Loading...
HomeMy WebLinkAbout7305_DukeMayo_APPROVAL_OnsitePGWaiverRequest_DIN27363_20170207 February 7, 2017 Sent via email – Kimberlee.Witt@duke-energy.com Kimberlee Witt, P.E. Duke Energy Progress, LLC Environmental Services 3191 Pine Hall Road Walnut Cove, North Carolina 27009 Re: Approval of Permit Waiver Request Duke Energy Progress, Inc. - Mayo Steam Electric Plant 7305-INDUS-2012 Person County DIN 27363 Dear Ms. Witt: The North Carolina Division of Waste Management, Solid Waste Section (Section) has reviewed the Permit Waiver Request (DIN 27362) submitted on February 5, 2017 for the Groundwater Assessment Work Plan at the Mayo Steam Electric Plant. The request concerns Permit Condition Attachment 3, Part 1, #11 which requires a licensed geologist be present to supervise the installation of groundwater monitoring wells. Duke requests a waiver from this requirement. In lieu of the requirement, Duke will have a Professional Geologist (P.G.) on call during drilling activities. A field technician, under the supervision of a P.G., will be present throughout the drilling activities. In addition, the request concerns Permit Condition Attachment 3, Part IV, #21 which requires all well construction records and boring logs to be submitted to the Section Hydrogeologist within 30 days of well installation. Duke requests a waiver from this requirement and proposes the well construction records and boring logs be submitted with the final assessment report. The Section grants the waiver request. Approval-Permit Waiver Request Duke Energy Progress Mayo Steam Electric Plant February 7, 2017 Page 2 If you have any questions or concerns, please contact me via email elizabeth.werner@ncdenr.gov or phone (919) 707-8253. Sincerely, Elizabeth S. Werner Permitting Hydrogeologist Solid Waste Section Cc: Ed Sullivan, P.E. – Duke Energy Ed Mussler, P.E. – SWS, Permitting Branch Head Drew Hammonds – SWS, Eastern District Supervisor Shannon Aufman – SWS, Permitting Engineer Shawn McKee – SWS, Environmental Specialist