HomeMy WebLinkAbout1011_ExpressRecoveryCenterPTC_DIN27026_20170217 Permit No: 1011-MWP-2017
Express Recovery Center
February 17, 2017
Document ID No.27026
Page 1 of 10
North Carolina Department of Environmental Quality
Division of Waste Management
Roy Cooper Michael S. Regan
Governor Secretary
1646 Mail Service Center, Raleigh, North Carolina 27699-1646
Phone: 919-707-8200 Internet: http://deq.nc.gov/about/divisions/waste-management/solid-waste-section
An Equal Opportunity \ Affirmative Action Employer
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF WASTE MANAGEMENT
SOLID WASTE SECTION
SOLID WASTE MANAGEMENT FACILITY
HOT MIX, INC.
(Owner and Operator)
is hereby issued a
PERMIT APPROVAL TO CONSTRUCT
1011-MWP-2017, Express Recovery Center
PERMIT APPROVAL TO OPERATE
1011-MWP-2017, Express Recovery Center
PERMIT FOR CLOSURE
Not Applicable
located at 1151 Whiteville Road NW, Shallotte, Brunswick County, North Carolina, in accordance with
Article 9, Chapter 130A, of the General Statutes of North Carolina and all rules promulgated there under
and subject to the conditions set forth in this permit. The legal description of the site is identified on the
deeds recorded for this property listed in Attachment 1 of this permit.
Edward F. Mussler, III, P.E.
Permitting Branch Supervisor
Solid Waste Section
Permit No: 1011-MWP-2017
Express Recovery Center
February 17, 2017
Document ID No. 27026
Page 2 of 10
ATTACHMENT 1
GENERAL PERMIT CONDITIONS INFORMATION
PERMIT(S) TO OPERATE
Permit Status Issuance Expiration
1011-MWP-2017 Active February 17, 2017 February 17, 2022
Part I General Facility
1. This permit is issued by the North Carolina Department of Environmental Quality, Division of
Waste Management, Solid Waste Section (Section). In accordance with North Carolina Solid
Waste Management Rule 15A NCAC 13B .0201(d), a solid waste management permit shall
have two parts: a permit approval to construct and a permit approval to operate. The permit
approval to construct must be implemented in accordance with Attachment 2 of this permit. The
permit approval to operate must be implemented in accordance with Attachment 3 of this
permit.
2. The persons to whom this permit is issued (“permittee”) are the owners and operators of
the solid waste management facility.
3. This permit shall not be effective until the certified copy of this permit which references
legal descriptions for all land within the solid waste management facility boundary is
recorded in the Register of Deeds office and indexed in the grantor index under the name
of the owner of the land in the county or counties in which the land is located. The
certified copy of the permit affixed with the Register’s seal and the date, book, and page
number of recording must be returned to the Section within 30 calendar days of issuance
of this permit. If the Section does not receive the certified copy of the recorded permit
within 30 calendar days of issuance of the permit, then and in that event, the permit is
suspended and of no effect until the date the Section received the certified copy of the
recorded permit.
4. When this property is sold, leased, conveyed, or transferred in any manner, the deed or
other instrument of transfer must contain in the description section in no smaller type than
that used in the body of the deed or instrument, a statement that the property has been used
as a solid waste transfer station and a reference by book and page to the recordation of the
permit.
5. By beginning construction or receiving waste at this facility the permittee shall be
considered to have accepted the terms and conditions of this permit.
6. Operation of this solid waste management facility must be in accordance with the Solid
Permit No: 1011-MWP-2017
Express Recovery Center
February 17, 2017
Document ID No. 27026
Page 3 of 10
Waste Management Rules, 15A NCAC 13B; Article 9 of Chapter 130A of the North
Carolina General Statutes (N.C.G.S. §130A-290, et seq.); the conditions contained in this
permit; and the approved plan. Should the approved plan and the rules conflict, the Solid
Waste Management Rules shall take precedence unless specifically addressed by permit
condition. Failure to comply may result in compliance action or permit revocation.
7. This permit is issued based on the documents submitted in support of the application for
permitting the facility identified in Attachment 1, “List of Documents for Approved Plan”,
which constitutes the approved plan for the facility. Where discrepancies exist, the most
recent submittals and the Conditions of Permit shall govern.
8. This permit may be transferred only with the approval of the Section and through the
issuance of a new or substantially amended permit in accordance with applicable statutes
and rules. In accordance with N.C.G.S. §130A-295.2(g), the permittee must notify the
Section thirty (30) days prior to any significant change in the identity or business structure
of either the owner or the operator, including but not limited to, a proposed transfer of
ownership of the facility or a change in the parent company of the owner or operator of the
facility.
