Loading...
HomeMy WebLinkAbout3402_HanesMillRdMSWLF_comment_CQA_Cell5_DIN27405_201702141 Chao, Ming-tai From:Chao, Ming-tai Sent:Tuesday, February 14, 2017 2:08 PM To:'Plummer, Michael' Cc:'Jan McHargue (janm@cityofws.org)'; 'EDWARDG@cityofws.org'; Heim, Susan A Subject:comments on the CQA Report- Winston-Salem Hanes Mill Rd Cell 5 Construction Certification, DIN 27405 Hi Mike: DIN 27405 I have completed a review of the CQA report for the Phase 2, Cell 5 Construction (DIN 27325) and several comments are made for clarification and/or collecting additional data which are not available in the CQA report. The comments are: 1. Please provide the following data or info in the CQA report: i. Please provide a copy of the pre-construction meeting record/document including participant sign-sheet and meeting agenda according to Permit Condition No. 3, Attachment 2 of the Permit To Construct (PTC) dated October 8, 2010 (DIN 8572). ii. Please provide the well or piezometer abandonment logs (as shown the Section 7 of the CQA Report, on Page 24) according to Permit Condition Nos. 7 & 9, Attachment 2 of the PTC dated October 8, 2010 (DIN 8572). iii. Please provide the well completion log for the landfill gas monitoring well MM-12 adjacent to Cell 5 prior to receiving permitted waste for disposal. Section 7 of the CQA report (on Page 40) states the well ID is MMW-22 which is inconsistent with the ID shown on drawing Sheet 00G- 04 of the PTC Permit Application. Please verify and make a necessary correction. 2. (Section 3.3.1) Please add a statement(s) to describe if the requirement of testing compaction effort at the subgrade underneath the test strip liner/test pad was successfully conducted according to the specification of Part 3.1A.6 of Technical Specification Section 02276 – 7. 3. (Section 4.2.4) The Part 2.1 of Technical Specification Section 02800-4 requires the reinforced GCL is used on the sloped area (slopes greater than 10%). Please describe in the section if this requirement was implemented in the construction of the landfill cell (West Slope Area). 4. (Appendix B1) i. The lab testing results of standard proctor test (ASTM D 698) and hydraulic conductivity test (ASTM D 5084) for the soil samples DS4-1 through DS4-13 are not available in Appendix B-1. Please provide the lab results. ii. The lab testing results of standard proctor test (ASTM D 698) for the soil samples DS4-14 & DS-18 were used as reference in Appendix B-2, but the test results are not available in Appendix B-1. Please provide the lab results iii. The lab testing results of standard proctor test (ASTM D 698) for the soil samples DS4-14 & DS4-20 were used as reference in Appendix B-3, but the test results are not available in Appendix B-1. Please provide the lab results. 2 5. (Appendices B1, C1 & C2) The soil sample DS4-11 (in Appendix B1) and Sample Test Pit # 3 & #11 (in Appendix C1) and Stockpile Sample No. 2 (in Appendix C2) have hydraulic conductivities (K) higher than the minimum value K of 1 x 10-5 cm/sec (Technical Specification Section 02276 – 9). Please indicate the soil borrows/stockpiles represented by these soil samples did not used as clay liner material in the narrative Section 3.2.2 of the CQA report. 6. (Appendix B3) Please respond the following comments: i. According to test result in Appendix B1, the soil sample DS4-11 has a hydraulic conductivity (K) of 2.9x10-5 cm/sec which is higher than the minimum K of 1 x 10-5 cm/sec (Part 3.3.B of Technical Specification Section 02276 – 9). Please explain why the soil borrow/stockpile represented by this soil sample can be used as clay liner material. ii. Please provide the moisture and density relation result (according to ASTM D 698) of soil sample D4S-26 (referenced value for in-place soil density testing conducted on 06/27/2016). iii. According to Part 3.1.A.8 of Technical Specification Section 02276 – 7, please provide the laboratory hydraulic conductivity test results on three (3) composite soil samples (one for each lift of the test strip). 