Loading...
HomeMy WebLinkAbout0403_Chambers MSW_leachateCQA_20170104FINAL CERTIFICATION REPORT PREPARED FOR WASTE CONNECTIONS OF THE CAROLINAS ANSON COUNTY LANDFILL CONSTRUCTION OF LEACHATE STORAGE FACILITY UPGRADE POLKTON, NORTH CAROLINA PREPARED BY MJM CONSULTING, LLC in partnership with 21 December 2016 MJM CONSUL TING, LLC in partnership with December 21, 2016 Mr. John Murray NC DENR-Solid Waste Section 601 East Center Ave. Mooresville, NC 28115 Subject: Waste Connection of the Carolinas Anson County Landfill Polkton, North Carolina CON~TIIIK:IION S!'l!VlCa c Anson Leachate Storage Facility Upgrade Quality Assurance (CQA) Report Dear Mr. Murray: On behalf of Waste Connections, we are writing to provide documentation and certification of construction of the Leachate Storage Facility Upgrade at the Anson County Landfill in Polkton, North Carolina. Based on my review of the monitoring, testing and visual observation of the construction; and the final report, it is my professional opinion that construction of the Leachate Storage Facility Upgrade was completed in substantial compliance with the approved permit drawings and approved modifications as documented by the enclosed Final Construction Quality Assurance Report. I hereby certify the construction as evidenced by my North Carolina seal and signature. Please contact me at (404) 307-2680 or mikemontel@comcast.net with any questions or comments regarding the report. cc: Nelson Breeden Glenn Wallace Kash Khatami encl. 4192 Liberty Trace * Marietta. GA 30066 * Phone: (404) 307-2680 Anson Waste Management Facility Leachate Storage Facility Upgrade Final Certification Report 1 1. General 2. Project Overview 2.1 Project Team 2.2 Project Schedule 3. Subgrade Construction, Reinforced Steel and Concrete 4. General Monitoring Procedures Photographs Figures 1. As-Built Drawing for Liner Appendices A Listing of Monitoring and Installation Personnel B Manufacturer’s Quality Control Certificates Section 1 – HDPE Geomembrane Section 2 – Geocomposite c Geomembrane Documentation Section 1 - Subgrade Acceptance Certificates Section 2 - Geomembrane Panel Deployment Log Section 3 - Geomembrane Trial Seam Log Section 4 - Geomembrane Fusion Seam Log Section 5 - Geomembrane Extrusion Seam Log Section 6 - Geomembrane Defect, Repair, and Vacuum Testing Log Section 7 - Fusion and Extrusion Destructive Sample Test Results d Daily Field Reports Anson Waste Management Facility Leachate Storage Facility Upgrade Final Certification Report 2 1.General MJM Consulting, LLC in conjuction with Oasis Construction Services, Inc. (MJM/Oasis) was retained by Waste Connections of the Carolinas to provide construction quality assurance (CQA) monitoring and final certification services for the construction of the Leachate Storage Facility Upgrade at the Anson County Landfill in Polkton, North Carolina. For the Leachate Storage Facility Upgrade construction, the project structure consisted of a fine graded subgrade, a Concrete rebar bed, a 60-mil high-density polyethylene(HDPE) micro spike (textured) geomembrane, and a geocomposite drainage layer. The contract drawings for the construction of the Leachate Storage Facility Upgrade, Anson Waste Management Facility are dated June 6, 2016, and were prepared by Civil & Environmental Consulting, Inc. (CEC) of Charlotte, North Carolina, and the approved Construction Quality Assurance & Construction Quality Control (CQA/CQC) Plan was used to construct Leachate Storage Facility Upgrade. 2.Project Oveview 2.1. Project Team MJM/Oasis provided CQA services throughout the project to monitor the construction activities performed by contractors and to compile all the required testing and surveying data for the final certification report documenting that the project has been constructed in substantial compliance with the approved permit drawings and the CQA/CQC Plan. Design and engineering services were provided by CEC. 2.2. Project Schedule The construction of the Leachate Storage Facility Upgrade began on October 2016 and was substantially completed by December 21, 2016. Anson Contracting, Inc. of Stanley, North Carolina (Anson Contracting) was the general contractor for construction ofthe Leachate Storage Facility Upgrade. MJM/Oasis had a full-time monitor on site from December 12, 2016 through the project completion date. A geosynthetic material pre-construction meeting was held on December 12, 2016, and was attended by representatives of ESI, Anson Contracting, and MJM/Oasis. Topics of this meeting included the project scope, lines of communication and responsibilities, liner construction scheduling, material specifications, geomembrane, and drainage geocomposite installation procedures. All parties in attendance were in agreement concerning the scheduling, specification, and installation procedures. Anson Waste Management Facility Leachate Storage Facility Upgrade Final Certification Report 3 Detailed results of all of the required testing and material properties, and CQA monitoring services are contained in this final certification report. 3. Subgrade Construction, Reinforced Steel and Concrete Initially, the construction site was stripped of vegetation in the designated area. Fill was placed in the Leachate Storage Facility Upgrade footprint to meet the design subgrade. The completed subgrade was proof-rolled with a loaded truck to verify soundness and acceptability of in-situ material. Suspect areas were undercut, and clean structural fill was placed by Anson Contracting and compacted and rechecked, either by testing or by proof-rolling.  Foundation and slab subgrades were approved for the design bearing pressure, and all reinforcement was found to be placed in accordance with the plans.  Reinforcing steel was inspected for the leachate tank walls. All reinforcing steel was found to comply with the plans and project requirements.  Concrete testing and sampling of foundations, slab, and walls were performed. All compressive strengths for the foundations and slab concrete met or exceeded the required compressive strengths. One set of cylinders had not reached 28 days at the time of this letter. The 7 day break for this set met the required strength; therefore, it is safe to assume that the 28 day breaks for this set will exceed the required strength. 4. General Monitoring Procedures The CQA monitoring activities performed by MJM/Oasis during installation of the geosynthetic components (HDPE geomembrane and drainage geocomposite) of the composite liner were as follows:  Obtaining and reviewing all product submittals required of the manufacturer and installer  Observing, documenting, and evaluating trial seam test results  Observing and documenting HDPE geomembrane seaming techniques and field seams  Identifying and documenting defects, as well as observing and documenting repairs  Observing and documenting the installation of the drainage geocomposite and geotextile in the leachate collection system The CQA monitors were present at the site on a full-time basis to perform the above activities during the installation of the geomembrane liner. PHOTOGRAPHS Subgrade preparation Tank area Rebar Tank area rebar Concrete Pouring Floor of the tank Completed Concrete Tank Geocomposte deployment Geocomposte Installation before Liner Liner Installation Fusion Welding Extrusion Welding \ Air Testing Vacuum Testing Positioning the Baten Strip on the inside wall Securing Baten Strip Weather Proofing the Baten Strip Cap Strip Over the Baten Strip Installation of Detection Device Installed Detection Device FIGURES GEOMEMBRANE PANEL LAYOUT WITH DESTRUCTIVE TEST AND REPAIR LOCATIONS APPENDICES LISTING OF MONITORING AND INSTALLATION PERSONNEL CONSULTING SERVICES Listing of Quality Assurance Monitoring Personnel Anson Landfill Leachate Storage Facility Upgrade Mike Monteleone Engineer/ Project Manager Kash Khatami Lead QA Monitor 45 Woodstock Street, Roswell, Georgia 30075 • Telephone: (678) 739-2400 • Fax: (770) 552-5550 Oasis Construclion Set vices. fnc dfb/a Oasis Consulting Services ENVIRONMENTAL SPECIAL TIES INTERNATIONAL, INC. Name: Position: EXPERIENCE RESUME Nick Thommavongsa Superintendent Nick has 25 years of experience in the supervision of the installation and seaming of a variety of synthetic liners and components in a wide range of industry applications. He has extensive experience in the on site supervision of safety, quality control, and all required documentation. In addition to his supervisory experience Nick also has actual hands on installation experience which far exceed all of the requirements to be qualified as a Leadman, Quality Control Technician and Master Seamer. As the on site ESI Superintendent he is also responsible for the direct, day to day, on site safety management of the crew. SQUARE CUSTOMER LOCATION MATERIAL FEET COMMENTS Southern Co. Plant Daniel MS 60 Mil, 40 Mil, Comp 3,900,000 Fossil Fuel TVA Gallatin Fossil Plant TN GCL, 60 Mil, Comp 848,721 Fossil Fuel Sonoco Products Ash Cell Closure SC 40 Mil, Comp 550,368 Ash Cell WM North Milam Phase 1 North IL 60 Mil, Geo 258,157 MSW ADS Evergreen Temp Cap GA 40Mil 534,422 MSW WM-Meadowfill Cell WV GCL, 60 Mil, Comp 204,308 MSW ADS Glacier Ridge WI 60 Mil, Comp 308,804 MSW WM-Arden LF Cell N1 (D) PA GCL, 60 Mil, Comp 569,650 MSW WM-Arden LF Stage 6 CAP PA 40 Mil, Comp 471,788 MSW Rep-Sycamore Ridge IN 60 Mil, Geo 255,162 MSW WM-Prairie View LF CEii 5 E IL 60 Mil, Geo 550,000 MSW West Helena LF PH 2 AR GCL, 60 Mil, Comp 145,660 MSW WCI-Oklahoma City LF OK 60 Mil, Comp 578,284 MSW ADS-Emerald Park PH 3 WI 60 