9. The permittee is responsible for obtaining all permits and approvals necessary for the
development of this project including approval from appropriate agencies for a General or
individual National Pollutant Discharge Elimination System (NPDES) Stormwater
Discharge Permit. Issuance of this permit does not remove the permittee's responsibilities
for compliance with any other local, state or federal rule, regulation or statute.
PROPERTIES APPROVED FOR THE SOLID WASTE MANAGEMENT FACILITY
BRUNSWICK COUNTY, NC REGISTER OF DEEDS
Book Page Grantor Grantee Acres
3759 117 TLM Investments, LLC Hot Mix, Inc. 32.82
(DIN = Document Identification Number)
Note: A copy of the property deed in part of DIN 27025.
Permit No: 1011-MWP-2017
Express Recovery Center
February 17, 2017
Document ID No. 27026
Page 4 of 10
Part II Transfer Station/Treatment & Processing Unit(s)
C&D Recycling Facility - Permitting History
Permit Issuance Date Issued Document ID
Original Issue Permit to Construct and Operate February 17, 2017 27026
C&D Recycling Facility - List of Documents for Approved Plan
1. 908 Recycling and Recovery Site. Application for Construction and Operation. Submitted by
East Coast Engineering & Surveying, P.C. August 3, 2016. Revised through January 26,
2017. Revision included name change to Express Recovery Center. DIN 27025
- End of Section -
Permit No: 1011-MWP-2017
Express Recovery Center
February 17, 2017
Document ID No. 27026
Page 5 of 10
ATTACHMENT 2
CONDITIONS OF PERMIT TO CONSTRUCT
Part I: General Facility
1. Construction of all solid waste management units within this facility must be in
accordance with the pertinent approved plans.
2. Modification or revision of the approved plans or changes during construction require
approval by the Section and may constitute a permit modification and be subject to a
permitting fee.
3. All sedimentation and erosion control activities must be conducted in accordance with the
Sedimentation Control Act N.C.G.S. §113A-50, et seq., and rules promulgated under 15A
NCAC 4. The facility must furnish a copy of the approved Sedimentation and Erosion
Control Plan from the NC Division of Energy, Mineral and Land Resources, Land Quality
Section, to the Solid Waste Section.
4. Modifications to the approved sedimentation and erosion control activities require
approval by the NC Division of Energy, Mineral and Land Resources, Land Quality
Section. The Solid Waste Section must be notified of any modifications.
5. Facility construction must not cause or result in a discharge of pollution, dredged material,
and/or fill material into waters of the state in violation of the requirement under Sections
401 and 4040 of the Clean Water Act, as amended.
Part II Transfer Station/Treatment & Processing Unit(s)
1. Substantial construction of the processing facility must commence within 18 months of
issuance of this permit. Substantial construction includes, but is not limited to, the
issuance of construction contracts, mobilization of equipment onsite, and construction
activities including the installation of sedimentation and erosion control structures. If
substantial construction of the facility does not commence within 18 months, the permit to
construct will expire unless the permittee has requested and the Section has approved an
extension to the permit to construct. Any extension of the permit or reapplication will be
subject to the statues and rule in effect on that date and may be subject to additional fees.
2. Approval to operate by the Section is required prior to commencement of the operation
and acceptance of waste at the processing facility as specified in Attachment 3 of this
permit. The following requirements must be met prior to issuance of an approval to
operate:
a. A site inspection must be made by a representative of the Section. It is the
permittee’s responsibility to contact the Section and request the inspection.
b. A certification letter stating that the facility was constructed in accordance with the
approved plan must be submitted to the Section by the project engineer. The engineer
issuing the certification must be a North Carolina registered professional engineer.
Permit No: 1011-MWP-2017
Express Recovery Center
February 17, 2017
Document ID No. 27026
Page 6 of 10
3. A representative of the Section will notify the Permitting Branch Supervisor in writing,
either by letter or email, after the conditions in Attachment 2, Part VI, Item 2 have been
met. The owner and operator will be copied on the correspondence. The notification will
serve as permission to operate the processing facility as of the date of the notification. A
copy of the notification must be kept as part of the permanent record.
4. Two paper copies and one electronic copy of the construction record (as-built) drawings
must be submitted to the Section within 30 days of certification of construction by the
project engineer. If drawings are not received within 30 days, operation must cease until
the drawings are submitted to the Section.
