Loading...
HomeMy WebLinkAbout7305_DukeMayo_Approval_GWAssessmentWorkplan_DIN27539_20170322 March 22, 2017 Sent via email – Kimberlee.Witt@duke-energy.com Kimberlee Witt, P.E. Duke Energy Progress, LLC Environmental Services 3195 Pine Hall Road Belews Creek, North Carolina 27009 RE: Approval of Groundwater Assessment Work Plan Duke Energy Progress - Mayo Steam Station CCR Landfill 7305-INDUS-2012 Person County DIN 27539 Dear Ms. Witt, The Solid Waste Section (Section) has reviewed the Work Plan for Assessment of Groundwater at Mayo Plant Landfill (DIN 27462) submitted on your behalf by SynTerra on February 23, 2016. The Work Plan includes assessing three separate areas around the landfill: 1) Area 1 downgradient of the truck wash station, 2) Area 2 downgradient of the leachate transfer vault and 3) Area 3 downgradient of the leachate pump station east of the landfill. The Work Plan proposes to install well clusters in the three areas which includes wells screened in the surficial (S), transition zone (D) and upper bedrock (BR) flow zones. The Section understands not every well cluster location will have sufficient saturation to install all three well depths. The Work Plan proposes the following well clusters: Area 1 LMW-6, LMW-7, LMW-8 and LMW-9; Area 2 LMW-10, LMW-11 and LMW-12; and Area 3 LMW-13. The Section approves this Work Plan. Please contact me at (919) 707-8253 or via email elizabeth.werner@ncdenr.gov if you have any questions or concerns regarding this letter. Sincerely, Elizabeth S. Werner Permitting Hydrogeologist Solid Waste Section Cc: Ed Sullivan, P.E. – Duke Energy Progress Ellen Lorscheider – Section Chief, SWS Ed Mussler, P.E. – Permitting Branch Head, SWS Shannon Aufman – Permitting Engineer, SWS Shawn McKee – Environmental Senior Specialist, SWS Jason Watkins – Field Operations Branch Head, SWS