Mil, Comp 278,438 MSW TOTAL 9,453,762 Page 1 ENVIRONMENTAL SPECIAL TIES INTERNATIONAL, INC. Name: Position: EXPERIENCE RESUME Monty Sanchaleun QC Foreman Monty has 20 years of experience in the installation and seaming of a variety of synthetic liners and components in a wide range of industry applications. He is familiar with current field welding and installation testing and documentation requirements. He has experience and training for the execution of and documentation for required on site testing, QC and safety procedures. He is also qualified to assist in the training of geomembrane Welders, Installers, and QC Technicians. SQUARE CUSTOMER LOCATION MATERIAL FEET COMMENTS Southern Co. Plant Daniel MS 60 Mil, 40 Mil, Comp 3,900,000 Fossil Fuel TVA Gallatin Fossil Plant TN GCL, 60 Mil, Comp 848,72f Fossil Fuel Sonoco Products Ash Cell Closure SC 40 Mil, Comp 550,368 Ash Cell WM North Milam Phase 1 North IL 60 Mil, Geo 258,157 MSW ADS Evergreen Temp Cap GA 40Mil 534,422 MSW WM-Meadowfill Cell WV GCL, 60 Mil, Comp 204,308 MSW ADS Glacier Ridge WI 60 Mil, Comp 308,804 MSW WM-Arden LF Cell N1 (D) PA GCL, 60 Mil, Comp 569,650 MSW WM-Arden LF Stage 6 CAP PA 40 Mil, Comp 471,788 MSW Rep-Sycamore Ridge IN 60 Mil, Geo 255,162 MSW WM-Prairie View LF CEii 5 E IL 60 Mil, Geo 550,000 MSW West Helena LF PH 2 AR GCL, 60 Mil, Comp 145,660 MSW WCI-Oklahoma City LF OK 60 Mil, Comp 578,284 MSW ADS-Emerald Park PH 3 WI 60 Mil, Comp 278,438 MSW TOTAL 9,453,762 Page 1 ENVIRONMENTAL SPECIAL TIES INTERNATIONAL, INC. Name: Position: EXPERIENCE RESUME Yan Yourm Master Seamer Yan has 11 years of experience in installation and seaming of a variety of synthetic liners and components A Master Seamer qualification requires a minimum of five million square feet of actual hands on geomembrane welding experience. Bounpheng is familiar with all currently utilized welding techniques, welder set up I maintenance, safety and installation procedures. He is also familiar with and has experience with detail work including pipe boots, sumps, batten seals, and other miscellaneous appurtenances. He is also qualified to assist in the training of Geomembrane Welders. SQUARE CUSTOMER LOCATION MATERIAL FEET COMMENTS Southern Co. Plant Daniel MS 60 Mil, 40 Mil, Comp 3,900,000 Fossil Fuel TVA Gallatin Fossil Plant TN GCL, 60 Mil, Comp 848,721 Fossil Fuel Sonoco Products Ash Cell Closure SC 40 Mil, Comp 550,368 Ash Cell WM North Milam Phase 1 North IL 60 Mil, Geo 258,157 MSW ADS Evergreen Temp Cap GA 40Mil 534,422 MSW WM-Meadowfill Cell WV GCL, 60 Mil, Comp 204,308 MSW ADS Glacier Ridge WI 60 Mil, Comp 308,804 MSW WM-Arden LF Cell N1 (D) PA GCL, 60 Mil, Comp 569,650 MSW WM-Arden LF Stage 6 CAP PA 40 Mil, Comp 471,788 MSW Rep-Sycamore Ridge IN 60 Mil, Geo 255,162 MSW WM-Prairie View LF CEii 5 E IL 60 Mil, Geo 550,000 MSW West Helena LF PH 2 AR GCL, 60 Mil, Comp 145,660 MSW WCI-Oklahoma City LF OK 60 Mil, Comp 578,284 MSW ADS-Emerald Park PH 3 WI 60 Mil, Comp 278,438 MSW TOTAL 9,453,762 Page 1 ENVIRONMENTAL SPECIAL TIES INTERNATIONAL, INC. Name: Position: EXPERIENCE RESUME WestOudom Master Seamer West has 25 years of experience in installation and seaming of a variety of synthetic liners and components A Master Seamer qualification requires a minimum of five million square feet of actual hands on geomembrane welding experience. Bounpheng is familiar with all currently utilized welding techniques, welder set up I maintenance, safety and installation procedures. He is also familiar with and has experience with detail work including pipe boots, sumps, batten seals, and other miscellaneous appurtenances. He is also qualified to assist in the training of Geomembrane Welders. SQUARE CUSTOMER LOCATION MATERIAL FEET COMMENTS Southern Co. Plant Daniel MS 60 Mil, 40 Mfl, Comp 3,900,000 Fossil Fuel TVA Gallatin Fossil Plant TN GCL, 60 Mil, Comp 848,721 Fossil Fuel Sonoco Products Ash Cell Closure SC 40 Mil, Comp 550,368 Ash Cell WM North Milam Phase 1 North IL 60 Mil, Geo 258,157 MSW ADS Evergreen Temp Cap GA 40Mil 534,422 MSW WM-Meadowfill Cell WV GCL, 60 Mil, Comp 204,308 MSW ADS Glacier Ridge WI 60 Mil, Comp 308,804 MSW WM-Arden LF Cell N1 (D) PA GCL, 60 Mil, Comp 569,650 MSW WM-Arden LF Stage 6 CAP PA 40 Mil, Comp 471,788 MSW Rep-Sycamore Ridge IN 60 Mil, Geo 255,162 MSW WM-Prairie View LF CEii 5 E IL 60 Mil, Geo 550,000 MSW West Helena LF PH 2 AR GCL, 60 Mil, Comp 145,660 MSW WCI-Oklahoma City LF OK 60 Mil, Comp 578,284 MSW ADS-Emerafd Park PH 3 WI 60 Mil, Comp 278,438 MSW TOTAL 9,453,762 Page 1 ENVIRONMENTAL SPECIAL TIES INTERNATIONAL, INC. Name: Position: EXPERIENCE RESUME Vinit Rattanavong Master Seamer Vinit has 14 years of experience in installation and seaming of a variety of synthetic liners and components A Master Seamer qualification requires a minimum of five million square feet of actual hands on geomembrane welding experience Bounpheng is familiar with all currently utilized welding techniques, welder set up I maintenance, safety and installation procedures. He is also familiar with and has experience with detail work including pipe boots, sumps, batten seals, and other miscellaneous appurtenances. He is also qualified to assist in the training of Geomembrane Welders. SQUARE CUSTOMER LOCATION MATERIAL FEET COMMENTS Southern Co. Plant Daniel MS 60 Mil, 40 Mil, Comp 3,900,000 Fossil Fuel TVA Gallatin Fossil Plant TN GCL, 60 Mil, Comp 848,721 Fossil Fuel Sonoco Products Ash Cell Closure SC 40 Mil, Comp 550,368 Ash Cell WM North Milam Phase 1 North IL 60 Mil, Geo 258,157 MSW ADS Evergreen Temp Cap GA 40Mil 534,422 MSW WM-Meadowfill Cell WV GCL, 60 Mil, Comp 204,308 MSW ADS Glacier Ridge WI 60 Mil, Comp 308,804 MSW WM-Arden LF Cell N1 (D) PA GCL, 60 Mil, Comp 569,650 MSW WM-Arden LF Stage 6 CAP PA 40 Mil, Comp 471,788 MSW Rep-Sycamore Ridge IN 60 Mil, Geo 255,162 MSW WM-Prairie View LF CEii 5 E IL 60 Mil, Geo 550,000 MSW West Helena LF PH 2 AR GCL, 60 Mil, Comp 145,660 MSW WCI-Oklahoma City LF OK 60 Mil, Comp 578,284 MSW ADS-Emerald Park PH 3 WI 60 Mil, Comp 278,438 MSW TOTAL 9,453,762 Page 1 ENVIRONMENTAL SPECIAL TIES INTERNATIONAL, INC. Name: Position: EXPERIENCE RESUME Somphet Bounsithith Master Seamer Somphet has 24 years of experience in installation and seaming of a variety of synthetic liners and components A Master Seamer qualification requires a minimum of five million square feet of actual hands on geomembrane welding experience. Bounpheng is familiar with all currently utilized welding techniques, welder set up I maintenance, safety and installation procedures. He is also familiar with and has experience with detail work including pipe boots, sumps, batten seals, and other miscellaneous appurtenances. He is also qualified to assist in the training of Geomembrane Welders. SQUARE CUSTOMER LOCATION MATERIAL FEET COMMENTS Southern Co. Plant Daniel MS 60 Mil, 40 Mil, Comp 3,900,000 Fossil Fuel TVA Gallatin Fossil Plant TN GCL, 60 Mil, Comp 848,721 Fossil Fuel Sonoco Products Ash Cell Closure SC 40 Mil, Comp 5-50,368 Ash Cell WM North Milam Phase 1 North IL 60 Mil, Geo 258,157 MSW ADS Evergreen Temp Cap GA 40Mil 534,422 MSW WM-Meadowfill Cell WV GCL, 60 Mil, Comp 204,308 MSW ADS Glacier Ridge WI 60 Mil, Comp 308,804 MSW WM-Arden LF Cell N1 (D) PA GCL, 60 Mil, Comp 569,650 MSW WM-Arden LF Stage 6 CAP PA 40 Mil, Comp 471,788 MSW Rep-Sycamore Ridge IN 60 Mil, Geo 255,162 MSW WM-Prairie View LF CEii 5 E IL 60 Mil, Geo 550,000 MSW West Helena LF PH 2 AR GCL, 60 Mil, Comp 145,660 MSW WCI-Oklahoma City LF OK 60 Mil, Comp 578,284 MSW ADS-Emerald Park PH 3 WI 60 Mil, Comp 278,438 MSW TOTAL 9,453,762 Page 1 ENVIRONMENTAL SPECIAL TIES INTERNATIONAL, INC . Name: Position: EXPERIENCE RESUME Somboun Sadakhoun Master Seamer Somboun has 14 years of experience in installation and seaming of a variety of synthetic liners and components A Master Seamer qualification requires a minimum of five million square feet of actual hands on geomembrane welding experience. Bounpheng is familiar with all currently utilized welding techniques, welder set up I maintenance, safety and installation procedures. He is also familiar with and has experience with detail work including pipe boots, sumps, batten seals, and other miscellaneous appurtenances. He is also qualified to assist in the training of Geomembrane Welders. SQUARE CUSTOMER LOCATION MATERIAL FEET COMMENTS Southern Co. Plant Daniel MS 60 Mil, 40 Mil, Comp 3,900,000 Fossir Fuel TVA Gallatin Fossil Plant TN GCL, 60 Mil, Comp 848,721 Fossil Fuel Sonoco Products Ash Cell Closure SC 40 Mil, Comp 550,368 Ash Cell WM North Milam Phase 1 North IL 60 Mil, Geo 258,157 MSW ADS Evergreen Temp Cap GA 40Mil 534,422 MSW WM-Meadowfill Cell WV GCL, 60 Mil, Comp 204,308 MSW ADS Glacier Ridge WI 60 Mil, Comp 308,804 MSW WM-Arden LF Cell N1 (D) PA GCL, 60 Mil, Comp 569,650 MSW WM-Arden LF Stage 6 CAP PA 40 Mil, Comp 471,788 MSW Rep-Sycamore Ridge IN 60 Mil, Geo 255,162 MSW WM-Prairie View LF CEii 5 E IL 60 Mil, Geo 550,000 MSW West Helena LF PH 2 AR GCL, 60 Mil, Comp 145,660 MSW WCI-Oklahoma City LF OK 60 Mil, Comp 578,284 MSW ADS-Emerald Park PH 3 WI 60 Mil, Comp 278,438 MSW TOTAL 9,453,762 Page 1 ENVIRONMENTAL SPECIAL TIES INTERNATIONAL, INC. Name: Position: EXPERIENCE RESUME Sengphouthone Saysanavong Master Seamer Sengphouthone has 23 years of experience in installation and seaming of a variety of synthetic liners and components A Master Seamer qualification requires a minimum of five million square feet of actual hands on geomembrane welding experience. Bounpheng is familiar with all currently utilized welding techniques, welder set up I maintenance, safety