-End of Section-
Permit No: 1011-MWP-2017
Express Recovery Center
February 17, 2017
Document ID No. 27026
Page 7 of 10
ATTACHMENT 3
CONDITIONS OF PERMIT TO OPERATE
Part I: General Facility
1. The facility must be adequately secured by means of gates, chains, berms, fences, or other
security measures approved by the Section to prevent unauthorized entry.
2. Signs must be posted at the entrance to the facility that state types of waste that can and
cannot be received at the facility, the hours of operation, the permit number(s), contact
name, telephone number, and other pertinent information. Traffic signs or markers must
be provided as necessary to promote an orderly traffic pattern to and from the operating
areas and to maintain efficient operating conditions.
3. Interior roadway must be of all-weather construction and maintained in good condition.
4. A responsible individual trained and certified in facility operations must be on-site at all
times during all operating hours of the facility, in accordance with N.C.G.S. §130A-
309.25. An attendant must be present to oversee the loading and unloading of waste.
5. Copies of this permit, the approved plans, and all records required to be maintained by the
permittee must be maintained at the facility and made available to the Section upon
request during normal business hours.
6. All sedimentation and erosion control activities must be conducted in accordance with the
Sedimentation Control Act, N.C.G.S. §113A-50 et seq., and rules promulgated under 15A
NCAC 4. All required sedimentation and erosion control measures must be installed and
operable to mitigate excessive on-site erosion and to prevent silt from leaving the area of
the landfill unit during the service life of the facility. The Section must be notified of any
modifications to the approved sedimentation and erosion plan.
7. Facility construction, operations or practices must not cause or result in a discharge of
pollution, dredged material, and/or fill material into waters of the state in violation of the
requirements under Sections 401 and 4040 or the Clean Water Act, as amended.
8. Fire lanes must be established and maintained at all times. The dimensions of the fire
lanes must be coordinated with the Fire Marshall having jurisdiction over the site.
9. Open burning of solid waste is prohibited.
10. Fires and non-conforming waste incidents shall be reported to the Section’s Regional
Waste Management Specialist within twenty-four hours followed by a written notification
to be submitted within 15 days.
11. Financial assurance as required by state rules and statutes must be continuously
maintained for the duration of the facility and updated and submitted annually to the
Section by the anniversary date of the issuance of this permit.
12. Any modifications to the approved plans must be submitted to the Section and approved
prior to implementation.
Permit No: 1011-MWP-2017
Express Recovery Center
February 17, 2017
Document ID No. 27026
Page 8 of 10
Part II: Transfer Station / Treatment and Processing Unit
1. The permit to operate for the C&D processing facility shall expire December 17, 2021.
Pursuant to 15A NCAC 13B .0201(c) and .0201(g), no later than June 17, 2021, the
permittee must submit a request to Section for a permit amendment and must update
pertinent facility plans including, but not limited to, the facility plan, operation plan, and
waste screening plan.
2. The facility is permitted to receive construction and demolition debris waste as defined in
N.C.G.S. §130A – 290 (a) (4): "Construction" or "demolition" when used in connection
with "waste" or "debris" means solid waste resulting solely from construction, remodeling,
repair, or demolition operations on pavement, buildings, or other structures, but does not
include inert debris, land-clearing debris or yard debris.
3. The following, at a minimum, must not be accepted for disposal through the facility:
hazardous waste, yard trash, liquid wastes, regulated medical waste, sharps not properly
packaged, regulated-asbestos containing material as defined in 40 CFR 61, PCB waste as
defined in 40 CFR 761, and wastes banned from disposal in North Carolina by NCGS
130A-309.10(f) and prohibited from disposal in a C&D landfill, as listed in 15A NCAC
13B .0542(e). Barrels and drums must not be accepted unless they are empty and
perforated sufficiently to ensure that no liquid or hazardous waste is contained therein.
4. The permittee must not knowingly dispose of, or accept for transfer for subsequent
disposal, solid waste that is generated within the boundaries of a unit of local government
that by ordinance:
a. Prohibits generators or collectors of solid waste from disposing of that type or form of
solid waste.
b. Requires generators or collectors of solid waste to recycle that type or form of solid
waste.
5. The waste transported for disposal from this facility must go to a sanitary landfill facility
that is
a. permitted to receive the type of waste specified, and
b. whose service area includes the origin of the waste.
