HomeMy WebLinkAbout20013_Kinston_Work-Plan_20170302
March 2, 2017
Mr. Lebeed Kady
North Carolina Department of Environmental Quality
Brownfields Program
1646 Mail Service Center
Raleigh, North Carolina 27699-1646
Subject: PROPOSED WORK PLAN-REVISION 2
KINSTON SHIRT FACTORY
E. KING STREET, E. CASWELL STREET &
DR. MARTIN LUTHER KING JR. BOULEVARD
KINSTON, LENOIR COUNTY, NORTH CAROLINA
MID-ATLANTIC JOB NUMBER: 000R2611.00
BROWNFIELDS PROJECT NUMBER 20013-16-054
Dear Mr. Kady:
Mid-Atlantic Associates, Inc. (Mid-Atlantic) appreciates the opportunity to submit this revised
proposed work plan for additional assessment activities at the Kinston Shirt Factory site in
Kinston, North Carolina. The purposes of these activities are to provide the safe
redevelopment of the site and to ensure materials generated at the site are handled properly.
PROJECT INFORMATION
The City of Kinston (Kinston) owns 14 parcels of land that make up the Kinston Shirt Factory
redevelopment site. Kinston applied for entry into the North Carolina Department of
Environmental Quality (NCDEQ), Division of Environmental Management (DWM), Brownfields
Program (NCBP) and received a Letter of Eligibility dated March 1, 2016. During a December 15,
2016 meeting and subsequent follow up telephone conversations, it was agreed that some
additional data was necessary for completion of the brownfields process.
WORKPLAN ASSUMPTIONS
We have made the following assumptions in preparing the scope of work for this work plan.
Although Kinston owns the parcels, their plan is to actively market the sites for sale. As
such redevelopment plans have not been developed.
The known sources for potential soil contamination at the site have been investigated.
Proposed Work Plan Rev. 2 – Kinston Shirt Factory March 2, 2017
Kinston, North Carolina Page 2
NCBP Project Number 20013-16-054
Kinston anticipates a potential user will conduct a “ground-up” development (i.e. very
little net export of soil). Additional surficial soil sampling that may be necessary at the
site will be addressed in the forthcoming environmental management plan (EMP).
PROPOSED SCOPE OF SERVICES
Mid-Atlantic proposed to collect a groundwater sample from temporary monitoring wells installed
on parcels A, C, G, L/M, and N. The locations of the proposed temporary monitoring wells are
shown on the attached Site Map. Groundwater samples collected from these wells will be
analyzed for volatile organic compounds (VOCs) by EPA Method 8260B. Groundwater samples
collected from parcels A and G will also be analyzed by EPA Method 8270B.
Mid-Atlantic also proposes to collect one sub-slab soil gas sample at the site in general
accordance with the DWM’s, Vapor Intrusion Guidance (April 2014). The sample will be
collected beneath the slab of the city-owned structure located on parcel J. The sample location
for the sub-slab soil gas sample is included on the attached Site Map. The sample will be
collected through a temporary vapor pin installed in the concrete floor slab. The sample will be
drawn into a vacuumized Summa canister and sent to the laboratory for VOC analysis for the
TO-15 compendium.
Upon receipt of laboratory results, Mid-Atlantic will provide a brief report which will include a
sample location map, tabulated analytical data, laboratory analytical reports, a description of field
activities and our findings, risk calculations (if necessary), conclusions and recommendations.
CLOSING
We appreciate the opportunity to present this work plan to the NCBP. If you have any questions
or need additional information, please feel free to contact us at 250-9918.
Sincerely,
MID-ATLANTIC ASSOCIATES, INC.
Darin M. McClure, PE
Principal Engineer
Attachments: Site Map
ATTACHMENT A
SITE MAP
SI
T
E
M
A
P
FO
R
M
E
R
K
I
N
S
T
O
N
S
H
I
R
T
F
A
C
T
O
R
Y
LA
N
D
A
S
S
E
M
B
L
A
G
E
EA
S
T
C
A
S
W
E
L
L
A
N
D
E
A
S
T
K
I
N
G
S
T
R
E
E
T
S
KI
N
S
T
O
N
,
N
O
R
T
H
C
A
R
O
L
I
N
A
DR
A
W
N
BY
:
DA
T
E
:
EN
G
.
CH
E
C
K
:
JO
B
N
O
:
AP
P
R
O
V
A
L
:
DR
A
F
T
CH
E
C
K
:
GI
S
N
O
:
DW
G
N
O
:
1
5
.
2
JA
N
U
A
R
Y
2
0
1
6
00
0
R
2
6
1
1
.
0
0
T
4
0
3
6
04
G
-
R
2
6
1
1
.
0
0
T
4
0
3
6
OO
T
E
N
0
1
0
0
2
0
0
3
0
0
Fe
e
t
RE
F
E
R
E
N
C
E
S
:
1.
G
I
S
D
A
T
A
F
R
O
M
L
E
N
O
I
R
C
O
U
N
T
Y
G
I
S
.
2.
M
I
D
-
A
T
L
A
N
T
I
C
F
I
E
L
D
N
O
T
E
S
.
3.
U
S
T
L
O
C
A
T
I
O
N
D
A
T
A
F
R
O
M
UT
T
S
/
E
N
V
I
R
O
N
M
E
N
T
A
L
R
E
P
O
R
T
´
EA
S
T
C
A
S
W
E
L
L
S
T
R
E
E
T
EA
S
T
K
I
N
G
S
T
R
E
E
T
DR. MARTIN LUTHER KING JR BOULEVARD SOUTH
T
I
F
F
A
N
Y
A
V
E
1:
1
,
2
0
0
NC
R
R
C
O
R
R
I
D
O
R
L
I
N
E
AB
C
D
E
F
G
H
I
J
K
L M
Le
g
e
n
d
SU
B
J
E
C
T
S
I
T
E
PR
O
P
E
R
T
Y
L
I
N
E
S
N
Pr
o
p
o
s
e
d
l
o
c
a
t
i
o
n
o
f
g
r
o
u
n
d
w
a
t
e
r
s
a
m
p
l
e
s
Pr
o
p
o
s
e
d
l
o
c
a
t
i
o
n
o
f
s
u
b
-
s
l
a
b
s
o
i
l
g
a
s
s
a
m
p
l
e