HomeMy WebLinkAbout2503_INSP_20170130FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
UNIT TYPE:
Lined
MSWLF LCID YW Transfer Compost SLAS COUNTY: Craven
Closed MSWLF X HHW White goods Incin T&P FIRM PERMIT NO.: 2503-MSWLF-1982
CDLF Tire T&P /
Collection Tire
Monofill Industrial
Landfill DEMO SDTF FILE TYPE: COMPLIANCE
Date of Inspection: 30 January 2017 Date of Last Inspection: 22 August 2016
FACILITY NAME AND ADDRESS:
Craven County Landfill
7400 Old Highway 70
New Bern, NC
GPS COORDINATES: N: 35.17067 E: -077.22744
FACILITY CONTACT NAME AND PHONE NUMBER:
S Rusty Cotton; Director
Craven County Solid Waste & Recycling
252.636.6659
FACILITY CONTACT ADDRESS:
406 Craven Street
New Bern, NC 28560
E-mail: rcotton@cravencountync.gov
PARTICIPANTS:
Ray Williams; NCDEQ-Solid Waste
STATUS OF PERMIT:
Closed MSWLF under Subtitle D
PURPOSE OF SITE VISIT:
Partial Facility Compliance Inspection without records review
STATUS OF PAST NOTED VIOLATIONS:
None applicable
OBSERVED VIOLATIONS:
No violations were observed during this Facility Compliance Inspection; please see the ADDITIONAL COMMENTS
section below.
ADDITIONAL COMMENTS:
1) This Facility is a closed Municipal Solid Waste Landfill.
2) The site is secured by a locked gate at the Coastal Environmental Partnership Facility entrance.
3) The Facility access road is of all-weather construction and is being well maintained at this time.
4) Edge-of-waste markers have been installed at the corners of the disposal footprint and are being maintained as
required.
5) This Facility manages landfill gas through a passive venting system. The gas vents appear to be properly
maintained and functioning as designed at this time.
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
2503_INSP_20170130
Page 2 of 3
6) Leachate is collected through a French drain system into a sump and pumped to the Coastal Environmental
Partnership MSW Landfill, permit #25-09 leachate management lagoon for treatment. Plans are underway for
the installation of a force main system which will pump all collected leachate directly to the City of New Bern
Wastewater Treatment Plant.
7) The Facility monitoring wells were observed during this Facility Compliance Inspection. All wells were
readily accessible, properly labeled, and secured with functioning locks.
8) Soil has been brought on site and is being staged for use in settlement and cap repair projects. Two soil
stockpiles are being maintained; one stockpile on the lower lift and one stockpile on the uppermost lift.
9) Overall this facility has a well-established and maintained cover crop of native warm season grasses. The
cover crop is mowed twice per year.
10) Areas of differential settlement were observed during this Facility Compliance Inspection. These areas appear
to be preventing the positive flow of surface wasters from the landfill during rain events, however, no
standing water was observed in these areas at this time. *Please fill and grade these areas to promote positive
drainage of all surface waters away from the landfill. All filled areas should be graded at a slope not greater
than 3:1 and seeded and mulched to establish a cover crop suitable to prevent erosion of your landfill cap
system.
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
2503_INSP_20170130
Page 3 of 3
11) Some areas of erosion were observed in various places along the eastern sideslope. The majority of these
areas was located approximately midway down the length of the sideslope near the toe of the slope. *Please
continue working to fill and grade these areas at a slope not greater than 3:1. After grading, all repaired areas
should be seeded and mulched to establish a groundcover suitable to protect your landfill cap system.
12) No off-site erosion was observed during this Facility Compliance Inspection.
13) The stormwater management basin was clear of excessive brush and is being maintained in overall good
condition.
14) No violations were observed during this Facility Compliance Inspection.
15) *Continued corrective measures are required as a result of this Facility Compliance Inspection.
Please contact me if you have any questions or concerns regarding this Facility Compliance Inspection Report.
Ray Williams; Environmental Senior Specialist Phone: 252.948.3955 E-mail: ray.williams@ncdenr.gov
Regional Representative
Delivered on: 14 February 2017 by X Electronic delivery US Mail Certified No. [ _]
cc: Andrew Hammonds; Eastern District Supervisor/SWS: andrew.hammonds@ncdenr.gov
Jessica Montie; Chief Compliance Officer/SWS: jessica.montie@ncdenr.gov
C: \2017\Craven\Facilities\25-03\Inspections\2503_INSP_20170130
NCDEQ DWM Laserfiche Online Document Management System: http://edocs.deq.nc.gov/WasteManagement/Welcome.aspx
Go Green! Thank you for helping NCDEQ be environmentally responsible.