and installation procedures. He is also familiar with and has experience with detail work including pipe boots, sumps, batten seals, and other miscellaneous appurtenances. He is also qualified to assist in the training of Geomembrane Welders. SQUARE CUSTOMER LOCATION MATERIAL FEET COMMENTS Southern Co. Plant Daniel MS 60 Mil, 40 Mil, Comp 3,900,000 Fossil Fuel TVA Gallatin Fossil Plant TN GCL, 60 Mil, Comp 848,721 Fossil Fuel Sonoco Products Ash Cell Closure SC 40 Mil, Comp 550,368 Ash Cell WM North Milam Phase 1 North IL 60 Mil, Geo 258,157 MSW ADS Evergreen Temp Cap GA 40Mil 534,422 MSW WM-Meadowfill Cell WV GCL, 60 Mil, Comp 204,308 MSW ADS Glacier Ridge WI 60 Mil, Comp 308,804 MSW WM-Arden LF Cell N1 (D) PA GCL, 60 Mil, Comp 569,650 MSW WM-Arden LF Stage 6 CAP PA 40 Mil, Comp 471,788 MSW Rep-Sycamore Ridge IN 60 Mil, Geo 255,162 MSW WM-Prairie View LF CEii 5 E IL 60 Mil, Geo 550,000 MSW West Helena LF PH 2 AR GCL, 60 Mil, Comp 145,660 MSW WCI-Oklahoma City LF OK 60 Mil, Comp 578,284 MSW ADS-Emerald Park PH 3 WI 60 Mil, Comp 278,438 MSW TOTAL 9,453,762 Page 1 ENVIRONMENTAL SPECIAL TIES INTERNATIONAL, INC. Name: Position: EXPERIENCE RESUME Patrisk Sengthavone Master Seamer Patrisk has 20 years of experience in installation and seaming of a variety of synthetic liners and components A Master Seamer qualification requires a minimum of five million square feet of actual hands on geomembrane welding experience Bounpheng is familiar with all currently utilized welding techniques, welder set up I maintenance, safety and installation procedures. He is also familiar with and has experience with detail work including pipe boots, sumps, batten seals, and other miscellaneous appurtenances. He is also qualified to assist in the training of Geomembrane Welders. SQUARE CUSTOMER LOCATION MATERIAL FEET COMMENTS Southern Co. Plant Daniel MS 60 Mil, 40 Mil, Comp 3,900,000 Fossil Fuel TVA Gallatin Fossil Plant TN GCL, 60 Mil, Comp 848,721 Fossil Fuel Sonoco Products Ash Cell Closure SC 40 Mil, Comp 550,368 Ash Cell WM North Milam Phase 1 North IL 60 Mil, Geo 258, 157 MSW ADS Evergreen Temp Cap GA 40Mil 534,422 MSW WM-Meadowfill Cell WV GCL, 60 Mil, Comp 204,308 MSW ADS Glacier Ridge WI 60 Mil, Comp 308,804 MSW WM-Arden LF Cell N1 (D) PA GCL, 60 Mil, Comp 569,650 MSW WM-Arden LF Stage 6 CAP PA 40 Mil, Comp 471,788 MSW Rep-Sycamore Ridge IN 60 Mil, Geo 255,162 MSW WM-Prairie View LF CEii 5 E IL 60 Mil, Geo 550,000 MSW West Helena LF PH 2 AR GCL, 60 Mil, Comp 145,660 MSW WCI-Oklahoma City LF OK 60 Mil, Comp 578,284 MSW ADS-Emerald Park PH 3 WI 60 Mil, Comp 278,438 MSW TOTAL 9,453,762 Page 1 ENVIRONMENTAL SPECIAL TIES INTERNATIONAL, INC. Name: Position: EXPERIENCE RESUME Oudone Phouthavong Master Seamer Oudone has 16 years of experience in installation and seaming of a variety of synthetic liners and components A Master Seamer qualification requires a minimum of five million square feet of actual hands on geomembrane welding experience. Bounpheng is familiar with all currently utilized welding techniques, welder set up I maintenance, safety and installation procedures. He is also familiar with and has experience with detail work including pipe boots, sumps, batten seals, and other miscellaneous appurtenances. He is also qualified to assist in the training of Geomembrane Welders. SQUARE CUSTOMER LOCATION MATERIAL FEET COMMENTS Southern Co. Plant Daniel MS 60 Mil, 40 Mil, Comp, 3,900,000 Fossil Fuel TVA Gallatin Fossil Plant TN GCL, 60 Mil, Comp 848,721 Fossil Fuel Sonoco Products Ash Cell Closure SC 40 Mil, Comp 550,368 Ash Cell WM North Milam Phase 1 North IL 60 Mil, Geo 258,157 MSW ADS Evergreen Temp Cap GA 40Mil 534,422 MSW WM-Meadowfill Cell WV GCL, 60 Mil, Comp 204,308 MSW ADS Glacier Ridge WI 60 Mil, Comp 308,804 MSW WM-Arden LF Cell N1 (D) PA GCL, 60 Mil, Comp 569,650 MSW WM-Arden LF Stage 6 CAP PA 40 Mil, Comp 471,788 MSW Rep-Sycamore Ridge IN 60 Mil, Geo 255,162 MSW WM-Prairie View LF CEii 5 E IL 60 Mil, Geo 550,000 MSW West Helena LF PH 2 AR GCL, 60 Mil, Comp 145,660 MSW WCI-Oklahoma City LF OK 60 Mil, Comp 578,284 MSW ADS-Emerald Park PH 3 WI 60 Mil, Comp 278,438 MSW TOTAL 9,453,762 Page 1 ENVIRONMENTAL SPECIAL TIES INTERNATIONAL, INC. Name: Position: EXPERIENCE RESUME Khamphang Sinakone Master Seamer Khamphang has 14 years of experience in installation and seaming of a variety of synthetic liners and components A Master Seamer qualification requires a minimum of five million square feet of actual hands on geomembrane welding experience. Bounpheng is familiar with all currently utilized welding techniques, welder set up I maintenance, safety and installation procedures. He is also familiar with and has experience with detail work including pipe boots, sumps, batten seals, and other miscellaneous appurtenances. He is also qualified to assist in the training of Geomembrane Welders. SQUARE CUSTOMER LOCATION MATERIAL FEET COMMENTS Southern Co. Plant Daniel MS 60 Mil, 40 Mff, Comp 3,900,000 Fossil Fuel TVA Gallatin Fossil Plant TN GCL, 60 Mil, Comp 848,721 Fossil Fuel Sonoco Products Ash Cell Closure SC 40 Mil, Comp 550,368 Ash Cell WM North Milam Phase 1 North IL 60 Mil, Geo 258,157 MSW ADS Evergreen Temp Cap GA 40Mil 534,422 MSW WM-Meadowfill Cell WV GCL, 60 Mil, Comp 204,308 MSW ADS Glacier Ridge WI 60 Mil, Comp 308,804 MSW WM-Arden LF Cell N1 (D) PA GCL, 60 Mil, Comp 569,650 MSW WM-Arden LF Stage 6 CAP PA 40 Mil, Comp 471,788 MSW Rep-Sycamore Ridge IN 60 Mil, Geo 255,162 MSW WM-Prairie View LF CEii 5 E IL 60 Mil, Geo 550,000 MSW West Helena LF PH 2 AR GCL, 60 Mil, Comp 145,660 MSW WCI-Oklahoma City LF OK 60 Mil, Comp 578,284 MSW ADS-Emerald Park PH 3 WI 60 Mil, Comp 278,438 MSW TOTAL 9,453,762 Page 1 ENVIRONMENTAL SPECIAL TIES INTERNATIONAL, INC. Name: Position: EXPERIENCE RESUME Bounpheng Thammavong Master Seamer Bounpheng has 12 years of experience in installation and seaming of a variety of synthetic liners and components A Master Seamer qualification requires a minimum of five million square feet of actual hands on geomembrane welding experience. Bounpheng is familiar with all currently utilized welding techniques, welder set up I maintenance, safety and installation procedures. He is also familiar with and has experience with detail work including pipe boots, sumps, batten seals, and other miscellaneous appurtenances. He is also qualified to assist in the training of Geomembrane Welders. SQUARE CUSTOMER LOCATION MATERIAL FEET COMMENTS Southern Co. Plant Daniel MS 60 Mil, 40 Mil, Comp 3,900,000 Fossil Fuel TVA Gallatin Fossil Plant TN GCL, 60 Mil, Comp 848,721 Fossil Fuel Sonoco Products Ash Cell Closure SC 40 Mil, Comp 550,368 Ash Cell WM North Milam Phase 1 North IL 60 Mil, Geo 258,157 MSW ADS Evergreen Temp Cap GA 40Mil 534,422 MSW WM-Meadowfill Cell WV GCL, 60 Mil, Comp 204,308 MSW ADS Glacier Ridge WI 60 Mil, Comp 308,804 MSW WM-Arden LF Cell N1 (D) PA GCL, 60 Mil, Comp 569,650 MSW WM-Arden LF Stage 6 CAP PA 40 Mil, Comp 471,788 MSW Rep-Sycamore Ridge IN 60 Mil, Geo 255,162 MSW WM-Prairie View LF CEii 5 E IL 60 Mil, Geo 550,000 MSW West Helena LF PH 2 AR GCL, 60 Mil, Comp 145,660 MSW WCI-Oklahoma City LF OK 60 Mil, Comp 578,284 MSW ADS-Emerald Park PH 3 WI 60 Mil, Comp 278,438 MSW TOTAL 9,453,762 Page 1 ENVIRONMENTAL SPECIAL TIES INTERNATIONAL, INC. Name: Position: EXPERIENCE RESUME Sihalavongsa Sakoune Geomembrane Welder Sihalanongsa has 5 years of experience in installation and seaming of a variety of synthetic liners and components. A Geomembrane Welder qualification requires a minimum of one million square feet of actual hands on geomembrane welding experience. Daravanh is qualified to set-up and operate seaming equipment to include the following machines: hot wedge, hot air, extrusion, and sewing. He is familiar with all currently utilized welding techniques, installation, and safety procedures. SQUARE CUSTOMER LOCATION MATERIAL FEET COMMENTS Southern Co. Plant Daniel MS 60 Mil, 40 Mil, Comp 3,900,000 Fossil Fuel TVA Gallatin Fossil Plant TN GCL, 60 Mil, Comp 848,721 Fossil Fuel Sonoco Products Ash Cell Closure SC 40 Mil, Comp 550,368 Ash Cell WM North Milam Phase 1 North IL 60 Mil, Geo 258,157 MSW ADS Evergreen Temp Cap GA 40 Mil 534,422 MSW WM-Meadowfill Cell WV GCL, 60 Mil, Comp 204,308 MSW ADS Glacier Ridge WI 60 Mil, Comp 308,804 MSW WM-Arden LF Cell N1 (D) PA GCL, 60 Mil, Comp 569,650 MSW WM-Arden LF Stage 6 CAP PA 40 Mil, Comp 471,788 MSW Rep-Sycamore Ridge IN 60 Mil, Geo 255,162 MSW WM-Prairie View LF CEii 5 E IL 60 Mil, Geo 550,000 MSW West Helena LF PH 2 AR GCL, 60 Mil, Comp 145,660 MSW WCI-Oklahoma City LF OK 60 Mil, Comp 578,284 MSW ADS-Emerald Park PH 3 WI 60 Mil, Comp 278,438 MSW TOTAL 9,453,762 Page 1 ENVIRONMENTAL SPECIALTIES INTERNATIONAL, INC. Name: Position: EXPERIENCE RESUME Khampraseuth Chindavong Geomembrane Welder Khampraseuth has 4 years of experience in installation and seaming of a variety of synthetic liners and components. A Geomembrane Welder qualification requires a minimum of one million square feet of actual hands on geomembrane welding experience. Daravanh is qualified to set-up and operate seaming equipment to include the following machines: hot wedge, hot air, extrusion, and sewing. He is familiar with all currently utilized welding techniques, installation, and safety procedures. SQUARE CUSTOMER LOCATION MATERIAL FEET COMMENTS Southern Co. Plant Daniel MS 60 Mil, 40 Mil, Comp 3,900,000 Fossil Fuel TVA Gallatin Fossil Plant TN GCL, 60 Mil, Comp 848,721 Fossil Fuel Sonoco Products Ash Cell Closure SC 40 Mil, Comp 550,368 Ash Cell WM North Milam Phase 1 North IL 60 Mil, Geo 