Loading...
HomeMy WebLinkAbout7401_PittCountyMSWLF_Assessment_DIN27528_20170316Groundwater Management Associates, Inc. 4300 Sapphire Court, Suite 100 Greenville, North Carolina 27834 Telephone: (252) 758-3310 Facsimile: (252) 758-8835 www.gma-nc.com March 15, 2017 Ms. Jaclynne Drummond Compliance Hydrogeologist NCDEQ Solid Waste Section 2090 US Highway 70 Swannanoa, North Carolina 28778 Re: Proposal for Assessment of Benzene Contamination Migration Pitt County Solid Waste Municipal Landfill Dear Ms. Drummond, During the January 2017 groundwater monitoring event conducted by Groundwater Management Associates, Inc. (GMA) at the inactive Pitt County Solid Waste Municipal Landfill, benzene was detected at concentrations slightly exceeding the 1.0 µg/L 15A NCAC 2L standard in two groundwater monitoring wells. Specifically, the samples from well P16R and well P20R contained 2.4 and 1.7 µg/L of benzene, respectively. The source of benzene in wells P16R and P20R is unknown. Because benzene has been detected previously in wells P16R and P20R at concentrations above the 15A NCAC 2L standard, GMA submitted a 14-Day Notice documenting the exceedances to the North Carolina Solid Waste Section (SWS) on behalf of Pitt County on March 3, 2017 as required by rule 15A NCAC 13B.1633(c)(1). Well P16R is located hydraulically upgradient of well P20R and is used as an upgradient monitoring location for the Southern Pitt County Landfill Unit. Well P20R is located approximately 90 feet north of the Pitt County Landfill property boundary and in close proximity to the ditch along the property boundary. During our March 2, 2017 phone conversation regarding the benzene detections at this site, you indicated that Pitt County needs to assess whether benzene contamination has migrated off the property, and you suggested sampling the pore water beneath the ditch along the southern property boundary to establish this. Based on our conversation, GMA proposes to collect two pore water samples from the beneath the southern boundary ditch using a PushPointTM sampler and syringe. The proposed sampling locations are down gradient of well P20R, as shown in Figure 1. Sampling procedures will follow the Environmental Protection Agency, Science and Ecosystem Support Division’s (SESD) 2013 Pore Water Sampling Operating Procedure (SESDPROC-513-R2) guidelines to ensure sample integrity and avoid surface water intrusion. Pore water samples will be transferred to ENCO Laboratory in an ice-filled cooler under chain-of-custody protocol and analyzed for Appendix I parameters. Pore water samples will not be filtered in the field such that all metals are analyzed as total metals. Ms. Jaclynne Drummond NC Solid Waste Section March 15, 2017 Page 2 of 2 GMA proposes to conduct this pore water sampling during the next semi-annual monitoring event for the Southern portion of the Pitt County Landfill scheduled for July 2017. Analytical results will be reported as part of the corresponding Semi-Annual Monitoring Report. If you have any questions or comments regarding the proposed assessment work, please contact me at 758-3310 or emma@gma-nc.com. Sincerely, Groundwater Management Associates, Inc. Emma H. Shipley, P.G. Project Hydrogeologist Cc: Mr. John Demary, Pitt County Director of Solid Waste & Recycling Mr. Tim Corley, Pitt County Engineer Mr. Steve Campbell, GMA Enclosures: Figure 1 Z:\GMA\251XX- Pitt County\25101 - Landfill\2017 January\Mini-assessment Proposal Letter to NCSWS 20170314.docx P5 P4P6 MW1 P11R P1276.58 P16R P20R P19 P28 P17 MW6R P23 P21 P9 P13DP13 MW4 P7 P2 MW3 P26 P25 MW7 MW2MW8 MW8D P14 74.67 75.01 74.35 75.20 75.86 77.32 77.08 77.35 (75.12)77.71 77.7 P24 P10 P8 MW5 P3 78.58 78.01 77.31 78.56 80.2781.03 81.33 78 77 78 80 P15 140 120 100 80 100 MW7D 76.61 77 77 80 79 76 78 MW1R(78.06) 76 81 81 79 75 75 (75.14) 75 75 100 100 120 80 80 80 80 80 80 80 80 80 80 80 80 80 8 0 80 80 80 80 80 80 0 300 600' PROPOSED PORE WATERSAMPLING LOCATIONS - LEGEND - PROJECT: 25101 FIGURE 1 DATE 3/15/2017 SCALE IN FEET GENERAL NOTES:1. TOPOGRAPHIC CONTOUR INTERVAL = 2.0 FEET2. GROUNDWATER CONTOUR INTERVAL = 1.0 FOOT3. ARROW INDICATES DIRECTION OF GROUNDWATER FLOW4. WATER LEVEL ELEVATIONS ARE POSTED BY EACH WELL5. ( ) INDICATES DATA NOT USED 1" = 600' POND PROPERTY LINE TOPOGRAPHIC CONTOUR NORFOLK SOUTHERN RAILROAD (100' R / W ) RAILROAD TRACKS WATER LEVEL(FEET ABOVE SEA LEVEL)77.31 DRW BY: EHS MONITORING WELL ABANDONED MONITORING WELL UNMEASURED MONITORING WELL INDICATES DIRECTION OFGROUNDWATER FLOW JANUARY 2017 GROUNDWATERELEVATION CONTOUR PROPOSED PORE WATERSAMPLING LOCATION