Loading...
HomeMy WebLinkAbout3416T-OverdaleRdTransfer_Comment_PermitApplication_DIN27530_201703241 Chao, Ming-tai From:Chao, Ming-tai Sent:Friday, March 24, 2017 8:46 AM To:Matt Cheek Cc:Heim, Susan A; dbouchard@republicservices.com; dmoriarty@republicservices.com; tabaczynskim@republicservices.com; Eric Jackson; Aja, Deborah Subject:Comments on Overdale Road Transfer Station - Permit to Operate and Operation Plan, DIN 27530 Dear Mr. Cheek: The Solid Waste Section completed a review of the Life-of-Site Permit Application (DIN 27506) for Overdale Road Transfer Station, Permit No. 3416T-Transfer and has several comments on the application below: DIN 27530 1. The SWS records don’t have the following documents. Since the permit application is requesting a life- of-site permit approval to operate, please provide a copy of each document so that all required documents can be accessed in the SWS document tracking system. i. Property deed info recorded in the Forsyth County Register of Deeds Office. ii. Zoning approval letter issued by the City of Winston-Salem or Forsyth County. iii. Approval letter of the erosion and sediment control plan/permit issued by the NC Land Quality Section. 2. Throughout the Operation Plan, any written notification should be submitted to the Solid Waste Section mailing address below, not the office building address, which may be subjected to change in the future. Solid Waste Section, Division of Waste Management 1646 Mail Service Center Raleigh, NC 27699-1646 The phone number: 919-707-8200 should be used for verbal notification during business hours. 3. (Section 1.2) Please provide the physical address of the transfer station. The SWS record shows the physical address of the facility is 5000 Overdale Rd, Winston- Salem, NC 27107. 4. (Section 1.3) Please provide additional information of the transfer station building: i. The dimensions of the transfer station building, including the roof-covered area and no cover area. The info will be used as reference for future expansion or the increase of the designed capacity of the facility resulting in change of approved engineering plan [NCGS 130A 295.8(b)]. ii. In Paragraph 4, change the wording to reflect that the transfer station floor is sloped, since it already exists, unless modifications to the existing floor are proposed. 2 iii. In the last paragraph, please specify whether or not Republic staff will be onsite at the facility during operating hours or whether K. R. Drenth personnel will be solely responsible for day-to- day operations. 5. (Section 2.1) Explain how the recyclable materials will be removed from incoming loads, where and how long they will be stored onsite and where they will be transported. Will recyclable materials be weighed? 6. (Section 3.2, the fifth paragraph & Site Plan drawing) please provide the requested info or further clarification to the concerned matter: i. The locations of the drain located in the pit area on the lower level of the transfer building and the described sump on the Site Plan drawing. ii. An oil/water separator is shown on the Site Plan drawing; please describe the function of this oil/water separator related to the waste transfer operations and add this unit to the inspection list in Section 9.0. iii. The capacity of the sump and the oil/water separator. Is there an alarm system/device being installed inside the sump and the oil/water separator to provide warning to the operator about overfilling the washdown water storage unit(s)? If there is no an installed alarm system/device, please provide the procedures or practices to prevent overfill of the leachate/wastewater storage units. iv. This Section describes that “From the sump, the washdown water will be pumped into the City of Winston-Salem Sanitary Sewer System.” Is there a sewer manhole on site to receive the washdown water? If so, please provide the manhole location on the Site Plan drawing. Or will the collected washdown water be routinely pumped and hauled to the City owned WWTP? Please clarify. 7. (Section 3.2, last paragraph) Would non-putrescible wastes be allowed to remain on the transfer station tipping floor at the end of the working day if it is stored in containers designed for waste storage? Please clarify. 8. (Section 3.3 & Appendix) Will a standard waste screening form be used, and will the items included in each random load be listed on the form? Will the form include information about any unacceptable waste found? Will the form specify the disposition of any unacceptable waste found? Please clarify. 9. (Section 7.4) The Fire Occurrence Notification Form can be directly downloaded from the web link http://ncdenr.s3.amazonaws.com/s3fs- public/Waste%20Management/DWM/SW/Forms/FireOccurrenceReport.pdf Please append the form to the Operation Plan. Notification of a fire occurrence, both verbal and written, should be submitted to the Regional Environmental Senior Specialist for Forsyth County, not to the Raleigh office. 3 10. (Section 9.0 & Site Plan drawing) Please show the following items or features on the Site Plan drawing: i. The alignment/layout of the drain lines related to the floor drain and/or trench drain (described in the Section 9.0) leading to the sump and the oil/water separator. ii. The locations of fire hydrant and the water source to clean the tipping floor. Please submit a hard copy and an electronic copy of the responses to the above-mentioned comments and provide the requested info which should be incorporated into the final permit application document. Thank you for your corporation on this matter. Best regards, Ming Chao Ming-Tai Chao, P.E. Environmental Engineer Permitting Branch, Solid Waste Section NCDEQ, Division of Waste Management (Mailing Address) 1646 Mail Service Center Raleigh, NC 27699-1646 (Street Address) Green Square, 217 West Jones Street Raleigh, NC 27603 Tel. 919-707-8251 ming.chao@ncdenr.gov http://portal.ncdenr.org/web/wm/sw <image001.png> E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties From: Chelsea Madden [mailto:CMadden@HHNT.COM] Sent: Monday, March 13, 2017 9:05 AM To: Chao, Ming-tai <ming.chao@ncdenr.gov> Cc: Mussler, Ed <ed.mussler@ncdenr.gov>; dbouchard@republicservices.com; dmoriarty@republicservices.com; tabaczynskim@republicservices.com; Matt Cheek <MCheek@HHNT.COM>; Eric Jackson <EJackson@HHNT.COM> Subject: HHNT - Overdale Road Transfer Station - Permit to Operate and Operation Plan Dear Mr. Chao, Please see the attached document regarding the Permit to Operate – Life of Site Permit Request and Operation Plan 2017. A hard copy has been sent via FedEx. Should you have any questions, please call. Thank you, CHELSEA MADDEN 4 Administrative Assistant Hodges, Harbin, Newberry & Tribble, Inc. 3920 Arkwright Road, Suite 101 | Macon, Georgia 31210 Phone: (478) 743-7175 | Fax: (478) 743-1703 Email: cmadden@hhnt.com www.hhnt.com ***Confidentiality Statement & Notice: This email’s contents, including any attachments, are confidential and may be privileged. This email is protected under the Electronic Communications Privacy Act, 18 U.S.C. 2510-2522, and any review, retransmission, dissemination to unauthorized persons, or other use is strictly prohibited. If you have received this email by mistake, please notify the sender by reply e-mail and permanently delete the email from your system.