258,157 MSW ADS Evergreen Temp Cap GA 40Mil 534,422 MSW WM-Meadowfill Cell WV GCL, 60 Mil, Comp 204,308 MSW ADS Glacier Ridge WI 60 Mil, Comp 308,804 MSW WM-Arden LF Cell N1 (D) PA GCL, 60 Mil, Comp 569,650 MSW WM-Arden LF Stage 6 CAP PA 40 Mil, Comp 471,788 MSW Rep-Sycamore Ridge IN 60 Mil, Geo 255,162 MSW WM-Prairie View LF CEii 5 E IL 60 Mil, Geo 550,000 MSW West Helena LF PH 2 AR GCL, 60 Mil, Comp 145,660 MSW WCI-Oklahoma City LF OK 60 Mil, Comp 578,284 MSW ADS-Emerald Park PH 3 WI 60 Mil, Comp 278,438 MSW TOTAL 9,453,762 Page 1 ENVIRONMENTAL SPECIALTIES INTERNATIONAL, INC. Name: Position: EXPERIENCE RESUME Daravanh Hansana Geomembrane Welder Daravanh has 4 years of experience in installation and seaming of a variety of synthetic liners and components. A Geomembrane Welder qualification requires a minimum of one million square feet of actual hands on geomembrane welding experience. Daravanh is qualified to set-up and operate seaming equipment to include the following machines: hot wedge, hot air, extrusion, and sewing. He is familiar with all currently utilized welding techniques, installation, and safety procedures. SQUARE CUSTOMER LOCATION MATERIAL FEET COMMENTS Southern Co. Plant Daniel MS 60 Mil, 40 Mil, Comp 3,900,000 Fossil Fuel TVA Gallatin Fossil Plant TN GCL, 60 Mil, Comp 848,721 Fossil Fuel Sonoco Products Ash Cell Closure SC 40 Mil, Comp 550,368 Ash Cell WM North Milam Phase 1 North IL 60 Mil, Geo 258,157 MSW ADS Evergreen Temp Cap GA 40Mil 534,422 MSW WM-Meadowfill Cell WV GCL, 60 Mil, Comp 204,308 MSW ADS Glacier Ridge WI 60 Mil, Comp 308,804 MSW WM-Arden LF Cell N1 (D) PA GCL, 60 Mil, Comp 569,650 MSW WM-Arden LF Stage 6 CAP PA 40 Mil, Comp 471,788 MSW Rep-Sycamore Ridge IN 60 Mil, Geo 255,162 MSW WM-Prairie View LF CEii 5 E IL 60 Mil, Geo 550,000 MSW West Helena LF PH 2 AR GCL, 60 Mil, Comp 145,660 MSW WCI-Oklahoma City LF OK 60 Mil, Comp 578,284 MSW ADS-Emerald Park PH 3 WI 60 Mil, Comp 278,438 MSW TOTAL 9,453,762 Page 1 MANUFACTURER'S QUALITY CONTROL CERTIFICATION SECTION 1 HDPE GEOMEMBRANE GSE Roll Allocation Order S0-075755 Customer Environmental Specialties International, Inc Project Name Enterprise Brine Pond #8 Roll# Resin Lot Product Code 104176260 15C1193 H DS-060AE-WBC-B-OO 104176261 15C1193 HDS-060AE-WBC-B-OO 104176262 15C1193 HDS-060AE-WBC-B-OO 104176263 15C1193 HDS-060AE-WBC-B-OO 104176264 15C1193 HDS-060AE-WBC-B-OO 104176265 15C1193 HDS-060AE-WBC-B-OO 104176266 15C1193 HDS-060AE-WBC-B-OO 104176267 15C1193 H DS-060AE-WBC-B-OO 104176268 15C1193 H DS-060AE-WBC-B-OO 104176269 15C1193 HDS-060AE-WBC-B-OO 104176270 15C1193 HDS-060AE-WBC-B-OO 104176271 15C1193 HDS-060AE-WBC-B-OO 104176272 15C1193 HDS-060AE-WBC-B-OO 104176273 15C1193 H DS-060AE-WBC-B-OO 104176274 15C1193 HDS-060AE-WBC-B-OO 104176275 15C1193 HDS-060AE-WBC-B-OO 104176276 15C1193 HDS-060AE-WBC-B-OO 104176277 15C1193 HDS-060AE-WBC-B-OO 104176278 15C1193 HDS-060AE-WBC-B-OO 104176279 15C1193 HDS-060AE-WBC-B-OO 104176280 15C1193 HDS-060AE-WBC-B-OO 104176281 15C1193 HDS-060AE-WBC-B-OO 104176283 15C1193 HDS-060AE-WBC-B-OO 104176284 15C1193 HDS-060AE-WBC-B-OO 104176285 15C1195 HDS-060AE-WBC-B-OO 104176286 15C1195 HDS-060AE-WBC-B-OO 104176287 15C1195 HDS-060AE-WBC-B-OO 104176288 15C1195 HDS-060AE-WBC-B-OO 104176289 15C1195 HDS-060AE-WBC-B-OO 104176290 15C1195 HDS-060AE-WBC-B-OO 104176291 15C1195 HDS-060AE-WBC-B-OO 104176292 15C1195 H DS-060AE-WBC-B-OO 104176293 15C1195 HDS-060AE-WBC-B-OO 104176294 15C1195 HDS-060AE-WBC-B-OO 104176295 15C1195 HDS-060AE-WBC-B-OO 104176296 15C1195 HDS-060AE-WBC-B-OO 104176297 15C1195 HDS-060AE-WBC-B-OO 15C1195 H DS-060AE-WBC-B-OO 104176301 15C1195 H DS-060AE-WBC-B-OO GSE 8.2.4-020 Rev 01 02/10 Monday, April 13, 2015 Mfg Date Length 4/10/2015 560 4/10/2015 560 4/10/2015 560 4/10/2015 560 4/10/2015 560 4/10/2015 560 4/10/2015 560 4/11/2015 560 4/11/2015 560 4/11/2015 560 4/11/2015 560 4/11/2015 560 4/11/2015 560 4/11/2015 560 4/11/2015 560 4/11/2015 560 4/11/2015 560 4/11/2015 560 4/11/2015 560 4/11/2015 560 4/11/2015 560 4/12/2015 560 4/12/2015 560 4/12/2015 560 4/12/2015 560 4/12/2015 560 4/12/2015 560 4/12/2015 560 4/12/2015 560 4/12/2015 '560 4/12/2015 560 4/12/2015 560 4/12/2015 560 4/12/2015 560 4/12/2015 560 4/12/2015 560 4/13/2015 560 4/13/2015 560 4/13/2015 560 Page: 1 of 1 Gs E GSE Environmental, LLC ENVIRONMENTAL.:" ROLL TEST DATA REPORT Sales Onier No. I Customer Name I Roll Number 104176260 104176261 104176262 104176263 104176264 104176265 104176266 104176267 104176268 104176269 104176270 04176271 104176272 104176273 104176274 104176275 104176276 104176277 104176278 104176279 104176280 104176281 104176283 104176284 104176285 104176286 104176287 104176288 104176289 104176290 104176291 104176292 104176293 104176294 S0-075755 Environmental Specialties International, Yokl ,=~ ~rr~ s= ASTM ASTM 06693 (ppi) DS199(mils) 05199(rri'a) MD 62 60 61 61 62 61 61 61 61 61 61 61 61 60 61 61 61 61 60 61 61 60 61 61 61 61 61 61 61 61 61 61 61 60 60 58 59 59 59 59 60 58 60 58 59 59 58 58 58 58 58 58 59 59 60 59 60 60 60 58 57 58 57 59 57 57 57 59 136 138 138 138 143 143 143 145 145 145 136 136 136 147 147 147 147 147 147 140 140 140 144 144 144 146 146 146 142 142 142 140 140 140 y..., sl's-rr D66!13(ppi) TO 144 142 142 142 151 151 151 148 148 148 149 149 149 151 151 151 162 162 162 149 149 149 137 137 137 156 156 156 153 153 153 148 148 148 Inc ~ ... El~a,!f' 1>66!13(%) MO 17 17 17 17 16 16 16 17 17 17 17 17 17 17 17 17 17 17 17 16 16 16 16 16 16 17 17 17 17 17 17 17 17 17 17 17 17 17 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 16 17 17 17 17 17 17 299 284 284 284 286 286 286 296 296 296 298 298 298 300 300 300 319 319 319 296 296 296 305 305 305 274 274 274 297 297 297 259 259 259 Project Location Saint Martinville LA US Break s= D66!13{pp,) TO 307 290 290 290 297 297 297 300 300 300 283 283 283 316 316 316 311 311 311 294 294 294 287 287 287 300 300 300 299 299 299 304 304 304 857 832 832 832 804 804 804 845 845 845 867 867 867 862 862 862 882 882 882 823 823 823 926 928 928 789 789 789 654 854 854 720 720 720 906 855 855 855 896 896 696 906 906 906 876 876 876 943 943 943 907 907 907 897 897 897 841 841 841 912 912 912 875 875 675 893 893 893 T-Rni!lana! ASTM D1004(ll!I) "° 51 47 47 47 49 49 49 51 51 51 50 50 50 51 51 51 49 49 49 48 48 48 47 47 47 50 50 50 47 47 47 52 52 52 T-RmialNlce ASTM 01004(11:J:!) TD 47 44 44 44 45 45 45 48 48 48 48 48 48 47 47 47 46 46 46 45 45 45 46 46 46 46 46 46 44 44 44 46 46 46 Product Name HDS-060AE-WBC-B-00 149 145 145 145 152 152 152 150 150 150 148 148 148 147 147 147 140 140 140 149 149 149 147 147 147 156 156 156 144 144 144 151 151 151 ~::; D1505(gkc) Ca,boo .... """'"" ASTM 04218(%) 0.944 2.3 0.944 2.4 0.944 2.4 0.944 2.4 0.944 2.3 0.944 2.3 0.944 2.3 0.944 2.3 0.944 2.3 0.944 2.3 0.944 2.2 0.944 2.2 0.944 2.2 0.944 2.3 0.944 2.3 0.944 2.3 0.944 2.3 0.944 2.3 0.944 2.3 0.944 2.1 0.944 2.1 0.944 2.1 0.944 2.5 0.944 2.5 0.944 2.5 0.944 2.3 0.944 2.3 0.944 2.3 0.944 2.3 0.944 2.3 0.944 2.3 0.944 2.3 0.944 2.3 0.944 2.3 """""' """"' Dillpl!llllion ASTM 05596 tv-· Cal.1-Clll.2) 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 Page 1 of 2 Report Date:Apr/13/2015 SOL Number Gs e GSE Environmental. LLC ENVIRONMENTAL" ROLL TEST DATA REPORT ~ ~ Salos Ofder No. Cuslomer Nome Projoct Loc•llon Product Name S0-075755 Environmental Specialties International, Saint MMlnville LA US HOS-lJ60AE--WBC-B-OO Inc ca.t., ---. .,. y ... ..... ,._ ..... '=' ..... , ... ~ "::' .,_.., ....... ~ ~ ~ ~-..~ '.:.ii:" "':1:11"' °:l,':;"' ... ......,, -..,~ Roll Numbor ·-· '=-... N ....,.. ... _ 'l;';,1 .,,_, """" .. , .. or.c..,u., -.. ... , ~,..l _,,.., ~-, ~-, ~"' 06&Df'il O"t,,WII o,~,_, ~'!l., .... , .. (Y-• 0'5tN[ltk,u O,tlll-t,J ... ,o "' "' 01-"»~ 0011nu c.&l-c.11 104176295 61 S9 137 143 17 17 296 2llO 871 872 48 45 144 0.944 2.4 10 104176296 61 60 137 143 17 17 296 280 671 872 48 45 144 0.944 2-4 10 104176297 60 58 137 143 17 17 296 280 871 an 48 45 144 0.944 2.4 10 104178299 61 58 139 156 17 16 281 280 831 871 49 45 151 0.944 2.3 10 1104176300 61 59 139 156 17 16 281 280 831 87 49 45 151 0.944 2.3 10 104176301 61 60 139 156 17 16 281 280 831 871 49 45 151 0.944 2.3 10 Laboratory Manager ---~-=--"""~"""''---"'~4--=-/' ....... ~,::....;:....::::t..-;_-___ _ Page 2 of 2 Report Dota:Apt/1312015 SOL Number ::@::, Formosa Plastics FORMOSA PLASTICS CORPORATION, TEXAS 201 FORMOSA DRIVE PHONE: ( 888 )FPCUSA3 "' BOX 700 ~JINT COMFORT TX 77978 Certificate of Analysis CUSTOMER:GSE ENVIRONMENTAL, LLC UP TRACK 14732 WESTFIELD HOUSTON PRODUCT :HL3812 RAILCAR TEST ITEM Melt Index,g/lOmin HLMI, g/10 min. Density, g/cm3 TX FPAX940119 77070 S/0 NO CUSTOMER PO DATE SHIPPED: LOT NO WEIGHT (LB) : CUSTID:FT03112 REFERENCE METHOD ASTM D1238 ASTM D1238 ASTM D1505 SEQ2D32 03-502450 3/18/15 15Cll93 196,800.00 SPIDM4 TEST VALUE .070 11. 3 .9366 QC SUPERVISOR: LINDA KAO ::@:= Formosa Plastics FORMOSA PLASTICS CORPORATION, TEXAS ~01 FORMOSA DRIVE PHONE: ( 888 )FPCUSA3 l BOX 700 ... \)INT COMFORT TX 77978 Certificate of .Analysis CUSTQMER:GSE ENVIRONMENTAL, LLC UP TRACK 14732 WESTFIELD HOUSTON PRODUCT :HL3812 RAILCAR TEST ITEM Melt Index,g/lOmin HLMI , g/10 min . Density, g/cm3 TX FPAX940096 77070 S/0 NO CUSTOMER PO DATE SHIPPED: LOT NO WEIGHT (LB) : CUSTID:FT03112 REFERENCE METHOD ASTM D1238 ASTM Dl238 ASTM 01505 SEQ2D33 03-502450 3/18/15 15C1195 196,500.00 SPIDM4 TEST VALUE .060 10.6 .9365 QC SUPERVISOR: LINDA KAO GSE ENVIRONMENTAL" Job Name: Sales Order: Required Testing: Specification: Product Code HDS-060AE-WBC-B-OO HDS-060AE-WBC-B-OO Approved By: Date Approved: Report Date 4/13/2015 Quality Assurance Laboratory Test Results Enterprise Brine Pond #8 75755 ASTM D 3895 --Standard Test Method for Oxidative Induction Time of Polyolefins by Differential Scanning Calorimetry ASTM D 5397 --Standard Test Method for Evaluation of Stress Crack Resistance of Polyolefin Geomembranes Using Notched Constant Tensile Load Test D 3895 -> 100 Minutes D 5397 -> 500 Hours Resin Lot Number Test Results 15C1193 PASS 15C1195 PASS Debra Gortemiller April 13, 2015 The above stated data shall not be reproduced except in full, without the written approval of the laboratory. SECTION 2 GE.QCOMPOSITE ~ ~.....,;.