7. (Appendix B5) Please provide gradation test results for the leachate collection stones – NCDOT #78M & NCDOT#5 according to Part 3.2 of the Technical Specification Section 02240-3 & the narrative Section 3.4 of the CQA report. 8. (Appendix C3) Five (5) of eight (8) compaction effort tests (CQA test) at the test strip failed to meet the minimum criteria – 95% of maximum dry density. i. Please explain what remedial measures were taken to correct the compaction procedures according to the Section 2.5.4.2 of the approved CQA plan. ii. Have the repaired areas be re-tested to ensure the minimum compaction effort is achieved? The narrative Section 3.2.2 of the CQA report must address these concerns. 9. (Appendix D1) Please provide the additional data in the CQA report according to Technical Specification Section 02800- GCL. i. Written subgrade (compacted soil liner) acceptance documents according to Part 1.3.B of the specification. ii. Post-installation documents as specified in Part 1.4.B.1, 2. 3. & 4 of the specification. iii. According to the dimensions (15.5-ft by 150-ft per roll) and total number of rolls (78), the maximum square footage of the GCL arrived at the project site can only cover 181,350 square feet, approximately 4.16 acres. The constructed Cell 5 has the lined waste footprint approximately 14 acres; it is evident that the data in Appendix D1 is not complete. Please provide additional MQC data. 10. (Appendix D2) Please provide a copy of the 20-year Manufacturer’s warranty of the specified HDPE. 11. (Appendix D3) Please provide the results of transmissivity testing of specified drainage composite according to the Part 2.3A of Technical Specification Section 0277-3. 12. (Appendix G2) The following repair locations and nondestructive test results that are shown on the as- built drawing – Sheet No. 1 are not available in the Repair Log. Please provide data: (a) the locations in the fire damaged area - R309(5), R311(4), R312(4), R313, R314(4), R315, R316, R317, R318, R319- 3 DT62 (The numbers inside the parenthesis are duplicate number). (b) The locations in the “insert area” – R310, R311, &R312. 13. (Appendix G4- Seaming Log) i. The Seam No. P13/P73, P22/P82 & P22/P83 are likely typos. According to the panel layout drawing (as-built drawing Sheet No. 1), the Seam Nos. should be P14/P73 & P23/P82 & P23/P83, respectively. Please verify and make necessary correction in the log. ii. The seaming data between the following panels are not available in the log: P50/P51, P54/P102, P54/P48, P102/P48, P84/P111 & P82/P109. Please provide testing data. 14. (Appendix G5- Non-Destructive Test Log) i. Please provide the testing data conducted at the seam between these two panels – P17/P77. ii. The test results at seams between the following panels are not available in the log: P50/P51, P54/P102, P54/P48, P102/P48, P84/P111 & P82/P109. Please provide testing data 15. (Appendix I: as-built drawing Sheet No. 1) i. The repair testing locations at the capping area inside the fire damage area are identical, such as four R314, three R312, four R311, five R309. Should each repair location have the unique identification number? ii. The repair location R217-DT54 is likely the typo. To be consistent with the repair log, the correct identification number is R219-DT54. iii. The following data in the Repair Log but are not available on the as-built drawing Sheet No. 1: R320, R321, R322, R323, R66A. Please add the repair locations to the as-built drawing. iv. The Panel P-136 is mentioned in the logs in Appendix G but can’t located on the as-built drawing. Please contact me if you have any questions of the above-mentioned