HomeMy WebLinkAbout3606_Gaston_MSWLF_StormwaterPipeRequest_DIN27393_20170213
“Satisfying Our Clients with
Dedicated People Committed to Total Quality”
8720 Red Oak Boulevard, Suite 505, Charlotte, NC 28217-4938
T 704.527.3227 F 704.527.3228 www.chacompanies.com
February 8, 2017
Mr. Larry Frost
NCDEQ - Asheville Regional Office Solid Waste Section
2090 U.S. Highway 70 Swannanoa, NC 28778
Re: Phase 2 Construction
Gaston County Landfill Gaston County, North Carolina
CHA Project Number 21420
Dear Mr. Frost:
Please find attached for approval a sketch of the proposed stormwater pipe that would be temporarily installed to convey stormwater, captured on the Cell 1B and Cell 2 raincover areas, from the lined MSW
cell. The pipe would be installed on top of the protective cover layer and raincover. A standard 60-mil,
boot-type connection with an 18-inch diameter pipe sleeve will be provided for penetration of the 60-mil
liner. The raincover would also be booted at the pipe penetration location in similar fashion to the 60-mil
liner.
The stormwater pipe would be removed when Cell 2B filling operations begin. Removal would include
placement of a 10-foot by 10-foot 60-mil HDPE welded liner patch over the penetration section and
backfill of the pipe trench with 10-7 cm/sec clay materials.
If the proposed pipe penetration is acceptable, we will reflect the location and details on the liner in the
certification and as-built drawings.
If you have any comments or questions, please contact me.
Sincerely,
Robert C. Sallach, PE
Senior Vice President
RCS/der
Attachment
cc: Marcie Smith, Gaston County
Ed Shuffler, HDR