~, .. ~ October 20, 2016 Environmental Specialties Int'I, Inc Ref. : WCI Anson Evaporation Ponds, NC 7943 Pecue Lane, Suite A Customer P.O.# 24269 Baton Rouge, LA, 70809 Product : TN 270-2-6 We hereby certify that the TN 270-2-6 drainage geocomposite, meets or exceeds the project requirements as stated in the specifications. The properties listed in this section are: Property Test Method Unit Value I Qualifier Geonee Thickness ASTM D 5199 mil 250 MAV6 Carbon Black ASTM D 4218 % 2.0 MAV Tensile Strength ASTM D 7179 lbs/in 55 MAV Melt Flow ASTM D 12382 g/10 min 1.0 Maximum Density ASTM D 1505 a/cm3 0.94 MAV Transmissivitv1a ASTM D 4716 m2/sec 3.0 x 10-3 MAV Composite Ply Adhesion ASTM D 7005 lb/in 1.0 MAV Tra nsmissivitv1b ASTM D 4716 m2/sec 5.0 x 10-4 MAV Geotextile3 & 4 Fabric Weight ASTM D 5261 oz/vd2 6.0 MARV5 Grab Strength ASTM D 4632 lbs 160 MARV Grab Elongation ASTM D 4632 % 50 MARV Trap Tear Strength ASTM D 4533 lbs 65 MARV CBR Puncture ASTM D 6241 lbs 450 MARV Water Flow Rate ASTM D 4491 anm/ft2 125 MARV Permittivity ASTM D 4491 sec-1 1.63 MARV AOS ASTM D 4751 US Sieve 70 MaxARV UV Resistance ASTM D 4355 %/hrs 70/500 MARV Notes: la. Transmissivity measured using water at 21 ± 2 ° C (70 ± 4 ° F) with a gradient of 0.1 and a confining pressure of 1 O, 000 psf between steel plates after 15 minutes. lb. Transmissivity measured using water at 21 ± 2 ° C (70 ± 4 ° F) with a gradient of 0.1 and a confining pressure ·or 10,000 psf between steel plates after 15 minutes. 2. Condition 190/2.16 3. Geotextile and Geonet properties are prior to lamination. 4. Geotextile data is provided by the supplier. 5. MARV is statistically defined as mean minus two standard deviations and it is the value which is exceeded by 97.5% of all the test data. 6. Minium average value . Sincerely, a, ~Pdd Rajesh Patel OA Manaqer iA. 571 lndustria/ Parkway, Commerce, GA 30529 *Ph: 706-336-7000 *Fax: 706-336-7007 *Email: contact@skaps.com ~ Product: TN 270-2-6 Project: WCI Anson Evaporation Ponds, NC ~ We hereby certify the following test results for the above referenced product/project : Geocomposite Geonet Ply Adhesion Carbon Tens11e Roll Number (lb/in) Transmissivity Resin Lot Density Thickness Black Strength Transmissivity (m2/sec) Number (g/cm3) (mils) MD (m2/sec) Side"A" Side"B" (%) flh/in, 72981010001 2.n 2.46 9.44 x 10-4 PSPX 002159 0.9535 263 2.35 90 5.88 x 10-3 72981010002 PSPX 002159 0.9535 72981010003 PSPX 002159 0.9535 571 Industrial Parkway, Commerce, GA 30529 •Ph: 706-336-7000 •Fax: 706-336-7007 •Email: contact@skaps.com POLYETHYLENE RESIN CERTIFICATION Customer Name : Project Name : Geocomposite Manufacturer : Geocomposite Production Plant : Geocomposite Brand Name : Environmental Specialties Int'I, Inc WCI Anson Evaporation Ponds, NC SKAPS Industries Commerce, GA TN 270-2-6 We hereby certify the following test results for the above referenced product/project: Resin Resin Test Manufacturer Lot Number Property Method Marco Polo International Density ASTM 01505 PSPX 002159 Melt flow Index ASTM D1238<•l (a) Condition 190/2.16 * Data from SKAPS Quality Control Resin Units Manufacturer Value g/cm3 0.9480 g/10 min 0.17 571 Industrial Parkway, Commerce, GA 30529 • Ph : 706-336-7000 •Fax: 706-336-7007 •Email: contact@skaps.com Tested Value* 0.9483 0.19 ~ Geotextile Certification Product: TN 270-2·6 ~ Project: WCI Anson Evaporation Ponds, NC We hereby certify the following test results for the above referenced product/project : GEOCOMP FABRIC WEIGHT GRAB GRAB GRAB GRAB TRAP TRAP CBR AOS WATER-PERM-ITV ROLL# SIDE oz/yd2 lbs. ELG% lbs. ELG% lbs. lbs. PUNCTURE us sieve FLOW sec·1 (MD) (MD) (XMD) (XMD) (MD) (XMD) lbs gpm/tt2 Side A 72981010001 6.62 167 68 174 82 75 80 495 70 133 1.77 Side B 6.62 167 68 174 82 75 80 495 70 133 1.77 571 Industrial Parkway, Commerce, GA 30529 • Ph : 706-336-7000 •Fax: 106-336-1001 •Email: contact@skaps.com GEOMEMBRANE DOCUMENTATION SECTION 1 SUBGRADE ACCEPTANCE CERTIFICATES CERTIFICATE OF SUBGRADE SURFACE ACCEPTANCE INSTALLER: ENVIRONMENTAL SPECIAL TIES INTERNATIONAL, INC. PROJECT NAME: WCI ANSON LEACHATE PROJECT NO: 16-07-1332 __ .......;;.,~~=--- LOCATION: POLKTON.NC AREA ACCEPTED: PANEL-1 THRU PANEL-8 __________ .;_;_,;_;_ ____ ....:......:......:......:.. ___________ ~ PANEL NUMBERS: PANEL-1 THRU PANEL-8 GRADE ACCEPTANCE: INSPECTOR: GENERAL CONTRACTOR: OWNER: AUTHORIZED REPRESENTATIVE: The undersigned, Nick Thammavongsa ,certifies that he/she is a representative of Environmental Specialties International, Inc. authorized to execute this certificate, that he/she has visually inspected the subgrade surface described above on 12/13/2012 and found the surface to be acceptable for installation of the geomembrane. This certification is based on observation of the surface of the subgrade only. No subsurface inspections or test have been performed and Environmental Specialties International, Inc. makes no representations or warranties regarding conditions which may exist below the surface of the subgrade. ORIZED REPRESENTATIVE OF ENVIRONMENTAL SPECIAL TIES INTERNATIONAL, INC. Superintentdent 12/17/2016 Signature Title DATE V-<? D, 7 Title DATE 7943 PECUE LANE SUITE A -BATON ROUGE, LA. 70809 -PHONE 225-291-2700 -FAX 225-291-2788 r;'.· SECTION 2 GEOMEMBRANE PANEL DEPLOYMENT LOG PROJECT# : 163826 PROJECT DESCRIPTION : Leachate Tank PAGE APPROX. TOTAL (SQ FT): // i ').... 7 DAILY TOTAL {SQ FT): l f 12:-4: ; ACCUMULATED TOTAL(SQ FT): // I I)... t 7 OASIS COl ~TING SERVICES GEOMEMBRANE PANEL DEPLOYMENT LOG OWNER: Waste Connections ENGINEER: CEC PAGE# L ~ REVIEWED B~assoud Madani DATE: DEC 2 0 2016 SECTION 3 GEOMEMBRANE TRIAL SEAM LOG OASIS CONSUL .] SERVICES GEOMEMBRANE TRIAL SEAM LOG PROJECT# : 163826 PROJECT DISCRIPTION : Leachate Tank PROJECT LOCATION : Polkton, NC. .. I -FU-S-IO_N_W_E_LD ... i ... EXT-R-US-IO_N_W_EL_c} TF/TXI TIME IAMB IMACHJ WELD I SPEEDIWEDGEI PRE I BARREL ID# TEMP.I ID# I TECH SET I HEAT I SET ITf-1 ltos1 I <t6 I Yt1sl t<-51 ~.') I Cf,6D ,)(.-\ I 13;0 I tr7 1~"711 DH- l)c:il /31.<f Lf"~ [s",,o 11 v·~ -...... CONSULTING SERVICES PEEL VALUE lbs/inch OWNER: Waste Connections ENGINEER: CEC INSTALLER: ESI DATE: t :2., I 2.t I PAGE# __ _ SHEER VALUE lbs/inch P/F I QA I COMM Mont. ENTS I 3 . 1-. I 1 ~o I 1 ~111 ~1 1 I I 11>i l'fl-lJ T T~ \qi l"l~l1ci:1-I P INSIDE I H-1 I t '].-lr1,"l K++ 1J>s OUTSIDE 13'3 15'1 iYl- INSIDE l~i 12..b }? OUTSIDE ---l 7,I l6tl1 S>J I p Kl,).. I S/5 '~Cfl 111 IN<:1m: ·~ -\>4 !41 . ·- OUTSIDE --I ~ f M IS.15 -INSIDE -- OUTSIDE -INSIDE -- OUTSIDE -INSIDE --OUTSIDE -INSIDE -- OUTSIDE -INSIDE -- OUTSIDE -INSIDE -- OUTSIDE -INSIDE --OUTSIDE -INSIDE --- OUTSIDE FUSION MINIMUM PEEL VALUE:_91__ FUSION MINIMUM SHEER VALUE:_120_ EXTRUSION MINIMUM PEEL VALUE:_78__ EXTRUSION MINIMUM SHEER VALUE:_120_ Massoud Madani REVIEWED BY: _____ _ DATE : DEC 2 0 2016 PROJECT# : 163826 PROJECT DISCRIPTION : Leachate Tank PROJECT LOCATION : Polkton, NC. FUSION WELD TF/TX TIME AMS MACH WELD SPEED WEDGE ID# TEMP. ID# TECH SET rr·iic-i Vft --rJ73·~ 11-5· .. -,l.:,.,1 fx..."2, o73t ,i-5°3%-t DH --· 1x-3 13-S-o '-17 5a107. i; fl.... ---- Tx~'{ 1115 'It ~3!41 DH -- REVIEWED B~~SSOUd Madan; DATE: DEC 2 n 2016 OASIS CONSU '. 3 SERVICES GEOMEMBRANE TRIAL SEAM LOG ~......_.... CONSULTING SERVICES OWNER: Waste Connections ENGINEER: CEC INSTALLER: ESI DATE: 11, I 3, t I l I ( PAGE# ....2::_ EXTRUSION WEL[ PRE BARREL PEEL VALUE lbs/inch SHEER VALUE lbs/inch P/F QA COMM HEAT SET Mont. ENTS 55.., SSo INSIDE i{,5 IL( 1 qi 15·3 IT~ I '1 S f k11 5;5 11i ,,, ,,o 181 OUTSIDE .. ---- 5S'o INSIDE \"'12 , . ., 0 iSJ 1'1"{ 17 (. l "l' f 5So l, .. ,,, 1,~ r8Y IGH-'":>, s OUTSIDE ----- INSIDE /3--l ''<' ;«-( !<-/ ~ ! ,__.::, \ L'-1 p Ss.., S.50 OUTSIDE -t 2..3 ,so 17-1 ·,~> 14( 51,,~ ---- ·:,-'Sb 5So INSIDE J '5"'8 I ~ /I:, 160 /12 f' >(> rt'I 151-\1,l-' 1'59 f5'j KL~ OUTSIDE ----..... INSIDE OUTSIDE INSIDE OUTSIDE INSIDE OUTSIDE INSIDE OUTSIDE INSIDE OUTSIDE INSIDE OUTSIDE INSIDE OUTSIDE FUSION MINIMUM PEEL VALUE:_91__ FUSION MINIMUM SHEER VALUE:_120_ EXTRUSION MINIMUM PEEL VALUE:_78__ EXTRUSION MINIMUM SHEER VALUE:_120_ PROJECT# : 163826 PROJECT DISCRIPTION : Leachate Tank PROJECT LOCATION : Polkton, NC. FUSION WELD TF/TX TIME AMB MACH WELD SPEED WEDGE ID# TEMP. ID# TECH SET 1x-1 o72o Lf'J sn, Dt-1 -- Tx,J. o7~ '-13 5.,,, l-v~ --· ~)(,} "7sc lf6 53S'f t> \-\-~ '--- I'll-~ ll-3c 'f::r S<>10·2. VP--- Massoud Madan, REVIEWED BY:: ___ -=-_-- DATE = DEC 2 n 2016 OASIS CONSUL J SERVICES GEOMEMBRANE TRIAL SEAM LOG ~~ CONSULTING SERVICES OWNER: Waste Connections ENGINEER: CEC INSTALLER: ESI DATE: I .21 I y I I 6 j j PAGE# 3 EXTRUSION WELC PRE BARREL PEEL VALUE lbs/inch SHEER VALUE lbs/inch P/F QA COMM HEAT SET Mont. ENTS INSIDE 1.39 f(J /22... 11 '\ le;Cj I F l<J./ fhi.11 55,,, 5So OUTSIDE -'/f c; \l; 1 "63 It/ rP wc::1J -----I 55, ~So INSIDE 115 1'>5 lh3 H,i 160 f l<tl ng /')) i72-15b OUTSIDE -----1'5" INSIDE 13, f O) i3t 136 •'-13 1~4 )bb k ~ S-5.,. ~~ OUTSIDE -----f 6 2--1-; .;-)'t~ f' ~9 INSIDE I 11£ /5> /'1(,, I '-\O 13,; /tq i 9'c f 597 -165 1>"5 NC ~ OUTSIDE ---..