Loading...
HomeMy WebLinkAboutNCS00282_INSP_20160913FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 1 of 3 UNIT TYPE: Lined MSWLF LCID YW Transfer Compost SLAS COUNTY: Columbus Closed MSWLF HHW White goods Incin T&P FIRM X PERMIT NO.: NCS-00282 CDLF Tire T&P / Collection Tire Monofill Industrial Landfill DEMO SDTF FILE TYPE: COMPLIANCE Date of Site Inspection: 09/13/2016 Date of Last Inspection: 08/31/2016 FACILITY NAME AND ADDRESS: S & S Septic Tank Pumping 714 Mollie Iron Hill Road Clarendon, NC 28432 FACILITY CONTACT NAME AND PHONE NUMBER: Name: John G. Turner Telephone: (910) 653-4810 Email address: jgtiv7@hotmail.com Fax: N/A FACILITY CONTACT ADDRESS: Same as above PARTICIPANTS: Chester Cobb and John (Jack) Turner STATUS OF PERMIT: Active – permit expires December 31,2016 PURPOSE OF SITE VISIT: Follow-up STATUS OF PAST NOTED VIOLATIONS: On August 12, 2016, Mr. Turner informed Connie Wylie and Chester Cobb that he had discharged three loads of septage onto the ground surface on property owned by Southern Diversified Timber LLC (PIN 0164.00-25-6895.000) off Buck Ridge Drive in Columbus County. The three discharges of septage onto the property owned by Southern Diversified Timber LLC which was not a permitted septage disposal site were violations of N.C.G.S. 130A-291.1(d). On August 31, 2016, I met with Mr. Turner at the site to check on the removal of the septage and contaminated material (vegetation and soil). It was noted that more cleanup was needed. All septage and contaminated material has been removed from the site. Mr. Turner gave me copies of the disposal tickets from Sampson County Disposal where the septage and contaminated material was disposed of. The requested truck logs have been submitted. Also, Mr. Turner has emailed me his response to the Noticed of Violation issued on August 22, 2016. FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 2 of 2 OBSERVED VIOLATIONS: NONE ADDITIONAL COMMENTS 1. Inspection conducted to see if the cleanup of the three septage discharges had been completed. The wetland area was submerged in water. See picture below. Mr. Turner said that they had received around 7 inches of rain from Tropical Storm Hermine (Friday, September 2) and more rain recently. Wetland area submerged in water. Picture taken downslope from Discharge Location #2. 2. On September 8, 2016, Mr. Turner emailed me several pictures that he took of the cleanup. I have included two of the pictures below. The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that p ursuant to N.C.G.S. 130A-22, an administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit, or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules. FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 3 of 3 IMG_0825 received by email on 09/08/16 from Mr. Turner. Picture taken of the cleanup after my site visit on 08/31/16. IMG_0821 (2) received by email on 09/08/16 from Mr. Turner. Picture taken of the cleanup after my site visit on 08/31/16. 3. Mr. Turner gave me copies of the disposal tickets documenting the disposal of “soil mixed with septage from spill” at Sampson County Disposal. One ticket was for the 7.05-ton load taken to the landfill on August 30, 2016. The other ticket was for a 3.75-ton load taken to the landfill on September 9, 2016. Mr. Turner also gave me an updated WWTP Authorization for the Town of Clarkton. 4. I reviewed with Mr. Turner some discrepancies between the truck logs that he submitted and disposal dates that Connie Wylie received from the operator of the Town of Chadbourn WWTP. Mr. Turner said that he went by information (text) that he had put in his cell phone. Mr. Turner said that he still had the disposal tickets and would go back and review them. Any corrections to the logs that he had submitted should be made on a copy of the logs that he submitted. 5. On September 14, 2016, I asked Mr. Turner via email if he had spread any hydrated lime over the septage discharged area. On September 15, 2016, Mr. Turner responded to my email and said that he had “put down lime.” Please contact me if you have any questions or concerns regarding this inspection report. ____________________________ Phone: (919) 707-8283 Chester R. Cobb, Soil Scientist Division of Waste Management, NCDEQ Regional Representative Sent on: 09/20/16 Email Hand delivery X US Mail Certified No. [ _]