Loading...
HomeMy WebLinkAbout3606_Gaston_MSWLF_StormwaterPipeRequest_DIN27393_20170213 “Satisfying Our Clients with Dedicated People Committed to Total Quality” 8720 Red Oak Boulevard, Suite 505, Charlotte, NC 28217-4938 T 704.527.3227  F 704.527.3228  www.chacompanies.com February 8, 2017 Mr. Larry Frost NCDEQ - Asheville Regional Office Solid Waste Section 2090 U.S. Highway 70 Swannanoa, NC 28778 Re: Phase 2 Construction Gaston County Landfill Gaston County, North Carolina CHA Project Number 21420 Dear Mr. Frost: Please find attached for approval a sketch of the proposed stormwater pipe that would be temporarily installed to convey stormwater, captured on the Cell 1B and Cell 2 raincover areas, from the lined MSW cell. The pipe would be installed on top of the protective cover layer and raincover. A standard 60-mil, boot-type connection with an 18-inch diameter pipe sleeve will be provided for penetration of the 60-mil liner. The raincover would also be booted at the pipe penetration location in similar fashion to the 60-mil liner. The stormwater pipe would be removed when Cell 2B filling operations begin. Removal would include placement of a 10-foot by 10-foot 60-mil HDPE welded liner patch over the penetration section and backfill of the pipe trench with 10-7 cm/sec clay materials. If the proposed pipe penetration is acceptable, we will reflect the location and details on the liner in the certification and as-built drawings. If you have any comments or questions, please contact me. Sincerely, Robert C. Sallach, PE Senior Vice President RCS/der Attachment cc: Marcie Smith, Gaston County Ed Shuffler, HDR