- INSIDE OUTSIDE INSIDE OUTSIDE INSIDE OUTSIDE INSIDE OUTSIDE INSIDE OUTSIDE INSIDE OUTSIDE INSIDE OUTSIDE FUSION MINIMUM PEEL VALUE:_91__ FUSION MINIMUM SHEER VALUE:_120_ EXTRUSION MINIMUM PEEL VALUE:_78__ EXTRUSION MINIMUM SHEER VALUE:_120_ OASIS CONSL 3 SERVICES GEOMEMBRANE TRIAL SEAM U >G PROJECT#: 163826 OWNER: Waste Connections PROJECT DISCRIPTION : Leachate Tank C t?c,!~ ENGINEER: CEC INSTALLER: ESI l/ SERVICES 12:z \,d .:::'. PROJECT LOCATION: Polkton, NC. DATE: PAGE# ; -' FUSION WELD EXTRUSION WELIJ TF/TX TIME AMB MACH WELD SPEED WEDGE PRE BARREL PEEL VALUE lbs/inch SHEER VALUE lbs/inch P/F QA COMM ID# TEMP. ID# TECH SET HEAT SET Mont. ENTS ) ~ 1:, INSIDE rr, :2.<> ·-; t'H' lfb ,ct 7>.-1 cir 53 s: 102 'v R --"..:> ,.,-1) HI i "St -7 -2v;..; i'6f, p Kd-. " OUTSIDE ----· -t ) ,~, ., INSIDE / ,-.'-{ /Of IILi I~" it,{ 11g .p ~ I J.-'-· cNo )J 5J6i 85 --))L' )')--V 1%, -z.._.7-o )it f'\J OUTSIDE ---~ - "'-J IJ2;-3y 53~ INSIDE 1st ;,-~ I J "1 ,,2 17'1-J.:;,j {) /q{ ds --'>Sb SJo 'Tl lqf ,&J, l1"'l OUTSIDE ---- ]5" 1..-,· ~ v'~ --<i~LJ INSIDE 5 1-1tJ I '13 i {-3 It) 2oi I>''{ 2.:, if f r++ r;. _ 'f ( 3., ,J 17"° I..;; Z---))" 't,<)v lb1 OUTSIDE ------ ~)-1310.::, ,. __ 04-~ -5" St µ)i:,5_, INSIDE i11 ;--s-~1 ( '10 I> 1. ;1JC1 p )) foe?~ ;,r:'1 (;,L .2..tii ITL llS' ~ OUTSIDE ------ INSIDE OUTSIDE INSIDE OUTSIDE INSIDE OUTSIDE INSIDE OUTSIDE INSIDE OUTSIDE INSIDE OUTSIDE FUSION MINIMUM PEEL VALUE: '1 FUSION MINIMUM SHEER VALUE: 120 ---- EXTRUSION MINIMUM PEEL VALUE: 78 EXTRUSION MINIMUM SHEER VALUE: 120 -,----- REVIEWED B~~SSOUd Madan; DATE: DEC 2 8 2016 , OASIS CONSL 3 SERVICES GEOMEMBRANE TRIAL SEAM LC ~G PROJECT# : 163826 OWNER~ Waste Connections PROJECT DISCRIPTION : Leachate Tank C t~L~ ENGINEER: CEC INSTALLER: ESI SERVICES J h-7 \71{6 5 PROJECT LOCATION: Polkton, NC. DATE: PAGE# FUSION WELD EXTRUSION WEL[ TF/TX TIME AMB MACH WELD SPEED WEDGE PRE BARREL PEEL VALUE lbs/inch SHEER VALUE lbs/inch P/F QA COMM ID# TEMP. ID# TECH SET HEAT SET Mont. ENTS .DH-INSIDE IZ-4 /'-j l-/{;5:' I 'I z_. /),;; 1'>'1 p ~ tx-1 D7t5 31 5o;J -. Y5v )5b 171 fT~ \q_o It& OUTSIDE ----· - -INSIDE q3 !4)'i I '16 lo 2-I 1..-1 I ci p ~ Tx..--z. 0-,30 31 'f'Yt't !3S -)~ s-w I j1 ·21 't 2oj i:z...3 OUTSIDE -----· {)<..-) 3> I v/2..... -INSIDE l ',"·~ \.\l i 'iG l'f5 J5.:, p ~ 01~5 §oioi-,. -):)-0 5S-V 221: Lo'f 1155 It~ l~J OUTSIDE ----- INSIDE OUTSIDE INSIDE OUTSIDE INSIDE OUTSIDE INSIDE OUTSIDE INSIDE OUTSIDE INSIDE OUTSIDE INSIDE OUTSIDE INSIDE OUTSIDE FUSION MINIMUM PEEL VALUE: -~1 FUSION MINIMUM SHEER VALUE:_ 120 -- EXTRUSION MINIMUM PEEL VALUE:_ 78 EXTRUSION MINIMUM SHEER VALUE: -120 --- REVIEWED ~ssoud Madaoi DATE: DEC 2 o 2016 SECTION 4 GEOMEMBRANE FUSION AND EXTRUSION SEAM LOG CONSUlllNG SERVICES PROJECT NUMBER: 163826 PROJECT DESCRIPTION: Leachate Tank PROJECT LOCATION: Polkton, NC. OASIS CONSUL TING SERVICES GEOMEMBRANE FUSION SEAM LOG PASSING TRIAL SEAMS OWNER: Waste Connections ENGINEER: CEC INSTALLER: ESI DATE: i ~ I J../ ,, NO. TIME TECH ID I n-1 · 1 '·'~ I K-r I DESTRUCTIVE SEAM LENGTH CARRY-OVER FROM PAGE# ( 4-) r/ MACHINE# 11t5 PAGE NUMBER: __ 1,.__ __ .. MACHINE SETIINGS LENGTH O PASSING -NON SEAM SECTION APPROX. AMB. DIGITAL SET INDICATOR APPROX. FROM LOCATED DESTRUCTIVE TESTING SEAM START . FINISH START AIR WELD MACH LENGTH PREVIOUS DESTR. QA TEST QA NUMBER POINT . POINT TIME TEMP TECH SPEED WEDGE WEDGE WELDED DESTR. NO. MON. REMARKS DATE MON. r I ~ wei>..S . ~.) ll,o s <.+, K,S )") 'itfo 16( 150 loc/.50 [)F...-1 K~ / l., 13 l<.H: 5 I ' gEi.>~ ·T'.Eo5 f3:lo LM" ks S·~ {60 S6., If t, -f::f, ,.2 .. 113 ~ :~ I ,_, .B.&..> · 1fu) 1.3 sz, 'I'*" K; "5 · 1 'if6d '?6~ I 1 ,J.... ./ /.4t-11...,, 3 l<H ( I g l?fo.5> • TE3.:, .5 /9>c tt9 ks )•) gev ~ .. ;f-,1, --&-C~fft J tJ../IJ k::.\-1 l/ I 8 (3~..5 •16v.> /5,;,3' L{~ ks .. ---~--g-6 .. ii '1 D ~ c "lPe ~ · I "l-/\:, \~ ~-~ - I . I . I . I I I I I I I • REFERENCE SEAM ENDPOINTS FROM END OF SEAM (EOS), PAGE TOTAL: 1--to •• DATA TO BE COMPLETED BY THE DEFECT NUMBER OR A POINT LOCATION ON A SEAM PAGE DESTRUCTIVE LENGTH CARRY-OVER <,-o DATA REVIEWER ONLY. DAILY TOTAL WELDED (FT) 1!:\o REVIEWED BY= Massoud Madani NOT£'. B i;o.S 5 otl-q,'V\ b\D of SEtLNJ DAILY DESTRUCTIVE LENGTH CARRY-OVER cio l&o'::7 · To? frlD J-Stlt/Y1 DATE: AC'I" ? A 2016 OASIS CONS NG SERVICES GEOMEMBRANE EXTRUSION SEAM AND TEST LOG PROJECT# : 153518 PROJECT DISCRIPTION :Leachate Tank PROJECT LOCATION: Polkton, NC. MACH ID# S"o lo2- SEAM SEAM SECTION START AMB WELD # START FINISH TIME TEMP TECH I 6 (,.J Eos ~~ ,~1, S-o 'If< I 5 Wfo5 cG;>s f'1i5 5 C> tip ..... . I 6 Gw'> Wev5 I 6.?i 5b V(l... I 'is S{Ps. rJi:Y5 f 611 50 -.;(<._ ~ 'S 56:>) NOl5 ,,2~ y:, ..;~ 5 1 BE~ Tl::,S 1?,30 So ti!)...._ PAGE TOTAL PAGE CARRY OVER DAILY TOTAL WLDED DAILY CARRY OVER Massoud Madan; REVIEWED BY DEC 2 O 2016 DATE: APPROX LENGTH 0-=r 81 '-I .).. ')_. ri t ( 2.._o3 CONSULTING SERVICES EXTRUSION SEAMING LENGTH DESTRUCT QA FROM LAST LOCATION DESTRUCTIVE # Mont. --~u ~;/5o Dx~2 K\-t S"'f -~ 16 -~ '7~ -,9-t ( oS ~ tu· 105 .,_03. /05 NON DESTR. TEST DATE n-113 1 Z..113 I 1,/ I '3, 1 '2.., I) )'t; '3 I 1,11 ~ OWNER : Waste Connections ENGINEER : CEC INSTALLER: ESI DATE: ("Lc\'Z.-db » PAGE# '2- CARRY OVER FROM PAGE# (-t-)-¥---FT VACUUM TESTING TECH SEAM SECTION P/F QA REMARKS ID START FINISH Mon .:r" ~> 1,JCo) r I~ So l;e,5 IJv tbs p ~ -.5:~ E:Eo> 1,-.)(j;,';, f 4\-- .::s <:> 5~ ."1~~ p ~ I .~ .)€,.,_';, 1'1 Ci):, r ~ ;j., Is 6v? Tiios f t.,;\ c._;ir.,~· OASIS CONS, '\IG SERVICES GEOMEMBRANE EXTRUSION SEAM AND TEST LOG PROJECT ff ; 153518 PROJECT DISCRIPTION :Leachate Tank PROJECT LOCATION: Polkton, NC. MACH ID# ,ooTj SEAM SEAM SECTION START AMB WELD # START FINISH TIME TEMP TECH ).... '-{ l,..Jf:o> G: G..::,.s /33] 70 DH- 2-3 \...li,oS 6:b~ It 'f8 5-o DH- J_ 1 N£a5 S~> \too So D~ I 1 /\J6'') SM \ b \0 5.:. Dt\' 3 l-!3£=0) Tl;..:,~ f(.;Ls 5''t> Di.+ PAGE TOTAL PAGE CARRY OVER DAILY TOTAL WLDED DAILY CARRY OVER Massoud Madani REVIEWED BY : DEC 2 IJ 201' __ ..,. ----·- DATE:~~~~~~- CONSULTING SERVICES EXTRUSION SEAMING APPROX LENGTH FROM LAST DESTRUCT LOCATION QA LENGTH DESTRUCTIVE # Mont. 98 Cfo( f t>x-\ ~ 5-,-hri -~ 18 lb -14\ 2-'2-/en) -~ If II I -h- ~DI Ill 2._o( I/I NON DESTR. TEST DATE I l 111- ;~,, 'l,..- I 1-,.1'l- il,ll-- l ~ iJ. OWNER : Waste Connections ENGINEER : CEC INSTALLER: ESI DATE: \ '2..1 \ Z....,\L I J PAGE#_j_ CARRY OVER FROM PAGE# (f ) -1--FT VACUUM TESTING TECH SEAM SECTION P/F QA REMARKS ID START FINISH Mon ts Wc-o~ f!rf,,) p ~ lo lJ O,)~ ~s r 4 Kj ""'~) (-,;.,) p ,41 ;£'.....~ Wiaj.:, &,) f KJI--- K'J 13&> 'fG,) p {Li:,. v..y11cJ . SECTION 5 GEOMEMBRANE DEFECT, REPAIR AND VACUUM TEST LOG OASIS CONS NG SERVICES GEOMEMBRANE DEFECT AND REPAIR LOG PROJECT# : 163826 PROJECT DESCRIPTION : Leachate Tank PROJECT LOCATION : Polkton, NC. DEFECT DEFECT LOCATION DEFECT CODE SEAM, PANEL OR DEFECT DEFECT LOCATION TYPE CODE DESCRIPTION A I / ;J... 501 W~t-4 E&5 .Df -, B ;l.. 12.1 w .. 1r--E. I£ I r.J. -.,f-s. L._;T c ') S' IN ··f E J 6' ,J. c{,-S. c..;T D 2 6; W~f E/ t 'N .,;--S C11T · F J.. II t,.J,Ff;:/6'N·f.5 c...v1f G I/ 5 / h ~ P"""'.e.( \ .. .{-T H 'J-,/3.,c.f 3 ?""--<-I I ... -t l . J 2. / '-f Jo' W<eJt-c.l-~s DX-I K l / 5 '2-3; tAST { W€;;:, > 1).>li:-1.,. M ~I 4_ I '~ j Pc.-<-{ l"t T N l I '1-/ ~ ~ pc.-,.(!./ 'I\. t--T p \ / b ' / i 3 Pev-~ \ l ,t-r Q I / 5 i 1-:, P-.e.,( ),"\ t-T R l I .?., I 1 ~ f -~l h+-T s ?-./31'1-'J f......t '""-r T T )... / 7, t:;' W~1"',;~ ~) Cv I w .... 4./ t,J + e. J /, I 5, vi,... tv tc.,.1T ~ x y DEFECTS TYPES BO-BURNOUT DX -EXTRUSION DESTRUCTIVE ED -EQUIP. DAMAGE CO -CHANGE OF OVERLAP CUT-CUT D-DAMAGE CR-CREASE EXT -PANEL EXTENTION FM -FISH MOUTH FS-FAILED SEAM INT -INTERSECTION DF -FUSION DESTft.Jffill~OUd Mada9li INSUFFICIENT OVERLAP REVIEWED BY : DEC 2 o 2016 ...-~v --DATE: _____ _ DATE I'-/\ l. \'Z.../\'Z,..- \ '"L1\'Z... \1..-11'1- t 1../ , ... 12..,...,i. l ,..,,, 7. i 7....,..1 2-- \1.,"I Z.... )'Z...._,.17 11..../ ,;. 1 2....,, I l.- l?./13 lJ..; 1'2- , 1.../,;, I 2-113 I ·i...1 ! 'f CONSULTING SERVICES REPAIR TYPE APPROX MACH SIZE ID# e bA J,->d icl'J. t" l-><'Z... 5,,.11 f Z-.o ... s~, .. ·11 p 2.,< 'Z., "'°~11 f 1...-J( 'l--~-1'1 p )?(7 9>101.. f> J,.< ':7 5.,.n p '" '1.-- $'0 .. T1 ,"' 'k. 1--[S'o lcl2 1"_1\P ... ,3 )=>l<> J. p 'Z....,c:: 3 S:.101..- C..l~P /I .X ) '53'i'i WELD TECH Vrl.. DH f'il-t t)i+ l')t\ VR. OH- DH VP- v R. v[< vf..... t:,lif If x: ?; 5"31S'f !) L-t p y .<.3 (Jf'"J !)\-1, r>j)~ ii"< 3 5JS'f ~~- p Z)i"l.-'i3lf4 \)rt () 7 ,}(. '1-5c,~J.. \) (.).._ PT -PRESSURE TEST CUT T -THREE PANEL INTERSECTION VL-VACCUM LEAK WR-WRINKLE WS -WELDER RESTART OTHER ----------------- OTHER ----------------- OWNER: Waste Connections ENGINEER: CEC INSTALLER: ESI PAGE#_1...___ QA MONT. l(~. Ktt ~ 4 ~""' ~ l'.:. l~ K...U ,,:.Jr i(l-f- 14.1 "K.i+ '><ft ~\{" K. t\ \:::..\-\"' ,<'.: .+- VACUUM TEST DATE (2...,, 3, 12;,~ ( l11J , 2-.( I J 17-.113 I 2, I} \1-;l 7 ! Z....;I "$ tJ../1~ 1.:i;,, , ,_;,; f Z,./ I~ 12,../1? 1~11; 1:J,./1~ 12-.,13 I z,. 1'-l TECH P/F QA ID Mon k, p ~ fc.<,-p ~ )(_<; f' ~ je_<; f ~ ic5 p ¥'.-\.\- f:.5 r ~ k.5 p A\ Ks '( 'A'. J' t7 ? K4-I 5o ? ~ Jo ? IA. J _,. ( ~ j <> ? aj Jo p 4\ '5 "' p ~ 3';:, q> ~ 3.., \'? tr:\.