Loading...
HomeMy WebLinkAbout2908_INSP_20170112 (2)FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 1 of 4 UNIT TYPE: Lined MSWLF LCID YW Transfer X Compost SLAS COUNTY: Davidson Closed MSWLF HHW White goods Incin T&P X FIRM PERMIT NO.: 29-08 CDLF Tire T&P / Collection Tire Monofill Industrial Landfill DEMO SDTF FILE TYPE: COMPLIANCE Date of Site Inspection: 01/12/2017 Date of Last Inspection: 04/20/2016 FACILITY NAME AND ADDRESS: Todco, Inc. Wood Recycling Facility 1123 Roy Lopp Road Lexington, NC 27292 GPS COORDINATES: N: 35.82872° W: 80.17377° FACILITY CONTACT NAME AND PHONE NUMBER: Name: Todd Warfford Telephone: 336-248-2001 (office)/ 336-240-2219 (mobile) Email address: todd@todcoinc.com FACILITY CONTACT ADDRESS: Same as above PARTICIPANTS: Brian Warfford, Todco, Inc. Dalton Warfford, Todco, Inc. Becki Smith, Todco, Inc. Cherie Warfford, Todco, Inc. Susan Heim, Environmental Senior Specialist, Solid Waste Section STATUS OF PERMIT: Permit to Operate Solid Waste Treatment and Processing Facility Issued: April 29, 2004 Permit Renewal, Operations Plan Modification: April 30, 2009 Permit to Construct C&D Transfer Station and Processing Facility Issued: March 5, 2013 Permit to Operate C&D Transfer Station and Processing Facility Issued: June 10, 2013 Permit expires June 10, 2018 – submit permit renewal request by November 10, 2017 PURPOSE OF SITE VISIT: Comprehensive Inspection STATUS OF PAST NOTED VIOLATIONS: None OBSERVED VIOLATIONS: None The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit, or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules. FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 2 of 4 ADDITIONAL COMMENTS 1. The facility consists of construction and demolition (C&D) transfer and wood waste treatment and processing (T&P) facility. 2. The facility operates as a subsidiary of Best Disposal, Inc., and accepts loads primarily from that company for processing and disposal. 3. The facility is permitted to receive waste from Cabarrus, Davie, Forsyth, Guilford, Montgomery, Randolph, Rowan, Stanley and Davidson Counties. 4. The facility operates Monday through Saturday, 7:30 am to 4:30 pm; during the winter, Saturday hours are shortened to 7:30 am to 12:30 pm. 5. The facility permit and operations manual were available and reviewed. Please ensure that a copy of the updated operations manual, dated May 2013, is on hand at the scale house office and is available for review upon request. 6. At the time of this inspection, the facility appeared to be clean and well maintained. 7. Access roadways were of all-weather construction and adequately signed to direct customers to the appropriate areas for their needs. 8. The entrance sign includes the facility permit number and emergency contact information, and a sign at the scale house indicates hours of operation, acceptable materials and prohibited wastes. 9. A review of the FY 15-16 Facility Annual Report for the T&P operation showed that 18,786 tons of wood waste were accepted during the reporting period, for an average of 1,565 tons per month. 10. The FY 15-16 Facility Annual Report for the C&D transfer station indicated a total of 1,567 tons of waste were accepted, averaging approximately 131 tons per month. 11. Tonnage records were reviewed for calendar years 2015 and 2016. 17,450.42 tons of waste was received for the 2016 as compared to 19,161.51 tons in 2015. total of 11.10 tons of residual waste was transported to the Davidson County MSW Landfill (2906-MSWLF-1994). Brian Warfford stated that all residual waste is disposed of at this facility. 12. In December 2016, the facility received 1,028 tons of industrial wood waste and 48.61 tons of vegetative wood waste and shipped out 1,104.07 tons of boiler fuel. 13. Vegetative waste and other wood waste are stored separately for processing into mulch and boiler fuel, respectively. A large grinder is installed in both processing areas. A color injection system is used to produce colored mulch Processing is accomplished onsite through use of two tub grinders. 14. Wood grinding operations were taking place during the inspection. Several large portable wind screens were positioned around the conveyors that feed the grinder. These trap any pieces of material that escape the conveyor system and prevent them from leaving the processing area. 15. After processing, mulch and boiler fuel are stored in separate areas to avoid cross contamination. 16. Inspection of the unprocessed wood waste storage area revealed a brush pile that also contained some industrial wood waste. Brian Warfford explained that if time permits, staff removes the industrial wood waste from the pile. If not, the entire pile is processed for use as boiler fuel. 17. Piles and windrows in the processed wood storage areas were well defined and of manageable size, with adequate fire lanes to allow easy access to all areas. Brian Warfford explained that piles are turned at a rate that ensures no composting takes place at the site. Upon inspection, no hot spots or steam were observed in the piles. 18. Identified C&D loads are processed on a covered picking line to recover recyclable materials, including cardboard, metals and wood. At the time of this inspection, the picking line was not in operation. 19. Because C&D operations were not under way during the inspection, no containers for waste were present in the C&D area. However, Dalton Warfford explained that covered containers are always used for waste storage to ensure that water does not come into contact with waste prior to removal from the site for proper disposal. 20. In the C&D area, a row of portable wind screens is also staged on the south side of the concrete pad, outside of the covered tipping floor. These screens, along with an aggressive policy of continually policing the site, have been effective in keeping windblown trash to a minimum. 21. The tipping floor is covered with a fabric canopy structure that was observed to be intact. The tipping floor appeared to be in good repair. At the time of this inspection, a pile of C&D debris was observed to be pushed into a pile in one corner of the covered tipping area and tarped. 22. A pile of clean soil was stored on the opposite side of the covered tipping floor, and was being used for making FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 3 of 4 repairs to the internal roadways and processed material storage areas following the heavy snowstorm of the previous week. 23. Roadways were observed to be in good condition at the time of the inspection, and repairs were underway to smooth and fill the remaining ruts that had been caused by snow plowing operations. 24. The facility operates under a general storm water permit, and staff perform semiannual water tests to ensure compliance. 25. Silt fence was observed to be intact, is correctly positioned and appears to be functioning well in preventing sediment from leaving the facility. 26. Storm drains, surface water conveyance ditches and sediment traps were observed to be clean and functioning properly. 27. A review of the random load inspection/waste screening records from January 1, 2016 through the date of inspection revealed that the minimum of one random load inspection per week, as specified in the approved Operations Manual, was being met. 28. A review of the facility training records established that the following NC SWANA Transfer Station Operations Specialist certifications were current: Becki A. Smith, expires 6/19/19; Todd A. Warfford, expires 4/16/19; Brian Warfford, expires 3/23/19; Dalton Avery Warfford, expires 4/16/19. 29. Safety meetings for all facility staff are conducted monthly; staff training about recognizing prohibited and hazardous wastes is provided during these meetings. 30. Brian Warfford confirmed that the site is still intended to be used as a temporary disaster debris storage site (DS29-003). The contact information will remain the same. Above: tipping floor with tarped waste and soil stockpile. Below: Repairs underway to processed material storage areas. Above: wood grinding operations with wind screens in place. Below: silt fence in place and functioning properly. FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 4 of 4 Please contact me if you have any questions or concerns regarding this inspection report. _______________________________________ Phone: 336-776-9672 Susan Heim Environmental Senior Specialist Regional Representative Sent on: January 17, 2017 to Todd Warfford, Brian Warfford X Email Hand delivery US Mail Certified No. [ ] Copies: Deb Aja, Western District Supervisor - Solid Waste Section Jessica Montie, Compliance Officer – Solid Waste Section