry.sugg@ncdenr.gov or Jackie Drummond at (828) 296.4706 and Jaclynne.drummond@ncdenr.gov. With Best Regards, Perry Sugg, PG Permitting Hydrogeologist Solid Waste Section Cc: Van Burbach, PG - Joyce Engineering Bryan Steen – Burke County Manager Ed Mussler - SWS Permits Branch Supervisor Allen Gaither – SWS Permits Engineer Jason Watkins – SWS Field Operations Branch Supervisor Deb Aja – SWS Western FOB Supervisor Kris Riddle – SWS Environmental Specialist