\- REPAIR TYPES P-PATCH C-CAP RS -RECONSTRUCTED SEAM G&W -GRIND AND WELD REMARKS SECTION 6 FUSION AND EXTRUSION DESTRUCTIVE SAMPLE TEST RESULTS ~TING, RESEARCH, CONSULTING ANO FIELO SERVICES :USTIN, TX -USA I ANAHEIM, CA -USA I ANDEA!ICN, EiC -USA I GaLo CcABT -AUSTRALIA I SUZHcu -CHINA Date: 2016-12-14 Mail To: Bill To: Mike Monteleone Oasis Consultant Services Oasis Consultant Services ' ' e-mail:mmonteleone@oasis-cs.com Dear Monteleone, Thank you for consulting with TRI/Environmental, Inc. (TRI) for your geosynthetics testing needs. TRI is pleased to submit this final report for laboratory testing. Project: Anson Leachate Tank TRI Job Reference Number: 26043 Material(s) Tested: (1) Heat Fusion Weld Seam(s) (2) Single Extrusion Weld Seam(s) Test(s) Requested: SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) Codes: AD BRK SE AD-BRK SIP FTB NON-FTB Adhesion Failure (100% Peel) Break in sheeting away from Seam edge. Break in sheeting at edge of seam. Break in sheeting after some adhesion failure -partial peel. Separation in the plane of the sheet (leaving the bond intact). Film tearing bond (all non "AD" failures). 100% peel. If you have any questions or require any additional information, please call us at 1-800-880-8378. Sincerely, James Burgess Geosynthetic Services Division http://www.geosyntheticstestinc.com TRI ENVIRONMENTAL, INC. 9063 BEE CAVES Ro. -AusT1N, TX 7B733 -USA I PH: aaa.aaa.TEST aA 51 2.263.21 a 1 Page: 1 of 3 / .TING, RESEARCH, CONSULTING AND FIELD SERVICES J;:USTIN, TX -USA I ANAHEIM, CA -USA I ANOERSCN, SC -USA I GCLO CCAST -AUSTRALIA I SUZHCU -CHINA DESTRUCTIVE SEAM QUALITY ASSURANCE TEST RESULTS TRI Client: Oasis Consultant Services Project: Anson Leachate Tank Material: 60 mil. HDPE SAME DAY Peel and Shear (ASTM D 6392/GRI GM19/D 4437/NSF 54/882 mod.) TRI Log#: 26043 TEST REPLICATE NUMBER PARAMETER 1 2 3 4 5 Sample ID: DF-1 I Weld: Heat Fusion Side: A Peel Strength (ppi) 128 144 126 138 132 Peel Incursion (%) <5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Side: B Peel Strength (ppi) 134 139 138 144 131 Peel Incursion (%) <5 <5 <5 <5 <5 Peel Locus Of Failure Code SE SE SE SE SE Peel NSF Failure Code FTB FTB FTB FTB FTB Shear Shear Strength (ppi) 181 176 179 177 178 Shear Elongation @ Break(%) >50 >50 >50 >50 >50 TRI ENVIRONMENTAL, INC. 9063 BEE CAVES Ro. -AUSTIN, TX 78733 -USA I PH: BOO.BBC.TEST aR 51 Z.263.21 a 1 Page: 2 of 3 MEAN Peel A 134 Peele 137 Shear 178 DAILY FIELD REPORTS CONSULTING SERVICES Client Name: Waste Connections Project Name: Anson Landfill Project No: 163826 General Contractor: Location: Anson Landfill FIELD INSPECTION REPORT REGULAR WEEKLY Oasis Report # 103 • The liner crew finished capping the batten strip. • Placed an additional cap on the corners of the tank. • Welded the pipe boot to the liner. • Caulked and sealed all bolts, batten strip and corners. 45 Woodstock Street -Roswell, GA 30075 Tel. 678-739-2400, Fax 770-552-5550 Date: 12/17/2016 Day: Saturday Weather: Overcast Temperature: 32 -50° Evaluation Type: Regular Weekly Rainfall Amount: 0 inch • Performed one more spark test on all joints and across the liner surface area. Massoud Madani Prepared By Copyright Oasis Consulting Services 2016 Reviewed By Respectfully submitted OASIS CONSULTING SERVICES CONSULTING SERVICES Client Name: Waste Connections Project Name: Anson Landfill Project No: 163826 General Contractor: Location: Anson Landfill FIELD INSPECTION REPORT REGULAR WEEKLY Oasis Report# 102 • Liner crew continued with capping and welding the liner cap. • Installed a boot around the leak detection riser up. • Bolted the riser pipe to the tank wall. Massoud Madani Prepared By Copyright Oasis Consulting Services 2016 45 Woodstock Street -Roswell, GA 30075 Tel. 678-739-2400, Fax 770-552-5550 Date:12/16/2016 Day:Friday Weather: Overcast Temperature: 32 -so· Evaluation Type: Regular Weekly Rainfall Amount: 0 inch Reviewed By Respectfully submitted OASIS CONSULTING SERVICES CONSULTING SERVICES Client Name: Waste Connections Project Name: Anson Landfill Project No: 163826 General Contractor: Location: Anson Landfill FIELD INSPECTION REPORT REGULAR WEEKLY Oasis Report # 101 • Completed placing the batten strip. • Installed a roll of neoprene between the batten strip and the liner. • Caulked and sealed all bolts. • Placed a liner cap over the batten strip/bolts. Massoud Madani Prepared By Copyright Oasis Consulting Services 2016 45 Woodstock Street. Roswell, GA 30075 Tel. 678· 739·2400, Fax 770-552-5550 Date: 12/15/2016 Day: Thursday Weather: Overcast Temperature: 32 -so· Evaluation Type: Regular Weekly Rainfall Amount: a inch Reviewed By Respectfully submitted OASIS CONSULTING SERVICES CONSULTING SERVICES Client Name: Waste Connections Project Name: Anson Landfill Project No: 163826 General Contractor: Location: Anson Landfill FIELD INSPECTION REPORT REGULAR WEEKLY Oasis Report # 100 • The line crew continued with welding the liner to the Polylock strip. 45 Woodstock Street -Roswell, GA 30075 Tel. 678-739-2400, Fax 770-552-5550 Date:12/14/2016 Day:Wednesday Weather: Overcast Temperature: 32 -so· Evaluation Type: Regular Weekly Rainfall Amount: 0 inch • Performed the spark test on all welded joints and across the liner surface area, and repaird any leaks found. • Started placing the batten strip on the wait. Massoud Madani Prepared By Copyright Oasis Consulting Services 2016 Reviewed By Respectfully submitted OASIS CONSULTING SERVICES CONSULTING SERVICES Client Name: Waste Connections Project Name: Anson Landfill Project No: 163826 General Contractor: Location: Anson Landfill FIELD INSPECTION REPORT REGULAR WEEKLY Oasis Report# 99 45 Woodstock Street -Roswell, GA 30075 Tel. 678-739-2400, Fax 770-552-5550 Date:12/13/2016 Day:Tuesday Weather: Overcast Temperature: 32 -so· Evaluation Type: Regular Weekly Rainfall Amount: 0 inch • Liner crew continued with repairs, and trimming the liner at the embeded HDPE Polylock strip in concrete. • The crew double patched all corners and all previously patched areas. • Started welding liner from the west side to the Polylock strip. • Destruct samples for fusion and extrusion welds were sent to TRI labs for testing. Massoud Madani Prepared By Copyright Oasis Consulting Services 2016 ( ~· \ Reviewed By Respectfully submitted OASIS CONSULTING SERVICES CONSULTING SERVICES Client Name: Waste Connections Project Name: Anson Landfill Project No: 163826 General Contractor: Location: Anson Landfill FIELD INSPECTION REPORT REGULAR WEEKLY Oasis Report # 98 • Liner crew started with deploying Geo-composite and the 60 MIL liner. • Approximately 11,124 Sq. Ft. of liner was depolyed. • All trial welds met the passing criteria. 45 Woodstock Street -Roswell, GA 30075 Tel. 678-739-2400, Fax 770-552-5550 Date: 12/12/2016 Day: Monday Weather: Overcast Ten,perature:<32° Evaluation Type: Regular Weekly Rainfall Amount: 0 inch • The liner crew began with doing the repairs, air test, and vacuum box on all defect areas and seams. • A delivery of valves and pipes were recieved. (placed in the WCI workshop) • Contractor continued with placing backfill on the east and south end of the tank. Massoud Madani Prepared By Copyright Oasis Consulting Services 2016 Reviewed By Respectfully submitted OASIS CONSULTING SERVICES CONSULTING SERVICES Client Name: Waste Connections Project Name: Anson Landfill Project No: 163826 General Contractor: Location: Anson Landfill FIELD INSPECTION REPORT REGULAR WEEKLY Oasis Report# 97 • Contractor continued with placing backfill around the tank. • ESI liner crew indicated that they will be on site on Monday, 12/12/16 Massoud Madani Prepared By Copyright Oasis Consulting Services 2016 45 Woodstock Street -Roswell, GA 30075 Tel. 678-739-2400, Fax 770-552-5550 Date: 12/9/2016 Day: Friday Weather: Overcast Temperature: 32 -so· Evaluation Type: Regular Weekly Rainfall Amount: 0 inch Reviewed By Respectfully submitted OASIS CONSULTING SERVICES CONSULTING SERVICES CONCRETE TEST REPORT Oasis Report# 95 45 Woodstock Street -Roswell, GA 30075 Tel. 678-739-2400, Fax 770-552-5550 Project: Anson Landfill Client: Waste Connections Project Number: 163826 Date Made: ii72iV2016 Date Picked Up: 11/29/2016 ~CONCRETE LOCATION(S): Leachate storage pond walls, east section TESTING: 1 Set(s) of concrete specimens (~ Cylinder(s) per set) were cast during the cast-in-place concrete pour at the above referenced location, in accordance with ASTM C31. The cylinders will remain on site for the initial 24-48 hrs curing. COMPLIANCE: ~ Field placement of concrete appeared to be in accordance with the project specifications (i.e., slump, temperature, etc) D Deviations and/or noncompliances were noted during the field placement (refer to remarks below) CYLINDERS PICK UP: 1 Set(s) of concrete cylinders/~ cylinders per set were picked up & transported to Oasis Consulting Services' laboratory for curing and testing in accordance with ASTM C39, C670/1231 FIELD CURING: Cylinders were stored for the initial 24-48 hours ~ Near the poured structure REMARKS: PICKED UP BY: Austin Copyright Oasis Consulting Services 2016 ~ In an insulated curing box Dother Prepared By: Austen McCoy Respectfully submitted OASIS CONSULTING SERVICES CONSULTING SE:RVICES CONCRETE TEST REPORT Project: Anson Landfill Project Number: 163826 Mix ID: 480H7000 Sampled By: Austen McCoy PLACEMENT INFORMATION Date Sampled: 11/28/2016 Time Batched: 6:55am Time Sampled: 7:45am Batch Plant: Concrete Supply Company-Anson, NC Supplier: Concrete Supply Company -Anson, NC Truck: 2247 Ticket: 3914760 I.D. Age Date Tested Dia. Area (Days) (in.) (sq. in.) 1 7 12/5/2016 4.00 12.57 2 28 12/26/2016 4.00 12.57 3 28 12/26/2016 4.00 12.57 4 28 12/26/2016 4.00 12.57 5 28 12/26/2016 4.00 12.57 Maximum Strength Load (lbs) (psi) 56525 4500 45 Woodstock Street -Roswell, GA 30075 Tel. 678-739-2400, Fax 770-552-5550 Client: Waste Connections Laboratory Number: 2928 Set Number:~ Strength Required (PSI): 4500 Slump (C143): 7.0 in. Air Content (C231/C173): 4.4 % Air Temp (C1064): 34 Deg. F Mix Temp (C1064): 