comments. By the way, we need to conduct a pre-operating meeting in compliance with the Permit Condition No. 5c of the Attachment of the PTC (DIN 8572) and final site walk in the coming weeks, please provide several date and time so we can come up a best available time for the meeting/site walk. Thanks. Ming Chao Ming-Tai Chao, P.E. Environmental Engineer Permitting Branch, Solid Waste Section NCDEQ, Division of Waste Management (Mailing Address) 1646 Mail Service Center Raleigh, NC 27699-1646 (Street Address) Green Square, 217 West Jones Street Raleigh, NC 27603 Tel. 919-707-8251 ming.chao@ncdenr.gov http://portal.ncdenr.org/web/wm/sw 4 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties From: Chao, Ming-tai Sent: Wednesday, February 01, 2017 3:59 PM To: 'Plummer, Michael' <Michael.Plummer@hdrinc.com> Cc: Jan McHargue (janm@cityofws.org) <janm@cityofws.org>; EDWARDG@cityofws.org Subject: RE: Winston-Salem Hanes Mill Rd Cell 5 Construction Certification Hi Mike: The Solid Waste Section received the certified CQA Report for Hanes Mill Road MSWLF, Phase 2 – Cell 5 on 01/31/2017, one CD and one hard copy; this CQA Report is uploaded to the tracking system with a DIN 27325. I will review the CQA this week. Thanks for the submittal and have a wonderful day. Ming Chao Ming-Tai Chao, P.E. Environmental Engineer Permitting Branch, Solid Waste Section NCDEQ, Division of Waste Management (Mailing Address) 1646 Mail Service Center Raleigh, NC 27699-1646 (Street Address) Green Square, 217 West Jones Street Raleigh, NC 27603 Tel. 919-707-8251 ming.chao@ncdenr.gov http://portal.ncdenr.org/web/wm/sw E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties From: Plummer, Michael [mailto:Michael.Plummer@hdrinc.com] Sent: Saturday, January 28, 2017 1:41 PM To: Chao, Ming-tai <ming.chao@ncdenr.gov> Cc: Jan McHargue (janm@cityofws.org) <janm@cityofws.org>; EDWARDG@cityofws.org Subject: Re: Winston-Salem Hanes Mill Rd Cell 5 Construction Certification Absolutely! I thought you had converted to electronic only. Sent from my iPhone On Jan 28, 2017, at 10:16 AM, Chao, Ming-tai <ming.chao@ncdenr.gov> wrote: 5 Hi Mike: Could you please submit a hard copy and a full-size as-built drawing to me? It is very difficult to read/review a CQA report from computer screen. Thank you for the corporation on this matter. Please send the document to my attention at Solid Waste Section 1646 Mail Service Center Raleigh, NC 27699-1646 Ming Chao Ming-Tai Chao, P.E. Environmental Engineer Permitting Branch, Solid Waste Section NCDEQ, Division of Waste Management (Mailing Address) 1646 Mail Service Center Raleigh, NC 27699-1646 (Street Address) Green Square, 217 West Jones Street Raleigh, NC 27603 Tel. 919-707-8251 ming.chao@ncdenr.gov http://portal.ncdenr.org/web/wm/sw The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location. E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Plummer, Michael <Michael.Plummer@hdrinc.com> Sent: Friday, January 27, 2017 5:45 PM To: Chao, Ming-tai Cc: Jan McHargue (janm@cityofws.org); EDWARDG@cityofws.org Subject: Winston-Salem Hanes Mill Rd Cell 5 Construction Certification All, 6 We are placing and electronic copy of the Hanes Cell 5 Construction Certification in the mail to each of you. I’m going to save you the effort of trying to download a 297 MB file through email. Please let me know if you have any questions or need additional information. Thank you and have a good weekend, Mike Michael Plummer, PE Senior Project Manager HDR 440 South Church Street, Suite 1000 Charlotte, NC 28202 D [704.338.6843] M [704.578.4031] michael.plummer@hdrinc.com hdrinc.com/follow-us Follow Us < HDR, Inc. hdrinc.com Facebook HDR HDR, Architecture LinkedIn Instagram Issuu Twitter @HDR_Inc @HDRArchitecture YouTube Architizer Blog - BLiNK: Perspectives on Design RSS Feeds (RSS Feed ...