6. Recovered material, as defined by N.C.G.S. §130A-290(a)(24) means a material that has
known recycling potential, can be feasibly recycled, and has be diverted or removed from
the solid waste stream for sale, use, or reuse. Recovered material shall be managed as a
valuable commodity in a manner consistent with the desired use or end use, and all of the
following conditions shall be met:
a. Seventy-five percent (75%), by weight or volume, of the recovered material stored at
the facility at the beginning of a calendar year commencing January 1, shall be
removed from the facility through sale, use, or reuse by December 31 of the same year.
Permit No: 1011-MWP-2017
Express Recovery Center
February 17, 2017
Document ID No. 27026
Page 9 of 10
b. The recovered material or the products or by-products of operations that process
recovered material shall not be discharged, deposited, injected, or dumped, spilled,
leaked, or placed into or upon any land or water so that the products or by-products or
any constituent thereof may enter other lands or emitted into the air or discharged into
any waters including groundwaters, or otherwise enter the environment or pose a threat
to public health and safety. Facilities that process recovered materials shall be
operated in a manner to ensure compliance with this requirement.
c. The recovered material shall not be hazardous waste or have been recovered from a
hazardous waste.
d. The recovered material shall not contain significant concentrations of foreign
constituents that render it unserviceable or inadequate for sale, or its intended use or
reuse.
7. The permittee must develop and implement a training and screening programs at the facility
for detecting and preventing unauthorized wastes from being accepted at the facility. At a
minimum, the program must include:
a. Random inspections of incoming loads or other comparable procedures.
b. Records of all inspections.
c. Training of personnel to recognize hazardous, liquid and other excluded waste types.
d. Development of a contingency plan to properly manage any identified hazardous,
liquid, or other excluded or unauthorized wastes. The plan must address identification,
removal, storage and final disposition of these wastes.
8. The facility must not cause nuisance conditions.
a. The tipping floor and loading areas must be maintained in a clean, sanitary condition at
all times and must be cleaned at least daily.
b. Effective vector control measures must be applied at all times to control any potential
vectors including flies, rodents, insects, and other vermin.
c. Control measures must be utilized to minimize and eliminate visible dust emissions
and blowing litter.
i. Fugitive dust emissions are prohibited.
ii. Windblown materials must be collected by the end of the day and no windblown
materials may be allowed to leave the facility boundary.
9. Signs must be posted at the entrance to the facility that state that no hazardous waste or
liquid waste can be received at the facility; and provide information on dumping
procedures, the hours of operation, the permit number, and other pertinent information.
Traffic signs or markers must be provided as necessary to promote an orderly traffic pattern
to and from the discharge area and to maintain efficient operating conditions. A spotter
will be at the tipping building to direct vehicles to the appropriate tipping area.
10. C&D waste must only be deposited on the “tipping floor” designated for C&D waste,
directly into a transfer container, or directly into a recycling container in accordance with
the approved Operation Plan. C&D may not be stored on the tipping floor after operating
hours.
Permit No: 1011-MWP-2017
Express Recovery Center
February 17, 2017
Document ID No. 27026
Page 10 of 10
11. All water or liquid that comes in contact with solid waste, including vehicle wash-down
water, is leachate and must be captured and properly treated before release to the
environment.
a. The leachate control system, such as floor drains, leachate collection devices, sanitary
sewer connections and leachate storage tanks, must be operational during facility
operations.
b. The tipping floor must drain into the leachate collection system. No leachate may
leave the building.
12. The permittee must maintain a record of the amount of solid waste received at the facility,
including daily records of waste received and origins of the loads. The permittee must
maintain a record of the amounts of waste transported out of the processing facility for
disposal and for recovery and recycling. Scales must be used to weigh waste. The daily
records are to be summarized into a monthly report for use in the required annual reports.
13. On or before August 1 annually, the Permittee must submit an annual facility report to the
Section, on forms prescribed by the Section.
a. The reporting period shall be for the previous year beginning July 1 and ending June
30.
b. The annual facility report must list the amount of waste received in tons and be
compiled:
i. On a monthly basis.
ii. By county, city or transfer station of origin.
iii. By specific waste type.
iv. By receiving disposal facility.
v. By diversion to alternative management facilities.
c. The completed report must be forwarded to the Regional Environmental Senior
Specialist for the facility by the date due on the prescribed annual facility report form.
d. A copy of the completed report must be forwarded to each county manager for each
county from which waste was received the facility. Documentation that a copy of the
report has been forwarded to the county managers must be sent to the Regional
Environmental Senior Specialist by the date due on the prescribed annual facility
report form.
- End of Permit Conditions -