42 Deg. F Unit Weight (Cl38):142.85 pcf Yield (C138): cu ft./cu yds . Sample Taken At: 25 cu yds. Total Cubic Yards: 80 % Design Type of Reserve Strength Fracture 100.0 Type 3 ~ UNLESS OTHERWISE SPECIFIED, TESTS WERE PERFORMED IN ACCORDANCE WITH ASTM TEST METHODS C31, C39, C138, 043, C173, AND C1064. FRACTURE TYPE INDICATED BY NUMBER (Type 1) Cone (Type 2) Cone-split (Type 3) Vertical (Type 4) Shear (Type 5) Edge Fracture (Type 6) Pointed Pour Location: Leachate storage ta nk walls, east section .. Remarks: Copyright Oasis Consulting Services 2016 Sample Location: Approximately 6' north of southeast wall corner Reviewed By: Gene Groves Respectfully submitted OASIS CONSULTING SERVICES CONSULTING SERVICES CONCRETE TEST REPORT Oasis Report# 94 45 Woodstock Street -Roswell, GA 30075 Tel. 678-739-2400, Fax 770-552-5550 Project: Anson Landfill Cllent: Waste Connections Project Number: 163826 Date Made: 11/18/2016 Date Picked Up: ~CONCRETE LOCATION(S): Leachate storage pond walls, west section TESTING: 1 Set(s) of concrete specimens ( Cylinder(s) per set) were cast during the cast-in-place concrete pour at the above referenced location, in accordance with ASTM C31. The cylinders will remain on site for the initial 24-48 hrs curing. COMPLIANCE: ~ Field placement of concrete appeared to be in accordance with the project specifications (i.e., slump, temperature, etc) D Deviations and/or noncompliances were noted during the field placement (refer to remarks below) CYLINDERS PICK UP: 1 Set(s) of concrete cylinders/~ cylinders per set were picked up & transported to Oasis Consulting Services' laboratory for curing and testing in accordance with ASTM C39, C670/1231 FIELD CURING: Cylinders were stored for the initial 24-48 hours D Near the poured structure REMARKS: PICKED UP BY: Dustin Copyright Oasis Consulting Services 2016 I ~ In an insulated curing box Dather Prepared By: Lontake Williams Respectfully submitted OASIS CONSULTING SERVICES CONSULTING SERVICES 45 Woodstock Street -Roswell, GA 30075 Tel. 678-739-2400, Fax 770-552-5550 CONCRETE TEST REPORT Project: Anson Landfill Project Number: 163826 Mix ID: 480H7000 Sampled By: Lontake Williams Client: Waste Connections Laboratory Number: 2913 Set Number: ~ Strength Required (PSI): 4500 PLACEMENT INFORMATION Date Sampled: 11/18/2016 Time Batched: 7:12am Time Sampled: 8:00am Batch Plant: Concrete Supply Company -Anson, NC Supplier: Concrete Supply Company-Anson, NC Truck:2406 Ticket: 3908097 I.D. Age Date Tested Dia. Area (Days) (in.) (sq. in.) 1 7 11/25/2016 4.00 12.57 2 28 12/16/2016 4.00 12.57 3 28 12/16/2016 4.01 12.63 4 28 12/16/2016 3.99 12.50 5 28 12/16/2016 4.00 12.57 Maximum Strength Load (lbs) (psi) 47740 3800 59495 4730 57920 4590 60900 4870 Slump (C143): 7.5 in. Air Content (C231/C173): 6.5 % Air Temp (C1064): 48 Deg. F Mix Temp (Cl064): 64 Deg. F Unit Weight (C138):146.86 pcf Yield (C138): cu ft./cu yds. Sample Taken At: 30 cu yds. Total Cubic Yards: 70 % Design Type of Reserve Strength Fracture 84.4 Type 2 105.1 Type 5 102.0 Type 3 108.2 Type 3 ti UNLESS OTHERWISE SPECIFIED, TESTS WERE PERFORMED IN ACCORDANCE WITH ASTM TEST METHODS C31, C39, C138, C143, Cl73, AND Cl064. FRACTURE TYPE INDICATED BY NUMBER (Type 1) Cone (Type 2) Cone-split (Type 3) Vertlcal (Type 41 Shear (Type 5) Edge Fracture (Type 6) Pointed Pour Location: Leachate storage pond walls, west section. Remarks: Copyright Oasis Consulting Services 2016 Sample Location: Southwest corner bottom section. Reviewed By:~ I<..~ Gene Groves Respectfully submitted OASIS CONSULTING SERVICES CONSUlTING SERVICES Client Name: Waste Connections Project Name: Anson Cell 2C North Project No: 163826 General Contractor: Location: Leachate storage FIELD INSPECTION REPORT REGULAR WEEKLY Oasis Report # 93 45 Woodstock Street -Roswell, GA 30075 Tel. 678-739-2400, Fax 770-552-5550 Date: 11/16/2016 Day: Wednesday Weather: Sunny Temperature: SO -70° Evaluation Type: Regular Weekly Rainfall Amount: O inch The undersigned arrived on site as requested to evaluate reinforcing steel for the leachate storage pond. The undersigned evaluated the reinforcing steel for the leachate storage pond north, south, and west walls located in the West section of the storage pond. The reinforcing steel appeared to be in compliance with the plans on site, pertaining to bar size, spacing, number of bars and water stop. Please see attached photos. Lontake Williams Prepared By Copyright Oasis Consulting Services 2016 {(.~ Reviewed By Respectfully submitted OASIS CONSUL TING SERVICES CONSULTING SERVICES Project Name: Anson Cell 2C North Project No: 163826 General Contractor: Ref# I Additional Comments: Oasis Reviewer Copyright Oasis Consulting Services 2016 FIELD INSPECTION REPORT REGULAR WEEKLY For action Items found during this evaluation Action Item I Photo Description 45 Woodstock Street -Roswell, GA 30075 Tel. 678-739-2400, Fax 770-552-5550 Date: 11/16/2016 Day:Wednesday Weather: Sunny Temperature: 50 -70° Rainfall Amount: O inch I Location I Notes There are no corrective action Items for this report. Scanned by CamScanner Scanned by CamScanner Scanned by CamScanner CONSULTING SERVICES Project: Anson Landfill Client: Waste Connections fitJ CONCRETE LOCATION(S): Lechate tank slab CONCRETE TEST REPORT Oasis Report# 92 45 Woodstock Street -Roswell, GA 30075 Tel. 678-739-2400, Fax 770-552-5550 Project Number: 163826 Date Made: TI7wl2016 Date Picked Up: 11/11/2016 TESTING: 3 Set(s) of concrete specimens(~ Cylinder(s) per set) were cast during the cast-in-place concrete pour at the above referenced location, in accordance with ASTM C31. The cylinders will remain on site for the initial 24-48 hrs curing. COMPLIANCE: li2I Field placement of concrete appeared to be in accordance with the project specifications (i.e., slump, temperature, etc) O Deviations and/or noncompliances were noted during the field placement (refer to remarks below) CYLINDERS PICK UP:~ Set(s) of concrete cylinders/~ cylinders per set were picked up & transported to Oasis Consulting Services' laboratory for curing and testing in accordance with ASTM C39, C670/1231 FIELD CURING: Cylinders were stored for the initial 24-48 hours D Near the poured structure REMARKS: PICKED UP BY: Dustin Copyright Oasis Consulting Services 2016 ~ In an insulated curing box Dather Prepared By: Dustin O'Hara Respectfully submitted OASIS CONSUL TING SERVICES CONSULTING SERVICES CONCRETE TEST REPORT Project: Anson Landfill Project Number: 163826 Mix ID: 480H7000 Sampled By: Dustin O'Hara PLACEMENT INFORMATION Date Sampled: 11/10/2016 Time Batched: 3:26 pm Time Sampled: 4:35 pm Batch Plant: Concrete Supply Company -Anson, NC Supplier: Concrete Supply Company -Anson, NC Truck: 2449 Ticket: 3898734 I.D. Age Date Tested Dia. Area (Days) (in.) (sq. in.) 1 7 11/17/2016 4.0 12.57 2 28 12/8/2016 4.00 12.57 3 28 12/8/2016 3.99 12.50 4 28 12/8/2016 4.00 12.57 5 28 12/8/2016 4.00 12.57 Maximum Strength Load (lbs) (psi) 70815 5630 73295 5830 74610 5970 73985 5890 45 Woodstock Street -Roswell, GA 30075 Tel. 678-739-2400, Fax 770-552-5550 Client: Waste Con nections Laboratory Number: 2858 Set Number:~ Strength Required (PSI): 4000 Slump (C143): 8.25 in. Air Content (C231/C173): 3.75 % Air Temp (C1064): 60 Deg. F Mix Temp (C1064): 75 Deg. F Unit Weight (C138):146 pcf Yield (C138): 10 cu ft./cu yds. Sample Taken At: 226 cu yds. Total Cubic Yards: 250 % Design Type of Reserve Strength Fracture 140.8 Type 2 145.8 Type 3 149.3 Type 3 147.3 Type 3 .., UNLESS OTHERWISE SPECIFIED, TESTS WERE PERFORMED IN ACCORDANCE WITH ASTM TEST METHODS C31, C39, (138, (143, C173, AND C1064. FRACTURE TYPE INDICATED BY: NUMBER (Type 1) Cone (Type 2) Cone-split (Type 3) Vertlcal (Type 41 Shear (Type 6) Edge Fracture (Type 6) Pointed Pour Location: Leachate tank slab on grade. Remarks: Passed Copyright Oasis Consulting Services 2016 Sample Location: 3' North and 28' west from south east corner of the slab ~-R..~n._ Reviewed By: ~~ '-.. J ·-o Gene Groves Respectfully submitted OASIS CONSULTING SERVICES CONSULTING SERVICES Client Name: Waste Connections Project Name: Anson Landfill Project No: 163826 General Contractor: Anson Contractors FIELD INSPECTION REPORT REGULAR WEEKLY Oasis Report# 96 Location: Lechate tank footing and slab on grade 45 Woodstock Street -Roswell, GA 30075 Tel. 678-739-2400, Fax 770-552-5550 Date:11/4/2016 Day: Friday Weather: Partly Cloudy Ternperature:<32° Evaluation Type: Regular Weekly Rainfall Amount: 0 inch Undersigned arrived on location as requested to inspect the footing and steel for the Leachate footing and slab on grade. The Contractor placed reinforcing steel prior to the arrival of the undersigned. The undersigned verified the reinforcing steel in compliance to plans on site, in regards to si2e, condition, length, overlap, and support. The undersigned performed a footing inspection and found all footings to be in compliance to plans on site. Dustin O'Hara Prepared By Copyright Oasis Consulting Services 2016 ~ R.cre- Reviewed By Respectfully submitted OASIS CONSULTING SERVICES CONSULTING SERVICES Project Name: Anson Landfill Project No: 163826 General Contractor: Anson Contractors Ref# I Additional Comments: Oasis Reviewer Copyright Oasis Consulting Services 2016 FIELD INSPECTION REPORT REGULAR WEEKLY For action items found durinig this evaluation Action Item / Photo Description There are no corrective action items for this report. , 45 Woodstock Street -Roswell, GA 30075 Tel. 678-739-2400, Fax 770-552-5550 I Date: 11/4/2016 Day: Friday Weather: Partly Cloudy Temperature: < 32° Rainfall Amount: O inch Location I Notes