HomeMy WebLinkAbout6204_UwharrieMSWLF_approval_underdrainPlan_Cell14B_DIN27544_20170324 ROY COOPER Governor MICHAEL S. REGAN Secretary MICHAEL SCOTT Director Solid Waste Section Sent via Email March 24, 2017 Mr. Mike Gurley, Republic Services of North Carolina, LLC (Republic Services) Mr. Joe Reynolds, Uwharrie Regional Landfill Mr. Matthew M. Woodard, County Manager, Montgomery County Re: Approval of Underdrain Piping Plan Modification to the Permit Approval to Construct [PTC] (DIN 23532) Uwharrie Regional Landfill, Phase 4, Cell 14B Montgomery County, North Carolina Permit No. 6204-MSWLF-1995, Document ID No. (DIN) 27544 Gentlemen: The Division Waste Management (DWM), Solid Waste Section (SWS) has reviewed the March 21, 2017 responses (DIN 27540) to the SWS comments on the Underdrain Piping Plan [Plan] (DIN 27508) dated March 09, 2017. Hodges, Harbin, Newberry & Tribble, Inc. (HHNT), on behalf of Republic Services, prepared and submitted the original plan and the responses. The Plan proposes to install underdrain piping beneath the Uwharrie Regional Landfill (Landfill) - Phase 4, Cell 14B. The purpose is to intercept seeps that are being encountered during grading activities at Cell 14B and to gravity drain the flow to an existing drainage feature outside the footprint of Cell 14B. The SWS has no further comment on the Plan at this time and hereby approves the construction of the underdrain piping underneath Landfill Cell 14B according to the approved Plans, DIN 27508 & 27540 including the Technical Specification Section 02220 – Trenching, Backfilling, and Compaction. The construction quality testing results and as-built drawing(s) – piping layout/alignment and profile prepared by a surveyor registered in the State of North Carolina must be submitted as a portion of the Certified Construction Quality Assurance Report of the Cell 14B according to the Permit Condition No. 19, Part II of Attachment 2 of the PTC dated May 14, 2015 (DIN 23532). According to the Plan (DIN 27540) Republic Services shall conduct and document monthly monitoring of the seep flow to determine the long-term plan of the underdrain after pipe installation is completed. The finding of the seep and the long-term plan of the underdrain piping must be incorporated into the Landfill Phase 5 (Cells 15 & 16) Permit Approval to Construct Application. Additionally, from July 2017 the current Water Quality Monitoring Program at the Landfill shall include the seep sampling at the pipe outlet as part of the semi-annual groundwater & surface water monitoring activities. Mr. Mike Gurley, Republic Services of North Carolina, LLC (Republic Services) Mr. Joe Reynolds, Uwharrie Regional Landfill Mr. Matthew M. Woodard, County Manager, Montgomery County March 24, 2017 DIN 27544 Page 2 of 2 Please place the approved plan and this letter in the landfill operating record. If you have any questions of the permit, please contact my staff Ming Chao at 919-707-8251 ming.chao@ncdenr.gov or Cristine Ritter, at (919) 707-8254 or christine.ritter@ncdenr.gov. Sincerely, Edward F. Mussler, III, P.E, Permitting Branch Supervisor Division of Waste Management, NCDEQ cc: K. Matthew Cheek, P.E., HHNT Ming-Tai Chao, P.E, DWM Christine Ritter, DWM Teresa Bradford, DWM Ervin Lane, DWM Deb Aja, DWM Central Files